Sei sulla pagina 1di 10

SL.

NO ITEM SIZE CODE REMARKS


1 PIPING ASME B36.10M
for carbon steel
and ASME
B36.19M for
stainless steel

2 JOINTS Slip-on flanges or


socket welding shall
not be used.
Screwed fittings
shall not be used in
hydrocarbon
service except
where required by
equipment or
instrumentation.
3 Fittings ASME B16.11 for Welded
threaded and wrought fittings to
socket welding MSS SP-43 (26inch
fittings and ASME NPS & above) shall
B16.9 & MSS SP- be 100%
43 for butt radiographed
welding fittings
4 Flanges ASME B16.5 for All flange faces shall
all flange sizes up be smooth finish
to 24inch NPS and between Ra 3.2 and
ASME B16.47 6.3
Series B as a standard
for sizes 26inch irrespective of what
NPS and above type of gasket has
(for both vessel been applied.
nozzles as well as
pumps and other
rotating
equipment)
5 GASKET Dimensions shall Gaskets filler
be in accordance material shall be
with ASME made of non-
B16.20 for spiral asbestos fiber
wound gaskets materials.
6 WELD SPACING Pipe with wall
thickness up to 20
mm shall have 50
mm or 5 times wall
thickness
between weld,
whichever is the
greater.

Pipe with wall


thickness greater
than 20 mm shall
have 100 mm
between welds.

Branch
connections,
pressure and non-
pressure
attachments shall
have a mini-mum
of 50 mm or 5
times wall thickness
between welds.
VALVE Preferred height of
hand wheel from
ground or platform:
 Horizontally
mounted
valves
(vertical
stem)
1000 / 1350
mm
 Vertically
mounted
valves
(horizontal
stem)

UTILITY PIPING

 Equipment and piping containing slurries shall have minimum size 1inch NPS drain connections,
unless the type of drain valve dictates a larger size.
 Fire-fighting and fire-protection piping shall be as per existing Fire water piping class and shall
comply with the applicable NFPA standards and shall be in accordance with project SPEC.

STP piping

 2, 3 “ 1A1 mainly used which is 150# sch 40 for 2-6” SCH 40” , 8-18” SCH 30(ASTM A106 Gr.B)
and 20-28” SCH 20 (API 5L PSL2)
Corrosion allowance is 1 mm

Allowable Pressure : 1.96 Mpa @ -29/38℃ , 1.73 Mpa @ 110℃

 For hydrochloric dosing it uses .5” 1S0 PVCU (Unplasticized Polyvinyl Chloride) pipe as per BS
1452-2
Allowable Pressure 1.96 Mpa @ -29/38℃, 1.82 Mpa @ 85℃
2” 1G0 Pipe are also used for 2” SCH80 NPTM (ASTM A106 Gr.B
Galvanized)-aeration blower line
 12” uPVC line to inlet tank from domestic sewer

Inlet water pit 1 3500x3500x350 Material of Net


0 construction: Volume :
Reinforced concrete 37.5 m³
Inlet water pump 2 Rated flow: 6.5 Type: Centrifugal Rated
m³/h submersible power: 1
kW
Biological reactor tank 2 10375x 2500x Material
3500 Construction: FRP
Intermediate pit 3500x3500x350 Material of Net
0 construction: Volume :
Reinforced concrete 37.5 m³
Filter feed pump 2 Pump rated flow Type: Centrifugal
25 m³/h submersible
Multimedia filter 2 Filtration area Design pressure: 4 Media:
2,1 m² bar(g) , Diameter: Sand
1330 mm
Aeration blowers 3 Rated flow: 50 Rated power: 10 kW Type:
Nm³/h Roots
Backwash blowers 1 Rated flow: 105 Rated power: 15 kW Type:
Nm³/h Roots
Hydro chlorite dosing 2 Rated flow: 5 I/h Rated
pump power:
0.37 kW
Hydro chlorite dosing 2 Storage tank
tank capacity:400 I
Sludge pump 4 Rated flow: 3.125 Type: Centrifugal Rated
m³/h submersible power:
0.5 kW
Sludge tank 1 Net Volume: 26.1 Material
m³ Construction: FRP

Battery limit to evaporation pond and line to SWP from drainage system, 5 tie in connection
 The total population will be approximately 500 people. Sanitary effluent generated is based
on 300 l/capita/day. Therefore, the total daily flow to be considered in the STP’s is 150 m3/day
(6,25 m3/h) each.
 A peak factor of 4 shall be considered for the maximum flow, thus maximum flow at the
inlet to be considered will be 25 m 3/h. Pumping pit shall be capable of handling this flow
during 3 hours, in combination with pumps discharge flow to the treatment.
 Required pumping to treatment capacity shall be 2 times the average flow, meaning 12,5
m3/h, and therefore the inlet pumping pit net capacity shall be no less than 37,5 m3 to ensure
no overflows will occur.

Drainage system

 3 pump basin are used


PB1 Is connected by dia 300 mm pipe from Container Camp, Hotel Iraqi and Reception ,
International Dormitory and Employee dormitory
 PB2 by dia 200 mm from Gymansium and Dinning Hall
 PB3 by 200 mm dia to collect ewage from Hotel for Chinese and reception.
Each pump basin is a concrete pump basin with 2 pump which is a vertical immersed pump one
is stanby and one is active.(Q30 cm/h and H 25 m)

RO

400/230V, 3phase with neutral , 4 wire, 50Hz.

 Potable water tank minimum capacity is 150m3(expected 167 m3)


 Minimum inlet water temperature has been assumed as 13 ºC for design, and maximum inlet
water temperature has been assumed as 35 ºC. Raw water tie in is located in raw water pipe, at
the existing tie in for future expansion. Considering the recovery of the re-verse osmosis,
maximum of 42 m 3/h of Raw water is expected to be required.
 Two number of plants are considered with a net flow capacity of 32 m3/hr each, Running
parallel to achieve required flowrate of 60 m3/hr

Lamella Decanter 2 Rated Flow: 42 Material For pre


m³/h Construction: CS treatment
6000x3000x3000 Epoxy Painted
(LxWxH)
Inlet water tank 2 Capacity: 4 m3 Material of
units construction: FRP
(1 per
plant)
Feed water pumps 4 Pump rated flow: Type: Centrifugal
units 42 m3/h
(2 per
plant)
Coagulant Dosing 2 Storage tank Pump rated flow:
(FeCL3) units capacity: 200 l 2 l/h,
(1 per Pump rated head:
plant) 6 bar(g)
Multimedia filter 2 Diameter: 2300 Filtratoin area: 3.5 Media:
(1st & 2 nd stage) units mm m2, Sand+anthracite
(1 per Diameter: 2300
plant) mm,
1st Desing pressure: 5
stage bar(g)
2
units
(1 per
line)
2nd
stage
Backwash pumps 4 Pump rated flow: Type: Centrifugal
units 70 m3/h
(2 per
plant)
Backwash blowers 4 Rated flow: 175 Type: Roots
units Nm3/h
(2 per
plant)
Cartridge Filter 2 Rated Flow: 42 Type:
units m3/h, Polypropylen
(1 per Cartridge cartridge
plant) number: 20
Antiscalant Dosing 2 Storage tank
units capacity: 25 l
(1 per
line)
Antiscalant Pump 2 Pump rated flow:
units 1 l/h
(1 per
line)
Sodium Bisulphite 2 Storage tank
Dosing units capacity: 200 l
(1 per
plant)
Sodium Bisulphite 2 Pump rated flow:
pump units 2 l/h
(1 per
plant)
High 4 Pump rated flow: Type: Centrifugal
Pressure pumps units 42 m3/h
(2 per
plant)
Reverse Osmosis 2 Permeate total Nº of stages: 2, System
racks Flow: 32 m3/h, Nº of pressure recovery: 76,2%
(1 per Bypassed flow: 2 vessels: 4x2
plant) m3/h
CIP TANK 2 nits Tank capacity: 2
(1 per m3
plant)
CIP 2 nits Ratedl Flow: 40
(1 per m3/h
plant)
Multimedia & 2 nits Cartridge
filtration 1st 2nd (1 per filtration
stag plant)
Ozone dosing 2 Required dose: 3
units mg/l
(1 per
plant)

From ro package 4” (1C0 line) and 6” are used for backwash water (SCH40S, Seamless, Steel Pipe ASTM
A312-TP316L To ASME B36.19M (Note 4&5))

Inlet water tank 198 m3 6m dia, 7 m


capacit height stainless
y steel
Water pump 2 qty, Shut off pressure Shaft poer 7kw NPSH 15.5m
50 5.1 barg
m3/hr

4”, 2” 1J0 are used for distribution to tank under building scope (PN 20 PPR (Polypropylene Random)

ID tank 44 m3 4x4x3(lxbxh) GRP


Hotel for Iraqi 20 3x3x3 GRP
Gym building 33 4x3x3 GRP
Canteen 100 6x6x3 GRP
Hotel for chineese 33 4x4x3 GRP



HVAC
1. 3 SUBSTATION TOTAL 6 SPLIT
SS1-18.1 kW
SS2 16.7 kW
SS3 19.2 kW
2. FOR CANTEEN 2 VENT SYSTEM REQUIRED, 90SQ M AND 2 ROOF TOP PACKAGE , AREA
RTEQUIRED 150 SQ.M (Chinese) 68.8 kw
3. GYM BUILDING AC ROOF TOP TYPE PACKAGE , AREA 200 sq.m is required at the roof
4. CHINESE HOTEL AC ROOF TOP PACKAGE, Area 300 sq.m is required at the roof
5. LOCAL DORMITORY AC ROOF TOP TYPE PACKAGE , AREA 200 sq.m is required at the roof
6. INTERNATIONAL DORMITORY.
7. AS PER 5.14 VRF COMBO
FIRE FIGHTING

Dining Hall Smoke Detectors, Heat Fire Hydrants outside the


Detectors and Manual building. (2 nos) FP concept 1
Alarm Call Points.
Fire Hose Reels and Wet
Gas Detectors at HVAC In Sprinklers within the building.
take
Water Mist fire Extinguishers
and Fire Blankets

50 kg Foam Type fire


extinguisher for cooking fuel

Portable fire extinguishers


within the building

Inert Gas system for


unmanned Telecom and
Control Room.
Gym Building Smoke Detectors, Heat Fire Hydrants outside the
Detectors and Manual building. (2 Nos FP concept 2)
Alarm Call Points.
Fire Hose Reels within the
Gas Detectors at HVAC In building.
takes.
Fire Blankets

Portable fire extinguishers


within the building

Inert Gas system for


Unmanned Telecom and
Control Room.
Hotel for Chinese Smoke Detectors, Heat Fire Hydrants outside the
and Reception Detectors and Manual building. (4 nos) FP 1
Alarm Call Points.
Fire Hose Reels within the
Gas Detectors at HVAC In building.
takes.
Portable fire extinguishers
within the building

Inert Gas system for


unmanned Telecom and
Control Room
Hotel for Iraqi Smoke Detectors, Heat Fire Hydrants outside the
and Reception Detectors and Manual building. (3 nos ) FP concept 1
Alarm Call Points.
Fire Hose Reels within the
Gas Detectors at HVAC In build-ing.
takes.
Fire Blankets

Portable fire extinguishers


within the building

Inert Gas system for


Unmanned Telecom and
Control Room.
Sewage Treatment Plant Fire Hydrants outside the
building. .(01 nos FP concept
4)

Fire Hose Reels within the


building.

Portable fire extinguishers sur-


rounding the equipment.
RO Plant Fire Hydrants outside the
building.(01 nos FP concept 4)

Fire Hose Reels within the


building.

Portable fire extinguishers


within the building
International dormitory FP3, 4 nos of Hydrants

SS1
Heat detectors 6
Siren 1
beacon 1
Smoke detector 1
Flame detector 4
Potable co2 3
Potable dry chemical 3
Potable foam extinguisher 1
Deluge valve 1

SS2
Heat detectors 4
Siren 1
beacon 1
Smoke detector 1
Flame detector 2
Potable co2 2
Potable dry chemical 2
Deluge valve 1

SS3
Heat detectors 4
Siren 1
beacon 1
Smoke detector 1
Flame detector 2
Potable co2 2
Potable dry chemical 2
Deluge valve 1