Sei sulla pagina 1di 5

Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS

NKH HAB
SAUDI ARABIAN OIL COMPANY
ENGG CERT

ISSUED FOR CONSTRUCTION


DESCRIPTION

SAUDI ARABIAN OIL COMPANY

ELECTRICAL CALCULATIONS

F OR
JO/EWO
JAN.2015 14C0207
DATE

SHADED WAREHOUSE
@TANAJIB TOOL HOUSE FOR RIG SAR-201
00A
NO.
REV

DISCIPLINE
ENGINEER
AMO

(EWO. #: 14C207)
JAN2015
DATE:
PROJECT
ENGINEER
HAB

DATE:
JAN2015 PLANT NO. M #13
CERTIFIED
NKH

JAN2015
DATE:
CONSTRUCTION
AGENCY
DESIGN CONTRACTOR
TNB
JAN2015
DATE:
OPERATIONS
ARK

DATE:
JAN2015
KELLOGG BROWN & ROOT
CONTROL NUMBER

AZMI ABDULHADI & ABDULLAH AL MOAIBED


VERIFICATION

CONSULTANT ENG'G CO.


EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


_____________________
(DCC) NO. 10-00452.0004

ELECTRICAL CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SHADED WAREHOUSE DOC 1


@TANAJIB TOOL HOUSE FOR RIG SAR -201
M13 P CALC-P-001
Of 00A
TANAJIB SAUDI ARABIA JO / EWO: 14C207 5
EDSD/2616-0399.doc
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
00A

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00A JAN.2015 14C0207 ISSUED FOR CONSTRUCTION NKH HAB
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

NKH

ARK
TNB
AMO

HAB
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

JAN2015
JAN2015

CERTIFIED

JAN2015
JAN2015

JAN2015
OPERATIONS
CONSTRUCTION
_____________________
(DCC) NO. 10-00452.0004 DATE:

TANAJIB
2.0
1.0
Saudi Aramco 2616-ENG (03/99)

SECTION

SHADED WAREHOUSE
ELECTRICAL CALCULATIONS
DESCRIPTION

@TANAJIB TOOL HOUSE FOR RIG SAR -201


DOC

SAUDI ARABIA
TOTAL LOAD CONSUMPTION ( LP - 02).

M13
JO / EWO:
TABLE OF CONTENTS

P
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

14C207
CALCULATION FOR 30 KVA TRANSFORMER ( XFR - 01 ) .

DRAWING NO.

CALC-P-001
5
2
Of
SHT.NO.
4
3
PAGE

00A

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

1.0 CALCULATION FOR 30 KVA TRANSFORMER ( XFR – 01 ) :


NKH HAB
ENGG CERT

A - PRIMARY SIDE:

FLA = 30x 1000/ 480 x 1.732 = 36.0 AMP

Circuit Breaker Size:


36.0 x 1.25 = 45 AMP
ISSUED FOR CONSTRUCTION

Select 100AF/ 60 AT 3 Pole Enclosure Circuit Breaker (CB-001) .


DESCRIPTION

Use 1- 4C X 35 mm2 CU/XLPE/PVC.


+ 1/C 16 mm2 CU/PVC (Ground).

B - SECONDARY SIDE:

FLA = 30 X 1000 / 400 X 1.732 = 43.0AMP

Circuit Breaker Size:


JO/EWO
JAN.2015 14C0207

43.0X 1.25 = 54.12 AMP

Use 100AF/ 50 AT, 3P, Main breaker of the lighting panel LP-02.
DATE

Use 1- 4C X 16 mm2 CU/XLPE/PVC.


+ 1/C 16 mm2 CU/PVC ( Ground) .
00A
NO.
REV

DISCIPLINE
ENGINEER
AMO
JAN2015
DATE: 3.1 VOLTAGE DROP (FOR 30 KVA TRANSFORMER);
PROJECT
ENGINEER
HAB A - PRIMARY SIDE:
JAN2015
DATE:
CERTIFIED FLA= 45 Amp, Cable length (L) = 4 Meter
NKH

JAN2015
DATE: Is neglected as the cable size from is 35 mm2 copper conductor,
CONSTRUCTION
AGENCY Distance between CB-001 and the transformer is max. 4 meters.
TNB
JAN2015
DATE: B- SECONDARY SIDE:
OPERATIONS
ARK FLA= 54 Amp, Cable length (L) = 4 Meter
JAN2015
DATE:
CONTROL NUMBER

Is neglected as the cable size from is 35 mm2 copper conductor,


VERIFICATION

Distance between LP-02 and the transformer is max. 4 meters.


EDSD

C - VOLTAGE DROP (FOR 95 MM2 FEEDER CABLE) FROM CB-001 TO SUSTATION #4.
DATE:
BY:
REVISIONCERTIFICATION

FLA= 45 Amp, Cable length (L) = 600 Meter


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

mv/amp/m = 0.44 (Saudi Cable Catalogue section 6- Page:72)


_____________________
(DCC) NO. 10-00452.0004

ELECTRICAL CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SHADED WAREHOUSE DOC 3


@TANAJIB TOOL HOUSE FOR RIG SAR -201
M13 P CALC-P-001
Of 00A
TANAJIB SAUDI ARABIA JO / EWO: 14C207 5
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

The approximate Voltage drop % = (mv/amp/m) x L x FLA x100


N x Vph x 1000
NKH HAB
ENGG CERT

The approximate voltage drop % = (0.44 x 600 x 45 / 1X480 X 1000) X 100

2.47 %

Hence, voltage drop across the selected cable is less than 5% of the System Nominal Voltage
ISSUED FOR CONSTRUCTION

3.2 GROUNDING CONDUCTOR


DESCRIPTION

A- PRIMARY SIDE:

Equipment grounding conductor sized based on NEC Table 250-122. For 70Amp Over
Current protection, the minimum size of the grounding conductor is # 8 AWG Copper

Use 1/C X 16 mm2 Copper, 600V, Green, PVC Insulation

B- SECONDARY SIDE:
JO/EWO
JAN.2015 14C0207

Equipment grounding conductor sized based on NEC Table 250-122. For 70Amp Over
Current protection, the minimum size of the grounding conductor is # 8 AWG Copper
DATE

Use 1/C X 16 mm2 Copper, 600V, Green, PVC Insulation


00A
NO.
REV

DISCIPLINE
ENGINEER
AMO
JAN2015
DATE: 3.3 CONDUIT SIZING.
PROJECT
ENGINEER
HAB For cable ( 1- 4/C X 35 mm2 CU/XLPE/PVC +1/C 25mm2 CU/PVC ).
JAN2015
DATE:
CERTIFIED From (Saudi Cable Catalogue section 4- Page 29 & &section 2- Page: 9).
NKH

=  (25.2)²+(11.9)² /0.4
JAN2015
DATE: Minimum Conduit Size Requirement
CONSTRUCTION
AGENCY
TNB
= 43mm
JAN2015
DATE: = 2 IN
OPERATIONS
Use 2”// DIA. Rigid Steel Conduit.
ARK
JAN2015
DATE: .
CONTROL NUMBER

4.0 TOTAL LOAD CONSUMPTION (LP-02) :-


VERIFICATION
EDSD

 AC LOAD = 6000VA

DATE:

LIGHTING LOAD = 10400VA


BY:

 POWER LOAD = 4600VA


REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

TOTAL LOAD = 21000VA


THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 DEMAND LOAD 90% = 18900VA


_____________________

 DEMAND LOAD + 20% FUTURE LOAD = 22680VA


(DCC) NO. 10-00452.0004

ELECTRICAL CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SHADED WAREHOUSE DOC 4


@TANAJIB TOOL HOUSE FOR RIG SAR -201
M13 P CALC-P-001
Of 00A
TANAJIB SAUDI ARABIA JO / EWO: 14C207 5
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
 TOTAL LOAD = 23100VA


NKH HAB

FLA = 23100 / 400*1.372= 33.34A


ENGG CERT

 Select 150AF/80AT 3 Pole Circuit Breaker


Use 1- 4C X 16 mm2 CU/XLPE /PVC .
+ 1/C 16 mm2 CU/PVC Ground.

4.1 VOLTAGE DROP CALCULATION :-


ISSUED FOR CONSTRUCTION

FLA= 33.34 Amp, Cable length (L) = 4 Meter


DESCRIPTION

Is neglected as the cable size from is 16 mm2 copper conductor,


Distance between LP-02 and the transformer is max. 4 meters.

4.2 GROUNDING CONDUCTOR


JO/EWO

Equipment grounding conductor sized based on NEC Table 250-122. For 70Amp Over
JAN.2015 14C0207

Current protection, the minimum size of the grounding conductor is # 8 AWG Copper
DATE

Use 1/C X 16 mm2 Copper, 600V, Green, PVC Insulation

4. 3 CONDUIT SIZING CALCULATION:-


00A
NO.
REV

DISCIPLINE
ENGINEER
AMO
For cable (1- 4/C X 16mm2 CU/XLPE/ PVC + 1/C 16mm2 CU/PVC (GROUND) ) .
JAN2015
DATE:
PROJECT From (Saudi Cable Catalogue section 5 - Page 35 & &section 2- Page: 9).
ENGINEER
HAB
JAN2015 Minimum Conduit Size Requirement =  (23.9) ²+(9.1) ² /0.4
DATE:
CERTIFIED
NKH = 40 mm
DATE:
JAN2015 = 2 IN
CONSTRUCTION Use 2”// DIA. Rigid Steel Conduit.
AGENCY
TNB
JAN2015
DATE:
OPERATIONS
ARK
JAN2015
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


_____________________
(DCC) NO. 10-00452.0004

ELECTRICAL CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SHADED WAREHOUSE DOC 5


@TANAJIB TOOL HOUSE FOR RIG SAR -201
M13 P CALC-P-001
Of 00A
TANAJIB SAUDI ARABIA JO / EWO: 14C207 5
EDSD/2616-0399.doc