Section 25 Method statement
25.2 Method statement for Repair of HCS cracks 04 September, 2011Page 1 of
4
INDEX
1.0 INTRODUCTION
4.0 REFERENCES
5.0 RESOURCES
5.1 Manpower
5.2 Materials
5.3 Machinery and tools
7.0 SAFETY
Bahrain Precast Concrete Co. W.L.L.
Quality System
Section 25 Method statement
25.2 Method statement for Repair of HCS cracks 04 September, 2011Page 2 of
4
1.0 INTRODUCTION
This Method Statement accounts for the repair of Cracks on Hollowcore slabs (HCS)
4.0 REFERENCES
4.1 Layout Drawings
4.2 Shop Drawings
4.3 BPC Design Handbook volume 1
5.0 RESOURCES
5.1 Manpower
5.1.1 Foreman
5.1.2 Mason
5.2 Materials
5.2.1 Primer ISOPRIME30-S (Isola Chemicals Laboratory) or equivalent
5.2.2 Bonding Mix- Epoxy repair Mortar ISOPOX OH (Isola Chemicals
Laboratory)or equivalent (e.g. NITOMORTAR by Fosroc)
5.2.3 SICO grout powder.
5.2.4 Water
Quality System
Section 25 Method statement
25.2 Method statement for Repair of HCS cracks 04 September, 2011Page 3 of
4
steel or plywood plate for mixing the bond. Now fill the crack area with
this mix using the steel trowel.
Wait for 3-4 hours till the bond has dried and then smoothen the area with
a sand paper.
6.2 Hairline crack with width of more than 0.25 mm (top and bottom).
6.3 Hairline crack with width of more than 0.25 mm (bottom when roof is
screeded and/or waterproofing is done).
7.0 SAFETY
Standard Safety Rules and Regulations are to be observed in the
duration of work.
Bahrain Precast Concrete Co. W.L.L.
Quality System
Section 25 Method statement
25.2 Method statement for Repair of HCS cracks 04 September, 2011Page 4 of
4