Sei sulla pagina 1di 1

SUMMARY

INSPECTION REPORT
IN THE IMPLEMENTATION OF DEPARTMENT ORDER NO. 41 SERIES OF 2016 (D.O. No.41 s.2016)
Date Verified: June 7, 14, 21 & 28, 2019
Date of Inspection: June 3, 10, 17 & 24, 2019
REGION: I DISTRICT: Ilocos Norte 2nd District Engineering Office

Code/Defects/Deficiencies & Estimated Quantity


Length Per Pavement Type 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 Others
Total No/Faded Road Markings
Length Defects Alligat Pumping
Road Section or Major
Shoving &
and 06-E 06-C 06-Y 06-P Low/Inverted Open
No/Inadequate/ Unmaintaine Unmaintai
Verified Potholes
Crack Scalling
Corrugatio
Depressio Shoulder
Lush Vegetation Clogged Drains
Manhole
Excess Sealant Cracks Ravelling d Traffic ned slides
n Pedestrian on Joint Signange Bridges
s n
Concrete Asphalt Gravel Edgeline Centerline Yellowline
Crossing

(sq.m.) (sq.m.) (sq.m.) (sq.m.) (sq.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (Sq.m.) (no.) (No.) (cu.m.)
Km. 18.596 Km. 21.847 Km. Per Insp.
Manila North Road
Area 124.593 Sq.M. 146.3749 Sq.M. Accomp.

Km. 22.235 Km. Per Insp. 0.4 27.45 3,174 369 80 1,170 13,260 600 2693.3 384.5 7 5
Pinili-Nueva Era Road
Area 137.857 Sq.M. Accomp. 0.4 27.45 3,174 369 80 1,170 13,260 600 2693.3 384.5 7 5

Pias-Currimao-Paoay-Balacad Km. 14.883 Km. 4.912 Km. Per Insp. 0.16 600 198 100 40 580 10,390 550 2576.2 160 150 7 2
Road Area 99.716 Sq.M. 32.910 Sq.M. Accomp. 0.16 600 198 100 40 580 10,390 550 2576.2 160 150 7 2

Km. 33.614 Km. 8.893 Km. Per Insp. 42.24 11.4 4,150 322 400 2,220 4,480 610 1 1771 169 30 16 1
Ilocos Norte-Apayao Road
Area 225.214 Sq.M. 59.583 Sq.M. Accomp. 42.24 11.4 4,150 322 400 2,220 4,480 610 1 1771 169 30 16 1

Km. 18.359 Km. 0.503 Km. Per Insp. 0.43 600 571 150 110 7,505 450 2687.8 623 1 2
Batac-Banna Road
Area 123.005 Sq.M. 3.370 Sq.M. Accomp. 0.43 600 571 150 110 7,505 450 2687.8 623 1 2

Km. 40.905 Km. 0.502 Km. Per Insp. 1.41 6,080 432 200 40 100 14,205 100 1,254 216 1
Ilocos Norte-Abra Road
Area 274.064 Sq.M. 3.363 Sq.M. Accomp. 1.41 6,080 432 200 40 100 14,205 100 1,254 216 1

Km. 7.146 Km. Per Insp. 0.7 600 165 120 1,600 100 629.9 221
Dingras-Marcos Old Road
Area 47.878 Sq.M. Accomp. 0.7 600 165 120 1,600 100 629.9 221

Km. 1.601 Km. 6.754 Km. Per Insp. 0.12 35 160 7,215 300 14
MNR Jct. Baay-Suba Road
Area 10.727 Sq.M. 41.199 Sq.M. Accomp. 0.12 35 160 7,215 300 14

Laoag-Sarrat-Piddig-Solsona Km. 5.014 Km. 0.918 Km. Per Insp. 2.02 30 1,705 937 4
Road Area 33.594 Sq.M. 6.151 Sq.M. Accomp. 2.02 30 1,705 937 4

Km. 17.960 Km. 1 Km. Per Insp. 0.52 100 40 1,140 4,175 10 1 2,814 686 2
Batac-Pinili Road
Area 120.332 Sq.M. Accomp. 0.52 100 40 1,140 4,175 10 1 2,814 686 2

Km. 6.278 Km. Per Insp. 2,100 201 4,000 60 2113.9 162
Banna-Pinili Road
Area 42.063 Sq.M. Accomp. 2,100 201 4,000 60 2113.9 162

Km. 0.37 Km. Per Insp. 820 117.1


Gaang Wharf Road
Area 2.479 Sq.M. Accomp. 820 117.1

Km. 3,738 km. Per Insp. 2,502 900 2,560 146.85


Paoay-Batac Road
Area 22,428 Sq.M. Accomp. 2,502 900 2,560 146.85

Per Insp. 48.00 35 - 11.40 27.45 19,936 3,158 970 200 5,480 71,915 2,780 2 16,657 3,717.75 180 32 16 -
T O T A L
Accomp. 48.00 35 - 11.40 27.45 19,936 3,158 970 200 5,480 71,915 2,780 2 16,657 3,717.75 180 32 16 -

Prepared by: Submitted by:

SHERELL S. PE BENITO MATHIAS L. MALENAB


CHIEF, MAINTENANCE SECTION DISTRICT ENGINEER