8.9.

2 ERECTION PLANNING TILT 20 September 2018

Project No. Project Name:


Date: Section: Done by:

RECEIVED DATE CHECKED


ERECTION PLANNING BASIS REMARKS
ELEVATION DRAWINGS

PLAN DRAWINGS

SHOP DRAWINGS

ELEMENT DETAILS

ELEMENT SPECIFICATION

MATERIAL SPECIFICATION

SITE FIXING PART SPECIFICATION

ERECTION SCHEDULE

ELEMENT PLANNING REMARKS CHECKED

CRANE CAPACITY

LIFTING EQUIPMENT

SITE FIXING PARTS

TEMPORARY SCAFFOLDING/CONST.

METHODS OF GROUTING

METHODS OF JOINT SETTING

GROUTING MATERIAL

JOINT MATERIAL

DELIVERY SCHEDULE SUBMITTED

ERECTION SCHEDULE APPROVED

ROAD PERMISSION NEEDED

ERECTION COST COMPARED

(BS EN ISO 9001:2015, 4.9 Process control)