CRONOGRAMA VALORIZADO RE - PROGRAMADO

PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD DE LA AV. ARTERIAL TRAMO: AV. JACINTO IBARRA – JR. TUPAC AMARU, BARRIO PISHUPYACUN,
DISTRITO DE CHILCA - HUANCAYO - JUNIN"

ITEM DESCRIPCION PRESUPUESTO MES 01 MES 02 MES 03 MES 04 MES 05


01 ADECUADA CALZADA PARA EL TRANSITO VEHICULAR S/. 465,193.81 S/.115,588.61 S/.86,863.54 S/.18,524.91 S/.163,730.38 S/.80,486.37
01.01 OBRAS PROVISIONALES S/. 6,423.26 S/.5,222.01 S/.310.00 S/.300.00 S/.310.00 S/.281.25
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 8.50 X 3.60 m S/. 2,001.98 S/.2,001.98
01.01.02 ALMACEN Y CASETA DE GUARDIANIA S/. 1,500.00 S/.298.75 S/.310.00 S/.300.00 S/.310.00 S/.281.25
01.01.03 DESVÍO DE TRANSITO. S/. 2,921.28 S/.2,921.28
01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS S/. 2,000.00 S/.2,000.00
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO S/. 2,000.00 S/.2,000.00
01.03 SEGURIDAD Y SALUD EN EL TRABAJO S/. 3,320.00 S/.3,320.00
01.03.01 SEGURIDAD Y SALUD EN OBRA. S/. 3,320.00 S/.3,320.00
01.04 PAVIMENTO RIGIDO S/. 387,177.21 S/.102,046.60 S/.42,776.85 S/.13,369.11 S/.163,420.38 S/.65,564.27
01.04.01 TRABAJOS PRELIMINARES S/. 5,503.34 S/.5,503.34
01.04.01.01 TRAZO Y REPLANTEO PRELIMINAR S/. 5,503.34 S/.5,503.34
01.04.02 MOVIMIENTO DE TIERRAS S/. 62,979.34 S/.62,979.34
01.04.02.01 CORTE A NIVEL DE SUB RASANTE S/. 8,925.81 S/.8,925.81
01.04.02.02 EXCAVACION MANUAL PARA CUNETAS Y SARDINELES. S/. 565.77 S/.565.77
01.04.02.03 DEMOLICION DE PAVIMENTO FLEXIBLE C/EQUIPO (E=2") S/. 3,894.18 S/.3,894.18
01.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO S/. 49,593.58 S/.49,593.58
01.04.03 MEJORAMIENTO A NIVEL DE SUBRASANTE (e=0.15M) S/. 37,313.25 S/.33,563.92 S/.3,749.33
01.04.03.01 PERFILADO Y COMPACTADO DE LA SUB RASANTE S/. 9,162.63 S/.9,162.63
01.04.03.02 MAT. P/MEJ. DE SUBRASANTE PUESTO EN OBRA S/. 18,152.40 18152.4
01.04.03.03 EXTENDIDO, RIEGO Y COMPACT. DE MATERIAL P/MEJORAMIENTO S/. 9,998.22 6248.89 S/.3,749.33
01.04.04 BASE GRANULAR (e=0.20m) S/. 39,027.52 S/.39,027.52
01.04.04.01 MAT. P/BASE PUESTO EN OBRA S/. 25,460.00 S/.25,460.00
01.04.04.02 EXTENDIDO, RIEGO Y COMPACT. DE BASE GRANULAR S/. 13,567.52 S/.13,567.52
01.04.05 PAVIMENTACION RIGIDA S/. 207,219.77 S/.155,991.88 S/.51,227.89
01.04.05.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS S/. 8,896.87 8896.87
01.04.05.02 ACERO PARA PASADORES LONGITUDINALES S/. 14,571.84 S/.14,571.84
01.04.05.03 CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 Incluye Acabado S/. 177,755.63 S/.132,523.17 S/.45,232.46
01.04.05.04 CURADO TIPO ARROCERA S/. 1,967.39 S/.1,967.39
01.04.05.05 RELLENO DE JUNTAS CON ASFALTO S/. 4,028.04 S/.4,028.04
01.04.06 BADENES S/. 3,133.37 S/.3,133.37
01.04.06.01 ENCOFRADO Y DESENCOFRADO DE BADENES S/. 457.34 S/.457.34
01.04.06.02 CONCRETO EN BADENES f'c=210 kg/cm2 Incluye Acabado S/. 2,578.26 S/.2,578.26
01.04.06.03 CURADO TIPO ARROCERA S/. 28.50 S/.28.50
01.04.06.04 RELLENO DE JUNTAS CON ASFALTO S/. 69.27 S/.69.27
01.04.07 BOCACALLES S/. 10,235.74 S/.10,235.74
01.04.07.01 ENCOFRADO Y DESENCOFRADO BOCACALLES S/. 847.08 S/.847.08
01.04.07.02 CONCRETO EN BOCACALLES f'c=210 kg/cm2 Incluye Acabado S/. 8,879.45 S/.8,879.45
01.04.07.03 CURADO TIPO ARROCERA S/. 98.29 S/.98.29
01.04.07.04 RELLENO DE JUNTAS CON ASFALTO S/. 410.92 S/.410.92
01.04.08 CUNETAS S/. 21,764.88 S/.7,428.50 S/.14,336.38
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS S/. 3,530.78 S/.3,530.78
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado S/. 17,818.16 S/.3,897.72 S/.13,920.44
01.04.08.03 CURADO TIPO ARROCERA S/. 195.00 S/.195.00
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO S/. 220.94 S/.220.94
01.05 OBRAS DE CONCRETO SIMPLE S/. 46,049.87 S/.41,313.03 S/.4,736.84
01.05.01 SARDINEL PERALTADO S/. 46,049.87 S/.41,313.03 S/.4,736.84
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES S/. 24,546.93 S/.24,546.93
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 S/. 17,306.94 S/.16,766.10 S/.540.84
01.05.01.03 ACABADO EN SARDINEL PERALTADO S/. 3,914.58 S/.3,914.58
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO S/. 281.42 S/.281.42
01.06 SEÑALIZACION HORIZONTAL S/. 13,690.01 S/.13,690.01
01.06.01 PINTURA EN SARDINELES S/. 4,654.76 S/.4,654.76
01.06.02 PINTURA EN PAVIMENTO LINEA DISCONTINUA. S/. 735.38 S/.735.38
01.06.03 PINTURA ZONAL EN CRUCE PEATONAL. S/. 7,843.82 S/.7,843.82
01.06.04 PINTURA EN PAVIMENTO LETRAS Y SIMBOLOS. S/. 456.05 S/.456.05
01.07 IMPACTO AMBIENTAL S/. 3,000.00 S/.3,000.00
01.07.01 MITIGACION DE IMPACTO AMBIENTAL S/. 3,000.00 S/.3,000.00
01.08 VARIOS S/. 3,533.46 S/.2,463.66 S/.118.96 S/.950.84
01.08.01 NIVELACION DE TAPAS DE BUZON A NIVEL DE BASE S/. 2,463.66 S/.2,463.66
01.08.02 VENTANA SUMIDERO 0.60X0.30 m S/. 118.96 S/.118.96
01.08.03 LIMPIEZA FINAL DE LA OBRA S/. 950.84 S/.950.84
02 REPOSICION DE ESTRUCTURAS S/. 57,354.04 S/.27,155.82 S/.30,198.22
02.01 TRABAJOS PRELIMINARES S/. 125.14 S/.125.14
02.01.01 TRAZO Y REPLANTEO PRELIMINAR S/. 125.14 S/.125.14
02.02 MOVIMIENTO DE TIERRAS S/. 8,924.68 S/.8,924.68
02.02.01 EXCAVACION DE ZANJA C/MAQUINARIA S/. 626.39 S/.626.39
02.02.02 DEMOLICION DE CONCRETO CON EQUIPO S/. 4,537.99 S/.4,537.99
02.02.03 PERFILADO DE ZANJA S/. 377.72 S/.377.72
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. S/. 3,382.58 S/.3,382.58
02.03 OBRAS DE CONCRETO S/. 48,304.22 S/.18,106.00 S/.30,198.22
02.03.01 ENCOFRADO Y DESENCOFRADO PARA ALCANTARILLA S/. 6,918.47 S/.6,918.47
02.03.02 ACERO DE REFUERZO FY=4200KG/CM2 S/. 19,888.94 S/.11,187.53 S/.8,701.41
02.03.03 CONCRETO EN ALCANTARILLA f'c=210 kg/cm2 S/. 21,436.69 S/.21,436.69
02.03.04 CURADO DE CONCRETO EN ALCANTARILLA S/. 38.50 S/.38.50
02.03.05 LIMPIEZA FINAL DE LA OBRA S/. 21.62 S/.21.62
03 VEREDAS PEATONALES S/. 212,444.71 S/.35,932.14 S/.85,441.58 S/.78,137.95 S/.12,933.05
03.01 OBRAS PRELIMINARES S/. 2,858.45 S/.2,858.45
03.01.01 LIMPIEZA DE TERRENO S/. 453.32 S/.453.32
03.01.02 TRAZO Y REPLANTEO PRELIMINAR S/. 2,405.13 S/.2,405.13
03.02 MOVIMIENTO DE TIERRAS S/. 69,713.78 S/.33,073.69 S/.36,640.09
03.02.01 EXCAVACION MANUAL PARA VEREDAS S/. 5,399.72 S/.5,399.72
03.02.02 DEMOLICION DE VEREDAS DE CONCRETO C/EQUIPO S/. 51,090.40 S/.27,673.97 S/.23,416.43
03.02.03 ACARRERO MANUAL DE MATERIAL EXCDENTE S/. 5,384.20 S/.5,384.20
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO S/. 7,839.46 S/.7,839.46
03.03 SUB BASE GRANULAR S/. 16,972.88 S/.16,972.88
03.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE EN VEREDAS S/. 5,756.33 S/.5,756.33
03.03.02 CONFORMACION Y COMPACTADO DE SUB BASE E=10CM S/. 11,216.55 S/.11,216.55
03.04 VEREDAS DE CONCRETO S/. 69,109.11 S/.26,300.25 S/.42,808.86
03.04.01 ENCOFRADO Y DESENCOFRADO PARA VEREDAS S/. 7,538.55 S/.5,182.75 S/.2,355.80
03.04.02 CONCRETO PARA VEREDAS f'c=175 kg/cm2 Inc/Acabado y Bruñado S/. 53,231.25 S/.12,975.12 S/.40,256.13
03.04.03 CONCRETO PARA SARDINEL DE VEREDA f'c=175 kg/cm2 S/. 7,245.96 S/.7,245.96
03.04.04 CURADO TIPO ARROCERA S/. 896.42 S/.896.42
03.04.05 RELLENO DE JUNTAS CON ASFALTO S/. 196.93 S/.196.93
03.05 MARTILLOS S/. 8,632.48 S/.8,632.48
03.05.01 ENCOFRADO Y DESENCOFRADO EN MARTILLOS S/. 661.01 S/.661.01
03.05.02 CONCRETO PARA MARTILLOS f'c=175 kg/cm2 Inc/Acabado y Bruñado S/. 7,191.83 S/.7,191.83
03.05.03 CURADO TIPO ARROCERA S/. 112.82 S/.112.82
03.05.04 RELLENO DE JUNTAS CON ASFALTO S/. 666.82 S/.666.82
03.06 RAMPAS S/. 1,518.57 S/.1,518.57
03.06.01 ENCOFRADO Y DESENCOFRADO EN RAMPAS S/. 231.51 S/.231.51
03.06.02 CONCRETO f'c=175 kg/cm2 PARA RAMPAS S/. 948.22 S/.948.22
03.06.03 ACABADO EN RAMPA S/. 338.84 S/.338.84
03.07 AREAS VERDES S/. 26,168.80 S/.14,552.02 S/.11,616.78
03.07.01 SEMBRADO DE GRASS S/. 23,880.23 S/.14,552.02 S/.9,328.21
03.07.02 SEMBRADO DE PLANTONES S/. 2,288.57 S/.2,288.57
03.08 VARIOS S/. 17,470.64 S/.5,528.36 S/.10,626.02 S/.1,316.27
03.08.01 PLACA RECORDATORIA S/. 1,456.26 S/.1,456.26
03.08.02 SEÑALIZACION VERTICAL S/. 1,257.05 S/.1,257.05
03.08.03 TACHO ECOLOGICO S/. 8,845.38 5528.36 S/.3,317.02
03.08.04 REPOSICION DE CAJAS DE AGUA Y DESAGUE S/. 5,496.40 S/.4,465.83 S/.1,030.58
03.08.05 LIMPIEZA FINAL DE LA OBRA S/. 415.55 S/.129.86 S/.285.69
COSTO DIRECTO S/. 734,992.56 S/. 178,676.57 S/. 202,503.33 S/. 96,662.86 S/. 176,663.43 S/. 80,486.37
GASTOS GENERALES (11.50%) S/. 84,524.14 S/. 20,547.81 S/. 23,287.88 S/. 11,116.23 S/. 20,316.29 S/. 9,255.93
SUB TOTAL S/. 819,516.70 S/. 199,224.38 S/. 225,791.21 S/. 107,779.09 S/. 196,979.72 S/. 89,742.30
SUPERVISIÓN (3.50%) S/. 28,683.08 S/. 6,972.85 S/. 7,902.69 S/. 3,772.27 S/. 6,894.29 S/. 3,140.98
LIQUIDACIÓN (1.00%) S/. 8,195.17 S/. - S/. - S/. - S/. - S/. 8,195.17
EXPEDIENTE TÉCNICO S/. 10,000.00 S/. 10,000.00 S/. - S/. - S/. - S/. -
PRESUPUESTO TOTAL S/. 866,394.95 S/. 216,197.23 S/. 233,693.90 S/. 111,551.36 S/. 203,874.01 S/. 101,078.45

% DE AVANCE FISICO 100.00% 24.95% 26.97% 12.88% 23.53% 11.67%


% DE AVANCE ACUMULADO 24.95% 51.93% 64.80% 88.33% 100.00%
PART DESCRIPCION DE PARTIDA UND
I VIA EN BUEN ESTADO
01.00.00 PAVIMENTO RÍGIDO
01.01.00 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 8.50 X 3.60 m UND
01.01.02 ALMACEN Y CASETA DE GUARDIANIA MES
01.01.03 DESVÍO DE TRANSITO. UND
01.02.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB
01.03.00 SEGURIDAD Y SALUD EN EL TRABAJO
01.03.01 SEGURIDAD Y SALUD EN OBRA. GLB
01.04.00 PAVIMENTO RÍGIDO
01.04.01.00 TRABAJOS PRELIMINARES
01.04.01.0 TRAZO Y REPLANTEO PRELIMINAR M2
01.04.02.00 MOVIMIENTO DE TIERRAS
01.04.02.0 CORTE A NIVEL DE SUB RASANTE M3
01.04.02.0 EXCAVACION MANUAL PARA CUNETAS Y SARDINELES. M3
01.04.02.0 DEMOLICION DE PAVIMENTO FLEXIBLE C/EQUIPO (E=2") M2
01.04.02.0 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO M3
01.04.03.00 MEJORAMIENTO A NIVEL DE SUBRASANTE (e=0.15M)
01.04.03.0 PERFILADO Y COMPACTADO DE LA SUB RASANTE M2
01.04.03.0 MAT. P/MEJ. DE SUBRASANTE PUESTO EN OBRA M3
01.04.03.0 EXTENDIDO, RIEGO Y COMPACT. DE MATERIAL P/MEJORA M2
01.04.04.00 BASE GRANULAR (e=0.20m)
01.04.04.0 MAT. P/BASE PUESTO EN OBRA M3
01.04.04.0 EXTENDIDO, RIEGO Y COMPACT. DE BASE GRANULAR M2
01.04.05.00 PAVIMENTACION RIGIDA
01.04.05.0 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACI M2
01.04.05.0 ACERO PARA PASADORES LONGITUDINALES. KG
01.04.05.0 CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 Incluye Aca M3
01.04.05.0 CURADO TIPO ARROCERA M2
01.04.05.0 RELLENO DE JUNTAS CON ASFALTO ML
01.04.06.00 BADENES
01.04.06.0 ENCOFRADO Y DESENCOFRADO DE BADENES M2
01.04.06.0 CONCRETO EN BADENES f'c=210 kg/cm2 Incluye Acabado M3
01.04.06.0 CURADO TIPO ARROCERA M2
01.04.06.0 RELLENO DE JUNTAS CON ASFALTO ML
01.04.07.00 BOCACALLES
01.04.07.0 ENCOFRADO Y DESENCOFRADO BOCACALLES M2
01.04.07.0 CONCRETO EN BOCACALLES f'c=210 kg/cm2 Incluye Acaba M3
01.04.07.0 CURADO TIPO ARROCERA M2
01.04.07.0 RELLENO DE JUNTAS CON ASFALTO ML
01.04.08.00 CUNETAS
01.04.08.0 ENCOFRADO Y DESENCOFRADO PARA CUNETAS M2
01.04.08.0 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado M3
01.04.08.0 CURADO TIPO ARROCERA M2
01.04.08.0 RELLENO DE JUNTAS CON ASFALTO ML
01.05.00 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.0 ENCOFRADO Y DESENCOFRADO DE SARDINELES M2
01.05.01.0 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 M3
01.05.01.0 ACABADO EN SARDINEL PERALTADO M2
01.05.01.0 RELLENO DE JUNTAS CON ASFALTO ML
01.06.00 SEÑALIZACION HORIZONTAL
01.06.01 PINTURA EN SARDINELES M2
01.06.02 PINTURA EN PAVIMENTO LINEA DISCONTINUA. M
01.06.03 PINTURA ZONAL EN CRUCE PEATONAL. M2
01.06.04 PINTURA EN PAVIMENTO LETRAS Y SIMBOLOS. M2
01.07.00 IMPACTO AMBIENTAL
01.07.01 MITIGACION DE IMPACTO AMBIENTAL GLB
01.08.00 VARIOS
01.08.01 NIVELACION DE TAPAS DE BUZON A NIVEL DE BASE UND
01.08.02 VENTANA SUMIDERO 0.60X0.30 m UND
01.08.03 LIMPIEZA FINAL DE LA OBRA M2
II SUFICIENTE SECCION VIAL
02.01.00 TRABAJOS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO PRELIMINAR M2
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA C/MAQUINARIA M3
02.02.02 DEMOLICION DE CONCRETO CON EQUIPO M3
02.02.03 PERFILADO DE ZANJA M2
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. M3
02.03.00 OBRAS DE CONCRETO
02.03.01 ENCOFRADO Y DESENCOFRADO PARA ALCANTARILLA M2
02.03.02 ACERO DE REFUERZO FY=4200KG/CM2 KG
02.03.03 CONCRETO EN ALCANTARILLA f'c=210 kg/cm2 M3
02.03.04 CURADO DE CONCRETO EN ALCANTARILLA M2
02.03.05 LIMPIEZA FINAL DE LA OBRA M2
III ACERA PEATONAL EN BUEN ESTADO
03.01.00 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO M2
03.01.02 TRAZO Y REPLANTEO PRELIMINAR M2
03.02.00 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL PARA VEREDAS M3
03.02.02 DEMOLICION DE VEREDAS DE CONCRETO C/EQUIPO M2
03.02.03 ACARRERO MANUAL DE MATERIAL EXCDENTE M3
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO M3
03.03.00 SUB BASE GRANULAR
03.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE EN VEREDAS M2
03.03.02 CONFORMACION Y COMPACTADO DE SUB BASE E=10CM M2
03.04.00 VEREDAS DE CONCRETO
03.04.01 ENCOFRADO Y DESENCOFRADO PARA VEREDAS M2
03.04.02 CONCRETO PARA VEREDAS f'c=175 kg/cm2 Inc/Acabado y Bru M2
03.04.03 CONCRETO PARA SARDINEL DE VEREDA f'c=175 kg/cm2 M3
03.04.04 CURADO TIPO ARROCERA M2
03.04.05 RELLENO DE JUNTAS CON ASFALTO M
03.05.00 MARTILLOS
03.05.01 ENCOFRADO Y DESENCOFRADO EN MARTILLOS M2
03.05.02 CONCRETO PARA MARTILLOS f'c=175 kg/cm2 Inc/Acabado y B M2
03.05.03 CURADO TIPO ARROCERA M2
03.05.04 RELLENO DE JUNTAS CON ASFALTO M
03.06.00 RAMPAS
03.06.01 ENCOFRADO Y DESENCOFRADO EN RAMPAS M2
03.06.02 CONCRETO f'c=175 kg/cm2 PARA RAMPAS M3
03.06.03 ACABADO EN RAMPA M2
03.07.00 AREAS VERDES
03.07.01 SEMBRADO DE GRASS M2
03.07.02 SEMBRADO DE PLANTONES UND
03.08.00 VARIOS
03.08.01 PLACA RECORDATORIA UND
03.08.02 SEÑALIZACION VERTICAL UND
03.08.03 TACHO ECOLOGICO UND
03.08.04 REPOSICION DE CAJAS DE AGUA Y DESAGUE UND
03.08.05 LIMPIEZA FINAL DE LA OBRA M2
METRADO L M X J V TOTAL S D L
ARTERIAL 27 28 29 30 31 AGOSTO 1 2 3

1.00 0.00
5.00 0.03 0.03 0.03 0.03 0.03 0.17 0.03 0.03 0.03

8.00 1 1 2.00 2

1.00 0.5 0.50

1.00 1.00 1.00

2,881.33 500 500 500 899.25 2399.25 119.86 89.66

2,171.73 202.59 217.42 420.01


24.23 0.00
66.25 0.00
2,749.09 253.24 271.77 525.01

2,881.33 432 432.00


518.64 0.00
2,881.33 0.00

670.00 0.00
2,791.67 0.00

229.36 0.00
1,958.58 0.00
479.85 0.00
2,399.25 0.00
614.03 0.00

17.59 0.00
6.96 0.00
34.75 0.00
10.56 0.00

32.58 0.00
23.97 0.00
119.86 0.00
62.64 0.00
136.64 0.00
48.10 0.00
237.81 0.00
33.68 0.00

736.04 0.00
53.78 0.00
328.68 0.00
42.90 0.00

224.11 0.00
235.70 0.00
321.60 0.00
17.48 0.00

1.00 0.00

3.00 0.00
2.00 0.00
2,881.33 0.00

65.52 0.00

101.03 0.00
27.40 27.4 100 % EJECUTADO 27.40
77.72 0.00
160.54 0.00

202.65 0.00
3,376.73 0.00
53.96 0.00
202.65 0.00
65.52 0.00

1,259.23 180.32 180.32 360.64


1,259.23 180.32 180.32 360.64

260.73 37 36.99 73.99


869.18 277.54 277.54
434.56 92.49 34.69 127.18
434.56 0.00
1,184.43 0.00 38.61 179.31

1,184.43 0.00 38.61

299.03 0.00 29.98

1,018.39 0.00
22.45 0.00
1,093.19 0.00
30.02 0.00

26.22 0.00
137.59 0.00
137.59 0.00
101.65 0.00

9.29 0.00
2.85 0.00
28.45 0.00

920.95 0.00
131.00 0.00

2.00 0.00
5.00 0.00
18.00 0.00
56.00 0.00 5 2

1,259.23 0.00
M X J V S D L M X J
4 5 6 7 8 9 10 11 12 13

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
2

0.5

121.56 116.25 34.75

162.81 226.12 295.37 323.16 234


5.27

90.65
52.78 52.78 54.22
3.85 3.86
23.57 23.57

0.5

100 % EJECUTADO 100 % EJECUTADO

231.13
231.13

4.32
32.92 230.47
9.52 28.81
34 93.18
57.15 66.73 17.25
179.31 57.15 66.73 17.25

28.6 6.64 6.03


31.72 87.59 48.41 20.2 30
0.96 2.27 1.14 0.46 0.82
33.26 89.35 56.38 27.77 30

4.77
15 15.3
15 15.3

2 2 2 1
V S D L M X J V S D
14 15 16 17 18 19 20 21 22 23

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

229.74 280.52

1118.07 120.58
54.22 44.67 44.67
3.96 3.96 3.28
24.19 24.19 19.96

65.52

ECUTADO 100 % EJECUTADO

254.29
254.29

39.44 47.56
131.7
16.46 49.3 59.45
100 100 100 35.04

4 7.44
10 9.87 15 19.52
10 9.87 15 19.52
L M X J V S D TOTAL
SEPTIEM
24 25 26 27 28 29 30
BRE

0.00
0.03 0.03 0.03 0.03 0.03 0.03 0.03 1.00
4.00

0.50

0.00

482.08

100 % EJECUTADO 1751.72


5.27
0.00
0.00

1329.30
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

44.67 44.06 44.06 44.07 480.20


3.29 3.26 3.22 3.21 3.2 35.09
19.98 19.97 19.68 19.69 19.68 214.48
0.00

0.00
0.00
0.00
0.00

0.50

0.00
0.00
0.00

65.52

0.00
100 % EJECUTADO 0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

485.42
485.42

9.94 101.26
395.09
12.435 175.97
127.18
100 794.09
359.05

71.25
217.92
5.65
236.76
0.00

7.58 23.79
20 19.19 123.88
20 19.19 123.88
0.00

5.88 5.88
1.73 1.73
17.25 17.25

0.00
0.00

0.00
0.00
0.00
14.00
0.00
CRONOGRAMA VALORIZADO DEL MES DE AGOSTO
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD DE LA AV. ARTERIAL TRAMO: AV. JACINTO IBARRA – JR. TUPAC AMARU, BARRIO PISHUPYACUN, DISTRITO DE CHILCA - HUANCAYO - JUNIN"
ITEM DESCRIPCION PRESUPUESTO MES 01 MES 02 MES 03 MES 04 MES 04
01 ADECUADA CALZADA PARA EL TRANSITO VEHICULAR SEMANA 01 SEMANA 02 SEMANA 03 SEMANA 04 SEMANA 05 SEMANA 06 SEMANA 07 SEMANA 08 SEMANA 09 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20
01.01 OBRAS PROVISIONALES (05 DC AGOSTO) (07 DC SEPTIEMBRE) (07 DC SEPTIEMBRE) (07 DC SEPTIEMBRE) (09 DC SEPTIEMBRE) (07 DC OCTUBRE) (07 DC OCTUBRE) (07 DC OCTUBRE) (07 DC OCTUBRE) (07 DC NOVIEMBRE) (07 DC NOVIEMBRE) (07 DC NOVIEMBRE) (07 DC NOVIEMBRE) (07 DC DICIEMBRE) (07 DC DICIEMBRE) (07 DC DICIEMBRE) (07 DC DICIEMBRE) (07 DC ENERO) (07 DC ENERO) (09 DC ENERO)
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 8.50 X 3.60 m S/. 2,001.98
01.01.02 ALMACEN Y CASETA DE GUARDIANIA S/. 1,500.00 S/.51.00 S/.70.00 S/.70.00 S/.70.00 S/.90.00
01.01.03 DESVÍO DE TRANSITO. S/. 2,921.28 S/.730.32 S/.730.32 S/.730.32
01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO S/. 2,000.00 S/.1,000.00 S/.1,000.00
01.03 SEGURIDAD Y SALUD EN EL TRABAJO
01.03.01 SEGURIDAD Y SALUD EN OBRA. S/. 3,320.00 S/.3,320.00
01.04 PAVIMENTO RIGIDO
01.04.01 TRABAJOS PRELIMINARES
01.04.01.01 TRAZO Y REPLANTEO PRELIMINAR S/. 5,503.34 S/.4,582.57 S/.920.77
01.04.02 MOVIMIENTO DE TIERRAS
01.04.02.01 CORTE A NIVEL DE SUB RASANTE S/. 8,925.81 S/.1,726.24 S/.6,046.63 S/.1,152.94
01.04.02.02 EXCAVACION MANUAL PARA CUNETAS Y SARDINELES. S/. 565.77 S/.123.05
01.04.02.03 DEMOLICION DE PAVIMENTO FLEXIBLE C/EQUIPO (E=2") S/. 3,894.18
01.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO S/. 49,593.58 S/.9,471.18
01.04.03 MEJORAMIENTO A NIVEL DE SUBRASANTE (e=0.15M)
01.04.03.01 PERFILADO Y COMPACTADO DE LA SUB RASANTE S/. 9,162.63 S/.1,373.76 S/.288.27 S/.3,938.90
01.04.03.02 MAT. P/MEJ. DE SUBRASANTE PUESTO EN OBRA S/. 18,152.40
01.04.03.03 EXTENDIDO, RIEGO Y COMPACT. DE MATERIAL P/MEJORAMIENTO S/. 9,998.22
01.04.04 BASE GRANULAR (e=0.20m)
01.04.04.01 MAT. P/BASE PUESTO EN OBRA S/. 25,460.00
01.04.04.02 EXTENDIDO, RIEGO Y COMPACT. DE BASE GRANULAR S/. 13,567.52
01.04.05 PAVIMENTACION RIGIDA
01.04.05.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS S/. 8,896.87
01.04.05.02 ACERO PARA PASADORES LONGITUDINALES S/. 14,571.84
01.04.05.03 CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 Incluye Acabado S/. 177,755.63
01.04.05.04 CURADO TIPO ARROCERA S/. 1,967.39
01.04.05.05 RELLENO DE JUNTAS CON ASFALTO S/. 4,028.04
01.04.06 BADENES
01.04.06.01 ENCOFRADO Y DESENCOFRADO DE BADENES S/. 457.34
01.04.06.02 CONCRETO EN BADENES f'c=210 kg/cm2 Incluye Acabado S/. 2,578.26
01.04.06.03 CURADO TIPO ARROCERA S/. 28.50
01.04.06.04 RELLENO DE JUNTAS CON ASFALTO S/. 69.27
01.04.07 BOCACALLES
01.04.07.01 ENCOFRADO Y DESENCOFRADO BOCACALLES S/. 847.08
01.04.07.02 CONCRETO EN BOCACALLES f'c=210 kg/cm2 Incluye Acabado S/. 8,879.45
01.04.07.03 CURADO TIPO ARROCERA S/. 98.29
01.04.07.04 RELLENO DE JUNTAS CON ASFALTO S/. 410.92
01.04.08 CUNETAS
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS S/. 3,530.78
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado S/. 17,818.16
01.04.08.03 CURADO TIPO ARROCERA S/. 195.00
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO S/. 220.94
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES S/. 24,546.93 S/.7,136.90 S/.1,489.74 S/.7,388.03
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 S/. 17,306.94 S/.3,755.52 S/.1,274.37 S/.6,262.42
01.05.01.03 ACABADO EN SARDINEL PERALTADO S/. 3,914.58 S/.849.54 S/.288.10 S/.1,416.82
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO S/. 281.42
01.06 SEÑALIZACION HORIZONTAL
01.06.01 PINTURA EN SARDINELES S/. 4,654.76
01.06.02 PINTURA EN PAVIMENTO LINEA DISCONTINUA. S/. 735.38
01.06.03 PINTURA ZONAL EN CRUCE PEATONAL. S/. 7,843.82
01.06.04 PINTURA EN PAVIMENTO LETRAS Y SIMBOLOS. S/. 456.05
01.07 IMPACTO AMBIENTAL
01.07.01 MITIGACION DE IMPACTO AMBIENTAL S/. 3,000.00 S/.1,500.00
01.08 VARIOS
01.08.01 NIVELACION DE TAPAS DE BUZON A NIVEL DE BASE S/. 2,463.66
01.08.02 VENTANA SUMIDERO 0.60X0.30 m S/. 118.96
01.08.03 LIMPIEZA FINAL DE LA OBRA S/. 950.84
02 REPOSICION DE ESTRUCTURAS
02.01 TRABAJOS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO PRELIMINAR S/. 125.14 S/.125.14
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA C/MAQUINARIA S/. 626.39
02.02.02 DEMOLICION DE CONCRETO CON EQUIPO S/. 4,537.99 S/.4,537.99
02.02.03 PERFILADO DE ZANJA S/. 377.72
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. S/. 3,382.58
02.03 OBRAS DE CONCRETO
02.03.01 ENCOFRADO Y DESENCOFRADO PARA ALCANTARILLA S/. 6,918.47
02.03.02 ACERO DE REFUERZO FY=4200KG/CM2 S/. 19,888.94
02.03.03 CONCRETO EN ALCANTARILLA f'c=210 kg/cm2 S/. 21,436.69
02.03.04 CURADO DE CONCRETO EN ALCANTARILLA S/. 38.50
02.03.05 LIMPIEZA FINAL DE LA OBRA S/. 21.62
03 VEREDAS PEATONALES
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO S/. 453.32 S/.129.83 S/.83.21 S/.91.54
03.01.02 TRAZO Y REPLANTEO PRELIMINAR S/. 2,405.13 S/.688.82 S/.441.46 S/.485.69
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL PARA VEREDAS S/. 5,399.72 S/.1,532.33 S/.89.47 S/.1,801.77 S/.205.85
03.02.02 DEMOLICION DE VEREDAS DE CONCRETO C/EQUIPO S/. 51,090.40 S/.16,313.80 S/.23,223.39
03.02.03 ACARRERO MANUAL DE MATERIAL EXCDENTE S/. 5,384.20 S/.1,575.76 S/.678.85 S/.1,347.41 S/.154.01
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO S/. 7,839.46 S/.2,294.33
03.03 SUB BASE GRANULAR
03.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE EN VEREDAS S/. 5,756.33 S/.1,661.15 S/.83.84 S/.1,458.00 S/.656.29
03.03.02 CONFORMACION Y COMPACTADO DE SUB BASE E=10CM S/. 11,216.55 S/.3,236.85 S/.163.35
03.04 VEREDAS DE CONCRETO
03.04.01 ENCOFRADO Y DESENCOFRADO PARA VEREDAS S/. 7,538.55 S/.1,796.21
03.04.02 CONCRETO PARA VEREDAS f'c=175 kg/cm2 Inc/Acabado y Bruñado S/. 53,231.25 S/.9,822.58 S/.1,568.10
03.04.03 CONCRETO PARA SARDINEL DE VEREDA f'c=175 kg/cm2 S/. 7,245.96 S/.1,558.93 S/.264.66
03.04.04 CURADO TIPO ARROCERA S/. 896.42 S/.169.54 S/.24.60
03.04.05 RELLENO DE JUNTAS CON ASFALTO S/. 196.93
03.05 MARTILLOS
03.05.01 ENCOFRADO Y DESENCOFRADO EN MARTILLOS S/. 661.01 S/.120.25 S/.288.40 S/.191.10
03.05.02 CONCRETO PARA MARTILLOS f'c=175 kg/cm2 Inc/Acabado y Bruñado S/. 7,191.83 S/.1,583.78 S/.2,842.97 S/.2,048.46
03.05.03 CURADO TIPO ARROCERA S/. 112.82 S/.24.85 S/.44.60 S/.32.13
03.05.04 RELLENO DE JUNTAS CON ASFALTO S/. 666.82
03.06 RAMPAS
03.06.01 ENCOFRADO Y DESENCOFRADO EN RAMPAS S/. 231.51 S/.146.53
03.06.02 CONCRETO f'c=175 kg/cm2 PARA RAMPAS S/. 948.22 S/.575.59
03.06.03 ACABADO EN RAMPA S/. 338.84 S/.205.45
03.07 AREAS VERDES
03.07.01 SEMBRADO DE GRASS S/. 23,880.23
03.07.02 SEMBRADO DE PLANTONES S/. 2,288.57
03.08 VARIOS
03.08.01 PLACA RECORDATORIA S/. 1,456.26
03.08.02 SEÑALIZACION VERTICAL S/. 1,257.05
03.08.03 TACHO ECOLOGICO S/. 8,845.38
03.08.04 REPOSICION DE CAJAS DE AGUA Y DESAGUE S/. 5,496.40 S/.1,374.10
03.08.05 LIMPIEZA FINAL DE LA OBRA S/. 415.55

COSTO DIRECTO S/. 734,992.56 S/. 47,033.60 S/. 24,717.99 S/. 48,858.37 S/. 16,608.03 S/. 19,372.68 S/. - 0 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS GENERALES (11.50%) S/. 84,524.14 S/. 5,408.86 S/. 2,842.57 S/. 5,618.71 S/. 1,909.92 S/. 2,227.86 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
SUB TOTAL S/. 819,516.70 S/. 52,442.46 S/. 27,560.56 S/. 54,477.08 S/. 18,517.95 S/. 21,600.54 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
SUPERVISIÓN (3.50%) S/. 28,683.08 S/. 1,835.49 S/. 964.62 S/. 1,906.70 S/. 648.13 S/. 756.02 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
PRESUPUESTO TOTAL S/. 848,199.78 S/. 54,277.95 S/. 28,525.18 S/. 56,383.78 S/. 19,166.08 S/. 22,356.56 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -

% DE AVANCE FISICO 100.00% 6.40% 3.36% 6.65% 2.26% 2.64% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% DE AVANCE ACUMULADO 6.40% 9.76% 16.41% 18.67% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31%
CRONOGRAMA VALORIZADO DEL MES DE AGOSTO
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD DE LA AV. ARTERIAL TRAMO: AV. JACINTO IBARRA – JR. TUPAC AMARU, BARRIO PISHUPYACUN, DISTRITO DE CHILCA - HUANCAYO - JUNIN"
METRADO
ITEM DESCRIPCION UND PRESUPUESTO MES 01 MES 02 MES 03 MES 04 MES 0
ARTERIAL
01 ADECUADA CALZADA PARA EL TRANSITO VEHICULAR SEMANA 01 SEMANA 02 SEMANA 03 SEMANA 04 SEMANA 05 SEMANA 06 SEMANA 07 SEMANA 08 SEMANA 09 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18
01.01 OBRAS PROVISIONALES (05 DC AGOSTO) (07 DC SEPTIEMBRE) (07 DC SEPTIEMBRE) (07 DC SEPTIEMBRE) (09 DC SEPTIEMBRE) (07 DC OCTUBRE) (07 DC OCTUBRE) (07 DC OCTUBRE) (07 DC OCTUBRE) (07 DC NOVIEMBRE) (07 DC NOVIEMBRE) (07 DC NOVIEMBRE) (07 DC NOVIEMBRE) (07 DC DICIEMBRE) (07 DC DICIEMBRE) (07 DC DICIEMBRE) (07 DC DICIEMBRE) (07 DC ENERO)
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 8.50 X 3.60 m UND 1.00 S/. 2,001.98
01.01.02 ALMACEN Y CASETA DE GUARDIANIA MES 5.00 S/. 1,500.00 0.17 S/.51.00 0.23 S/.70.00 0.23 S/.70.00 0.23 S/.70.00 0.30 S/.90.00
01.01.03 DESVÍO DE TRANSITO. UND 8.00 S/. 2,921.28 2.00 S/.730.32 2.00 S/.730.32 2.00 S/.730.32
01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 S/. 2,000.00 0.50 S/.1,000.00 0.50 S/.1,000.00
01.03 SEGURIDAD Y SALUD EN EL TRABAJO
01.03.01 SEGURIDAD Y SALUD EN OBRA. GLB 1.00 S/. 3,320.00 1.00 S/.3,320.00
01.04 PAVIMENTO RIGIDO
01.04.01 TRABAJOS PRELIMINARES
01.04.01.01 TRAZO Y REPLANTEO PRELIMINAR M2 2,881.33 S/. 5,503.34 2399.25 S/.4,582.57 482.08 S/.920.77
01.04.02 MOVIMIENTO DE TIERRAS
01.04.02.01 CORTE A NIVEL DE SUB RASANTE M3 2,171.73 S/. 8,925.81 420.01 S/.1,726.24 1471.20 S/.6,046.63 280.52 S/.1,152.94
01.04.02.02 EXCAVACION MANUAL PARA CUNETAS Y SARDINELES. M3 24.23 S/. 565.77 S/.0.00 5.27 S/.123.05
01.04.02.03 DEMOLICION DE PAVIMENTO FLEXIBLE C/EQUIPO (E=2") M2 66.25 S/. 3,894.18 S/.0.00
01.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO M3 2,749.09 S/. 49,593.58 525.01 S/.9,471.18
01.04.03 MEJORAMIENTO A NIVEL DE SUBRASANTE (e=0.15M)
01.04.03.01 PERFILADO Y COMPACTADO DE LA SUB RASANTE M2 2,881.33 S/. 9,162.63 432.00 S/.1,373.76 90.65 S/.288.27 1238.65 S/.3,938.90
01.04.03.02 MAT. P/MEJ. DE SUBRASANTE PUESTO EN OBRA M3 518.64 S/. 18,152.40
01.04.03.03 EXTENDIDO, RIEGO Y COMPACT. DE MATERIAL P/MEJORAMIENTO M2 2,881.33 S/. 9,998.22
01.04.04 BASE GRANULAR (e=0.20m)
01.04.04.01 MAT. P/BASE PUESTO EN OBRA M3 670.00 S/. 25,460.00
01.04.04.02 EXTENDIDO, RIEGO Y COMPACT. DE BASE GRANULAR M2 2,791.67 S/. 13,567.52
01.04.05 PAVIMENTACION RIGIDA
01.04.05.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS M2 229.36 S/. 8,896.87
01.04.05.02 ACERO PARA PASADORES LONGITUDINALES KG 1,958.58 S/. 14,571.84
01.04.05.03 CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 Incluye Acabado M3 479.85 S/. 177,755.63
01.04.05.04 CURADO TIPO ARROCERA M2 2,399.25 S/. 1,967.39
01.04.05.05 RELLENO DE JUNTAS CON ASFALTO ML 614.03 S/. 4,028.04
01.04.06 BADENES
01.04.06.01 ENCOFRADO Y DESENCOFRADO DE BADENES M2 17.59 S/. 457.34
01.04.06.02 CONCRETO EN BADENES f'c=210 kg/cm2 Incluye Acabado M3 6.96 S/. 2,578.26
01.04.06.03 CURADO TIPO ARROCERA M2 34.75 S/. 28.50
01.04.06.04 RELLENO DE JUNTAS CON ASFALTO ML 10.56 S/. 69.27
01.04.07 BOCACALLES
01.04.07.01 ENCOFRADO Y DESENCOFRADO BOCACALLES M2 32.58 S/. 847.08
01.04.07.02 CONCRETO EN BOCACALLES f'c=210 kg/cm2 Incluye Acabado M3 23.97 S/. 8,879.45
01.04.07.03 CURADO TIPO ARROCERA M2 119.86 S/. 98.29
01.04.07.04 RELLENO DE JUNTAS CON ASFALTO ML 62.64 S/. 410.92
01.04.08 CUNETAS
01.04.08.01 ENCOFRADO Y DESENCOFRADO PARA CUNETAS M2 136.64 S/. 3,530.78
01.04.08.02 CONCRETO EN CUNETAS f'c=210 kg/cm2 Incluye Acabado M3 48.10 S/. 17,818.16
01.04.08.03 CURADO TIPO ARROCERA M2 237.81 S/. 195.00
01.04.08.04 RELLENO DE JUNTAS CON ASFALTO ML 33.68 S/. 220.94
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SARDINEL PERALTADO
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES M2 736.04 S/. 24,546.93 214.00 S/.7,136.90 44.67 S/.1,489.74 221.53 S/.7,388.03
01.05.01.02 CONCRETO EN SARDINEL PERALTADO f'c=175 kg/cm2 M3 53.78 S/. 17,306.94 11.67 S/.3,755.52 3.96 S/.1,274.37 19.46 S/.6,262.42
01.05.01.03 ACABADO EN SARDINEL PERALTADO M2 328.68 S/. 3,914.58 71.33 S/.849.54 24.19 S/.288.10 118.96 S/.1,416.82
01.05.01.04 RELLENO DE JUNTAS CON ASFALTO ML 42.90 S/. 281.42
01.06 SEÑALIZACION HORIZONTAL
01.06.01 PINTURA EN SARDINELES M2 224.11 S/. 4,654.76
01.06.02 PINTURA EN PAVIMENTO LINEA DISCONTINUA. M 235.70 S/. 735.38
01.06.03 PINTURA ZONAL EN CRUCE PEATONAL. M2 321.60 S/. 7,843.82
01.06.04 PINTURA EN PAVIMENTO LETRAS Y SIMBOLOS. M2 17.48 S/. 456.05
01.07 IMPACTO AMBIENTAL
01.07.01 MITIGACION DE IMPACTO AMBIENTAL GLB 1.00 S/. 3,000.00 0.50 S/.1,500.00
01.08 VARIOS
01.08.01 NIVELACION DE TAPAS DE BUZON A NIVEL DE BASE UND 3.00 S/. 2,463.66
01.08.02 VENTANA SUMIDERO 0.60X0.30 m UND 2.00 S/. 118.96
01.08.03 LIMPIEZA FINAL DE LA OBRA M2 2,881.33 S/. 950.84
02 REPOSICION DE ESTRUCTURAS
02.01 TRABAJOS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO PRELIMINAR M2 65.52 S/. 125.14 65.52 S/.125.14
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE ZANJA C/MAQUINARIA M3 101.03 S/. 626.39
02.02.02 DEMOLICION DE CONCRETO CON EQUIPO M3 27.40 S/. 4,537.99 27.40 S/.4,537.99
02.02.03 PERFILADO DE ZANJA M2 77.72 S/. 377.72
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO. M3 160.54 S/. 3,382.58
02.03 OBRAS DE CONCRETO
02.03.01 ENCOFRADO Y DESENCOFRADO PARA ALCANTARILLA M2 202.65 S/. 6,918.47
02.03.02 ACERO DE REFUERZO FY=4200KG/CM2 KG 3,376.73 S/. 19,888.94
02.03.03 CONCRETO EN ALCANTARILLA f'c=210 kg/cm2 M3 53.96 S/. 21,436.69
02.03.04 CURADO DE CONCRETO EN ALCANTARILLA M2 202.65 S/. 38.50
02.03.05 LIMPIEZA FINAL DE LA OBRA M2 65.52 S/. 21.62
03 VEREDAS PEATONALES
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO M2 1,259.23 S/. 453.32 360.64 S/.129.83 231.13 S/.83.21 254.29 S/.91.54
03.01.02 TRAZO Y REPLANTEO PRELIMINAR M2 1,259.23 S/. 2,405.13 360.64 S/.688.82 231.13 S/.441.46 254.29 S/.485.69
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL PARA VEREDAS M3 260.73 S/. 5,399.72 73.99 S/.1,532.33 4.32 S/.89.47 87.00 S/.1,801.77 9.94 S/.205.85 -
03.02.02 DEMOLICION DE VEREDAS DE CONCRETO C/EQUIPO M2 869.18 S/. 51,090.40 277.54 S/.16,313.80 395.09 S/.23,223.39
03.02.03 ACARRERO MANUAL DE MATERIAL EXCDENTE M3 434.56 S/. 5,384.20 127.18 S/.1,575.76 54.79 S/.678.85 108.75 S/.1,347.41 12.44 S/.154.01
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO M3 434.56 S/. 7,839.46 127.18 S/.2,294.33
03.03 SUB BASE GRANULAR
03.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE EN VEREDAS M2 1,184.43 S/. 5,756.33 341.80 S/.1,661.15 17.25 S/.83.84 300.00 S/.1,458.00 135.04 S/.656.29
03.03.02 CONFORMACION Y COMPACTADO DE SUB BASE E=10CM M2 1,184.43 S/. 11,216.55 341.80 S/.3,236.85 17.25 S/.163.35
03.04 VEREDAS DE CONCRETO
03.04.01 ENCOFRADO Y DESENCOFRADO PARA VEREDAS M2 299.03 S/. 7,538.55 71.25 S/.1,796.21
03.04.02 CONCRETO PARA VEREDAS f'c=175 kg/cm2 Inc/Acabado y Bruñado M2 1,018.39 S/. 53,231.25 187.92 S/.9,822.58 30.00 S/.1,568.10
03.04.03 CONCRETO PARA SARDINEL DE VEREDA f'c=175 kg/cm2 M3 22.45 S/. 7,245.96 4.83 S/.1,558.93 0.82 S/.264.66
03.04.04 CURADO TIPO ARROCERA M2 1,093.19 S/. 896.42 206.76 S/.169.54 30.00 S/.24.60
03.04.05 RELLENO DE JUNTAS CON ASFALTO M 30.02 S/. 196.93
03.05 MARTILLOS
03.05.01 ENCOFRADO Y DESENCOFRADO EN MARTILLOS M2 26.22 S/. 661.01 4.77 S/.120.25 11.44 S/.288.40 7.58 S/.191.10
03.05.02 CONCRETO PARA MARTILLOS f'c=175 kg/cm2 Inc/Acabado y Bruñado M2 137.59 S/. 7,191.83 30.30 S/.1,583.78 54.39 S/.2,842.97 39.19 S/.2,048.46
03.05.03 CURADO TIPO ARROCERA M2 137.59 S/. 112.82 30.30 S/.24.85 54.39 S/.44.60 39.19 S/.32.13
03.05.04 RELLENO DE JUNTAS CON ASFALTO M 101.65 S/. 666.82
03.06 RAMPAS
03.06.01 ENCOFRADO Y DESENCOFRADO EN RAMPAS M2 9.29 S/. 231.51 5.88 S/.146.53
03.06.02 CONCRETO f'c=175 kg/cm2 PARA RAMPAS M3 2.85 S/. 948.22 1.73 S/.575.59
03.06.03 ACABADO EN RAMPA M2 28.45 S/. 338.84 17.25 S/.205.45
03.07 AREAS VERDES
03.07.01 SEMBRADO DE GRASS M2 920.95 S/. 23,880.23
03.07.02 SEMBRADO DE PLANTONES UND 131.00 S/. 2,288.57
03.08 VARIOS
03.08.01 PLACA RECORDATORIA UND 2.00 S/. 1,456.26
03.08.02 SEÑALIZACION VERTICAL UND 5.00 S/. 1,257.05
03.08.03 TACHO ECOLOGICO UND 18.00 S/. 8,845.38
03.08.04 REPOSICION DE CAJAS DE AGUA Y DESAGUE UND 56.00 S/. 5,496.40 14.00 S/.1,374.10
03.08.05 LIMPIEZA FINAL DE LA OBRA M2 1,259.23 S/. 415.55

COSTO DIRECTO S/. 734,992.56 S/. 47,033.60 S/. 24,717.99 S/. 48,858.37 S/. 16,608.03 S/. 19,372.68 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS GENERALES (11.50%) S/. 84,524.14 S/. 5,408.86 S/. 2,842.57 S/. 5,618.71 S/. 1,909.92 S/. 2,227.86 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
SUB TOTAL S/. 819,516.70 S/. 52,442.46 S/. 27,560.56 S/. 54,477.08 S/. 18,517.95 S/. 21,600.54 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
SUPERVISIÓN (3.50%) S/. 28,683.08 S/. 1,835.49 S/. 964.62 S/. 1,906.70 S/. 648.13 S/. 756.02 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
PRESUPUESTO TOTAL S/. 848,199.78 S/. 54,277.95 S/. 28,525.18 S/. 56,383.78 S/. 19,166.08 S/. 22,356.56 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -

% DE AVANCE FISICO 100.00% 6.40% 3.36% 6.65% 2.26% 2.64% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% DE AVANCE ACUMULADO 6.40% 9.76% 16.41% 18.67% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31% 21.31%
S 04

SEMANA 19 SEMANA 20
(07 DC ENERO) (09 DC ENERO)

S/. - S/. -
S/. - S/. -
S/. - S/. -
S/. - S/. -
S/. - S/. -

0.00% 0.00%
21.31% 21.31%