Padma Bridge Rail Link Project

ENGINEERING DOCUMENT REVIEW & COMMENT RESPONSE FORM

REVIEW REQUEST NO
Cover Letter No: Date:
23/07/2020
Follow-up Letter No: Date:
Drawing/Document
Title:
Drawing No:

Contractor is requested to respond to Comments identified below by:

No. Consultant’s Comments Resolution Status


Contractor’s Response R – Resolved
NR – Not resolved
Structural (Letter 5273)

1. Setting out locations of the building is not


shown in drawings.
2. It is expected to submit a topographical
plan showing the location of the building’s
and other structures.
3. The location and capacity of overhead
water tank was not shown in drawings.
4. The bearing capacity of the foundation soil
which has been assumed in the design
should be confirmed before commencing
the foundation works.
5. We have reviewed your structural analysis
and design calculation reports and
drawings carefully.
6. Pls, resubmit by incorporating overhead
water tank location, analysis and drawings.

Structural (Letter 5274)

7. Setting out locations of the building is not


shown in drawings.
8. It is expected to submit a topographical
plan showing the location of the building’s
and other structures.
9. The location and capacity of overhead
water tank was not shown in drawings.
10. The bearing capacity of the foundation soil
which has been assumed in the design
should be confirmed before commencing

Page 1 of 2
the foundation works.
11. We have reviewed your structural analysis
and design calculation reports and
drawings carefully.
12. Pls, resubmit by incorporating overhead
water tank location, analysis and drawings

Structural (Letter 5275)

13. Setting out locations of the building is not


shown in drawings.
14. It is expected to submit a topographical
plan showing the location of the building’s
and other structures.
15. The location and capacity of overhead
water tank was not shown in drawings.
16. The bearing capacity of the foundation soil
which has been assumed in the design
should be confirmed before commencing
the foundation works.
17. We have reviewed your structural analysis
and design calculation reports and
drawings carefully.
18. Pls, resubmit by incorporating overhead
water tank location, analysis and drawings
Structural (Letter 5276)

19. Setting out locations of the building is not


shown in drawings.
20. It is expected to submit a topographical
plan showing the location of the building’s
and other structures.
21. The location and capacity of overhead
water tank was not shown in drawings.
22. The bearing capacity of the foundation soil
which has been assumed in the design
should be confirmed before commencing
the foundation works.
23. We have reviewed your structural analysis
and design calculation reports and
drawings carefully.
24. Pls, resubmit by incorporating overhead
water tank location, analysis and drawings

Page 2 of 2