ALTERNATIVE SOURCE FOR GAS SUPPLY TO INDORAMA PROJECT

CAUSE & EFFECT MATRIX

Approved for
EX-DE 02 14/8/2017 K.A.D E.B A.I SYL
Construction

EX-DE 01 21/7/2017 Issued for Approval K.A.D E.B A.I SYL

EX-DE 00 6/7/2017 Issued for Review K.A.D E.B A.I SYL

Validation Prepared Checked Approved Contractor Company


Rev. Date Description
Status by by by Approval Approval

Company logo and business name Project name Company identification

ALTERNATIVE SOURCE
FOR GAS SUPPLY TO 3202.31.DIEQ.24016
INDORAMA PROJECT

Contractor logo and business name Contractor Number


05048M-CTE-MOR-08-CEM-000001

Vendor logo and business name Vendor Identification

Facility Name Location Scale Sheet of Sheets

OBIAFU / OBRIKOM GAS PLANT LAND n.a. 1 OF 4


Document Title Supersedes N.
Superseded by N.
Cause and Effect Matrix Plant Area Plant Unit

Projects Development, Engineering Division


This document is CONFIDENTIAL and the sole property of the Company. It shall neither be shown to third parties nor used for other purposes than those for which it has been issued/sent. Any unauthorized attempt to
reproduce it, in any form, is strictly prohibited.
Company Identification Contractor Identification Rev. index. Rev. No. Sheet of Sheets
Validity Status
3202.31.DIEQ.24016 02 2 OF 4
EX-DE
Projects Development, Engineering Division

REVISION RECORD

02 14-Aug-17 Approved for Construction Third Issue


01 21-Jul-17 Issued for Approval Second Issue
00 6-Jul-17 Issued for Review First Issue
Rev. Date Reason for Revision Short Description of Changes

This document is CONFIDENTIAL and the sole property of the Company. It shall neither be shown to third parties nor used for other purposes than those for which it has been issued/sent. Any
unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Date Doc. No. Page

14/8/2017 3202.31.DIEQ.24016 3 of 4

Cause and Effect


INDEX
SHEET REVISION DESCRIPTION
1 00 01 02 Cover Sheet
2 00 01 02 Revision Sheet
3 00 01 02 Index
4 00 01 02 Chart

Notes:

This document is property of eni Turkmenistan Ltd. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
CAUSE & EFFECTS MATRIX NOTES

Rev.

02

02

02

02

02

02
NIGERIAN AGIP OIL COMPANY PLC 1. Emergency Shutdown Valve ESDV-101 / ESDV-102 to be in open position at normal conditions. ESDV-101 / ESDV-102

Note

4
DETAILED ENGINEERING DESIGN FOR ALTERNATIVE SOURCE FOR GAS SUPPLY TO should close when there is a TRIP signal from PSHH-101A & B / PSHH-102A & B, respectively, based on a voting logic of

3202.31.DPFM.11527

3202.31.DPFM.11527

3202.31.DPFM.11527

3202.31.DPFM.11527
INDORAMA PROJECT 1oo2.
2. Pressure Switches 101A/101B and 102A/102B are mechanical type initiators/sensing devices with no external power

P&ID No
supply.
3. Alarm Indicators on the Operator Human Machine Interface (HMI) indicating when the Valve is open or close (The
Operator does not interfere with the operation of the HIPPS system except on Startup ).
4. The gas sensors has two-stage intervention (PRE-ALARM and ALARM). The Lower Explosivity Limit to be considered shall
be that of the most critic gas.

(PRE ALARM) 20% of the Lower Explosivity Limit (L.E.L)


20193.VAR.SAF.SDS Selection of Sensors and Gas and Fire Detection Criteria

(ALARM) 50% of the Lower Explosivity Limit (L.E.L)


11586.CMP.STA.STD Explosive Atmosphere Detectors

Emergency shutdown valve 1 - Open/Close

Emergency shutdown valve 2 - Open/Close


EFFECT

Emergency shutdown valve 1

Emergency shutdown valve 2


Description

ALARM

ALARM

ALARM

ALARM
Action.

Close

Close
ESDV-101

ESDV-102
Tag No.
CAUSE
Timer
Instrument Tag SIL Set
Rev. P&ID No. Instrument Description Deviation Type Note
Number Value Point
min

02 3202.31.DPFM.11527 Pressure switch high high on Gas line PSHH-101A N/A 3 Pneu 85 Bar g N/A 2 X
02 3202.31.DPFM.11527 Pressure switch high high on Gas line PSHH-101B N/A 3 Pneu 85 Bar g N/A 2 X
02 3202.31.DPFM.11527 Pressure switch high high on Gas line PSHH-102A N/A 3 Pneu 85 Bar g N/A 2 X
02 3202.31.DPFM.11527 Pressure switch high high on Gas line PSHH-102B N/A 3 Pneu 85 Bar g N/A 2 X
02 3202.31.DPFM.11527 Limit switch high on ESDV 101 closure ZSH-101 ZAH - HARD N/A N/A - X
02 3202.31.DPFM.11527 Limit switch low on ESDV 101 open ZSL-101 ZAL - HARD N/A N/A - X
02 3202.31.DPFM.11527 Limit switch high on ESDV 102 closure ZSH-102 ZAH - HARD N/A N/A - X
02 3202.31.DPFM.11527 Limit switch low on ESDV 102 open ZSL-102 ZAL - HARD N/A N/A - X
20% LEL - HARD N/A N/A - X
02 3202.31.DPFM.11527 Gas Detection GDIR-030A
50% LEL - HARD N/A N/A X
20% LEL - HARD N/A N/A - X
02 3202.31.DPFM.11527 Gas Detection GDIR-030B
50% LEL - HARD N/A N/A X
CONTRACTOR NUMBER
SHEET REV

05048M-CTE-MOR-08-CEM-000001 4 OF 4 02