Sei sulla pagina 1di 3

Name of the structures CREC submission No. & date CSC Reply No.

CSC Reply No. CREC's Response CSC's Reply Remarks

1 Type-1 Station Building 2348; 12 Oct'19 2084; 12 Jan'2020 4983; 17 May'20 Overhead
2768; 17 Nov'19 2284; 06 Feb'2020 Elec Station Building Bhanga Jn.
(Archi)
2 Type-2 Station Building 3186; 19 Dec'19 2250; 04 Feb'2020 4518; 23 Mar'2020 2585; 25 Mar'2020
3959; 09 Feb'2020 Struc 2285; 06 Feb'2020 Elec Arch (12 station) (4519-struc.)
Mawa,Zajira,Shibchar 2418; 8 Mar'2020 Struc 4519; 23 Mar'2020 Struc 2680; 21 April'2020
(3 st.-Mawa,Janjira,Shibchar) (4521-Elec.)
4520; 23 Mar'2020 Plum 2768; 5 May'2020
(12 station) (4842-Arch)
4521; 23 Mar'2020 Elec 2769; 5 May'202
(12 station) (4772-Plumbing)
4842; 29 Apr'2020 Arch
(12 station)
4772; 29 Apr'2020 Plumbing
(12 station)

3 Type-3 Station Building 2490; 12 Oct'19 Gandaria 1452; 15 Oct'19


Arch,Struc,MEP
2794; 20 Nov'2019 Calc TL cancelled the reply
report of 16 st. b.
4 CTC Building
5 Reconstruction of RNB Barrack in Dhaka
6 Level crossing gate lodge
a. Gate Lodge for Out station Level Crossing 3925; 06 Feb'2020 Arch 2370; 27 Feb'2020 4732; 29 Apr'2020
(Arch,Struc,MEP)
b. Gate Lodge for In station Level Crossing 3924; 06 Feb'2020 Arch 2369; 27 Feb'2020 4771; 29 Apr'2020
(Arch,struc,MEP)
7 Type I Signal equipment room
8 Type I Signal equipment room 3923; 9 Feb'2020 Arch 2406; 5 Mar'2020 4888; 10 May'20
Bhanga Jn,Singia (Arch,struc, MEP)
9 Type I Signaling Workshop
10 Signaling maintenance office/strorage
11 Generator room for signaling system 1399; 11 June'19 1547; 22 Oct'2019
12 Room for electrical substation 3922; 6 Feb'2019 Arch 19 2330; 13 Feb'2020 Elec
Stations 2375; 27 Feb'2020 Arch
13 Pumping house and R.W & C.W tanks 2491; 16 Oct'2019 2178; 23 Jan'2020
2303; 10 February'2020
Plumbing

14 Overhead Water Tank (27000 gallon) 1845; 22 Aug'19 1586; 03 Nov'2019 4004; 18 Feb'2020 A,S Shop 2367; 27 Feb'2020
Reminder Drawing & Struc. Calc. Report Arch,Struc Bhanga Jn.
2227; 30 Jan'2020

15 Shed for track maintenance machine (Type 1)


16 Shed for track maintenance machine (Type 2)
17 Residence for Station Master 3663; 27 Jan'2020 Arch 2372; 27 Feb'2020 4183; 4 Mar'2020 A,S,P,E
Bhanga Jn.
18 Residence for all SSAE/SAE/TM/TXR/TIC/TIT & 3664; 27 Jan'2020 Arch 2374; 27 Feb'2020 4927; 10 May'2020
other 10th grade officials Bhanga Jn. (Arch,struc,MEP)
19 Residence for Staff Quarters (Class I)
Name of the structures CREC submission No. & date CSC Reply No. CREC's Response CSC's Reply Remarks

20 Residence for Staff Quarters (Class II) 3665; 27 Jan'2020 Arch 2373; 27 Feb'2020 4184; 4 Mar'2020 A,S,P,E
Bhanga Jn.
21 Residence for Staff Quarters (Class III)
22 Rest House
a. For Narail 3619; 23 Jan'2020 Arch
4185, 4 Mar'2020 A,S,P,E
b. For Bhanga Jn. 3619; 23 Jan'2020 Arch
4186; 4 Mar'2020 A,S,P,E
23 Dormitory Type-1 (for Class I officers) 3398; 12 Jan'2020 2219; 28 Jan'2020 4089; 23 Feb'2020 (2 Staff) 2496; 18 Mar'20 4756; 5 May'20 (4 staff)
2327; 13 Feb'2020 Arch,Struc,MEP (4089-2 staff) (Arch,struc,MEP)
(Superssesion to 2219) 4187; 4 Mar'2020 (4 staff) 2567; 24 Mar'20
A,S,P,E (4187-4 staff)

24 Dormitory Type-2 (for Class II officers) 3398; 12 Jan'2020 2219; 28 Jan'2020 4737; 30 Apr'20 (4 staff)
2327; 13 Feb'2020 (Arch,struc, MEP)
(Superssesion to 2219) 4858; 30 Apr'20 (8 staff)
(Arch,Struc, MEP)

25 Dormitory Type-3 (for Class III officers) 3398; 12 Jan'2020 2219; 28 Jan'2020 4090; 23 Feb'2020 (6 Staff) 2495; 18 Mar'20 4765; 5 May'20 (6 staff)
2327; 13 Feb'2020 Arch,Struc,MEP (4090-6 staff) (Arch,Struc,MEP)
(Superssesion to 2219) 4188; 4 Mar'2020 (18 staff) 2911; 4 June'20
A,S,P,E (4859-4 staff)
4859; 30 Apr'20 (4 staff)
(Arch,Struc, MEP)
4860; 30 Apr'20 (12 staff)
Nimtola (Arch,struc,MEP)
5066; 3 June'20
(Supersession of Plumbing
-4860)
4861; 30 Apr'20 (12 staff)
(Arch,struc,MEP)
5065; 3 June'20 (12 staff)
(Supersession of Plumbing
-4861)

26 Dormitory Type-4 (for Class IV officers) 3398; 12 Jan'2020 2219; 28 Jan'2020 4091; 23 Feb'2020 (12 Staff) 2498; 19 Mar'20 4880; 5 May'20 (12 staff) 2908; 4 June'20
2327; 13 Feb'2020 Arch,Struc,MEP (4091-12 staff) Arch,Struc,MEP (4879-6 staff)
(Superssesion to 2219) 4093; 23 Feb'2020 (6 Staff) 2497; 19 Mar'20 4879; 5 May'20 (6 staff)
Arch,Struc,MEP (4093-6 staff) Arch,Struc,MEP
4092; 3 Mar'2020 (24 staff)
A,S,E,P

27 Barrack (for 2*12 staff) 3618; 23 Jan;2020 Arch


Bhanga Jn.
4189; 4 Mar'2020 A,S,P,E
Name of the structures CREC submission No. & date CSC Reply No. CREC's Response CSC's Reply Remarks

28 Gang Hut 3398; 12 Jan'2020 2219; 28 Jan'2020 4096; 3 Mar'2020 (15 Staff) 2568; 24 Mar'20
2327; 13 Feb'2020 A,S,E,P (4094-20 staff)
(Superssesion to 2219) 4095; 3 Mar'2020 (10 staff) 2837; 20 May'20
A,S,E,P (4095-Gang Hut 10staff)
4094; 3 Mar'2020 (20 staff)
A,S,E,P

29 SAE/SSAE's Way/Works office 3756; 4 Feb'2020 SSAE-Arch 2407; 05 Mar'2020 4190; 4 Mar'2020 SSAE A,S,P,E
Nimtola, Bhanga Jn,Narail
Guard Post of SSAE Way/Works Office 1406; 11 June'2019 Struc 1546; 22 Oct'2019 Struc 4191; 4 Mar'2020 A,S,P,E 1078 (Apprvd.)
1422; 11 June'2019 Elec 1078; 21 July'2019 Elec
3756; 04 Feb'2020 Arch 2407; 5 Mar'2020
Nimtola,Bhanga Jn,Narail

Godown of SSAE/Works 3756; 04 Feb'2020 Arch 2407; 5 Mar'2020 4192; 4 Mar'2020 A,S,P,E
Nimtola,Bhanga Jn, Narail
30 Office of 9th & 10th grade Officers 3662; 04 Feb'2020 Arch 2400; 3 Mar'2020 4415; 10 Mar'2020 Arch
Nimtola,Narail 4928; 10 May'2020
(Arch,struc,MEP)

31 DEN/AEN Office 3754; 4 Feb'2020 Arch 2401; 3 Mar'2020 4929; 10 May'20


Bhanga Jn. (Arch,Struc,MEP)
32 SSAE (Signal) & Telecom Office
33 Residence for Class 1 Officer 3620; 23 Jan'2020 Arch
Bhanga Jn.
4193; 4 Mar'2020 A,S,P,E

34 Construction of 6 storied office building at Dhaka


having foundation of 12 storied
Boundary wall/Fence
a. Boundary Wall to Station Building 1846; 20 Aug'2019 Arch,Struc

b. Boundary fence (2m high) 1943; 20 Aug'2019 Struc


c. Boundary Fence on the top of Retaining Wall 1944; 20 Aug'2019 Struc
(1.35m high)
35 Master Layout Plan of 4 Stations 3976; 06 Feb'2020 4875; 3 May'20 Janjira 2791; 11 May'20
Mawa;Janjira, Shibchar, 4920; 10 May'20 Maheshpur (4875-Janjira)
Bhanga Jn. 4921; 10 May'20 Jamdia 2828; 18 May'20
4922; 10 May'20 Bhanga Jn. (4891-Sreenagar)
4890; 10 May'20 Nimtola 2840; 20 May'20
4891; 10 May'20 Sreenagar (4921-Jamdia)
4917; 11 May'20 Lohagora 2839; 20 May'20
4918; 11 May'20 Nagarkanda (4919-Muksudpur)
4919; 13 May'20 Muksudpur 2838; 20 May'20
(4920; Maheshpur)
2836; 20 May'20
(4890 - Nimtola)

36 Platform
37

Potrebbero piacerti anche