MANFACTURER - MINIMUM 4 LIFTING POINTS - REQUIRED LOAD RATING 128,000 LBS - SLINGER ROUND SLING TO BE LOOPED AT BOTTOM CHORD AT EACH END OF BRIDGE (32,000 LBS EACH)
DRAWING NOT TO SCALE
23
REV DATE DRAWN BY
0 2020-07-20 A. BARRETE-TSAUR
PROJECT TITLE
TRCA - PAN AM PATH
CONNECTION PHASE 1
SLINGER ROUND SLING SLINGER ROUND SLING
LOOPED AT END OF LOOPED AT END OF DRAWING TITLE
BRIDGE AT BOTTOM BRIDGE AT BOTTOM APPENDIX E R1: 60M