ALTERNATIVE SOURCE FOR GAS SUPPLY TO INDORAMA PROJECT

INSTRUMENT CABLE SCHEDULE

Approved for
EX-DE 02 8/8/2017 K.A.D E.B I.A SYL
Construction

EX-DE 01 19/7/2017 Issued for Approval K.A.D E.B I.A SYL

EX-DE 00 12/6/2017 Issued for Review K.A.D E.B I.A SYL

Validation Prepared Checked Approved Contractor Company


Rev. Date Description
Status by by by Approval Approval

Company logo and business name Project name Company identification

ALTERNATIVE SOURCE
FOR GAS SUPPLY TO 3202.31.DIES.24015
INDORAMA PROJECT

Contractor logo and business name Contractor Number


05048M-CTE-MOR-08-SCH-000001

Vendor logo and business name Vendor Identification

Facility Name Location Scale Sheet of Sheets

OBIAFU / OBRIKOM GAS PLANT LAND n.a. 1 OF 6


Document Title Supersedes N.
Superseded by N.
Instrument Cable Schedule Plant Area Plant Unit

Projects Development, Engineering Division


This document is CONFIDENTIAL and the sole property of the Company. It shall neither be shown to third parties nor used for other purposes than those for which it has been issued/sent. Any unauthorized attempt to
reproduce it, in any form, is strictly prohibited.
Company Identification Contractor Identification Rev. index. Rev. No. Sheet of Sheets
Validity Status
3202.31.DIES.24015 02 2 OF 6
EX-DE
Projects Development, Engineering Division

REVISION RECORD

02 8-Aug-17 Approved for Construction Third Issue


01 19-Jul-17 Issued for Approval Second Issue
00 12-Jun-17 Issued for Review First Issue
Rev. Date Reason for Revision Short Description of Changes

This document is CONFIDENTIAL and the sole property of the Company. It shall neither be shown to third parties nor used for other purposes than those for which it has been issued/sent. Any
unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Date Doc. No. Page

8/8/2017 3202.31.DIES.24015 3 of 6

Instrument Cable Schedule


INDEX
SHEET REVISION DESCRIPTION
1 00 01 02 Cover Sheet
2 00 01 02 Revision Sheet
3 00 01 02 Index
4 00 01 02 General Notes
5 00 01 02 Instrument Cable Schedule (SECONDARY)
6 00 01 02 Instrument Cable Schedule (PRIMARY)

Notes:

This document is CONFIDENTIAL and the sole property of the Company. It shall neither be shown to third parties nor used for other purposes than those for which it has been issued/sent.
Date Doc. No. Page

8/8/2017 3202.31.DIES.24015 4 of 6

GENERAL NOTES:
1. ALL INSTRUMENTS SHALL COMPLY WITH THE FOLLOWING MINIMUM SPECIFICATIONS. ANY DEVIATIONS FROM THESE STANDARDS
SHALL BE CLEARLY IDENTIFIED IN THE VENDOR'S QUOTATION:
3202.31.DIST.24070 TECHNICAL SPECIFICATION FOR PRESSURE INSTRUMENTS
3202.31.DISG.24061 GENERAL SPECIFICATION FOR INSTRUMENT INSTALLATION
20047.VAR.STA.SDS REQUIREMENTS FOR THE INSTALLATION OF INSTRUMENTATION
20048.VAR.STA.SDS INSTRUMENTATION AND AUTOMATION SYSTEM
08953 CMP.STA.STD SIGNAL TRANSDUCERS
15801.PIP.MEC.SDS MANUAL VALVES
06732.PIP.MEC.SDS PIPING CLASSES

2. ALL INSTRUMENTS SHALL BE TROPICALISED.


3. FOR ALL INSTRUMENTS, TAG Nos. SHALL BE PREFIXED WITH THE UNIT No. (e.g. 2570 -SDV-102).
ALL TAG NUMBERS SHALL BE IDENTIFIED AND CONFIRMED BEFORE MANUFACTURING.
4. ALL INSTRUMENTS AND DEVICES SHALL BE SUPPLIED WITH STAINLESS STEEL DATA PLATES WHICH SHALL BE AFFIXED TO THE
BODY OF THE DEVICE BY RIVETS OR SCREWS. THE PLATE SHALL CONTAIN AS A MINIMUM THE FOLLOWING INFORMATION: -
TAG NUMBER.
MANUFACTURER'S NAME AND CONTACT DETAILS
SERIAL & MODEL NUMBER
RANGE & CALIBRATION DETAILS
HAZARDOUS CERTIFICATION DETAILS
DEGREE OF PROTECTION

5. PAINTING AND COATING SHALL BE IN ACCORDANCE WITH COMPANY STANDARD 20000.VAR.PAI.FUN.

6. CONTRACTOR TO VERIFY ALL PROCESS DATA BEFORE SUPPLY OF INSTRUMENTS.


7. VENDOR SHALL PROVIDE MATERIAL TEST REPORT FOR ALL PRESSURE RETAINING PARTS, AS REQUIRED BY EN 10204 -3.1.B.
8. ABBREVIATIONS:
MFR - MANUFACTURER
N/A - NOT APPLICABLE
TBA - TO BE ADVISED
TBC - TO BE CONFIRMED
VTA - VENDOR TO ADVISE
TP - TIE-IN POINT
L - LOCAL

Eni S.p.A
ALTERNATIVE
SOURCE FOR
GAS SUPPLY TO
INDORAMA 3202.31.DIG
PROJECT A.24468

LAND

This document is CONFIDENTIAL and the sole property of the Company. It shall neither be shown to third parties nor used for other purposes than
those for which it has been issued/sent.
INSTRUMENT CABLE SCHEDULE

ALTERNATIVE SOURCE FOR GAS SUPPLY TO INDORAMA PROJECT


UNIT : 2570 UNIT DESCRIPTION : SALES GAS DELIVERY MANIFOLD

Document Type: SCH Discipline: INS Rev Date: 8-Aug-17


Page 5 of 6

TO JB TERMINATION CONTROL SYSTEM DETAILS


FROM

TYPE OF CABLE DESCRIPTION/ BRANCH CABLE INSULATION CABLE LENGTH


S.N Rev No. INST. CABLE ID DESCRIPTION PCS/PSS/F&G VOLTS/AMPS CABLE / WIRE ARMOUR OD (mm) GLAND SIZE REMARKS
SIGNAL SERVICE SIZE VOLTAGE RATING (m) TERMINAL CONTROL SYSTEM
INSTRUMENT LOCATION. JB LOCATION TERMINAL NO TB NO TERMINAL NO
STRIP CABINET

Loop powered from


1 02 CZSL/ZSH - 101 / JB-002 ZSL/ZSH - 101 L JB-002 L Limit Switches PSS/PCS DI Instrument cable 24VDC 2P x 1.5mm² 02IP15EGFA /G 300 / 500 22 [NOTE 1] 11.5 M20 TS-1 1,2, S and 3,4,S [NOTE 2] [NOTE 2] [NOTE 2]
Marshalling Cabinet
Loop powered from
2 02 CZSL/ZSH - 102 / JB-002 ZSL/ZSH - 102 L JB-002 L Limit Switches PSS/PCS DI Instrument cable 24VDC 2P x 1.5mm² 02IP15EGFA /G 300 / 500 22 [NOTE 1] 11.5 M20 TS-1 5,6, S and 7,8,S [NOTE 2] [NOTE 2] [NOTE 2]
Marshalling Cabinet

Loop powered from


3 02 CPT - 002A / JB-001 PT - 002A L JB-001 L Pressure Transmitter PSS/PCS AI Instrument cable 4-20mA 1P x 1.5mm² 01IP15EGFA /G 300 / 500 24 [NOTE 1] 10.5 M20 TS-2 1, 2, S [NOTE 2] [NOTE 2] [NOTE 2]
Marshalling Cabinet

Loop powered from


4 02 CPT - 002B / JB-001 PT - 002B L JB-001 L Pressure Transmitter PSS/PCS AI Instrument cable 4-20mA 1P x 1.5mm² 01IP15EGFA /G 300 / 500 24 [NOTE 1] 10.5 M20 TS-2 3, 4, S [NOTE 2] [NOTE 2] [NOTE 2]
Marshalling Cabinet

Loop powered from


5 02 CPT - 101 / JB-001 PT - 101 L JB-001 L Pressure Transmitter PSS/PCS AI Instrument cable 4-20mA 1P x 1.5mm² 01IP15EGFA /G 300 / 500 30 [NOTE 1] 10.5 M20 TS-2 7, 8, S [NOTE 2] [NOTE 2] [NOTE 2]
Marshalling Cabinet

Loop powered from


6 02 CTT - 101 / JB-001 TT - 101 L JB-001 L Temperature Transmitter PSS/PCS AI Instrument cable 4-20mA 1P x 1.5mm² 01IP15EGFA /G 300 / 500 24 [NOTE 1] 10.5 M20 TS-2 5, 6, S [NOTE 2] [NOTE 2] [NOTE 2]
Marshalling Cabinet

Loop powered from


7 02 CPY - 002A / JB-001 PY - 002A L JB-001 L I/P Converter PSS/PCS AO Instrument cable 4-20mA 1P x 1.5mm² 01IP15EGFA /G 300 / 500 20 [NOTE 1] 10.5 M20 TS-3 1, 2, S [NOTE 2] [NOTE 2] [NOTE 2]
Marshalling Cabinet

Loop powered from


8 02 CPY - 002B / JB-001 PY - 002B L JB-001 L I/P Converter PSS/PCS AO Instrument cable 4-20mA 1P x 1.5mm² 01IP15EGFA /G 300 / 500 20 [NOTE 1] 10.5 M20 TS-3 3, 4, S [NOTE 2] [NOTE 2] [NOTE 2]
Marshalling Cabinet

Loop powered from F&G


9 02 CGDIR - 030A / JB-003 GDIR - 030A L JB-003 L Infra-Red Gas Detector F&G AI Instrument cable 4-20mA 1T x 1.5mm² 01IT15EGFA FR /O 300 / 500 24 [NOTE 1] 12.7 M20 TS-4 1, 2, 3, S [NOTE 2] [NOTE 2] [NOTE 2]
Cabinet

Loop powered from F&G


10 02 CGDIR - 030B / JB-003 GDIR - 030B L JB-003 L Infra-Red Gas Detector F&G AI Instrument cable 4-20mA 1T x 1.5mm² 01IT15EGFA FR /O 300 / 500 24 [NOTE 1] 12.7 M20 TS-4 4, 5, 6, S [NOTE 2] [NOTE 2] [NOTE 2]
Cabinet

NOTE 1 : This is an estimated length based on the document (Plot plan/Site layout); the length is between the proposed location of each instrument and the JB

NOTE 2 : Construction contractor to complete and verify the ternimation point on the marshalling (field determined) as well as cable length for the multipair cables
INSTRUMENT CABLE SCHEDULE-

ALTERNATIVE SOURCE FOR GAS SUPPLY TO INDORAMA PROJECT


UNIT : 2570 UNIT DESCRIPTION : SALES GAS DELIVERY MANIFOLD

Document Type: SCH Discipline: INS Rev Date: 8-Aug-17


Page 6 of 6

TO MR TERMINATION CONTROL SYSTEM DETAILS


FROM
CABLE INSULATION CABLE
S.N Terminal Strip Rev No. INST. CABLE ID DESCRIPTION PCS/PSS/F&G TYPE OF VOLTS/AMPS BRANCH CABLE GLAND REMARKS
DESCRIPTION/ CABLE / WIRE VOLTAGE LENGTH ARMOUR OD (mm)
SIGNAL SIZE SIZE TERMINAL CONTROL SYSTEM
INSTRUMENT LOCATION. MARSHALLING LOCATION SERVICE RATING (m) TERMINAL NO TB NO
STRIP PANEL NO

1 02 L Junction box cable PSS/PCS DI Instrument cable 24VDC 6P x 1.5mm² 06IP15EIFA /G 300 / 500 [NOTE 2] 25.5 M32 [NOTE 2] [NOTE 2] [NOTE 2] [NOTE 2]
TS-1 CJB-002 / XXX-XXX JB-002 [NOTE 2] CONTROL ROOM
2 TS-2 / TS-3 02 JB-001 L [NOTE 2] CONTROL ROOM Junction box cable PSS/PCS AI / AO Instrument cable 4-20mA 12P x 1.5mm² 12IP15EIFA /G 300 / 500 [NOTE 2] 28 M40 [NOTE 2] [NOTE 2] [NOTE 2] [NOTE 2]
CJB-001 / XXX-XXX
3 TS-4 02 JB-003 L [NOTE 2] CONTROL ROOM Junction box cable F&G AI Instrument cable 4-20mA 4T x 1.5mm² 04IT15EIFA FR /O 300 / 500 [NOTE 2] 28 M32 [NOTE 2] [NOTE 2] [NOTE 2] [NOTE 2]