Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
1 A554-G-822-EL-GIR-0507
Visual Inspection of installed 2" & 1" diameter PVC STF Open DEC EL-0507-1 Verify fro the alignment of stub ups during connecting. L3503 MCC/PI BLDG - D. Tolentino Moh'd Majid
stub up conduit prior to closing of shuttering Construction Alignment Ahmed
2 A554-G-822-EL-GIR-0507
Visual Inspection of installed 2" & 1" diameter PVC STF Open DEC EL-0507-2 The installed conduits are meant for electrical L3503 MCC/PI BLDG - D. Tolentino Moh'd Majid
stub up conduit prior to closing of shuttering Construction Earthing grounding cable installation. Ahmed
Visual Inspection of installed 2" & 1" diameter PVC DEC The conduit should be 100mm above the finished Moh'd Majid
3 A554-G-822-EL-GIR-0507 STF Open PVC Stub Up EL-0507-3 grade as montioned in deatail A of IFC-G--014820- L3503 MCC/PI BLDG - D. Tolentino
stub up conduit prior to closing of shuttering Construction Conduit Ahmed
B0004-EL-EH2-002 / 001.
4 A554-G-822-EL-GIR-0507
Visual Inspection of installed 2" & 1" diameter PVC STF Open DEC EL-0507-4 Submit / Use appropriate checklist. L3503 MCC/PI BLDG - D. Tolentino Moh'd Majid
stub up conduit prior to closing of shuttering Construction Checklist Ref. With LBE (VAF-E-31) Daewoo to submit an official Ahmed
Letter from letter from corpro mentioning the changes & with
Installation inspection Impressed Current Cathodic DEC Corpro CP EL-0532-1 manufactures test certifcate as per the specifications Moh'd Majid
5 A554-G-822-EL-GIR-0532
protection permanent Reference Electrode STF Open Construction V-4500 - D. Tolentino Ahmed
Vendor & sadara requirement for revies & approval before
Impressed current cathodic protection permanent DEC next installation
Calibration EL-758-1 Calibration / Inspection.
certificate for ref. elec. Shall be provided Moh'd Majid
6 A554-G-822-EL-GIR-0758 STF Open V-4400 - D. Tolentino
reference electrode installation inspection Construction Certificate factor calibration W-V-T. Calowed standard elect. Ahmed
8 A554-G-822-EL-GIR-0760
Impressed current cathodic protection permanent STF Open DEC Calibration EL-760-1 Factory calibration for reference electrial W.V.T V-4315 - D. Tolentino Moh'd Majid
reference electrode installation inspection Construction Certificate standard calowed elec. Shall be provided. Ahmed
STF AREA (820-CB-08, 820-CB-
10 A554-G-822-EL-GIR-2166 Installation inspection for grounding rod STF Open KSS EL-2166-1 Changes in IFC drawing should be reflected in as-built 04-1, 820-CB-02-1, 820-CB-02- C. Aguila Jr. R. Panganiban Moh'd Majid
Drawing drawing.. 2) Ahmad
Changes in IFC drawing should be reflected in as-built STF AREA (820-CB-08, 820-CB- Moh'd Majid
11 A554-G-822-EL-GIR-2167 Witness for grounding rod earth resistance testing STF Open KSS EL-2167-1 drawing.. 04-1, 820-CB-02-1, 820-CB-02- C. Aguila Jr. R. Panganiban Ahmad
Partial inspection of installed 35mm² & 70mm² PVC Drawing 2) P-9956A, P-
P-9950A, P-9950B,
green insulated grounding cable @ P-9950A, P-9950B,
12 A554-G-822-EL-GIR-2290 P-9956A, P-9956B, P-9955, E-9955, E-9942, P-9942, P- STF Open KSS EL-2290-1 Affected drawing shall be revised. 9956B, P-9955, E-9955, E-9942, J. Ibarra M. D. Espejo Simon M.
Drawing P-9942, P-9943A, P-9943B Aromin, Jr.
9943A, P-9943B North side , (see highlighted attached
drawing). North side
Visual inspection of installed compression grounding (820-CB-09) : PU-4910 & PU- Moh'd Majid
16 A554-G-822-EL-GIR-2477
pad prior for closing of shuttering STF Open KSS EL-2477-1 Affected drawing shall be revised. 4911 C. Aguila Jr. R. Panganiban Ahmad
Drawing
17 A554-G-822-EL-GIR-2477
Visual inspection of installed compression grounding STF Open KSS EL-2477-2 Revised Electrical IFC DWG was not issued & (820-CB-09) : PU-4910 & PU- C. Aguila Jr. R. Panganiban Moh'd Majid
pad prior for closing of shuttering Drawing contractor had proceed as per site instructions. 4911 Ahmad
18 A554-G-822-EL-GIR-2477
Visual inspection of installed compression grounding STF Open KSS EL-2477-3 Contractor shall be responsible if any change in IFC (820-CB-09) : PU-4910 & PU- C. Aguila Jr. R. Panganiban Moh'd Majid
pad prior for closing of shuttering Drawing DWG issued later. 4911 Ahmad
19 A554-G-822-EL-GIR-2478
Final inspection of installed compression grounding STF Open KSS EL-2478-1 Affected drawing shall be revised. (820-CB-09) : PU-4910 & PU- C. Aguila Jr. R. Panganiban Moh'd Majid
pad prior for concrete pouring Drawing 4911 Ahmad
20 A554-G-822-EL-GIR-2478
Final inspection of installed compression grounding STF Open KSS EL-2478-2 Revised Electrical IFC DWG was not issued & (820-CB-09) : PU-4910 & PU- C. Aguila Jr. R. Panganiban Moh'd Majid
pad prior for concrete pouring Drawing contractor had proceed as per site instructions. 4911 Ahmad
Final inspection of installed compression grounding Contractor shall be responsible if any change in IFC (820-CB-09) : PU-4910 & PU- Moh'd Majid
21 A554-G-822-EL-GIR-2478 STF Open KSS EL-2478-3 C. Aguila Jr. R. Panganiban
pad prior for concrete pouring Drawing DWG issued later. 4911 Ahmad
22 A554-G-822-EL-GIR-2479
Visual inspection of installed compression grounding STF Open KSS EL-2479-1 Affected drawing shall be revised. (820-CB-06) : PU-4915B C. Aguila Jr. R. Panganiban Moh'd Majid
pad prior for closing of shuttering Drawing Ahmad
Visual inspection of installed compression grounding Electrical IFC DWG was not issued & contractor had Moh'd Majid
23 A554-G-822-EL-GIR-2479
pad prior for closing of shuttering STF Open KSS EL-2479-2 procedure as per site instructions. (820-CB-06) : PU-4915B C. Aguila Jr. R. Panganiban Ahmad
Drawing
Visual inspection of installed compression grounding Contractor shall be responsible if any change in IFC Moh'd Majid
24 A554-G-822-EL-GIR-2479
pad prior for closing of shuttering STF Open KSS EL-2479-3 DWG issued later. (820-CB-06) : PU-4915B C. Aguila Jr. R. Panganiban Ahmad
Drawing
25 A554-G-822-EL-GIR-2480
Final inspection of installed compression grounding STF Open KSS EL-2480-1 Affected drawing shall be revised. (820-CB-06) : PU-4915B C. Aguila Jr. R. Panganiban Moh'd Majid
pad prior for concrete pouring Drawing Ahmad
26 A554-G-822-EL-GIR-2480
Final inspection of installed compression grounding STF Open KSS EL-2480-2 Revised Electrical IFC DWG was not issued & (820-CB-06) : PU-4915B C. Aguila Jr. R. Panganiban Moh'd Majid
pad prior for concrete pouring Drawing contractor had proceed as per site instruction. Ahmad
Final inspection of installed compression grounding Contractor shall be responsible if any change in IFC Moh'd Majid
27 A554-G-822-EL-GIR-2480
pad prior for concrete pouring STF Open KSS EL-2480-3 DWG issued later. (820-CB-06) : PU-4915B C. Aguila Jr. R. Panganiban Ahmad
Drawing
28 A554-G-822-EL-GIR-2494
Trench inspection prior to installation of STF Open KSS EL-2494-1 Affected drawing shall be revised. 820-CB-06 C. Aguila Jr. R. Panganiban Moh'd Majid
35 mm² PVC green insulated grounding cable Drawing Ahmad
Pre-installation Inspection of LV Switchgear prior to Circuit breaker number on the drawing needs to be Moh'd Majid
32 A554-G-822-EL-GIR-2715
final Anchoring STF Open KSS E-2715-1 changed from TB-820H001 To TB-820H001A MCC Bldg. (SWR-820H001) C. Aguila Jr. M. Hussain Ahmad
Drawing
Pre-installation Inspection of LV Switchgear prior to Circuit breaker FB-820H001B1 should be replaced as Moh'd Majid
33 A554-G-822-EL-GIR-2715
final Anchoring STF Open KSS EL-2715-2 FB-820H00B and another. Circuit breaker FB- MCC Bldg. (SWR-820H001) C. Aguila Jr. M. Hussain Ahmad
820H001B1 should be added in the drawing as space.
Drawing
34 A554-G-822-EL-GIR-2716
Pre-installation Inspection of LV MCC prior to final STF Open KSS EL-2716-1 Refer LBE issued against requirement of meters. MCC Bldg. (MCC-820H001) C. Aguila Jr. M. Hussain Moh'd Majid
Anchoring Refer LBE Ahmad
Pre-installation Inspection of LV MCC prior to final Moh'd Majid
35 A554-G-822-EL-GIR-2717 STF Open KSS EL-2717-1 Rearrange the cubcile no in SLD IFC As the MCC. MCC Bldg. (MCC-820H003) C. Aguila Jr. M. Hussain
Anchoring Drawing Ahmad
36 A554-G-822-EL-GIR-2717
Pre-installation Inspection of LV MCC prior to final STF Open KSS EL-2717-2 Refer LBE issued against requirement of indicators. MCC Bldg. (MCC-820H003) C. Aguila Jr. M. Hussain Moh'd Majid
Anchoring Refer LBE Ahmad
Pre-installation Inspection of MV Switchgear prior to final DEC EL-2748-1 The rated minimum voltage on the switch gear and the IFC Moh'd Majid
37 Not Defined A554-G-822-EL-GIR-2748
Anchoring
STF Open
Construction dwg do not match.
MCC Bldg. (SWR-820G001) C. Aguila Jr. M. Hussain
Ahmad
Drawing
Pre-installation Inspection of MV Switchgear prior to final DEC EL-2748-2 Rating of CB is not at the appropriate place i.e. bot on the Moh'd Majid
38 Not Defined A554-G-822-EL-GIR-2748
Anchoring
STF Open
Construction CB panel.
MCC Bldg. (SWR-820G001) C. Aguila Jr. M. Hussain
Ahmad
Missing bolt etc.
1 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Pre-installation Inspection of MV Switchgear prior to final EL-2748-4 Drawing represent Bus as Bus 001 and Bus 002 whereas on Moh'd Majid
40 Not Defined A554-G-822-EL-GIR-2748
Anchoring
STF Open KSS
the SWGR its represent as Bus A & Bus B.
MCC Bldg. (SWR-820G001) C. Aguila Jr. M. Hussain
Ahmad
Drawing
Pre-installation Inspection of MV MCC prior to final DEC There is no rating on the MCC which represents MRV of Moh'd Majid
46 Not Defined A554-G-822-EL-GIR-2749
Anchoring
STF Open
Construction
EL-2749-3
4.16kV and rated current of 1200A.
MCC Bldg. (MCC-820G001) C. Aguila Jr. M. Hussain
Ahmad
Missing bolt etc.
Pre-installation Inspection of MV MCC prior to final The rated KA on the drawing and on the MCC does not Moh'd Majid
47 Not Defined A554-G-822-EL-GIR-2749
Anchoring
STF Open KSS EL-2749-4 match, the dwg shows rated KA-36A whereas on the MCC MCC Bldg. (MCC-820G001) C. Aguila Jr. M. Hussain
Ahmad
is 49KA.
Drawing
Pre-installation Inspection of MV MCC prior to final DEC EL-2750-3 There is no rating on the MCC which represents MRV of Moh'd Majid
51 Not Defined A554-G-822-EL-GIR-2750
Anchoring
STF Open
Construction 4.16kV and rated current of 1200A.
MCC Bldg. (MCC-820G002) C. Aguila Jr. M. Hussain
Ahmad
Missing bolt etc.
Pre-installation Inspection of LV MCC prior to final EL-2808-1 Short circuit current rating on the drawing and on site is Moh'd Majid
55 Not Defined A554-G-822-EL-GIR-2808
Anchoring
STF Open KSS
not match.
MCC Bldg. (MCC-820H002) C. Aguila Jr. M. Hussain
Ahmad
Drawing
Pre-installation Inspection of LV MCC prior to final The dwg shows the rating as 85kA whereas on the site it is Moh'd Majid
56 Not Defined A554-G-822-EL-GIR-2808
Anchoring
STF Open KSS EL-2808-2
100,000A (100kA)
MCC Bldg. (MCC-820H002) C. Aguila Jr. M. Hussain
Ahmad
Drawing
Short circuit current rating on the drawing and on site is Moh'd Majid
57 Not Defined A554-G-822-EL-GIR-2830 Installation Inspection of LV ( 480 V ) MCC STF Open KSS EL-2830-1
not match.
MCC Bldg. ( MCC - 820H002 ) C. Aguila Jr. M. Hussain
Ahmad
Drawing
The dwg shows the rating as 85kA whereas on the site it is Moh'd Majid
58 Not Defined A554-G-822-EL-GIR-2830 Installation Inspection of LV ( 480 V ) MCC STF Open KSS EL-2830-2
100,000A (100kA)
MCC Bldg. ( MCC - 820H002 ) C. Aguila Jr. M. Hussain
Ahmad
Drawing
Visual inspection of installed compression grounding pad EL-2848-1 Additional grounding pads shown by red line drawing Moh'd Majid
59 A554-G-822-EL-GIR-2848
prior for closing of shuttering
STF Open KSS
should be reflected in the IFC drawing.
820-CB-08 C. Aguila Jr. M. Hussain
Ahmad
Drawing
Final inspection of installed compression grounding pad EL-2849-1 Additional grounding pads shown by red line drawing Moh'd Majid
60 A554-G-822-EL-GIR-2849
prior for concrete pouring
STF Open KSS
should be reflected in the IFC drawing.
820-CB-08 C. Aguila Jr. M. Hussain
Ahmad
Drawing
MCC BLDG: GB-8203B001,GB-
8203B002,GB-8203B003,
Installation of Grounding Bus Bar EL-3421-1 Dust and seal paint marks on tap the bus bar needs to be Moh'd Majid
70 A554-G-822-EL-GIR-3421
MCC BLDG (see attached drawing)
STF Open KSS
cleared. GB-8203B011,GB-8203B012,GB- R. Gomez M. Hussain
Ahmad
8203B013,GB-8203B014 & GB-
duct seal 8203B015
MCC BLDG: GB-8203B001,GB-
8203B002,GB-8203B003,
Installation of Grounding Bus Bar Moh'd Majid
71 A554-G-822-EL-GIR-3421
MCC BLDG (see attached drawing)
STF Open KSS EL-3421-2 A few nut bolts should be tightened. GB-8203B011,GB-8203B012,GB- R. Gomez M. Hussain
Ahmad
8203B013,GB-8203B014 & GB-
Bolts Tightened 8203B015
Partial Inspection of Electrical Cable Tray Installation @ PR
3/01-1, PR 3/01-2, Moh'd Majid
72 Not Defined A554-G-822-EL-GIR-3498
PR 3/02, PR 3/03-1 & PR 3/03-2
STF Open KSS EL-3498-1 Plastic stop nuts for splice joints not installed. 820-CB-04-2 & 820-CB-04-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Missing bolt etc.
2 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Partial Inspection of Electrical Cable Tray Installation @ PR
3/01-1, PR 3/01-2, Moh'd Majid
73 Not Defined A554-G-822-EL-GIR-3498
PR 3/02, PR 3/03-1 & PR 3/03-2
STF Open KSS EL-3498-2 Grounding cable not provided. 820-CB-04-2 & 820-CB-04-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Earthing
Partial Inspection of Electrical Cable Tray Installation @ PR
3/01-1, PR 3/01-2, Moh'd Majid
74 Not Defined A554-G-822-EL-GIR-3498
PR 3/02, PR 3/03-1 & PR 3/03-2
STF Open KSS EL-3498-3 At one point, splice plate is over the support. 820-CB-04-2 & 820-CB-04-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Support
Partial Inspection of Electrical Cable Tray Installation @ PR
3/01-1, PR 3/01-2, Moh'd Majid
75 Not Defined A554-G-822-EL-GIR-3498
PR 3/02, PR 3/03-1 & PR 3/03-2
STF Open KSS EL-3498-4 Numbering of cable tray should be marked every 12 mtrs. 820-CB-04-2 & 820-CB-04-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Label marking
Partial Inspection of Electrical Cable Tray Installation @ PR
2/02, PR 3/05, Moh'd Majid
76 Not Defined A554-G-822-EL-GIR-3564
PR 3/04-4, PR 3/04-5 & PR 3/07-2
STF Open KSS EL-3564-1 Marking on the cable trays not provide. 820-CB-03-2 & 820-CB-03-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Label marking
Partial Inspection of Electrical Cable Tray Installation @ PR
2/02, PR 3/05, Moh'd Majid
77 Not Defined A554-G-822-EL-GIR-3564
PR 3/04-4, PR 3/04-5 & PR 3/07-2
STF Open KSS EL-3564-2 Cable tray should be ground every I & METRES. 820-CB-03-2 & 820-CB-03-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Earthing
Partial Inspection of Electrical Cable Tray Installation @ PR
2/02, PR 3/05, Moh'd Majid
78 Not Defined A554-G-822-EL-GIR-3564
PR 3/04-4, PR 3/04-5 & PR 3/07-2
STF Open KSS EL-3564-3 Splice toint is falling on the support at two places. 820-CB-03-2 & 820-CB-03-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Support
Partial Inspection of Electrical Cable Tray Installation @ PR
2/02, PR 3/05, Moh'd Majid
79 Not Defined A554-G-822-EL-GIR-3564
PR 3/04-4, PR 3/04-5 & PR 3/07-2
STF Open KSS EL-3564-4 Cleaning of the cable tray due. 820-CB-03-2 & 820-CB-03-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Clean & Dress
Partial Inspection of Electrical Cable Tray Installation @ PR
2/02, PR 3/05, Moh'd Majid
80 Not Defined A554-G-822-EL-GIR-3564
PR 3/04-4, PR 3/04-5 & PR 3/07-2
STF Open KSS EL-3564-5 Support need to be installed at the bends. 820-CB-03-2 & 820-CB-03-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Support
Partial Inspection of Electrical Cable Tray Installation @ PR
2/02, PR 3/05, EL-3564-6 Supports need to be installed at 600mm on each side of Moh'd Majid
83 Not Defined A554-G-822-EL-GIR-3564
PR 3/04-4, PR 3/04-5 & PR 3/07-2
STF Open KSS
the expansiion splice joint
820-CB-03-2 & 820-CB-03-1 R. Gomez M. Hussain
Ahmad
(see attached drawing) Support
3 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Visual Inspection of installed Electrical Cable Tray Ladder
STF- Piperack 820-CB02-2 / 820- Moh'd Majid
102 Not Defined A554-G-820-EL-GIR-3829 @ Piperack 820-CB02-2 / 820-CB02-1 prior for cable STF Open KSS EL-3829-5 Cable Trays to be cleaned.
CB02-1
J. Ibarra M. Hussain
Ahmad
pulling.
Clean & Dress
Visual Inspection Installation of Cable Exit Conduit & Support for Moh'd Majid
106 A554-G-820-EL-GIR-4316 Cathodic Protection System @ Tank V-4400. STF Open KSS EL-4316-1 Supports shall be PVC coated. V-4400 J. Ibarra L. Gonzaga
Ahmad
Support
Inspection of installed Cathodic Protection Junction Box @ DEC EL-4433-1 Not meeting item no. B2, D32 of attached checklist SFTIC- Moh'd Majid
107 Not Defined A554-G-822-EL-GIR-4433
V-4500.
STF Open
Construction P-3015
V-4500 J. Ibarra L. Gonzaga
Ahmad
Missing bolt etc.
Installation Inspection of Lighting Panel/TR (LP-820R002 / MCC Bldg. (LP-820R002 / PTR- Moh'd Majid
142 A554-G-822-EL-GIR-6472
PTR-LP820R002).
STF Open KSS EL-6472-1 Attach updated SLD & panel schedule.
LP820R002)
J. Ibarra M. Hussain
Ahmad
Drawing
Installation Inspection of Lighting Panel/TR (LP-820R002 / MCC Bldg. (LP-820R002 / PTR- Moh'd Majid
143 A554-G-822-EL-GIR-6472
PTR-LP820R002).
STF Open KSS EL-6472-2 Only physical inspection done.
LP820R002)
J. Ibarra M. Hussain
Ahmad
N/A
Installation Inspection of Power Panel/TR (PP-820R002 / MCC Bldg. (PP-820R002 / PTR- Moh'd Majid
144 A554-G-822-EL-GIR-6473
PTR-PP820R002).
STF Open KSS EL-6473-1 Attach updated SLD & panel schedule.
PP820R002)
J. Ibarra M. Hussain
Ahmad
Drawing
Installation Inspection of Power Panel/TR (PP-820R002 / MCC Bldg. (PP-820R002 / PTR- Moh'd Majid
145 A554-G-822-EL-GIR-6473
PTR-PP820R002).
STF Open KSS EL-6473-2 Only physical isepction done.
PP820R002)
J. Ibarra M. Hussain
Ahmad
N/A
Pre-Installation Inspection of Emergency Lighting Panel DEC EL-6542-2 The connections diagram and the tagging on the circuilt Moh'd Majid
173 Not Defined A554-G-822-EL-GIR-6542
(ELP-UPS820R002)prior for anchoring.
STF Open
Construction breakers of connection diagram needs to be changed.
MCC Bldg. (ELP-UPS820R002) J. Ibarra M. Hussain
Ahmad
Drawing
4 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Pre-Installation Inspection of Emergency Lighting Control EL-6543-2 Only physical ispection done. Contractor should raise RFI Moh'd Majid
176 A554-G-822-EL-GIR-6543
Panel (ELCP-UPS820R002)prior for anchoring.
STF Open KSS
with revised / Latest IFC showing panel schedule.
MCC Bldg. (ELCP-UPS820R002) J. Ibarra M. Hussain
Ahmad
Drawing
Installation Inspection of Emergency Lighting Control Panel Contractor to raise RFI attaching panel schedule or Vendor Moh'd Majid
179 A554-G-822-EL-GIR-6544
(ELCP-UPS820R002).
STF Open KSS EL-6544-3
DWG.
MCC Bldg. (ELCP-UPS820R002) J. Ibarra M. Hussain
Ahmad
RFI
5 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Visual Inspection of installed Electrical Cable Tray Ladder For vertical cable trays, support at 600 mm on each side Moh'd Majid
217 Not Defined A554-G-822-EL-GIR-6824
@ Piperack 820-CB-1, 820-CB-02-3.
STF Open KSS EL-6824-1
should be provided.
Piperack 820-CB-1, 820-CB-02-3 J. Ibarra M. Hussain
Ahmad
Support
Visual Inspection of installed Electrical Cable Tray Ladder Additional support required at the hings and MCT Moh'd Majid
218 Not Defined A554-G-822-EL-GIR-6824
@ Piperack 820-CB-1, 820-CB-02-3.
STF Open KSS EL-6824-2
entrance.
Piperack 820-CB-1, 820-CB-02-3 J. Ibarra M. Hussain
Ahmad
Support
Visual Inspection of installed Electrical Cable Tray Ladder At the entrance for the MCT for cable trays AC and AM ( as Moh'd Majid
219 Not Defined A554-G-822-EL-GIR-6824
@ Piperack 820-CB-1, 820-CB-02-3.
STF Open KSS EL-6824-3 per drawing ) the cable tray should be lowered at least Piperack 820-CB-1, 820-CB-02-3 J. Ibarra M. Hussain
Ahmad
50mm.
Missing bolt etc.
Visual Inspection of installed Electrical Cable Tray Ladder EL-6824-7 Plastic stop-nut should be at the centre of the slooted hole Piperack 820-CB-1, 820-CB-02-3 Moh'd Majid
223 Not Defined A554-G-822-EL-GIR-6824
@ Piperack 820-CB-1, 820-CB-02-3.
STF Open KSS
of expansion joint.
J. Ibarra M. Hussain
Ahmad
Missing bolt etc.
Visual Inspection of installed Electrical Cable Tray Ladder EL-6824-8 Support not touching the cable tray at one point. ( Check Moh'd Majid
224 Not Defined A554-G-822-EL-GIR-6824
@ Piperack 820-CB-1, 820-CB-02-3.
STF Open KSS
the drawing)
Piperack 820-CB-1, 820-CB-02-3 J. Ibarra M. Hussain
Ahmad
Touch-Up
Visual Inspection of installed Electrical Cable Tray Ladder EL-6874-3 As per Nema VE2, supports should be provided at 600mm Moh'd Majid
231 Not Defined A554-G-822-EL-GIR-6874
@ Piperack 820-CB-03-3.
STF Open KSS
at each side of the expansions splice plate.
Piperack 820-CB-03-3 J. Ibarra M. Hussain
Ahmad
Support
6 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Visual Inspection of Installed Galvanized Rigid Steel EL-6953-2 Bolts tightened from the bottom i.e bolt head is at the Moh'd Majid
240 Not Defined A554-G-822-EL-GIR-6953
Conduit for LIGHTING SYSTEM of Transformer Yard.
STF Open KSS
bottom of the clamp.
Transformer Yard J. Ibarra M. Hussain
Ahmad
Missing bolt etc.
Visual Inspection of Installed Lighting Fixture (L4A) for JB not as per Moh'd Majid
241 A554-G-822-EL-GIR-6955
LIGHTING SYSTEM of Transformer Yard.
STF Open KSS EL-6955-1 Junction box not as per the bill of materials. Transformer Yard J. Ibarra M. Hussain
Ahmad
Bill of
Materiial
7 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Inspection for Backfilling of Electrical Trench, Red Tiles &
Moh'd Majid
251 Not Defined A554-G-822-EL-GIR-7085 Warning Tape Installation STF Open KSS EL-7085-1 IFC to be updated ( for not using the conduit ). 820-CB-05 J. Ibarra M. Hussain
Ahmad
( for STREET LIGHTING SYSTEM )
Drawing
Moh'd Majid
252 A554-G-822-EL-GIR-7089 ICCP Test Station Pre-Commissioning Inspection STF Open KSS EL-7089-1 DWG should be IFC stamped. Cathodic Protection Tank V-4307 - M. Hussain
Ahmad
Drawing
Inspection for Installation of High Pressure Sodium Storage Tank V-4440, V-4441, V- Moh'd Majid
253 Not Defined A554-G-822-EL-GIR-7099 Lighting Fixture, Stanchion Mounting Type, LP-820R002- STF Open KSS EL-7099-1 Lock washer from U-Bolt missing.
4445, V-4451, V-4450
J. Ibarra M. Hussain
Ahmad
L03/L04 & ELP-UPS820R002-E02/E08, 70 WATTS,
Missing bolt etc.
Inspection for Installation of High Pressure Sodium Storage Tank V-4440, V-4441, V- Moh'd Majid
254 Not Defined A554-G-822-EL-GIR-7099 Lighting Fixture, Stanchion Mounting Type, LP-820R002- STF Open KSS EL-7099-2 HDG angle should be painted.
4445, V-4451, V-4450
J. Ibarra M. Hussain
Ahmad
L03/L04 & ELP-UPS820R002-E02/E08, 70 WATTS,
Touch-Up
Inspection for Installation of High Pressure Sodium Storage Tank V-4440, V-4441, V- Moh'd Majid
255 Not Defined A554-G-822-EL-GIR-7099 Lighting Fixture, Stanchion Mounting Type, LP-820R002- STF Open KSS EL-7099-3 Builds need to be installed.
4445, V-4451, V-4450
J. Ibarra M. Hussain
Ahmad
L03/L04 & ELP-UPS820R002-E02/E08, 70 WATTS,
Missing bolt etc.
Inspection for Installation of High Pressure Sodium From the drawing RTIC-1841-01, Items 11, 12, 13, 14 and 6 Moh'd Majid
261 Not Defined A554-G-822-EL-GIR-7141 Lighting Fixture, Stanchion Mounting Type, LP-820R002- STF Open KSS EL-7141-4 (Junction box at some places ) needs to be installed of the V-4525, V-4515, V-4516 J. Ibarra M. Hussain
Ahmad
L05/L06 & ELP-UPS820R002-E03, 70 WATTS, bom.
Missing bolt etc.
Visual Inspection of installed Perforated Cable Tray for EL-7357-2 Attach RFV has been denied by SME. Daewoo as advised to Moh'd Majid
277 A554-G-822-EL-GIR-7357
Equipment Panel @ MCC Building.
STF Open KSS
clarify.
MCC Building J. Ibarra M. Hussain
Ahmad
RFV
8 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Visual Inspection of the MV Power Cable Installation for
PC-HRGTR820G001A, PC- Moh'd Majid
279 Not Defined A554-G-822-EL-GIR-7361 (TR-820G001A/ TR-820G001B to HRGTR-820G001A/ STF Open KSS EL-7361-2 Nylon base SS cable tie required per sme email.
HRGTR820G001B
J. Ibarra M. Hussain
Ahmad
HRGTR-820G001B) .
Clean & Dress
Visual Inspection of Installed Control Cable (5C X 2.5mm², CC-SWG820G001-21, CC-
10C X 2.5mm²) for EL-7418-1 Replace O-ring on the T/X side for CC-SWGR820G001- SWG820G001-23, CC- Moh'd Majid
280 Not Defined A554-G-822-EL-GIR-7418
SWR-820G001 to TR-820R001A
STF Open KSS
35/23. SWG820G001-33, CC-
J. Ibarra M. Hussain
Ahmad
SWR-820G001 to TR-820R001B. Missing bolt etc. SWG820G001-35
Visual Inspection of Installed Control Cable (5C X 2.5mm², CC-SWG820G001-21, CC-
10C X 2.5mm²) for Provide stainless steel cable tagging at the transfermer SWG820G001-23, CC- Moh'd Majid
281 Not Defined A554-G-822-EL-GIR-7418
SWR-820G001 to TR-820R001A
STF Open KSS EL-7418-2
side. SWG820G001-33, CC-
J. Ibarra M. Hussain
Ahmad
SWR-820G001 to TR-820R001B. Tag No. SWG820G001-35
Installation Inspection of Grounding TR for NGR-820G001A MCC Bldg. (HRGTR-820G001A / Moh'd Majid
287 Not Defined A554-G-822-EL-GIR-7437
& NGR-820G001B
STF Open KSS EL-7437-1 S.L.D of HRGTR with IFC stamp required.
HRGTR-820G001B)
J. Ibarra M. Hussain
Ahmad
Drawing
Installation Inspection of Disconnect Switch for NGR- MCC Bldg. (HRGSW1-820G001A & Moh'd Majid
288 Not Defined A554-G-822-EL-GIR-7438
820G001A & NGR-820G001B
STF Open KSS EL-7438-1 S.L.D of N.G.R with IFC stamp required.
HRGSW1-820G001B)
J. Ibarra M. Hussain
Ahmad
Drawing CC-UPS820R001A-1, CC-
Visual Inspection of Installed Control Cable (1P X 18AWG, UPS820R001A-2, CC-
2C X 4mm², 2C X 2.5mm²) for UPS820R001A-3, CC- Moh'd Majid
289 Not Defined A554-G-822-EL-GIR-7439 UPS-820R001A to MCJB-820J001-01 STF Open KSS EL-7439-1 IP washer broken missing. UPS820R001A-4, CC- J. Ibarra M. Hussain
Ahmad
UPS-820H001A to ECP-820R001A UPS820R001A-5, CC-
UPS-820R001A to DS-UPS820R001A. Missing IP Washer CC-UPS820R001B-1, CC-
UPS820R001A-6, CC-
Visual Inspection of Installed Control Cable (1P X 18AWG, UPS820R001B-2,
UPS820R001A-7CC-
2C X 4mm², 2C X 2.5mm²) for UPS820R001B-3, CC- Moh'd Majid
290 Not Defined A554-G-822-EL-GIR-7440 UPS-820R001B to MCJB-820J001-01 STF Open KSS EL-7440-1 IP washer broken missing. UPS820R001B-4, CC- J. Ibarra M. Hussain
Ahmad
UPS-820H001B to ECP-820R001B UPS820R001B-5, CC-
UPS-820R001B to DS-UPS820R001B. Missing IP Washer UPS820R001B-6, CC-
Visual Inspection of Installed Control Cable (1P X 18AWG, UPS820R001A-7CC-
CC-UPS820R002-1,
2C X 2.5mm²) for UPS820R002-2, CC-UPS820R002- Moh'd Majid
291 Not Defined A554-G-822-EL-GIR-7441
UPS-820R002 to MCJB-820J001-01
STF Open KSS EL-7441-1 IP washer broken missing.
3, CC-UPS820R002-4, CC-
J. Ibarra M. Hussain
Ahmad
UPS-820R002 to DS-UPS820R002. Missing IP Washer
UPS820R002-5, CC-UPS820R002-6
PC-UPS820R001A-05, PC-
UPS820R001A-06, PC-
UPS820R001A-07, PC- Moh'd Majid
292 Not Defined A554-G-822-EL-GIR-7468 Witness for LV POWER CABLE termination and torque test. STF Open KSS EL-7468-1 Terminal X-41 missing in ups-820R001.A
UPS820R001A-08, PC-
J. Ibarra M. Hussain
Ahmad
Missing Terminal Block
UPS820R001A-09, PC-
PC-UPS820R001A-05,
UPS820R001A-10 PC-
Vendor UPS820R001A-06, PC-
293 Not Defined A554-G-822-EL-GIR-7468 Witness for LV POWER CABLE termination and torque test. STF Open KSS Confirmation EL-7468-2 Vendor conformation for bolt torquing & No of threads UPS820R001A-07, PC- J. Ibarra M. Hussain Moh'd Majid
for bolt protruding. UPS820R001A-08, PC-
PC-UPS820R001B-05, PC- Ahmad
Torqueing UPS820R001A-09, PC-
UPS820R001B-06, PC-
UPS820R001A-10
UPS820R001B-07, PC-
Vendor UPS820R001B-08, PC-
294 Not Defined A554-G-822-EL-GIR-7469 Witness for LV POWER CABLE termination and torque test. STF Open KSS Confirmation EL-7469-1 Vendor conformation required for bolt torquing & No of UPS820R001B-09, PC- J. Ibarra M. Hussain Moh'd Majid
for bolt threads protruding required. Ahmad
UPS820R001B-10, PC-
Torqueing UPS820R001B-11, PC-
Visual Inspection of Installed LV Power Cable (2C X 50mm², PC-DCPBC820K001A,
UPS820R001B-12, PC-
PC-
4C X 240mm², 4C X 50mm²) for DCPBC820K001B,
UPS820R001B-13PC-
Moh'd Majid
295 A554-G-822-EL-GIR-7484 BC-820K001A/B to DCP-BC820K001 /1A STF Open KSS EL-7484-1 Incomplete cable tray for PIB. EPPUPS820R001A1, PC- J. Ibarra M. Hussain
Ahmad
TS-UPS820R001A/B to EPP-UPS820R001A1 /B1 EPPUPS820R001B1, PC-
TS-UPS820R002 to ELCP-UPS820R002 Incomplete Cable Tray ELCPUPS820R002
Visual Inspection of Installed LV Power Cable (2C X 50mm², PC-DCPBC820K001A, PC-
4C X 240mm², 4C X 50mm²) for DCPBC820K001B, PC-
Moh'd Majid
296 A554-G-822-EL-GIR-7484 BC-820K001A/B to DCP-BC820K001 /1A STF Open KSS EL-7484-2 Tagging boding 240mm EPPUPS820R001A1, PC- J. Ibarra M. Hussain
Ahmad
TS-UPS820R001A/B to EPP-UPS820R001A1 /B1 EPPUPS820R001B1, PC-
TS-UPS820R002 to ELCP-UPS820R002 Tag No. ELCPUPS820R002
9 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Visual Inspection of Installed LV Power Cable (2C X 50mm², PC-DCPBC820K001A, PC-
4C X 240mm², 4C X 50mm²) for DCPBC820K001B, PC-
Moh'd Majid
297 A554-G-822-EL-GIR-7484 BC-820K001A/B to DCP-BC820K001 /1A STF Open KSS EL-7484-3 Cable dressing & Cable ties for 260mm, PIB is pending EPPUPS820R001A1, PC-PC-
PC-HRGSW1820H001A-1, J. Ibarra M. Hussain
Ahmad
TS-UPS820R001A/B to EPP-UPS820R001A1 /B1 EPPUPS820R001B1,
HRGR820H001A, PC-PC-
TS-UPS820R002 to ELCP-UPS820R002 cable & dressing ELCPUPS820R002PC-
HRGSW1820H001A,
Visual Inspection of Installed LV Power Cable (2C X 16mm², HRGSW1820H001A-2, CC-
3C X 16mm², 1P X 18AWG, 1C X 70mm²) for SLD showing inter connection to be attached from NGR to HRGR820H001A, PC- Moh'd Majid
298 Not Defined A554-G-822-EL-GIR-7513
LV SWGR to NGR A
STF Open KSS EL-7513-1
SWR, TR TO NGR. HRGSW1820H001B-1, PC-
J. Ibarra M. Hussain
Ahmad
LV SWGR to NGR B Drawing HRGR820H001B, PC-
PC-UPS820R001A-04,
HRGSW1820H001B, PC- PC-
TRUPS820R001B-04, PC-
HRGSW1820H001B-2, CC-
Witness for Insulation Resistance Testing of LV Power UPS820R002-04, PC-UPS820R002-
HRGR820H001B Moh'd Majid
299 A554-G-822-EL-GIR-7528
Cable, ( FOR UPS SYSTEM )
STF Open KSS EL-7528-1 IFC should be revised.
08, PC-DCPBC820K001A, PC-
J. Ibarra M. Hussain
Ahmad
Drawing BC820K001A-02, PC-
PC-UPS820R001A,
DCPBC820K001BPC-
TRUPS820R001, PC-
UPS820R001B, PC- Moh'd Majid
300 Not Defined A554-G-822-EL-GIR-7529 Witness for LV POWER CABLE termination and torque test. STF Open KSS EL-7529-1 MCC-820 H002 cubical NO 6M door to be aligned.
TRUPS820R001B, PC-
J. Ibarra M. Hussain
Ahmad
Alignment UPS820R002, PC-TRUPS820R002,
PC-BC820K001A,
PC-UPS820R001A,
PC-BC820K001B
PC-
TRUPS820R001, PC-
UPS820R001B, PC- Moh'd Majid
301 Not Defined A554-G-822-EL-GIR-7529 Witness for LV POWER CABLE termination and torque test. STF Open KSS EL-7529-2 Cubical numbers to be update add in the connection dwg.
TRUPS820R001B, PC-
J. Ibarra M. Hussain
Ahmad
Drawing UPS820R002, PC-TRUPS820R002,
PC-UPS820R001A,
PC-BC820K001A, PC-
PC-BC820K001B
TRUPS820R001, PC-
UPS820R001B, PC- Moh'd Majid
302 Not Defined A554-G-822-EL-GIR-7529 Witness for LV POWER CABLE termination and torque test. STF Open KSS EL-7529-3 Terminal number (T1, T2, T3) to be changed to (L1, L2, L3)
TRUPS820R001B, PC-
J. Ibarra M. Hussain
Ahmad
Drawing UPS820R002, PC-TRUPS820R002,
PC-UPS820R001A,
PC-BC820K001A, PC-
PC-BC820K001B
Vendor TRUPS820R001, PC-
Confirmation Vendar conformations required for bolt torquing & no of UPS820R001B, PC- Moh'd Majid
303 Not Defined A554-G-822-EL-GIR-7529 Witness for LV POWER CABLE termination and torque test. STF Open KSS EL-7529-4
threads. TRUPS820R001B, PC-
J. Ibarra M. Hussain
Ahmad
for bolt
Torqueing UPS820R002, PC-TRUPS820R002,
PC-UPS820R001A-04,
PC-BC820K001A, PC-
PC-BC820K001B
TRUPS820R001B-04, PC-
UPS820R002-04, PC-UPS820R002- Moh'd Majid
304 Not Defined A554-G-822-EL-GIR-7530 Witness for LV POWER CABLE termination and torque test. STF Open KSS EL-7530-1 Drawing to be updated (Check the red line drawing)
08, PC-DCPBC820K001A, PC-
J. Ibarra M. Hussain
Ahmad
Drawing BC820K001A-02, PC-
PC-UPS820R001A-04,
DCPBC820K001B PC-
Vendor TRUPS820R001B-04, PC-
Confirmation Vendor conformation required for bolt torquing & no of UPS820R002-04, PC-UPS820R002- Moh'd Majid
305 Not Defined A554-G-822-EL-GIR-7530 Witness for LV POWER CABLE termination and torque test. STF Open KSS EL-7530-2
threads . 08, PC-DCPBC820K001A, PC-
J. Ibarra M. Hussain
Ahmad
for bolt
Torqueing BC820K001A-02, PC-
DCPBC820K001B
Grounding Cable Termination & Torque Testing for BC-
Moh'd Majid
306 A554-G-822-EL-GIR-7573 820K001A, BC-820K001B STF Open KSS EL-7573-1 Attach bolt torque form. BC-820K001A, BC-820K001B J. Ibarra M. Hussain
Ahmad
@ MCC Room PC-DCPBC820K001INTER-1, PC-
Bolt Torque Form
DCPBC820K001INTER-2, PC-
RP2505FB662C031A9, PC-
Visual Inspection of Installed LV Power Cable for (DCP Cable tie for the inter-2 cable Missing on DCP side for RP2505FB662C031B2, PC- Moh'd Majid
307 A554-G-822-EL-GIR-7653
SYSTEM)
STF Open KSS EL-7653-1
cables PC-EPMSS820K001-1 & PC-EPMSS820K001-2 EPMS820K001-1, PC-
J. Ibarra M. Hussain
Ahmad
cable Tie EPMS820K001-2, PC-
TSSWR820G001, PC-
Installation inspection of Equipment Grounding for BAT- TSSWR820H001
BAT-UPS820R001A, BAT-UPS820R001B,
Moh'd Majid
308 A554-G-822-EL-GIR-7658 UPS820R001A, BAT-UPS820R001B, BAT-UPS820R002, STF Open KSS EL-7658-1 Provide duct seal on the PVC conduit. BAT-UPS820R002, J. Ibarra M. Hussain Ahmad
BAT-BC820K001 BAT-BC820K001
duct seal
Grounding Cable Termination & Torque Testing for DS- DS-UPS820R001A, DS-
UPS820R001ATS, DS-
UPS820R001A, DS-UPS820R001ATS, DS-UPS820R001B, DS- UPS820R001B, DS- Moh'd Majid
309 A554-G-822-EL-GIR-7663 UPS820R001BTS, DS-UPS820R002, DS-UPS820R002TS DS- STF Open KSS EL-7663-1 Bolt type to be conform.
UPS820R001BTS, DS-
J. Ibarra M. Hussain
Ahmad
BC820K001, Bolt Type to
be confirm UPS820R002, DS-UPS820R002TS
DS-BC820K001TS DS-BC820K001, DS-BC820K001TS
Vendor BAT-UPS820R001A, BAT-
310 Not Defined A554-G-822-EL-GIR-7684 Witness for LV Power Cable termination and torque test. STF Open KSS Confirmation EL-7684-1 Vendor conformation required for bolt torquing & no of UPS820R001B, BAT-UPS820R002, J. Ibarra M. Hussain Moh'd Majid
for bolt threads protruding the bolt. Ahmad
BAT-BC820K001
Torqueing
BAT-UPS820R001A, BAT-
311 Not Defined A554-G-822-EL-GIR-7684 Witness for LV Power Cable termination and torque test. STF Open KSS EL-7684-2 Update the connection diagrams for UPS-8200R002TS UPS820R001B, BAT-UPS820R002, J. Ibarra M. Hussain Moh'd Majid
(Check the red line in the RFI. CC-SWR820H001B-2, CC- Ahmad
BAT-BC820K001CC-
SWR820H001B-3,
Drawing
SWR820H001B-4, CC-
SWR820H001B-5, CC-
RP2505FB662C031B2-01, CC- Moh'd Majid
312 Not Defined A554-G-822-EL-GIR-7727 Visual Inspection for termination of Control Cables. STF Open KSS EL-7727-1 Revise the IFC. CC-SWR820H001B-2, CC-
SWR820H001B-7, CC-
J. Ibarra M. Hussain
Ahmad
Drawing SWR820H001B-8, CC-
SWR820H001B-3,
SWR820H001B-4,
SWR820H001B-9, CC-
SWR820H001B-5, CC-
SWR820H001B-10, CC-
RP2505FB662C031B2-01,
SWR820H001B-11 CC- Moh'd Majid
313 Not Defined A554-G-822-EL-GIR-7727 Visual Inspection for termination of Control Cables. STF Open KSS EL-7727-2 IFC & Actual termination are not matching.
SWR820H001B-7, CC-
J. Ibarra M. Hussain
Ahmad
Drawing SWR820H001B-8, CC-
SWR820H001B-9, CC-
Visual Inspection of Low Voltage Building Wire Termination SWR820H001B-10, CC-
SWR820H001B-11 Moh'd Majid
314 A554-G-822-EL-GIR-7862 CKT. No. (S) & (U) 4C X 2.5 Sqmm+2.5 Battery Room STF Open KSS EL-7862-1 IFC to be revised ( Cable size has been changed.0 J. Ibarra M. Hussain
Ahmad
LIGHTING SYSTEM.
Drawing
10 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Moh'd Majid
317 A554-G-822-EL-GIR-7935 Installation Inspection of DS-BCS820K001TS. STF Open KSS EL-7935-1 Tagging Missing. Battery Room (DS-BCS820K001TS) J. Ibarra M. Hussain
Ahmad
Tag No.
Inspection for Inspection of Street Lighting Pole and
Moh'd Majid
318 A554-G-822-EL-GIR-7966 COOPER HPS 250 WATTS Street Lighting Fixture, Circuit NO. STF Open KSS EL-7966-1 Installation detail drawing Missing. 820-CB-05, 07 J. Ibarra M. Hussain
Ahmad
LP-820H001-S01 ( 10 MTRS )
Drawing
Moh'd Majid
319 A554-G-822-EL-GIR-8037 Witness for LV Power Cable termination. STF Open KSS EL-8037-1 Cable gland shall be bonded to ground. J. Ibarra M. Hussain
Ahmad
Earthing
Inspection for Installation of High Pressure Sodium
Missingf Light Moh'd Majid
320 A554-G-822-EL-GIR-8006 Lighting Fixture, Stanchion Mounting Type, LP-820R002- STF Open KSS EL-8006-1 One of the lighting fixtures is missing as per IFC. J. Ibarra M. Hussain
Ahmad
L07/L08 & ELP-UPS820R002-E04, 70 WATTS, Fixture
Inspection for Installation of High Pressure Sodium
321 A554-G-822-EL-GIR-8006 Lighting Fixture, Stanchion Mounting Type, LP-820R002- STF Open KSS Missing Lock EL-8006-2 Lock-Washer missing at same of the U-Bolts of lighting J. Ibarra M. Hussain Moh'd Majid
Washer fixtures. Ahmad
L07/L08 & ELP-UPS820R002-E04, 70 WATTS,
Inspection for Installation of High Pressure Sodium
Moh'd Majid
322 A554-G-822-EL-GIR-8006 Lighting Fixture, Stanchion Mounting Type, LP-820R002- STF Open KSS JB to be Install EL-8006-3 Junction boxes at same of the fixtures to be installed. J. Ibarra M. Hussain
Ahmad
L07/L08 & ELP-UPS820R002-E04, 70 WATTS, at Light Fixture
Inspection for Installation of High Pressure Sodium
323 A554-G-822-EL-GIR-8006 Lighting Fixture, Stanchion Mounting Type, LP-820R002- STF Open KSS EL-8006-4 Touch up paint required at plates of the junctions boxes & J. Ibarra M. Hussain Moh'd Majid
Touch-Up supports. Ahmad
L07/L08 & ELP-UPS820R002-E04, 70 WATTS,
Visual Inspection of Installed LV Power Cable for MCC- Moh'd Majid
324 A554-G-822-EL-GIR-8062
820H003 to LIGHTING PANELBOARD / TRANSFORMER.
STF Open KSS EL-8062-1 Glands to be grounded. PC-TRLP820R001, PC-LP820R001 J. Ibarra M. Hussain
Ahmad
Earthing
Inspection for Inspection of 250W HPS Stanchion MTD Moh'd Majid
325 A554-G-822-EL-GIR-8074
Vaportight Fixture Pole Mounted Type ( 4 MTRS ).
STF Open KSS EL-8074-1 Duct seal not installed properly to cover the PVC conduit. 820-CB-08, 09 J. Ibarra M. Hussain
Ahmad
duct seal
Inspection for Installation of High Pressure Sodium
Missing Lock Moh'd Majid
326 A554-G-822-EL-GIR-8076 Lighting Fixture, Stanchion Mounting Type, CKT# LP- STF Open KSS EL-8076-1 Lock washer missing to the U-Bolts of lighting. J. Ibarra M. Hussain
Ahmad
820R002-L13/L14 & ELP-UPS820R002-E07, 70 WATTS, Washer
Inspection for Installation of High Pressure Sodium
Missing Lock Moh'd Majid
327 A554-G-822-EL-GIR-8076 Lighting Fixture, Stanchion Mounting Type, CKT# LP- STF Open KSS EL-8076-2 Lock washer missing at some junctions boxes. J. Ibarra M. Hussain
Ahmad
820R002-L13/L14 & ELP-UPS820R002-E07, 70 WATTS, Washer
Inspection for Installation of High Pressure Sodium Touch up paint required at plates of the junctions boxes & Moh'd Majid
328 A554-G-822-EL-GIR-8076 Lighting Fixture, Stanchion Mounting Type, CKT# LP- STF Open KSS EL-8076-3
supports.
J. Ibarra M. Hussain
Ahmad
820R002-L13/L14 & ELP-UPS820R002-E07, 70 WATTS, Touch-Up
Inspection for Installation of High Pressure Sodium
329 A554-G-822-EL-GIR-8076 Lighting Fixture, Stanchion Mounting Type, CKT# LP- STF Open KSS EL-8076-4 Hight from the box of the lamp to the plates in grater than J. Ibarra M. Hussain Moh'd Majid
Drawing 2300mm(not as mentioned in the IFC drawing.) Ahmad
820R002-L13/L14 & ELP-UPS820R002-E07, 70 WATTS,
Inspection for Installation of High Pressure Sodium Provide one lighting fixture at the start of the stawase of Moh'd Majid
330 A554-G-822-EL-GIR-8076 Lighting Fixture, Stanchion Mounting Type, CKT# LP- STF Open KSS Missing Light EL-8076-5 J. Ibarra M. Hussain
820R002-L13/L14 & ELP-UPS820R002-E07, 70 WATTS, Fixture the tank V-4310. Ahmad
Inspection for Backfilling of Electrical Trench, Red Tiles &
Need to provided temporary cable marks after the Moh'd Majid
331 A554-G-822-EL-GIR-8097 Warning Tape Installation STF Open KSS Under Ground EL-8097-1 backfilling. 820-CB-09 J. Ibarra M. Hussain
Ahmad
(for HPS Lighting Fiture Pole at Ground Mounted ) Cable Marker
Visual Inspection of Lighting Fixture Installation at PIB Room LIGHTING Lamp to be Moh'd Majid
332 A554-G-822-EL-GIR-8098 SYSTEM, Fluorescent Lamp 2 X 32 watts STF Open KSS EL-8098-1 One lamp of the lighting fixture not working. PIB room J. Ibarra M. Hussain
Ahmad
replace
Visual Inspection of Lighting Fixture Installation at PIB Room LIGHTING The hight of the fixture from the F. F. L in the telecom Moh'd Majid
333 A554-G-822-EL-GIR-8098 SYSTEM, Fluorescent Lamp 2 X 32 watts STF Open KSS EL-8098-2
room im 2500mm where as IFC states 2600mm.
PIB room J. Ibarra M. Hussain
Ahmad
Drawing
Inspection for Inspection of 250W HPS Stanchion MTD Moh'd Majid
334 A554-G-822-EL-GIR-8102 STF Open KSS EL-8102-1 Duct seal to be preovided to the PVC conduit. J. Ibarra M. Hussain
Ahmad
Vaportight Fixture Pole Mounted Type ( 8 MTRS ). duct seal
Inspection for Installation of the Lighting Fixture for CANOPY Moh'd Majid
335 A554-G-822-EL-GIR-8114 STF Open KSS EL-8114-1 MCT missing at two places. J. Ibarra M. Hussain Ahmad
LIGHTING SYSTEM with Incandescent Lamp 60 watts. Missing MCT
Aluminum
Inspection for Installation of the Lighting Fixture for CANOPY Cover to be As per G7D-0311-01, SEC 4.4.1.2: Fittings seal have cast iron Moh'd Majid
336 A554-G-822-EL-GIR-8114 STF Open KSS EL-8114-2
cover. Aluminum cover are not accepteable. J. Ibarra M. Hussain Ahmad
LIGHTING SYSTEM with Incandescent Lamp 60 watts. replace
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L03/L04 & Missing Lock Moh'd Majid
337 A554-G-822-EL-GIR-8115 STF Open KSS EL-8115-1 Lock washer missing at the U.Bolts of lighting fixtures. J. Ibarra M. Hussain Ahmad
ELP-UPS820R002-E02/E08, 70 WATTS. Washer
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L03/L04 & Touch up paint required at U-Bolts supports & junction box Moh'd Majid
338 A554-G-822-EL-GIR-8115 STF Open KSS EL-8115-2
plate.
J. Ibarra M. Hussain
Ahmad
ELP-UPS820R002-E02/E08, 70 WATTS. Touch-Up
Inspection for Backfilling of Electrical Trench, Red Tiles &
Warning Tape Installation Under Ground Moh'd Majid
339 A554-G-822-EL-GIR-8131 STF Open KSS EL-8131-1 Cable marker need to be provided. J. Ibarra M. Hussain Ahmad
(for HPS Lighting Fiture Pole at Ground Mounted ) Cable Marker
Inspection for Backfilling of Electrical Trench, Red Tiles &
Warning Tape Installation Under Ground Moh'd Majid
340 A554-G-822-EL-GIR-8134 STF Open KSS EL-8134-1 Cable marker need to be provided. J. Ibarra M. Hussain Ahmad
( for STREET LIGHTING SYSTEM ) Cable Marker
Inspection for Backfilling of Electrical Trench, Red Tiles &
Warning Tape Installation Under Ground Moh'd Majid
341 A554-G-822-EL-GIR-8160 STF Open KSS EL-8160-1 Cable marker need to be provided. J. Ibarra M. Hussain
Ahmad
( for STREET LIGHTING SYSTEM ) Cable Marker
Inspection for Backfilling of Electrical Trench, Red Tiles & Under Ground Moh'd Majid
342 A554-G-822-EL-GIR-8179 STF Open KSS EL-8179-1 Cable markes need to be provided. J. Ibarra M. Hussain Ahmad
Warning Tape Installation. PC-TEL001 (ITC-005993) Cable Marker 820-CB-06
11 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L09/L10 & Missing Lock Moh'd Majid
343 A554-G-822-EL-GIR-8191 STF Open KSS EL-8191-1 Lock washer missing at U-Bolts. J. Ibarra M. Hussain
Ahmad
ELP-UPS820R002-E05, 70 WATTS. Washer
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L09/L10 & Bolts need to be tightened at various U-Bolts and junctions box Moh'd Majid
344 A554-G-822-EL-GIR-8191 STF Open KSS EL-8191-2
plates. J. Ibarra M. Hussain Ahmad
ELP-UPS820R002-E05, 70 WATTS. Bolts Tightened
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L05/L06 & JB to be Install Moh'd Majid
345 A554-G-822-EL-GIR-8252 STF Open KSS EL-8252-1 Junction boxes missing at various fixtures. J. Ibarra M. Hussain Ahmad
ELP-UPS820R002-E03, 70 WATTS. at Light Fixture
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L05/L06 & Missing Lock Moh'd Majid
346 A554-G-822-EL-GIR-8252 STF Open KSS EL-8252-2 Lock washer missing at U-Bolts. J. Ibarra M. Hussain Ahmad
ELP-UPS820R002-E03, 70 WATTS. Washer
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L05/L06 & Missing Lock Moh'd Majid
347 A554-G-822-EL-GIR-8252 STF Open KSS EL-8252-3 Lock washers missing at junction box plate. J. Ibarra M. Hussain
Ahmad
ELP-UPS820R002-E03, 70 WATTS. Washer
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L11/L12 & Moh'd Majid
348 A554-G-822-EL-GIR-8281 STF Open KSS EL-8281-1 Bolts missing at most of the junction box plate. J. Ibarra M. Hussain Ahmad
ELP-UPS820R002-E06, 70 WATTS. Missing bolt etc.
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L11/L12 & Missing Lock At places bolts are installed, lock washers missing and at some Moh'd Majid
349 A554-G-822-EL-GIR-8281 STF Open KSS EL-8281-2
places, bolts are rusted. J. Ibarra M. Hussain Ahmad
ELP-UPS820R002-E06, 70 WATTS. Washer
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L11/L12 & Missing Lock Moh'd Majid
350 A554-G-822-EL-GIR-8281 STF Open KSS EL-8281-3 Lock washers missing at U-Bolts. J. Ibarra M. Hussain
Ahmad
ELP-UPS820R002-E06, 70 WATTS. Washer
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L11/L12 & Moh'd Majid
351 A554-G-822-EL-GIR-8281 STF Open KSS EL-8281-4 Supports need to be painted at some places. J. Ibarra M. Hussain Ahmad
ELP-UPS820R002-E06, 70 WATTS. Touch-Up
Inspection for Inspection of Street Lighting Pole and COOPER
HPS 250 WATTS Street Lighting Fixture, Circuit NO. LP-820H001- Moh'd Majid
352 A554-G-822-EL-GIR-8288 STF Open KSS EL-8288-1 Duct seal shall be applied at the PVC conduit. J. Ibarra M. Hussain Ahmad
S03 ( 10 MTRS ) duct seal 820-CB-06
Inspection for Inspection of Street Lighting Pole and COOPER
HPS 250 WATTS Street Lighting Fixture, Circuit NO. LP-820H001- Moh'd Majid
353 A554-G-822-EL-GIR-8288 STF Open KSS EL-8288-2 Attach installation detail drawing. J. Ibarra M. Hussain Ahmad
S03 ( 10 MTRS ) Drawing 820-CB-06
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L09/L10 & Missing Lock Moh'd Majid
354 A554-G-822-EL-GIR-8305 STF Open KSS EL-8305-1 U-Bolt need flat lock and flat washers. J. Ibarra M. Hussain
Ahmad
ELP-UPS820R002-E05, 70 WATTS. Washer
Inspection for Installation of High Pressure Sodium Lighting
Fixture, Stanchion Mounting Type, CKT# LP-820R002-L09/L10 & Moh'd Majid
355 A554-G-822-EL-GIR-8305 STF Open KSS EL-8305-2 Some of the supports are rusted J. Ibarra M. Hussain Ahmad
ELP-UPS820R002-E05, 70 WATTS. Touch-Up
Inspection for Installation of High Pressure Sodium 250W Actual installation does not matching with the attached
Moh'd Majid
356 A554-G-822-EL-GIR-8356 FloodLight Fixture (Column Mounted Type), CKT# LP-820H001- STF Open KSS EL-8356-1 installation detail drawing. Supports area beem welded installed J. Ibarra M. Hussain Ahmad
S01, 250 WATTS. Drawing of threaded Rod (Bracket)installation)
Inspection for Installation of High Pressure Sodium 250W
FloodLight Fixture (Column Mounted Type), CKT# LP-820H001- Moh'd Majid
357 A554-G-822-EL-GIR-8356 STF Open KSS EL-8356-2 Touch up paint to be applied. J. Ibarra M. Hussain Ahmad
S01, 250 WATTS. Touch-Up
Inspection for Installation of High Pressure Sodium 250W
FloodLight Fixture (Column Mounted Type), CKT# LP-820H001- Moh'd Majid
358 A554-G-822-EL-GIR-8356 STF Open KSS EL-8356-3 Elevation to be confirmed. J. Ibarra M. Hussain Ahmad
S01, 250 WATTS. height to be confirm
Moh'd Majid
359 A554-G-822-EL-GIR-8429 Witness for MV POWER CABLE termination and torque test. STF Open KSS EL-8429-1 Cable tie to be replaced with nylon base SS as per SME. J. Ibarra M. Hussain
Ahmad
cable Tie
Moh'd Majid
360 A554-G-822-EL-GIR-8475 STF Open KSS EL-8475-1 See attached red line drawing and update it accordingly. J. Ibarra M. Hussain Ahmad
Visual Inspection for termination of Control Cables. Drawing
Visual Inspection of Installed LV Power Cable for POWER Moh'd Majid
361 A554-G-822-EL-GIR-8496 STF Open KSS EL-8496-1 See attached red line drawing and update it according. J. Ibarra M. Hussain Ahmad
PANELBOARD Drawing
Visual Inspection of Low Voltage Building Wire Termination CKT. Panel schedule with circuit assignmenttobe attached inside LP- Moh'd Majid
371 A554-G-822-EL-GIR-8551 No. LP-820R001-L05, LP-820R001-L02, LP-820R001-L03, LP- STF Open KSS Panel Schedule EL-8551-1
820R001.
J. Ibarra M. Hussain Ahmad
820R001-L04, to be attached
Visual Inspection(2C
LP-820R001-E13 of Low Voltage Building Wire Termination CKT.
X 2.5mm²+E). in panel
No. LP-820R001-L05, LP-820R001-L02, LP-820R001-L03, LP-
820R001-L04, Tube Light Moh'd Majid
372 A554-G-822-EL-GIR-8551 STF Open KSS EL-8551-2 All lamps to be changes to cool white I.E the installed. J. Ibarra M. Hussain
Ahmad
LP-820R001-E13 (2C X 2.5mm²+E). Replacement
12 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item PC-SWR820H001A-1A, PC-
Visual Inspection of Low Voltage Building Wire Termination CKT. Category SWR820H001A-1B, PC-
No. LP-820R001-L05, LP-820R001-L02, LP-820R001-L03, LP- SWR820H001A-1C, PC-
820R001-L04, Tube Light PC-SWR820H001B-1A, PC-
SWR820H001A-2A, PC- Moh'd Majid
373 A554-G-822-EL-GIR-8551 STF Open KSS EL-8551-3 Lamps are 3500 they should be replaced by 4100.
SWR820H001B-1B, PC-
SWR820H001A-2B,
J. Ibarra M. Hussain
Ahmad
LP-820R001-E13 (2C X 2.5mm²+E). Replacement
SWR820H001B-1C, PC-
SWR820H001A-2C,
Visual Inspection of Low Voltage Building Wire Termination CKT. The emergency lighting circuit is not terminated to the SWR820H001B-2A, PC-
SWR820H001A-3A, Moh'd Majid
374 A554-G-822-EL-GIR-8552 No. LP-820R001-L06, LP-820R001-E15 STF Open KSS EL-8552-1
corresponding circuit breaker in the LP-820R001 provide. SWR820H001B-2B, PC-
SWR820H001A-3B, J. Ibarra M. Hussain
Ahmad
(2C X 2.5mm²+E). Circuit Breaker SWR820H001B-2C, PC-
SWR820H001A-3C,
Visual Inspection of Low Voltage Building Wire Termination CKT. SWR820H001B-3A, PC-
SWR820H001A-4A,
No. LP-820R001-L06, LP-820R001-E15 Tube Light SWR820H001A-4B, PC-
SWR820H001B-3B, Moh'd Majid
375 A554-G-822-EL-GIR-8552 STF Open KSS EL-8552-2 The installed lamps are 3500 these shall be replaced 4100.
SWR820H001B-3C, PC-
J. Ibarra M. Hussain Ahmad
Visual Inspection of Low Voltage Building Wire Termination CKT.
(2C X 2.5mm²+E). Replacement SWR820H001A-4C,
No. LP-820R001-L11, LP-820R001-L08, LP-820R001-L09, LP- SWR820H001B-4A, PC-
SWR820H001A-5A,
820R001-L10, Tube Light SWR820H001B-4B, PC-
SWR820H001A-5B, Moh'd Majid
376 A554-G-822-EL-GIR-8553 STF Open KSS EL-8553-1 The installed lamps are 3500 these shall be replaced. J. Ibarra M. Hussain Ahmad
LP-820R001-E16 (2C X 2.5mm²+E). Replacement SWR820H001B-4C, PC-
SWR820H001A-5C,
SWR820H001B-5A, PC-
SWR820H001A-6A,
SWR820H001A-6B, PC-
SWR820H001B-5B, Moh'd Majid
377 A554-G-822-EL-GIR-8585 STF Open KSS EL-8585-1 Panels to be cleaned. J. Ibarra M. Hussain
Ahmad
Witness for LV POWER CABLE termination and torque test. cleaning SWR820H001B-5C,
SWR820H001A-6CPC-
SWR820H001B-6A, PC-
Panels to be cleaned & verify all the lightness where ever torque SWR820H001B-6B, PC- Moh'd Majid
378 A554-G-822-EL-GIR-8586 STF Open KSS EL-8586-1
valves dos'nt apply.
J. Ibarra M. Hussain
Ahmad
Witness for LV POWER CABLE termination and torque test. clleanin SWR820H001B-6C
Protection
Cover on Protect line covers on terminal inside the pane ECP- Moh'd Majid
379 A554-G-822-EL-GIR-8594 Visual Inspection of Installed LV Power Cable @ PIB Room. STF Open KSS EL-8594-1
UPS822(00H) missing.
J. Ibarra M. Hussain Ahmad
Terminal
Moh'd Majid
380 A554-G-822-EL-GIR-8594 Visual Inspection of Installed LV Power Cable @ PIB Room. STF Open KSS EL-8594-2 Enter opening on top of the panel for cable entries to be closed. J. Ibarra M. Hussain
Ahmad
Spare Holes
Cable dressing for horizantal cable tray on top of the wall Moh'd Majid
381 A554-G-822-EL-GIR-8594 Visual Inspection of Installed LV Power Cable @ PIB Room. STF Open KSS EL-8594-3
mounted panels to be rectified.
J. Ibarra M. Hussain Ahmad
Dressing
Moh'd Majid
382 A554-G-822-EL-GIR-8594 Visual Inspection of Installed LV Power Cable @ PIB Room. STF Open KSS EL-8594-4 The armows for the cabinets to be grounded (Instrument). J. Ibarra M. Hussain Ahmad
Earthing
Installation Inspection of Panel
IFC with panel details dimensional / Gad have not been Moh'd Majid
383 A554-G-822-EL-GIR-8609 RP-2505-FB-662C031A9 & STF Open KSS EL-8609-1
attached.
J. Ibarra M. Hussain Ahmad
RP-2505-FB-662C031B2. Drawing
Visual inspection
Installation of lighting
Inspection cable installation, STREET LIGHTING
of Panel
CKT. No. LP-820H001-S01, Moh'd Majid
384 A554-G-822-EL-GIR-8609 RP-2505-FB-662C031A9 & LP-820H001-S02, STF Open KSS EL-8609-2 No test reports. J. Ibarra M. Hussain
Ahmad
LP-820H001-S03, LP-820H001-S04
RP-2505-FB-662C031B2. Test Reports
Visual inspection
(2C X 6mm²+E, 4CofX lighting
10mm² cable installation,
+ E). STREET STREET
LIGHTING LIGHTING
CKT. No. LP-
385 A554-G-822-EL-GIR-8676 CKT. No. LP-820H001-S01,
820H001-S01, LP-820H001-S02,LP-820H001-S02, STF Open KSS EL-8676-1 Tagging on the poles side in missing. For the cable Jerson Hussain Majid
LP-820H001-S03, LP-820H001-S04 Tag No.
Visual inspection
(2C X 6mm²+E, 4CofX lighting
10mm² cable installation,
+ E). STREET STREET
LIGHTING LIGHTING
CKT. No. LP-
386 A554-G-822-EL-GIR-8676 CKT. No. LP-820H001-S01,
820H001-S01, LP-820H001-S02,LP-820H001-S02, STF Open KSS EL-8676-2 Some of the covers are broken. Jerson Hussain Majid
LP-820H001-S03, LP-820H001-S04 Broken Cover
Visual inspection
(2C X 6mm²+E, 4CofX lighting
10mm² cable installation,
+ E). STREET STREET
LIGHTING LIGHTING
CKT. No. LP-
387 A554-G-822-EL-GIR-8676 CKT. No. LP-820H001-S01,
820H001-S01, LP-820H001-S02,LP-820H001-S02, STF Open KSS EL-8676-3 Permanent circuit number is missing Jerson Hussain Majid
LP-820H001-S03, LP-820H001-S04 Label marking
Visual Inspection
(2C X 6mm²+E, 4CofX Low
10mm² Voltage
+ E). STREET LIGHTING Termination
CKT. No. LP-
CKT. No. LP-820H001-S01,
820H001-S01, LP-820H001-S02,LP-820H001-S02, The home run cable is not as per the drawing IFC at two circuits
388 A554-G-822-EL-GIR-8676 STF Open KSS EL-8676-4
Make it as build.
Jerson Hussain Majid
LP-820H001-S03, LP-820H001-S04 Label marking
Visual Inspection
(2C X 6mm²+E, 4CofX Low
10mm² Voltage
+ E). STREET
STREETLIGHTING
LIGHTINGTermination
CKT. No. LP-
389 A554-G-822-EL-GIR-8680 CKT. No. LP-820H001-S01,
820H001-S01, LP-820H001-S02,LP-820H001-S02, STF Open KSS EL-8680-1 Some of the terminal covers are broken. Jerson Hussain Majid
LP-820H001-S03, LP-820H001-S04 Broken Cover
Visual Inspection
(2C X 6mm²+E, 4CofX Low
10mm² Voltage
+ E). STREET
STREETLIGHTING
LIGHTINGTermination
CKT. No. LP-
390 A554-G-822-EL-GIR-8680 CKT. No. LP-820H001-S01,
820H001-S01, LP-820H001-S02,LP-820H001-S02, STF Open KSS EL-8680-2 Permanent circuit number is missing Jerson Hussain Majid
LP-820H001-S03, LP-820H001-S04 Label marking
Visual Inspection
(2C X 6mm²+E, 4CofX Low
10mm² Voltage
+ E). STREET
STREETLIGHTING
LIGHTINGTermination
CKT. No. LP-
391 A554-G-822-EL-GIR-8680 CKT. No. LP-820H001-S01,
820H001-S01, LP-820H001-S02,LP-820H001-S02, STF Open KSS EL-8680-3 Permanent tag is missing. Jerson Hussain Majid
LP-820H001-S03, LP-820H001-S04 Label marking
(2C X 6mm²+E, 4C X 10mm² + E). STREET LIGHTING CKT. No. LP-
820H001-S01, LP-820H001-S02, The home run cable is not as per the drawing IFC at two circuits
392 A554-G-822-EL-GIR-8680 STF Open KSS EL-8680-4
Make it as build.
Jerson Hussain Majid
LP-820H001-S03, LP-820H001-S04 Drawing
Inspection Of 2" & 1 ¼" R.G.S. Conduit Installation for Pump Motor @ Moh'd Majid
393 A554-G-822-EL-GIR-8699 820-CB-09. STF Open KSS EL-8699-1 Conduits aer not bonded at some plate. J. Ibarra M. Hussain Ahmad
Earthing
Inspection Of 2" & 1 ¼" R.G.S. Conduit Installation for Pump Motor @ Moh'd Majid
394 A554-G-822-EL-GIR-8699 820-CB-09. STF Open KSS EL-8699-2 Conduits should be bonded to LCS J. Ibarra M. Hussain Ahmad
Earthing
Inspection Of 2" & 1 ¼" R.G.S. Conduit Installation for Pump Motor @ Missing Lock Moh'd Majid
395 A554-G-822-EL-GIR-8699 820-CB-09. STF Open KSS EL-8699-3 Lock washers missing on the conduct clamps J. Ibarra M. Hussain
Ahmad
Washer
Inspection Of 2" & 1 ¼" R.G.S. Conduit Installation for Pump Motor @ Moh'd Majid
396 A554-G-822-EL-GIR-8699 820-CB-09. STF Open KSS EL-8699-4 Duct seal to be provided on the conduits. J. Ibarra M. Hussain Ahmad
duct seal
397 A554-G-822-EL-GIR-8700 Installation Inspection of Junction Box for Street Lighting. STF Open KSS EL-8700-1 Provide ducd seal on the conduit. Jerson Hussain Majid
duct seal
Missing Lock Lock washers that washers missing for bolts on stainles steel
398 A554-G-822-EL-GIR-8700 Installation Inspection of Junction Box for Street Lighting. STF Open KSS EL-8700-2
plate.
Jerson Hussain Majid
Washer
399 A554-G-822-EL-GIR-8700 Installation Inspection of Junction Box for Street Lighting. STF Open KSS EL-8700-3 JB to be grounded. Jerson Hussain Majid
Earthing
Visual Inspection of installed Perforated Cable Tray (150W X 50H) for
400 A554-G-822-EL-GIR-8701 Lighting System. STF Open KSS EL-8701-1 Numbering of cable tray to be done. Jerson Hussain Majid
stencil
Visual Inspection of installed Perforated Cable Tray (150W X 50H) for
401 A554-G-822-EL-GIR-8701 Lighting System. STF Open KSS EL-8701-2 Grounding cable to be installed. Jerson Hussain Majid
Earthing
Visual Inspection of installed Perforated Cable Tray (150W X 50H) for
402 A554-G-822-EL-GIR-8701 Lighting System. STF Open KSS EL-8701-3 Cable tray to be grounded. Jerson Hussain Majid
Earthing
Inspection for Backfilling of Electrical Trench, Red Tiles &
Warning Tape Installation Under Ground Moh'd Majid
403 A554-G-822-EL-GIR-8704 STF Open KSS EL-8704-1 Cable markes to be provided. J. Ibarra M. Hussain Ahmad
(for HPS Lighting Fiture Pole at Ground Mounted ) Cable Marker
Installation Inspection of Junction Box LJB-820R002-L05, LJB-
404 A554-G-822-EL-GIR-8726 820R002-L06, EJB-UPS820R002-E03, PJB-820R001-R02, LJB- STF Open KSS EL-8726-1 JB tagging should be made permanent. 820-CB-02-2 J. Ibarra M. Hussain
820R002-L03-1, LJB-820R002-L04-1, EJB-UPS820R002-E02-1. Phenolic Tag
Installation Inspection of Junction Box LJB-820R002-L05, LJB-
405 A554-G-822-EL-GIR-8726 820R002-L06, EJB-UPS820R002-E03, PJB-820R001-R02, LJB- STF Open KSS Missing Lock EL-8726-2 Lock washers missing for bolts holding JB 820-CB-02-2 J. Ibarra M. Hussain
820R002-L03-1, LJB-820R002-L04-1, EJB-UPS820R002-E02-1. Washer
13 of 17
Electrical Punch Status
SI. No. System No. RFI No. Title of Inspection Area Official Responsible ID Punch Structure No. QC QC QC Closing Remark
Status Discipilne Description Subcont. Contractor Company RFI
Punch Item
Category
Visual Inspection of installed Electrical Cable Tray Ladder for Moh'd Majid
406 A554-G-822-EL-GIR-8727 STF Open KSS EL-8727-1 Cable tray marking not done. J. Ibarra M. Hussain
Ahmad
Lighting & Power JB.. stencil 820-CB-02-2
Visual Inspection of installed Electrical Cable Tray Ladder for Moh'd Majid
407 A554-G-822-EL-GIR-8727 STF Open KSS EL-8727-2 Cable tray should be grounded. J. Ibarra M. Hussain Ahmad
Lighting & Power JB.. Earthing 820-CB-02-2
Visual Inspection of installed Electrical Cable Tray Ladder for Change the drawing .(One of the Two highlighted cable trays is Moh'd Majid
408 A554-G-822-EL-GIR-8727 STF Open KSS EL-8727-3
not installed. J. Ibarra M. Hussain Ahmad
Lighting & Power JB.. Drawing 820-CB-02-2
Visual Inspection of installed Electrical Cable Tray Ladder for Cable Tray Adjustable hings in vertical drop in not accepted provied 45 Moh'd Majid
409 A554-G-822-EL-GIR-8727 STF Open KSS EL-8727-4
bends. J. Ibarra M. Hussain Ahmad
Visual Inspection
Lighting of Installed LV Power Cable @ PIB Room.. PC-
& Power JB.. Fittings PC-HVACP, PC-EPPUPS820R003,
820-CB-02-2 PC-
HVACP, PC-EPPUPS820R003, PC-AFSE490003-9, PC-AFSE491001- AFSE490003-9, PC-AFSE491001-9,
410 A554-G-822-EL-GIR-8749 9, PC-AFSE490004-9, STF Open KSS EL-8749-1 Bonding for conduit for HVAC panel to be done. PC-AFSE490004-9, Jerson Hussain Majid
PC-AFSE491002-9 Earthing PC-AFSE491002-9
411 A554-G-822-EL-GIR-8783 Inspection for Backfilling of Electrical Trench, Red Tiles & STF Open KSS Under Ground EL-8783-1 Permanent cable markes missing. V-4220 Jerson Hussain Majid
Warning Tape Installation PC-RTF820H035 (RTF-820H035 ). Cable Marker
Inspection Of 1" R.G.S. Conduit Installation for Lighting System @ Missing Lock Moh'd Majid
412 A554-G-822-EL-GIR-8795 V-4530, V-4520. STF Open KSS EL-8795-1 Lock washer flate washer for C-Clamp. V-4530, V-4520 J. Ibarra M. Hussain Ahmad
Washer
Inspection Of 1" R.G.S. Conduit Installation for Lighting System @ Moh'd Majid
413 A554-G-822-EL-GIR-8795 V-4530, V-4520. STF Open KSS EL-8795-2 Bonding between the conduits missing. V-4530, V-4520 J. Ibarra M. Hussain Ahmad
Earthing
Inspection Of 1" R.G.S. Conduit Installation for Lighting System @ Moh'd Majid
414 A554-G-822-EL-GIR-8795 V-4530, V-4520. STF Open KSS EL-8795-3 Grounding bushing insulation to be re-aligned V-4530, V-4520 J. Ibarra M. Hussain Ahmad
Earthing
Visual Inspection of installed Perforated Cable Tray (150W X Moh'd Majid
415 A554-G-822-EL-GIR-8796 STF Open KSS EL-8796-1 Grounding to be done. V-4530, V-4520 J. Ibarra M. Hussain Ahmad
50H) for Lighting System. Earthing
Visual Inspection of installed Perforated Cable Tray (150W X Moh'd Majid
416 A554-G-822-EL-GIR-8796 STF Open KSS EL-8796-2 Cable tray shall be marked tagging. V-4530, V-4520 J. Ibarra M. Hussain Ahmad
4/9펀치끝 50H) for Lighting System. stencil
Visual Inspection of installed Electrical Cable Tray Ladder of MV Moh'd Majid
417 A554-G-822-EL-GIR-8807 STF Open KSS EL-8807-1 Make the drawing red line as per site installation. 820-CB-07 J. Ibarra M. Hussain Ahmad
Cable for Motor. Drawing
Visual Inspection of installed Electrical Cable Tray Ladder of MV Moh'd Majid
418 A554-G-822-EL-GIR-8807 STF Open KSS EL-8807-2 Tagging of cable tray due. 820-CB-07 J. Ibarra M. Hussain
Ahmad
Cable for Motor. stencil
Visual Inspection of installed Electrical Cable Tray Ladder of MV Moh'd Majid
419 A554-G-822-EL-GIR-8807 STF Open KSS EL-8807-3 Grounding to be done for the cable tray. 820-CB-07 J. Ibarra M. Hussain Ahmad
Cable for Motor. Earthing
Inspection for Installation of the TERMINATION KIT AND LUGS Moh'd Majid
420 A554-G-822-EL-GIR-8809 STF Open KSS EL-8809-1 Cable sheild grounding shall be done as per SME instruction. J. Ibarra M. Hussain
Ahmad
for MV Power Cable for MC-4915B Earthing PC-MC4915B
Installation Inspection of
Electrical Cable Tray Ladder for Moh'd Majid
421 A554-G-822-EL-GIR-8817 STF Open KSS EL-8817-1 Provide tagging for cable trays J. Ibarra M. Hussain Ahmad
HTP System. stencil HTP-820H006, HTP-820H007
Installation Inspection of
Electrical Cable Tray Ladder for Moh'd Majid
422 A554-G-822-EL-GIR-8817 STF Open KSS EL-8817-2 Provide grounding and bonding for cable trays J. Ibarra M. Hussain Ahmad
HTP System. Earthing HTP-820H006, HTP-820H007
Installation Inspection of
Electrical Cable Tray Ladder for Cable Tray Moh'd Majid
423 A554-G-822-EL-GIR-8817 STF Open KSS EL-8817-3 For vertical cable trays use proper bends J. Ibarra M. Hussain Ahmad
HTP System. Fittings HTP-820H006, HTP-820H007
Installation Inspection of
Electrical Cable Tray Ladder for Cable Tray Moh'd Majid
424 A554-G-822-EL-GIR-8817 STF Open KSS EL-8817-4 Seperator / barrier shall be installed to segregate E&I cables. J. Ibarra M. Hussain
Ahmad
HTP System. barrier HTP-820H006, HTP-820H007
Installation Inspection of Panel
EHT Control Panel & Transformer (HTP-820H006, HTP-820H007) Moh'd Majid
425 A554-G-822-EL-GIR-8818 STF Open KSS EL-8818 Sun shade to be installed for the HTPS. J. Ibarra M. Hussain Ahmad
& Transformer (HTP-820H005). sun shade HTP-820H006, HTP-820H007
HTP-820H005, HTP-820H006, HTP- Moh'd Majid
426 A554-G-822-EL-GIR-8819 STF Open KSS EL-8819-1 Bonding of R.G.S conduit to be done. J. Ibarra M. Hussain Ahmad
Inspection Of R.G.S. Conduit Installation for HTP Panel. Earthing 820H007
Missing Lock HTP-820H005, HTP-820H006, HTP- Moh'd Majid
427 A554-G-822-EL-GIR-8819 STF Open KSS EL-8819-2 Lock washer / Flat washer missing for U-Clamps J. Ibarra M. Hussain
Ahmad
Inspection Of R.G.S. Conduit Installation for HTP Panel. Washer 820H007
Inspection Of R.G.S. Conduit Installation for Surface Mounted Moh'd Majid
428 A554-G-822-EL-GIR-8821 STF Open KSS EL-8821-1 R.G.S conduit to be bonded. J. Ibarra M. Hussain Ahmad
Photo Cell. Earthing West Side MCC Building
Inspection Of R.G.S. Conduit Installation for Surface Mounted Missing Lock Moh'd Majid
429 A554-G-822-EL-GIR-8821 STF Open KSS EL-8821-2 Lock washer / Flat washer missing at U-Clamps J. Ibarra M. Hussain Ahmad
Photo Cell. Washer West Side MCC Building
Inspection Of R.G.S. Conduit Installation for High Pressure Make the drawing red line for the installation of conduit and Moh'd Majid
430 A554-G-822-EL-GIR-8823 STF Open KSS EL-8823-1
junction boxes. J. Ibarra M. Hussain Ahmad
Sodium 400W FloodLight Fixture (Column Mounted Type). Drawing 820-CB-02-1
Inspection Of R.G.S. Conduit Installation for High Pressure Missing Lock Moh'd Majid
431 A554-G-822-EL-GIR-8823 STF Open KSS EL-8823-2 Lock washer / flate washer missing for U-clamp. J. Ibarra M. Hussain
Ahmad
Sodium 400W FloodLight Fixture (Column Mounted Type). Washer 820-CB-02-1
HTP-820H002 (ET-108), from VG- Moh'd Majid
432 A554-G-822-EL-GIR-8845 Visual Inspection of Installation for Self-Regulating Heating STF Open KSS EL-8845-1 Cricuit number to be provided near the terminations. 150CS1CRF to VB-150CS111VNRFG (820- J. Ibarra M. Hussain
Cable. Label marking CB-06) Ahmad
15 of 17
Instrument Punch Status
SI. No. System No. RFI No. Title of Inspection Area Officail Responsible Punch Item ID Punch PIC Sub-Cont. Target SADARA Date Fun Structure No. QC QC QC Closing Remark
Status Discipilne Category Description Status Date Signature Subcont. Contractor Company RFI
1 Not Defined A554-G-822-IC-GIR-0232 Installed Control Cable Tray in HVAC & MCC Room Area As STF Open DEC Support IC-232-1
Supports Should be Provided Under L3503 MCC/PIB Building HVAC & Melvin Cabillo Hassan Jose B.Depino
Marked Prior to Cable Pulling. Construction the TEE-HORIZONTAL-G7C-0324-06 MCC Room
3 Not Defined A554-G-822-IC-GIR-0239 Installation of HVAC CP- in L3503 MCC/PIB Building As STF Closed DEC Label marking IC-239-2
Panel is Obstructing the Grounding Closed Closed Closed Done L3503 MCC/PIB Building HVAC Melvin Cabillo Hassan Jose B.Depino 5288 Accepted
Marked Prior to cable Pulling. Construction RUR-BAR. Room
4 A554-G-822-IC-GIR-0263 Inspection of installed control cable tray in ACCU area & PIB Room as STF Closed KCS Label marking IC-263-1
Marking / Tagging due on the cable Closed Closed Closed Done L3503 MCC/PIB Building PIB Room Melvin Cabillo
Shanawaz
Majid Ahmad 5349 Accepted
marked prior to cable pulling.
tray. Hussian
VISUAL INSPECTION OF CABLE TRAY INSTALLATION ( 300W Provide Bonding Jumpers & Tray
7 Not Defined A554-G-822-IC-GIR-0367 X 150H, 600W X 150H ) INSIDE PIB ROOM @ SITE TANK STF Closed KSS Earthing IC-367-2 Closed Closed Closed Done PI ROOM Jorge Richard Vener 5288 Accepted
AREA Grounding Bus Bar.
VISUAL INSPECTION OF CABLE TRAY INSTALLATION ( 300W Hold Down Provide Hold Down Clamps on Some
10 Not Defined A554-G-822-IC-GIR-0367 X 150H, 600W X 150H ) INSIDE PIB ROOM @ SITE TANK STF Closed KSS IC-367-5 Closed Closed Closed Done PI ROOM Jorge Richard Vener 5331 Accepted
AREA Clamp Locations.
Main Cable Tray (F,D,A 300X150, 450X150, 600x150) Addittional support to be installed to
24 Not Defined A554-G-822-IC-GIR-1992 Installation Inspection from Column 130 to 171 @ SITE STF Open KSS Support IC-1992-3 horzantal bend and vertical inside 820-CB-02-2 & 820-CB-02-1 J. Canlas Jiessy Vener Gutierrez
TANK FARM Prior cable pulling.
bend. Cat-B
Main Cable Tray (F,D,A 300X150, 450X150, & 600x150 ) Addittional support to be installed to
Installation Inspection from Column 214 to 221, Column 820-CB-03-3, 820-CB-02-3 & 820-
35 Not Defined A554-G-822-IC-GIR-1994
222 & 223 @ SITE TANK FARM Prior cable pulling.
STF Open KSS Support IC-1994-3 horizantal bend and vertical inside CB-01
J. Canlas Jiessy Vener Gutierrez
bend. Cat-B
VISUAL INSPECTION OF TELECOM CABLE TRAY( 300W x Expansion guide clip to be installed
150H) INSTALLATION IN PIPE RACK 1/03,3/04-3,3/07-
42 Not Defined A554-G-822-IC-GIR-2574
1,1/02,1/01,3/04-2,3/08,3/03-2,3/06,3/04-
STF Open KSS Guide Clamp IC-2574-5 along col. # 130 to col. # 136 and col. # Main Pipe Rack J. Canlas Jiessy Jose B. Depino
1,2/01,3/02,/03-1SITE TANK FARM AREA 214 to col. # 222. Cat-B
VISUAL
VISUAL INSPECTION
INSPECTION INSTALLATION OF INSTRUMENT
OF TELECOM CABLE TRAY( 300W x Updated redline drawing of change of
MARSHALLING PANELIN
150H) INSTALLATION INPIPE
PIB BUILDING @ SITE TANK FARM
RACK 1/03,3/04-3,3/07-
47 Not Defined A554-G-822-IC-GIR-2574 AREA
1,1/02,1/01,3/04-2,3/08,3/03-2,3/06,3/04-
STF Open KSS Drawing IC-2574-10 elevation and direction to be attached. Main Pipe Rack J. Canlas Jiessy Jose B. Depino
BPC-P-820-17-01
1,2/01,3/02,/03-1SITE TANK FARM AREA Cat-B
SIS-P-820-17-01
BPC-M-820-17-10(F)
SIS-M-820-17-01
SIS-M-820-17-02
BPC-M-820-17-01
VISUAL INSPECTION INSTALLATION OF INSTRUMENT
BPC-M-820-17-02
MARSHALLING PANEL IN PIB BUILDING @ SITE TANK FARM All panels inside and top side shall be
48 Not Defined A554-G-822-IC-GIR-3143 BPC-M-820-17-03
AREA STF Closed KSS Clean & Dress IC-3143-1 Closed Closed Closed Done PIB BUILDING J. Canlas Jessy Vener Gutierrez 5288 Accepted
BPC-M-820-17-04
BPC-P-820-17-01 clean for proper preservation. Cat-B
NET-X-820-17-01
SIS-P-820-17-01
BPC-C-820-17-01
BPC-M-820-17-10(F)
SIS-C-820-17-01
SIS-M-820-17-01
BPC-I-820-17-01
SIS-M-820-17-02
BPC-I-820-17-02
BPC-M-820-17-01
BPC-I-820-17-03
BPC-M-820-17-02
49 Not Defined A554-G-822-IC-GIR-3143 SIS-I-820-17-01
BPC-M-820-17-03 STF Closed KSS Earthing IC-2143-2
All panel grounding to be terminated. Closed Closed Closed Done PIB BUILDING J. Canlas Jessy Vener Gutierrez 5288 Accepted
SIS-I-820-17-02
BPC-M-820-17-04 Cat-B
MPS-I-820-17-01
NET-X-820-17-01
BPC-C-820-17-01
SIS-C-820-17-01
BPC-I-820-17-01
BPC-I-820-17-02
VISUAL INSPECTION FOR INSTALLATION OF INSTRUMENT
BPC-I-820-17-03
50 Not Defined A554-G-822-IC-GIR-3228
JUNCTION BOX (JB) @ PIPE RACK 3/04-2 COLUMN 820-152
SIS-I-820-17-01 STF Closed KSS Clean & Dress IC-3228-1
Wood box cover to be provided for JB Closed Closed Closed Done
PIPE RACK 3/04-2 COLUMN 820-
J. Canlas Jessy Jose B. Depino 5288 Accepted
@ SITE TANK FARM AREA
SIS-I-820-17-02 protection and preservation. Cat-B 152
FJBG-820-003
MPS-I-820-17-01
INSTALLATION INSPECTION OF (300WX50H) PERFORATED Provide end cover for channel tray.
53 Not Defined A554-G-822-IC-GIR-3319 TRAY AND CHANNEL TRAY FOR FIRE ALARM SYSTEM @ STF Closed KSS End Cover IC-3319-1 Closed Closed Closed Done MCC ROOM f. Secusana Jessy Jose B. Depino 5331 Accepted
MCC ROOM Cat-B
INSTALLATION INSPECTION OF (300WX50H) PERFORATED Provide stencil for channel tray system
54 Not Defined A554-G-822-IC-GIR-3319 TRAY AND CHANNEL TRAY FOR FIRE ALARM SYSTEM @ STF Closed KSS Label Marking IC-3319-2 MCC ROOM f. Secusana Jessy Jose B. Depino 5298 Accepted
MCC ROOM name identification. Cat-B
INSTALLATION INSPECTION OF (300WX50H & 100WX50H) All sharp edges to be provided rubber
TELECOM ROOM, PIB AND
56 Not Defined A554-G-822-IC-GIR-3539 PERFORATED TRAY AND CHANNEL TRAY FOR FIRE ALARM Closed KSS Gromment IC-3539-1 protection gromment for cable Closed Closed Closed Done
AIRLOCK
f. Secusana Jessy Vener Gutierrez 5349 Accepted
SYSTEM @ STF/ TELECOM ROOM, PIB AND AIRLOCK
protection. Cat-B
VISUAL INSPECTION FOR INSTALLATION OF CHANNEL All channel tray opening entry on the
71 A554-G-822-IC-GIR-4198 CABLE TRAY STF Open KSS kick plate IC-4198-1 grating to be provided with kick plate. A. Kamal Jessy Jose B. Depino
UP SIDE OF V-4451 (100W x 50H & 50W x 50H)
VISUAL INSPECTION FOR INSTRUMENT PRIMARY CABLE
Cat-C
TERMINATION AT MARSHALLING CABINET TO FIELD
INSTRUMENT JUNCTION BOX.
I-822-PT-976012 I-822-TT-976103 I-822-TT-
I-FJBB-820-131 Excluded on the this RFI
976144 I-822-TT-976146 terminal strip (TS) # 9 & 10 from the
72 A554-G-822-IC-GIR-4454A
I-822-PT-976202
976145
I-822-TT-976104 I-822-TT-
STF Open KSS Drawing IC-4454-1
connection list showing spare, But P/R 3/07-1, PR 3/04-3, PR3/04-2 Asad Kamal Jessy Jose Depino
I-822-FT-976010 I-822-PT-976302 I-822-TT- there is cable connection actual
976105
I-822-FT-976304 I-822-PT-976210 I-822-TT-
installed with tag # ZSC-495807A &
976106 ZSC-495807B.
I-822-FT-976204
VISUAL
976143
INSPECTION FORI-822-LIT-976211 I-822-TT-
INSTALLATION OF INSTRUMENT Instrument cable secondary to be
SECONDARY CABLE FROM INSTRUMENT JUNCTION BOX TO
FIELD INSTRUMENT. properly arrange along the ladder &
73 A554-G-822-IC-GIR-4456 I-822-TT-976011 STF Open KSS Clean & Dress IC-4456-1 channel tray and removed others V-4450 Asad Kamal Jessy Jose Depino
I-822-TT-976111
I-822-TT-976212 materials above cable prior for cable
I-822-TT-976301 tray cover.
VISUAL INSPECTION FOR INSTALLATION OF CHANNEL Opening entry of channel tray on the
UP SIDE OF V-4445 @ SITE TANK
74 A554-G-822-IC-GIR-4520 CABLE TRAY STF Open KSS kick plate IC-4520-1 grating to be provided with kick plate FARM AREA
Asad Jessy Jose Depino
UP SIDE OF V-4445 (100W x 50H & 50W x 50H)
and apply touch up paint. Cat-C
VISUAL INSPECTION FOR INSTALLATION OF CHANNEL Channel tray opening entry on the
CABLE TRAY UP SIDE OF V-4440, V-4510, V-
75 A554-G-822-IC-GIR-4552
UP SIDE OF V-4440, V-4510, V-4505 (100W x 50H & 50W x
STF Open KSS kick plate IC-4552-1 grating to be provided with kick plate 4505
A. Kamal Jessy Jose B. Depino
50H) and touch paint. Cat-C
VISUAL INSPECTION FOR INSTALLATION OF CHANNEL
76 A554-G-822-IC-GIR-4552
CABLE TRAY
STF Closed KSS Clean & Dress IC-4552-2
Cable dressing to be finally arrange Closed Closed Closed Done
UP SIDE OF V-4440, V-4510, V-
A. Kamal Jessy Jose B. Depino 5288 Accepted
UP SIDE OF V-4440, V-4510, V-4505 (100W x 50H & 50W x
50H)
prior for tray cover . Cat-C 4505
84 A554-G-822-IC-GIR-4673
I-820-LUT-451004B-1
I-820-LUT-450504A-1 STF Open KSS Drawing IC-4673-1
Device side connection list not as per V-4450, V-4451, V-4445, V-4440,
A. Kamal Jessy Jose B. Depino
I-820-LUT-450504B-1 actual to be updated. Cat-C V-4441, V-4510, V-4505
I-820-LUT-445004A-2
I-820-LUT-445004B-2
I-820-LUT-445204A-2
I-820-LUT-445204B-2
VISUAL INSPECTION FOR INSTALLATION OF CHANNEL
I-820-LUT-444504A-2
Channel tray on V-4315 and V-4312
CABLE TRAY UP SIDE OF V-4305, V-4300, V-
85 A554-G-822-IC-GIR-4826 I-820-LUT-444504B-2
UP SIDE OF V-4305, V-4300, V-4307, V-4310, V-4315 & V-
STF Open KSS Support IC-4826-1 Excluded on this RFI, T-Fittings not 4307, V-4310, V-4315 & V-4312
A. Kamal Jessy Jose B. Depino
I-820-LUT-444004A-2
4312 (100W x 50H & 50W x 50H)
I-820-LUT-444004B-2
installed.
I-820-LUT-444304A-2
I-820-LUT-444304B-2
VISUAL INSPECTION FOR INSTALLATION OF PRESSURE
I-820-LUT-451004A-2
TRANSMITTER IN NEAR PIPE RACK 3/02 AREA @
I-820-LUT-451004B-2 Round SS Tag
86 A554-G-822-IC-GIR-4856 FEEDSTOCK TANK FARM AREA
I-820-LUT-450504A-2
STF Closed KSS
No.
IC-4856-1 Round S/S tag to be provided. Closed Closed Closed Done PIPE RACK 3/02 AREA J. Canlas Cris Vener Gutierrez 5349 Accepted
822-PT-996752
I-820-LUT-450504B-2
822-PT-996762
VISUAL INSPECTION FOR INSTALLATION OF ON AND OFF
VALVE IN V-4451,V-4450,V-4445,V-4440,V-4441,V-4510 @
SITE TANK FARM 820-EBV-444002, 820-EBV-444011, 820-
87 A554-G-822-IC-GIR-5109
EBV-444013, 820-EBV-444302, 820-EBV-4311, 820-EBV-
STF Open KSS PVC Cap IC-5109-1
PVC cap missing for 820EBV- V-4451,V-4450,V-4445,V-4440,V-
J. Canlas Cris Vener Gutierrez
444502, 820-EBV-444511, 820-EBV-444513, 820-EBV- 444002/444302/445002445013. Cat-B 4441,V-4510
445002, 820-EBV-445011, 820-EBV-445013, 820-EBV-
445202, 820-EBV-445211, 820-EBV-445213, 820-EBV-
VISUAL
450011,INSPECTION FOR INSTALLATION
820-EBV-451002, OF ON AND OFF
820-EBV-451011
VALVE IN V-4451,V-4450,V-4445,V-4440,V-4441,V-4510 @
SITE TANK FARM 820-EBV-444002, 820-EBV-444011, 820-
EBV-444013, 820-EBV-444302, 820-EBV-4311, 820-EBV- V-4451,V-4450,V-4445,V-4440,V-
88 A554-G-822-IC-GIR-5109 444502, 820-EBV-444511, 820-EBV-444513, 820-EBV- STF Open KSS Bug Screen IC-5109-2 Bug screen and breather missing. Cat-B 4441,V-4510 J. Canlas Cris Vener Gutierrez
445002, 820-EBV-445011, 820-EBV-445013, 820-EBV-
445202, 820-EBV-445211, 820-EBV-445213, 820-EBV-
450011, 820-EBV-451002, 820-EBV-451011
VISUAL INSPECTION FOR INSTALLATION OF INSTRUMENT
AIRLINE FROM ( HEADER 820-IA-002 TO VALVES ) IN V- Kickplate on airline entry on grating to
89 A554-G-822-IC-GIR-5112 4450 AREA @ SITE TANK FARM 820-EBV-445010, 820-EBV- STF Open KSS kick plate IC-5112-1 V-4450 AREA J. Canlas Cris Vener Gutierrez
445013, 820-EBV-445002, 820-EBV-445011, 820-EBV- be provided "B" punch.
445211, 820-PV-445001A
VISUAL INSPECTION FOR INSTALLATION OF ON AND OFF
VALVE IN V-4305,V-4307,V-4310,V-4312,V-4315 @ SITE
TANK FARM 820-EBV-430502, 820-EBV-430510, 820-EBV- Broken breather shall be replaced. Cat-
90 A554-G-822-IC-GIR-5116 430511, 820-EBV-430711, 820-EBV-431002, 820-EBV- STF Open KSS Bug Screen IC-5116-2 V-4305,V-4307,V-4310,V-4312,V-4315 J. Canlas Hilal Vener Gutierrez
431011, 820-EBV-431013, 820-EBV-431014, 820-EBV- B
431202, 820-EBV-431210, 820-EBV-431211, 820-EBV-
431502, 820-EBV-431511
VISUAL INSPECTION FOR INSTALLATION OF ON AND OFF
VALVE IN V-4305,V-4307,V-4310,V-4312,V-4315 @ SITE
TANK FARM 820-EBV-430502, 820-EBV-430510, 820-EBV-
91 A554-G-822-IC-GIR-5116 430511, 820-EBV-430711, 820-EBV-431002, 820-EBV- STF Open KSS Bug Screen IC-5116-3 Bugscreen not installed. Cat-B V-4305,V-4307,V-4310,V-4312,V-4315 J. Canlas Hilal Vener Gutierrez
431011, 820-EBV-431013, 820-EBV-431014, 820-EBV-
431202, 820-EBV-431210, 820-EBV-431211, 820-EBV-
431502, 820-EBV-431511
VISUAL INSPECTION FOR INSTALLATION OF ON AND OFF
VALVE IN V-4305,V-4307,V-4310,V-4312,V-4315 @ SITE
TANK FARM 820-EBV-430502, 820-EBV-430510, 820-EBV-
92 A554-G-822-IC-GIR-5116 430511, 820-EBV-430711, 820-EBV-431002, 820-EBV- STF Open KSS PVC Cap IC-5116-4 PVC cap missing. Cat-B V-4305,V-4307,V-4310,V-4312,V-4315 J. Canlas Hilal Vener Gutierrez
431011, 820-EBV-431013, 820-EBV-431014, 820-EBV-
431202, 820-EBV-431210, 820-EBV-431211, 820-EBV-
431502,INSPECTION
VISUAL 820-EBV-431511
FOR INSTALLATION OF ON AND OFF
VALVE IN PUMP AREA NEAR PIPE RACK 3/05 @ SITE TANK
FARM 820-ABV-440015, 820-ABV-440033, 820-ABV-
440034, 820-ABV-440035, 820-ABV-440036, 820-ABV- PUMP AREA NEAR PIPE RACK
93 A554-G-822-IC-GIR-5117
440040, 820-ABV-440108, 820-ABV-440534, 820-ABV-
STF Open KSS Bug Screen IC-5117-1 Bugscreen to be install. (Metallic) 3/05
J. Canlas Cris Vener Gutierrez
440515, 820-ABV-440535, 820-ABV-440608, 820-ABV-
440733, 820-ABV-440734, 820-ABV-440735, 820-ABV-
VISUAL
440743 INSPECTION FOR INSTALLATION OF ON AND OFF
VALVE IN PUMP AREA NEAR PIPE RACK 3/05 @ SITE TANK
FARM 820-ABV-440015, 820-ABV-440033, 820-ABV-
440034, 820-ABV-440035, 820-ABV-440036, 820-ABV- PUMP AREA NEAR PIPE RACK
94 A554-G-822-IC-GIR-5117
440040, 820-ABV-440108, 820-ABV-440534, 820-ABV-
STF Open KSS Breather IC-5117-2 Breather to be install. (Non-Metallic) 3/05
J. Canlas Cris Vener Gutierrez
440515, 820-ABV-440535, 820-ABV-440608, 820-ABV-
440733, 820-ABV-440734, 820-ABV-440735, 820-ABV-
440743 INSPECTION FOR INSTALLATION OF ON AND OFF
VISUAL
VALVE IN PUMP AREA NEAR PIPE RACK 3/02,3/01-2,3//01-
95 A554-G-822-IC-GIR-5161
2 @ SITE TANK FARM 820-ABV-431035, 820-ABV-431108,
820-ABV-431235, 820-ABV-431433, 820- BV-431434, 820- STF Open KSS Bug Screen IC-5161-1
Provide breather and bugscreen along PUMP AREA NEAR PIPE RACK
J. Canlas Cris Vener Gutierrez
ABV-431435, 820-ABV-431443, 820-ABV-431535, 820-ABV- the valve. 3/02,3/01-2,3//01-2
431608, 820-ABV-431734, 820-ABV-431833, 820-ABV-
431843, 820-ABV-431743, 820-ABV-431733
VISUAL INSPECTION FOR INSTALLATION OF ON AND OFF
VALVE IN PUMP AREA NEAR PIPE RACK 3/04-4,3/04-5 @
96 A554-G-822-IC-GIR-5163
SITE TANK FARM 820-ABV-441015, 820-ABV-441108, 820-
STF Open KSS Bug Screen IC-5163-1
Provide breather and bugscreen along PUMP AREA NEAR PIPE RACK
J. Canlas Cris Vener Gutierrez
ABV-441233, 820-ABV-441246, 820-ABV-41515, 820-ABV-
441533, 820-ABV-441534, 820-ABV-441536, 820-ABV-
the valve. 3/04-4,3/04-5
17 of 17