Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
: RHM-QF-E-009-0
R.H. Al-MARI & SONS COMPANY
Rev. : 0
Date 1-Mar-12
SHAYBAH NGL PIPELINE PROJECT
Page 1 of 1
DESCRIPTION : LOACATION :
INSTALLATION
ITEM ITEMS TO CHECK
SIGNATURE DATE
1 EQUIPMENT INSTALLATION DETAILS IS CORRECT AS PER DESI
DRAWINGS
DIAGRAMS
SPECIFICATION
REMARKS:
Page 1 of 1
RESULT P - N
APPROVALS RHM SAPMT SAPID
NAME
SIGNATURE
DATE
Form No. : RHM-QF-E-008-0
R.H. Al-MARI & SONS COMPANY
Rev. : 0
Date 1-Mar-12
SHAYBAH NGL PIPELINE PROJECT
Page 1 of 1
INSTALLATION
ITEM ITEMS TO CHECK
SIGNATURE DATE
1 EQUIPMENT LOCATION AND INSTALLATION DETAILS CORRECT
SPECIFICATION
SPECIFICATION
ETC.)
REMARKS:
Page 1 of 1
EQUIPMENT PROTECTED :
IMMERSED LOCATION :
RESULT
1. BURIED ANODES P N
2. IMMERSED ANODES
2.1 FIXING POINTS AS PER DETAILED DWGS
Page 1 of 1
DESCRIPTION : LOACATION :
Page 1 of 1
DESCRIPTION : LOACATION :
Page 1 of 1
WORK DESCRIPTION:
ITEMS TO CHECK:
18" others
5 Backfilling Material
It is recommended this part of the job with limits stated above be completely backfilled.