Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
A. DEFINITION
The metric is a measure of how quickly inventory is flowing through the storeroom
inventory system.
B. OBJECTIVES
This metric is used to measure the appropriateness of storeroom inventory levels.
C. FORMULA
Stores Inventory Turns =
Value of stock purchased ÷ Value of stock on hand
The unit of measure is inventory turns per unit of time.
D. COMPONENT DEFINITIONS
Value of Stock on Hand
The current value of the stock in inventory.
E. QUALIFICATIONS
1. Time Basis: Monthly
2. To be used by storeroom, purchasing and finance management.
F. SAMPLE CALCULATION
A given storeroom has current values and purchases over the previous twelve months
as follows:
H. CAUTIONS
Since Inventory can be divided in several categories including total inventory, insurance
spares, critical spares, consumables, A items, active/inactive, etc., categories must be
well defined and standardized between facilities to make comparisons accurate.
I. HARMONIZATION
This metric and its supporting definitions are similar or identical to EN 15341 indicator
E12.
Note 1. The EN 15341 indicator includes only the inventory turns of spare parts in the
calculation. The SMRP metric calculates the value of the spare parts + operating parts
(MRO). However the SMRP metric 5.5.31 offers the possibility to calcu-late spare parts
separately.
J. REFERENCES
Baldwin, R.C. (2006). Secrets of Effective Maintenance. Presented at the SMRP 14th
annual Convention. Birmingham, AL
Banerji, R. A (n,d,). World class approach to asset management; Parts 2 and 3
AMMJ. Vol 21 No 4.
Davis, J.W. (n.d.). Strategic planning for asset management – An overview.
Farmington, CT. Strategic Asset Management Inc.
DeWald, D. (2011). Key performance indicators for stores and MRO. Life Cycle
Engineering
Frazelle, E. H. (2005). TLI/WERC warehouse benchmarking survey. Retrieved from
http://www.ciltuk.org.uk/pages/downloadfile?d=C8518219-80B1-45CB-882C-
8D77129A5B7C&a=stream
Hedding, R. (n.d.) The operational reliability maturity continuum: Part 5: Materials
management: The hidden productivity barrier. Retrieved from
http://www.reliabilityweb.com/articles/sami_material_management_02.htm
Hedding,R. P.E. (2001). Want to hire a benchmarking consultant?. Itasca, IL. Plant
Services.