Sei sulla pagina 1di 7

Form No.

: RHM-QF-E-009-0
R.H. Al-MARI & SONS COMPANY
Rev. : 0
Date 1-Mar-12
SHAYBAH NGL PIPELINE PROJECT

Page 1 of 1

FIELD INSTALLATION CHECKLIST NO:


JOB NO:
(M.O.V) DATE:

DESCRIPTION : LOACATION :

LOCATION : REFERENCE DWG. :

INSTALLATION
ITEM ITEMS TO CHECK
SIGNATURE DATE
1 EQUIPMENT INSTALLATION DETAILS IS CORRECT AS PER DESI

DRAWINGS

2 MATERAILS/ EQUIPMENT SUITABLE FOR AREA


3 COMPLIED WITH SAES REQUIREMENTS

4 INSTALLATION MATERIALS USED, COMPLY WITH DESIGN MTO/

SPECIFICATION (IF ANY)

5 CABLE/ WIRING SIZES CORRECT AS PER SPECIFICATION

6 CHECK/ VERIFY TERMINALS AGAINST INTER CONNECTION

DIAGRAMS

7 CHECK/ VERIFY POWER AND CONTROL CABLES TERMINATION.

PROPER WIRE MARKERS WAS INSTALLED

8 EQUIPMENT TAG NUMBERS CORRECT AS PER SPECIFICATION

9 CABLE IDENTIFICATION NUMBERS CORRECT AS PER SPECIFICA


10 CONDUIT IDENTIFICATION NUMBERS CORRECT AS PER

SPECIFICATION

REMARKS:

APPROVALS RHM SAPMT SAPID


NAME
SIGNATURE
DATE
Form No. : RHM-QF-E-001-0
R.H. Al-MARI & SONS COMPANY
Rev. : 0
Date 1-Mar-12
SHAYBAH NGL PIPELINE PROJECT

Page 1 of 1

ANODE BED GROUND/ EARTH RESISTANCE


JOB NO: NO:
MEASUREMENT

TYPE ANODE BED: HORIZONTAL :

DEEP WELL DEPTH: ANODE TYPE :

ANODE TYPE NO. OR ANODE :


NO. OF ANODE ANODE SPACING:

1. HORIZONTAL BED RESULT


P N
1.1 LOCATION AGAINST LAYOUT DRAWINGS

1.2 BOTTOM LAYER BACKFILL AS PER DWG

1.3 ANODES SPACING AND DEPTH CORRECT

1.4 BACKFILL COMPLETE

1.5 ANODE CABLE ROUTING CORRECT

2. OIL DIELECTRIC STRENGTH

2.1 LOCATION AGAINST LAYOUT DRAWINGS

2.2 DRILLING TO SPECIFIED DEPTH

2.3 WELL CASING INSTALLED AND CLEAR

2.4 WELL HEAD AS PER SPECIFICATION

2.5 ANODES INSTALLED


2.6 COCK BREEZE BACKFILLED

2.7 GROUND BED SEALED AS PER SPEC.

3. ANODE BED RESISTANCE

NETWORK TO NETWORK TO RESISTANCE DIFF AVERAGE


POTENTIAL SPIKE - CURRENT SPIKE - MEASUREMENT
P N VALUE
MTS MTS OHMS
R1

RESULT P - N
APPROVALS RHM SAPMT SAPID
NAME
SIGNATURE
DATE
Form No. : RHM-QF-E-008-0
R.H. Al-MARI & SONS COMPANY
Rev. : 0
Date 1-Mar-12
SHAYBAH NGL PIPELINE PROJECT

Page 1 of 1

FIELD INSTALLATION CHECKLIST NO:


JOB NO:
(SWITCHRACK) DATE:
DESCRIPTION : LOACATION :

LOCATION : REFERENCE DWG. :

INSTALLATION
ITEM ITEMS TO CHECK
SIGNATURE DATE
1 EQUIPMENT LOCATION AND INSTALLATION DETAILS CORRECT

PER DESIGN DRAWINGS

2 MATERAILS/ EQUIPMENT SUITABLE FOR AREA


3 REQUIREMENTS COMPLIED WITH SAES

4 INSTALLATION MATERIALS USED, COMPLY WITH DESIGN MTO/

SPECIFICATION

5 AS-BUILT DRAWING MARK-UP CORRECT AND CHANGES SAPMT

APPROVED (IF ANY)

6 EQUIPMENT TAG NUMBERS CORRECT AS PER SPECIFICATION

7 CABLE IDENTIFICATION NUMBERS CORRECT AS PER SPECIFICA

8 CONDUIT IDENTIFICATION NUMBERS CORRECT AS PER

SPECIFICATION

9 CABLE / WIRING SIZES CORRECT AS PER SPECIFICATION


10 PROPER TERMINATION OF CABLES (POWER, CONTROLS, ALAR

ETC.)

11 PROPER CONNECTION AND SIZE OF GROUNDING WIRES

REMARKS:

APPROVALS RHM SAPMT SAPID


NAME
SIGNATURE
DATE
Form No. :RHM-QF-E-001-02
R.H. Al-MARI & SONS COMPANY
Rev. 0
Date 1-Mar-12
SHAYBAH NGL PIPELINE PROJECT

Page 1 of 1

SACRIFICIAL ANODES AND ELECTRODES SYSTEM


JOB NO: NO:
INSPECTION RECORD

EQUIPMENT PROTECTED :

PROTECTION SYSTEM : TYPE OF ELECTRODES :

TYPE OF ANODES : NUMBER OF ELECTRODES :

BURIED TEST POSTS :

IMMERSED LOCATION :

NUMBER OF ANODES : PIPE TO SOIL POTENTIAL (VOLTS) :

RESULT

1. BURIED ANODES P N

1.1 LOCATION AGAINST LAYOUT DRAWINGS

1.2 INSTALLATION AS PER DETAIL DWG.

1.3 HOLIDAY TEST ANODE CABLE @ 18KV DC


1.4 ANODES, SATURATED WITH WATER
1.5 BACKFILL MATERIAL INSTALLED
1.6 CONNECTIONS AS PER DETAIL DWG

2. IMMERSED ANODES
2.1 FIXING POINTS AS PER DETAILED DWGS

2.2 SUSPENDED ANODES SECURELY TIED

2.3 DIRECTLY ATTACHED ANODES SECURITY FIXED

2.4 NO SECONDARY INTERFERENCE

3. ANODE BED RESISTANCE


3.1 LOCATION AS PER LAYOUT DWG.

3.2 INSTALLATION AS PER DETAIL DWG.

4. JUNCTION BOXES, TEST POSTS

4.1 EQUIPMENT AS PER DATA SHEET

4.2 SUPPORTS AS PER DETAIL DWG.


4.3 FOUNDATIONS LOCATION AND DETAIL CORRECT
4.4 INSTALLATION AS PER DETAIL CORRECT
4.5 CABLE CONNECTIONS AS PER CONNECTION DIAGRAM
4.6 CADWELDS INSPECTED

APPROVALS RHM SAPMT SAPID


NAME
SIGNATURE
DATE
Form No. : RHM-QF-E-002-02
R.H. Al-MARI & SONS COMPANY
Rev. : 0
Date 1-Mar-12
SHAYBAH NGL PIPELINE PROJECT

Page 1 of 1

INSULATION RESISTANCE TEST RECORD


JOB NO: NO:
(MEDIUM VOLTAGE CABLES)

DESCRIPTION : LOACATION :

TEST EQUIPMENT : AMBIENT CONDITIONS:

TYPE AND RATING : TEMPERATURE CLIMATE :

DRUM NO. CABLE SIZE INSULATION RESISTANCE - M. OHMS CONTINUITY RESULT

CABLE NO. TYPE A-B A-C B-C ABC-N ABCN-E A-B-C-N P N

APPROVALS RHM SAPMT SAPID


NAME
SIGNATURE
DATE
Form No. :RHM-QF-E-002-01
R.H. Al-MARI & SONS COMPANY
Rev. 0
Date 1-Mar-12
SHAYBAH NGL PIPELINE PROJECT

Page 1 of 1

INSULATION RESISTANCE TEST RECORD


JOB NO: NO:
(LOW VOLTAGE CABLES)

DESCRIPTION : LOACATION :

TEST EQUIPMENT : AMBIENT CONDITIONS:

TYPE AND RATING : TEMPERATURE CLIMATE :

DRUM NO. CABLE SIZE INSULATION RESISTANCE - M. OHMS CONTINUITY RESULT

CABLE NO. TYPE A-B A-C B-C ABC-N ABCN-E A-B-C-N P N

APPROVALS RHM SAPMT SAPID


NAME
SIGNATURE
DATE
Form No.RHM-QF-E-004-0
R.H. Al-MARRI & SONS COMPANY
Rev. 0
Date 1-Mar-12
SHAYBAH NGL PIPELINE PROJECT

Page 1 of 1

DIRECT BURIAL ELECTRIC CABLE AND CONDUIT


JOB NO: NO:
(INSTALLATION CHECKLIST)

MEDIUM VOLTAGE CABLES : LOCATION :

LOW VOLTAGE CABLES : AMBIENT CONDITIONS:

WORK DESCRIPTION:

ITEMS TO CHECK:

1 Minimum dry sand cover 12"

2 Minimum dry sand cushion 6"

3 Minimum depth (cable to ground surgace 24" traffic

18" others

4 Cover: Red Tles/ Warning Tape

5 Backfilling Material

It is recommended this part of the job with limits stated above be completely backfilled.

APPROVALS RHM SAPMT SAPID


NAME
SIGNATURE
DATE

Potrebbero piacerti anche