CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA

PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)


SUB PACKAGE - B CH (46+090) TO CH (46+800)

PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE

Work Done of Base month Current


Price Deviation Escalated
Work Month IPA Each Month Reinforcement Reinforcment
Rs./M.Ton Amount
(M.Ton) Price Rs./M.Ton Price Rs./M.Ton

April-19 IPA 23 0.776 87,000.00 122,000.00 35,000.00 27,160.00

May-19 IPA 24 4.144 87,000.00 125,000.00 38,000.00 157,472.00

June-19 IPA 25 0.149 87,000.00 125,000.00 38,000.00 5,662.00

July-19 IPA 26 1.462 87,000.00 125,000.00 38,000.00 55,556.00

August-19 IPA 27 1.462 87,000.00 125,000.00 38,000.00 55,556.00

September-19 IPA 28 0.298 87,000.00 125,000.00 38,000.00 11,324.00

October-19 IPA 29 - 87,000.00 125,000.00 38,000.00 -

November-19 IPA 30 0.298 87,000.00 125,000.00 38,000.00 11,324.00

December-19 IPA 31 2.246 87,000.00 121,500.00 34,500.00 77,487.00

January-20 IPA 32 2.098 87,000.00 121,500.00 34,500.00 72,381.00

February-20 IPA 33 1.883 87,000.00 121,500.00 34,500.00 64,963.50

March-20 IPA 34 6.529 87,000.00 121,500.00 34,500.00 225,250.50

April-20
IPA 35 1.515 87,000.00 121,500.00 34,500.00 52,267.50
May-20

June-20 IPA 36 0.852 87,000.00 121,500.00 34,500.00 29,380.20

23.712 845,783.70

Prepared by Subcontracor's Checked By Main Contractor's

Quantity Surveyor Quantity Surveyor Project Engineer


CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 23
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of
Total Requirement Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton)
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 - 12.00 12.00 - - 0.126 0.502 0.126 0.502
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 - - - - - - - - -
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - - - - - - - - - -
- - 0.126 0.502 0.126 0.502

Wall
M.Ton per L.m of
Total Requirement Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - - 12.00 12.00 - - 0.149 - 0.149 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - - - - - - - - - -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - - - - - - - - - -
- - 0.149 - 0.149 -

Wall/Base
M.Ton per L.m of
Total Requirement Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 23 - APRIL 2019 - - 0.275 0.502 0.275 0.502

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 24
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 12.00 36.00 48.00 0.126 0.502 0.378 1.505 0.504 2.006
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 - - - - - - - - -
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - - 110.00 110.00 - - 2.112 - 2.112 -
0.126 0.502 2.490 1.505 2.616 2.006

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 12.00 - 12.00 0.149 - - - 0.149 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - - - - - - - - - -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - - 24.00 24.00 - - 0.149 - 0.149 -
0.149 - 0.149 - 0.298 -

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 24 - MAY 2019 0.275 0.502 2.639 1.505 2.914 2.006

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 25
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 48.00 - 48.00 0.504 2.006 - - 0.504 2.006
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 - - - - - - - - -
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
2.616 2.006 - - 2.616 2.006

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 12.00 - 12.00 0.149 - - - 0.149 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - - - - - - - - - -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 24.00 24.00 48.00 0.149 - 0.149 - 0.298 -
0.298 - 0.149 - 0.446 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 25 - JUNE 2019 2.914 2.006 0.149 - 3.062 2.006

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 26
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 48.00 - 48.00 0.504 2.006 - - 0.504 2.006
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 - 24.00 24.00 - - 0.302 1.159 0.302 1.159
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
2.616 2.006 0.302 1.159 2.918 3.166

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 12.00 - 12.00 0.149 - - - 0.149 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - - - - - - - - - -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
0.446 - - - 0.446 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 26 - JULY 2019 3.062 2.006 0.302 1.159 3.365 3.166

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 27
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 48.00 - 48.00 0.504 2.006 - - 0.504 2.006
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 24.00 24.00 48.00 0.302 1.159 0.302 1.159 0.605 2.318
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
2.918 3.166 0.302 1.159 3.221 4.325

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 12.00 - 12.00 0.149 - - - 0.149 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - - - - - - - - - -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
0.446 - - - 0.446 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 27 - AUGUST 2019 3.365 3.166 0.302 1.159 3.667 4.325

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 28
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 48.00 - 48.00 0.504 2.006 - - 0.504 2.006
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 48.00 - 48.00 0.605 2.318 - - 0.605 2.318
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
3.221 4.325 - - 3.221 4.325

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 12.00 - 12.00 0.149 - - - 0.149 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - - 24.00 24.00 - - 0.298 - 0.298 -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
0.446 - 0.298 - 0.744 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 28 - SEPTEMBER 2019 3.667 4.325 0.298 - 3.965 4.325

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 29
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 48.00 - 48.00 0.504 2.006 - - 0.504 2.006
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 48.00 - 48.00 0.605 2.318 - - 0.605 2.318
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
3.221 4.325 - - 3.221 4.325

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 12.00 - 12.00 0.149 - - - 0.149 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - 24.00 - 24.00 0.298 - - - 0.298 -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
0.744 - - - 0.744 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 29 - OCTOBER 2019 3.965 4.325 - - 3.965 4.325

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 30
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 48.00 - 48.00 0.504 2.006 - - 0.504 2.006
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 48.00 - 48.00 0.605 2.318 - - 0.605 2.318
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
3.221 4.325 - - 3.221 4.325

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 12.00 - 12.00 0.149 - - - 0.149 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - 24.00 24.00 48.00 0.298 - 0.298 - 0.595 -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
0.744 - 0.298 - 1.042 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 30 - NOVEMBER 2019 3.965 4.325 0.298 - 4.262 4.325

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 31
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 48.00 - 48.00 0.504 2.006 - - 0.504 2.006
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 48.00 32.00 80.00 0.605 2.318 0.403 1.546 1.008 3.864
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
3.221 4.325 0.403 1.546 3.624 5.870

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 12.00 - 12.00 0.149 - - - 0.149 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - 48.00 24.00 72.00 0.595 - 0.298 - 0.893 -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
1.042 - 0.298 - 1.339 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 31 - DECEMBER 2019 4.262 4.325 0.701 1.546 4.963 5.870

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 32
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 48.00 24.00 72.00 0.504 2.006 0.252 1.003 0.756 3.010
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 80.00 - 80.00 1.008 3.864 - - 1.008 3.864
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
3.624 5.870 0.252 1.003 3.876 6.874

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 12.00 60.00 72.00 0.149 - 0.744 - 0.893 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - 72.00 8.00 80.00 0.893 - 0.099 - 0.992 -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
1.339 - 0.843 - 2.182 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 32 - JANUARY 2020 4.963 5.870 1.095 1.003 6.058 6.874

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 33
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 72.00 36.00 108.00 0.756 3.010 0.378 1.505 1.134 4.514
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 80.00 - 80.00 1.008 3.864 - - 1.008 3.864
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
3.876 6.874 0.378 1.505 4.254 8.378

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 72.00 - 72.00 0.893 - - - 0.893 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - 80.00 - 80.00 0.992 - - - 0.992 -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
2.182 - - - 2.182 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 33 - FEBRUARY 2020 6.058 6.874 0.378 1.505 6.436 8.378

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 34
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 108.00 122.00 230.00 1.134 4.514 1.281 5.100 2.415 9.614
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 80.00 - 80.00 1.008 3.864 - - 1.008 3.864
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
4.254 8.378 1.281 5.100 5.535 13.478

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 72.00 12.00 84.00 0.893 - 0.149 - 1.042 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - 80.00 - 80.00 0.992 - - - 0.992 -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
2.182 - 0.149 - 2.331 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - - - - - - - - -
TOTAL REINFORCMENT QUANTITY UP TO IPA 34 - MARCH 2020 6.436 8.378 1.430 5.100 7.866 13.478

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 35
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 230.00 12.00 242.00 2.415 9.614 0.126 0.502 2.541 10.116
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 80.00 - 80.00 1.008 3.864 - - 1.008 3.864
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
5.535 13.478 0.126 0.502 5.661 13.980

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 84.00 48.00 132.00 1.042 - 0.595 - 1.637 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - 80.00 - 80.00 0.992 - - - 0.992 -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
2.331 - 0.595 - 2.926 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - - 40.00 40.00 - - 0.292 - 0.292 -
TOTAL REINFORCMENT QUANTITY UP TO IPA 35 - APRIL AND MAY 2020 7.866 13.478 1.013 0.502 8.879 13.980

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
CENTRAL EXPRESSWAY SECTION PROJECT SECTION 02 - MIRIGAMA TO KURUNEGALA
PACKAGE - A FROM MIRIGAMA (37+090) TO RILLOLUWA (46+800)
BILL NO IPA 36
SUB PACKAGE - B CH (46+090) TO CH (46+800)
PRICE ADJUSTMENT TO REINFORCEMENT IN CONCRETE LINE DRAINS (LHS ROW) AND MAIN TRACE
Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Base (M.Ton) Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.013 0.051 1.134 4.617 - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.011 0.042 3.087 12.289 242.00 (4.00) 238.00 2.541 10.116 (0.042) (0.167) 2.499 9.948
46+480 - 46+660 LHS 180.00 0.013 0.048 2.268 8.694 80.00 - 80.00 1.008 3.864 - - 1.008 3.864
46+680 - 46+800 LHS 120.00 0.019 - 2.304 - 110.00 - 110.00 2.112 - - - 2.112 -
5.661 13.980 (0.042) (0.167) 5.619 13.812

Wall
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (LHS) Wall Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+050 - 46+140 LHS 90.00 0.015 - 1.341 - - - - - - - - - -
46+140 - 46+434 LHS 294.00 0.012 - 3.646 - 132.00 62.00 194.00 1.637 - 0.769 - 2.406 -
46+480 - 46+660 LHS 180.00 0.012 - 2.232 - 80.00 - 80.00 0.992 - - - 0.992 -
46+680 - 46+800 LHS 120.00 0.006 - 0.744 - 48.00 - 48.00 0.298 - - - 0.298 -
2.926 - 0.769 - 3.695 -

Wall/Base
M.Ton per L.m of Total
Previous Current Cummulative In M.Ton
Drain Section (verge drain) Wall & Base Requirement
Length Length Length Pre. Reinf. Curr. Reinf. Cumm. Reinf.
10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm 10mm 12mm
46+620 - 46+660 BS 80.00 0.007 - 0.584 - 40.00 40.00 80.00 0.292 - 0.292 - 0.584 -
TOTAL REINFORCMENT QUANTITY UP TO IPA 36 - JUNE 2020 8.879 13.980 1.019 (0.167) 9.898 13.812

Prepared by Subcontracor's Checked By Main Contractor's


Quantity Surveyor Quantity Surveyor Project Engineer
BOQ ITEM NO : DRAIN/DITCH TYPE DS ( C )-VO.01 46+050 - 46+140 LHS Item Description : Tor Steel Reinforcement Schedule of Bars
IPA NO : VARIATION Str. Ref No: : 46+050 - 46+140 LHS ROW Drain
MONTH ENDING ON : Drawing Reference :
Date :
Dimension : Pitch(m) Main.(m) Distr.(m)
0.000 90.00
Spacing : 0.15 0.25

Cutting Shedule - Shape & Dimensions (mm) - [BS 4449]


No.of No.of
Total Nos
Member Bar Mark Type & Size Members Each BS Unit Weight Total Shape
axb Length Total Length
(a) (b) Shape A B C D Weight
(m) (m)
Code (kg/m) (t)

Main Bar 1 Y 12 1 601 601 99 1.13 2.80 1.13 5.060 3041.060 0.888 2.700

Hunch Bar 2 Y 10 2 601 1202 99 0.20 0.36 0.20 0.760 913.520 0.617 0.564

Base Top Net - Main Bar 3 Y 10 1 601 601 99 0.13 2.80 0.13 3.050 1833.050 0.617 1.131

Wall - Distribution Bar 4 Y 10 2 7 14 99 90.00 90.000 1260.000 0.617 0.777

Base Distribution-Top Net 5 Y 12 12 1 12 99 90.00 90.000 1080.000 0.888 0.959

Base Distribution-Bottom Net 6 Y 12 12 1 12 99 90.00 90.000 1080.000 0.888 0.959

Total 7.091 Total


BOQ ITEM NO : DRAIN/DITCH TYPE DS ( C )-VO.02 46+140 - 46+430 LHS Item Description : Tor Steel Reinforcement Schedule of Bars
IPA NO : VARIATION Str. Ref No: : 46+140 - 46+430 LHS ROW Drain
MONTH ENDING ON : Drawing Reference :
Date :
Dimension : Pitch(m) Main.(m) Distr.(m)
0.000 290.00
Spacing : 0.15 0.25

Cutting Shedule - Shape & Dimensions (mm) - [BS 4449]


No.of No.of
Total Nos
Member Bar Mark Type & Size Members Each BS Unit Weight Total Shape
axb Length Total Length
(a) (b) Shape A B C D Weight
(m) (m)
Code (kg/m) (t)

Main Bar 1 Y 12 1 1934 1934 99 0.88 2.30 0.88 4.060 7852.040 0.888 6.973

Hunch Bar 2 Y 10 2 1934 3868 99 0.20 0.36 0.20 0.760 2939.680 0.617 1.814

Base Top Net - Main Bar 3 Y 10 1 1934 1934 99 0.13 2.30 0.13 2.550 4931.700 0.617 3.043

Wall - Distribution Bar 4 Y 10 2 5 10 99 290.00 290.000 2900.000 0.617 1.789

Base Distribution-Top Net 5 Y 12 10 1 10 99 290.00 290.000 2900.000 0.888 2.575

Base Distribution-Bottom Net 6 Y 12 10 1 10 99 290.00 290.000 2900.000 0.888 2.575

Total 18.769 Total


BOQ ITEM NO : DRAIN/DITCH TYPE DS ( C )-VO.03 46+480 - 46+660 LHS Item Description : Tor Steel Reinforcement Schedule of Bars
IPA NO : VARIATION Str. Ref No: : 46+480 - 46+660 LHS ROW Drain
MONTH ENDING ON : Drawing Reference :
Date :
Dimension : Pitch(m) Main.(m) Distr.(m)
0.000 180.00
Spacing : 0.15 0.25

Cutting Shedule - Shape & Dimensions (mm) - [BS 4449]


No.of No.of
Total Nos
Member Bar Mark Type & Size Members Each BS Unit Weight Total Shape
axb Length Total Length
(a) (b) Shape A B C D Weight
(m) (m)
Code (kg/m) (t)

Main Bar 1 Y 12 1 1201 1201 99 0.88 2.80 0.88 4.560 5476.560 0.888 4.863

Hunch Bar 2 Y 10 2 1201 2402 99 0.20 0.36 0.20 0.760 1825.520 0.617 1.126

Base Top Net - Main Bar 3 Y 10 1 1201 1201 99 0.13 2.80 0.13 3.050 3663.050 0.617 2.260

Wall - Distribution Bar 4 Y 10 2 5 10 99 180.00 180.000 1800.000 0.617 1.111

Base Distribution-Top Net 5 Y 12 12 1 12 99 180.00 180.000 2160.000 0.888 1.918

Base Distribution-Bottom Net 6 Y 12 12 1 12 99 180.00 180.000 2160.000 0.888 1.918

Total 13.196 Total


BOQ ITEM NO : DRAIN/DITCH TYPE DS ( C )-VO.04 46+680 - 46+800 LHS Item Description : Tor Steel Reinforcement Schedule of Bars
ITEM NO. : VARIATION Str. Ref No: : 46+680 - 46+800 LHS ROW Drain
MONTH ENDING ON : Drawing Reference :
Date :
Dimension : Pitch(m) Main.(m) Distr.(m)
0.000 120.00
Spacing : 0.15 0.15

Cutting Shedule - Shape & Dimensions (mm) - [BS 4449]


No.of No.of
Total Nos
Member Bar Mark Type & Size Members Each BS Unit Weight Total Shape
axb Length Total Length
(a) (b) Shape A B C D Weight
(m) (m)
Code (kg/m) (t)

Main Bar 1 Y 10 1 801 801 99 0.78 1.45 0.78 3.010 2411.010 0.617 1.488

Wall - Distribution Bar 4 Y 10 2 5 10 99 120.00 120.000 1200.000 0.617 0.740

Base Distribution-Bottom Net 6 Y 10 11 1 11 99 120.00 120.000 1320.000 0.617 0.814

Total 3.042 Total


BOQ ITEM NO : VERGE DRAIN : 46+620- 46+46+660 BS Item Description : Tor Steel Reinforcement Schedule of Bars
ITEM NO. : TYPE - DS (C ) - Aa Str. Ref No: : 46+620 - 46+660 BS ROW Drain
MONTH ENDING ON : Drawing Reference :
Date :
Dimension : Pitch(m) Main.(m) Distr.(m)
0.000 80.00
Spacing : 0.25 0.15

Cutting Shedule - Shape & Dimensions (mm) - [BS 4449]


No.of No.of
Total Nos
Member Bar Mark Type & Size Members Each BS Unit Weight Total Shape
axb Length Total Length
(a) (b) Shape A B C D Weight
(m) (m)
Code (kg/m) (t)

Main Bar 1 Y 10 1 321 321 99 0.37 0.44 0.39 1.202 385.842 0.617 0.238

Wall - Distribution Bar 4 Y 10 2 2 4 99 80.00 80.000 320.000 0.617 0.197

Base Distribution-Bottom Net 6 Y 10 3 1 3 99 80.00 80.000 240.000 0.617 0.148

Total 0.584 Total