Documenti di Cultura
Branch
connections,
pressure and non-
pressure
attachments shall
have a mini-mum
of 50 mm or 5
times wall thickness
between welds.
VALVE Preferred height of
hand wheel from
ground or platform:
Horizontally
mounted
valves
(vertical
stem)
1000 / 1350
mm
Vertically
mounted
valves
(horizontal
stem)
UTILITY PIPING
Equipment and piping containing slurries shall have minimum size 1inch NPS drain connections,
unless the type of drain valve dictates a larger size.
Fire-fighting and fire-protection piping shall be as per existing Fire water piping class and shall
comply with the applicable NFPA standards and shall be in accordance with project SPEC.
STP piping
2, 3 “ 1A1 mainly used which is 150# sch 40 for 2-6” SCH 40” , 8-18” SCH 30(ASTM A106 Gr.B)
and 20-28” SCH 20 (API 5L PSL2)
Corrosion allowance is 1 mm
For hydrochloric dosing it uses .5” 1S0 PVCU (Unplasticized Polyvinyl Chloride) pipe as per BS
1452-2
Allowable Pressure 1.96 Mpa @ -29/38℃, 1.82 Mpa @ 85℃
2” 1G0 Pipe are also used for 2” SCH80 NPTM (ASTM A106 Gr.B
Galvanized)-aeration blower line
12” uPVC line to inlet tank from domestic sewer
Battery limit to evaporation pond and line to SWP from drainage system, 5 tie in connection
The total population will be approximately 500 people. Sanitary effluent generated is based
on 300 l/capita/day. Therefore, the total daily flow to be considered in the STP’s is 150 m3/day
(6,25 m3/h) each.
A peak factor of 4 shall be considered for the maximum flow, thus maximum flow at the
inlet to be considered will be 25 m 3/h. Pumping pit shall be capable of handling this flow
during 3 hours, in combination with pumps discharge flow to the treatment.
Required pumping to treatment capacity shall be 2 times the average flow, meaning 12,5
m3/h, and therefore the inlet pumping pit net capacity shall be no less than 37,5 m3 to ensure
no overflows will occur.
Drainage system
RO
From ro package 4” (1C0 line) and 6” are used for backwash water (SCH40S, Seamless, Steel Pipe ASTM
A312-TP316L To ASME B36.19M (Note 4&5))
4”, 2” 1J0 are used for distribution to tank under building scope (PN 20 PPR (Polypropylene Random)
HVAC
1. 3 SUBSTATION TOTAL 6 SPLIT
SS1-18.1 kW
SS2 16.7 kW
SS3 19.2 kW
2. FOR CANTEEN 2 VENT SYSTEM REQUIRED, 90SQ M AND 2 ROOF TOP PACKAGE , AREA
RTEQUIRED 150 SQ.M (Chinese) 68.8 kw
3. GYM BUILDING AC ROOF TOP TYPE PACKAGE , AREA 200 sq.m is required at the roof
4. CHINESE HOTEL AC ROOF TOP PACKAGE, Area 300 sq.m is required at the roof
5. LOCAL DORMITORY AC ROOF TOP TYPE PACKAGE , AREA 200 sq.m is required at the roof
6. INTERNATIONAL DORMITORY.
7. AS PER 5.14 VRF COMBO
FIRE FIGHTING
SS1
Heat detectors 6
Siren 1
beacon 1
Smoke detector 1
Flame detector 4
Potable co2 3
Potable dry chemical 3
Potable foam extinguisher 1
Deluge valve 1
SS2
Heat detectors 4
Siren 1
beacon 1
Smoke detector 1
Flame detector 2
Potable co2 2
Potable dry chemical 2
Deluge valve 1
SS3
Heat detectors 4
Siren 1
beacon 1
Smoke detector 1
Flame detector 2
Potable co2 2
Potable dry chemical 2
Deluge valve 1