Purpose:
Client:
Contractor:
KPC027-ITP-KPS1-37-01 Page 1 of 4
Document Title: Inspection & Test Plan Document No.: KPC027-ITP-KPS1-37-01
Project Title: Provision of Electrical & Instrument Rectification Services Project No: KPC1901-0000-PRC-TP-027
Defect Data:
Defect Area Defect Description Equipment Tag No. Equipment Recommendations for repair works
ID no
E398 KPS1 Trip and alarm signals KPS1-PWE-DTT-005 Power Transformer The signals must be sent individually. Annunciators must be
of Buchholz, winding installed in related cubicles.
temperature and
pressure relief valve
are merged and sent as
a trip signal to the
circuit breaker.
# Equipment Inspection/ Test Item to be Reference Accepting Criteria / Inspection Parties/ Status
/Device verified Documents Procedure / Document
Uni-Tech KPC
/System to be
inspected
1 The opened Visual inspection of the Method - During opening hole, Status: Status:
square hole installation statement the panel door not is
quality (Attachment #1) not damaged Name: Name:
- The sharp edges
removed. Date: Date:
- The cut edges painted
well Signature: Signature:
Project Title: Provision of Electrical & Instrument Rectification Services Project No: KPC1901-0000-PRC-TP-027
3 Installation of Visual inspection of the Method - The installed auxiliary Status: Status:
auxiliary relays at installation statement relays without any
the switchgear (Attachment #1) physical damage Name: Name:
cubicle
Date: Date:
Signature: Signature:
4 Wiring, Visual wiring, termination, Method - The wires inside Status: Status:
termination, and and labelling statement cubicle are arranged
labelling correctly and they are Name: Name:
(Attachment #1) without damage
- The bootlaces crimped Date: Date:
strongly and pass the
pull check Signature: Signature:
- Labels installed
according to schematic
drawing and they are
in good condition
5 Cold loop-check Continuity and connection Method - Pass the cold loop- Status: Status:
test test statement check for modified
connection as Name: Name:
(Attachment #1) mentioned in related
MST Date: Date:
- Pass the cold loop-
check for the Signature: Signature:
transformer to
switchgear cubicle
connection as
mentioned in related
MST
Project Title: Provision of Electrical & Instrument Rectification Services Project No: KPC1901-0000-PRC-TP-027
6 Hot loop-check Simulation of alarm and trip Method - Pass the hot loop- Status: Status:
and signals statement check for transformer
commissioning alarm and trip signals Name: Name:
(Attachment #1) by stimulation of
signals and checking Date: Date:
reflection of signal
effect on annunciator Signature: Signature:
and protection device
Abbreviation:
W = Witness Point; H = Hold Point; H(A) = Inspection/Test by Authority; U(C) = Inspection/Test by Consultant; S = Surveillance or monitoring; X = Self inspection by
performer of work, A = Approved
Attachments:
1- Method Statement
Name: Name:
Position: Position:
Date: Date: