Sei sulla pagina 1di 34

STAR RAFİNERİ, A.Ş.

CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 2/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

TABLE OF CONTENTS

1.  PURPOSE 3 
2.  SCOPE 3 
3.  DEFINITIONS 3 
4.  REFERENCES 4 
5.  PAINTING REPAIR PROCEDURE FOR PIPING 6 
6.  GENERAL APPLICATION CONDITIONS 32 
7.  ATTACHMENTS AND TEMPLATES 32 
 

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 3/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

1. PURPOSE

This general procedure defines the type, materials and methods of application for the painting repair
works which will be carried out at piping and it’s inline components such as fittings, supports,…etc. at
ARP Project.

2. SCOPE

This procedure covers the guidelines for surface preparation, paint materials, painting systems and
application of paints during the repair works for piping and it’s inline components. The protective
coating systems specified include Surface preparation, paint material selection, paint application
methods.

3. DEFINITIONS

OWNER: STAR RAFİNERİ, A.Ş. (STAR)

CONTRACTOR: Joint Venture between Técnicas Reunidas (TR), Saipem (SP), GS E&C
and Itochu.

PROJECT: Means the Aegean Refinery (AR) Project, being executed by OWNER or its
affiliates.

SUBCONTRACTOR: Entity (and its legal successors in title) named as Subcontractor in the Contractor
purchase order and/or the contract awarded to the Subcontractor to perform
specific services and/or works

TANK “EC” The party which shall carry out all engineering, design and mechanical
CONTRACTOR : fabrication for the storage tanks (except sphere tanks) as per the work spit
between Tank EC contractor and Tank P contractor. In addition, it shall carry
out all the material procurements, surface preparation, installation, inspection
and testing of the lining systems.

TANK “P” The party which shall supply materials for tank fabrication in the site as per
CONTRACTOR : the work split between Tank EC contractor and Tank P contractor.

INSPECTOR: The individual responsible for implementing the inspection function specified
in the contract documents in order to minimize or eliminated defects or failures.

MANUFACTURER: The manufacturer of the lining system(s) and paint materials.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 4/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

4. REFERENCES

The Society for Protective Coating (SSPC)


ISO 4628 Standard
ASTM - American Society for Testing and Materials
Colors in accordance with RAL-F2 color card
Paint Manufacturer's Instructions
ISO 1461 Standard
ISO 12944-4 Standard
NACE RP0198-2010: Control of Corrosion Under Thermal Insulation and Fireproofing Materials
“RAL 840 HR" issued by "DEUTSCHER NORMENAUSSCHUSS”
STGPS-N1-6
SSPC-VIS 2
ASTM D610
Request for Information (RI’s)
 RI-DIR-0004: Painting System for Bulk Valves
 RI-DIR-0007 : Painting System for Piping subject to Sea Water Spray and Slashes
 RI-DIR-0008 : Final Color for Pressure Vessel >120ºC
 RI-DIR-0011 : Painting System for Static Equipment to be insulated for personnel protection

 WR-DIR-0002: Painting General Specification


Code: ASME Section VIII Division 1 & Division 2, ASME Sec. V, ASME Sec IX
Painting Spec – Turkey (STGPS – N1)
American Steel Structures Painting Council Standards
SSPC - PA1 Shop, Field and Maintenance Painting
SSPC - PA2 Measurement of Dry Paint Thickness with Magnetic Gauges
SSPC - SP1 Solvent Cleaning
SSPC - SP2 Hand Tool Cleaning
SSPC - SP3 Power Tool Cleaning
SSPC - SP5 White Metal Blast Cleaning
SSPC - SP7 Brush-off Blast Cleaning
ISO 12944-6- Paints and varnishes -- Corrosion protection of steel
Structures by protective paint systems -- Part 6: Laboratory performance test methods.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 5/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

OWNER SPECIFICATIONS AND PROCEDURES

000-A-PE-0020008 Authority Requirements and Technical Standards.

000-A-EE-0190137 Tank internal lining.

STGPS-N1 Painting – General project design specification.

STGPS-W1 Field construction, supervision, inspection and testing requirements.

PROJECT PROCEDURES

000-A-EE-0190410 Construction Quality Plan.

000-A-EE-0190407 Construction Subcontractors Quality Requirements.

000-A-EE-0190406 Control Procedure for Inspection, Measuring and Testing Equipment.

000-A-EE-0190403 Material Identification and Traceability Procedure.

000-A-EE-0190605 Site Inspection Procedure.

000-A-EE-0190414 Site Non-conformity Control and Corrective Action Procedure.

000-A-EE-0190608 Material Control Procedure.

000-A-EE-0190611 Preservation Control Procedure.

000-A-EE-0190502 Site Quality Records.


000-A-EE-0190420 Site QC Painting & Coating Plan

TERMS AND ABBREVIATIONS

Abrasive Blast Cleaning: Also called abrasive-blasting, a surface preparation method that uses
an abrasive propelled by air pressure, centrifugal force, or water pressure to clean and usually to
add a profile (anchor pattern) to a surface.
Anchor Pattern (Profile): contour of a blast-cleaned surface, it is classified by peaks-to-valleys
depth (amplitude) and texture (dense, rounded or angular).
Dry-Film Thickness: Thickness of cured film, usually expressed in micrometres (or micron,
millionth of a meter).

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 6/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

Holding Primer: A thin-film primer applied to prevent rust blooming prior to the application of the
subsequent build-up lining system.
Holiday: A discontinuity in a protective lining that exposes an unprotected surface to the
environment.
Holiday Detector, Low-Voltage Wet-Sponge Type: An instrument that uses 5 to 90V DC for
detecting holidays in a lining. It is typically used for linings less than 500 micron (dry film
thickness) thick.
Holiday Detector, High-Voltage Type: Also called spark-tester, it’s an instrument for detecting
holidays in a non-conductive coating applied over a conductive substrate. A spark-test instrument
applies a high-voltage (thousands of volt) to the surface with a probe that creates a spark
whenever a holiday, pinhole, or other film defect is found.
The spark triggers an alarm or light on the instrument.The voltage used depends on the lining
type and thickness. It is typically used for linings thicker than 500 micron (dry film thickness).
Manufacturer’s Technical Data Sheet: Sheet printed by the supplier of a product to provide
instructions and information on its use.
Operating Temperature: Means “Maximum operating temperature”
Pot-Life: the elapsed time within which a coating can be effectively applied after all components
of the coating have been thoroughly mixed.
Shelf-Life: the maximum length of time packaged materials (e.g. coating materials) can be
stored at specified conditions and remain in usable conditions.
Shop-Primer: synonymous of Prefabrication Primer (see above).

5. PAINTING REPAIR PROCEDURE FOR PIPING & INLINE COMPONENTS

5.1 REPAIR WORKS FOR SYSTEM 2-1 (PIPING & INLINE COMPONENTS)

5.1.1 PAINT SYSTEM 2.1 – (temp. up to 120 °C); 
 Primer: ZINC RICH EPOXY / INORGANIC ZINC……….….75 mµ
 Intermediate: POLYAMIDE EPOXY ………………………..125 mµ
 Finish: ALIPHATIC ACRYLIC POLYURETHANE.……...…..50 mµ

SPECIFIED TOUCH UP SYSTEM FOR SYS 2.1; 
 Primer: SURFACE TOLERANT EPOXY………….…..100~125 mµ
 Intermediate: POLYAMIDE EPOXY ………………….……..125 mµ

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 7/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

 Finish: ALIPHATIC ACRYLIC POLYURETHANE.……...…..50 mµ

A. SPECIFIED SYSTEM by JOTUN MANUFACTURER (SYS 2.1 temp. up to 120 °C); 
 BARRIER 80 / RESIST 78.……………….………………........75 mµ
 PENGUARD EXPRESS XT……...…………………………...125 mµ
 HARDTOP XP……………………………………………….…...50 mµ
B. RECOMMENDED TOUCH UP REPAIR SYSTEM by JOTUN; 
 JOTAMASTIC 80…………………….……………...……100~125 mµ
 PENGUARD EXPRESS XT…………………………….……..125 mµ
 HARDTOP XP……………………………………………….……50 mµ
5.1.2 SURFACE PREPARATION

a) On the surfaces to be painted, all grease, oils and salts and other contaminants shall be cleaned
according to SSPC SP1 and high pressure fresh water washing.
b) For small defects;
Small defects defined as less than 50cm X 50cm dimensions can be power tool cleaned to a
minimum of ISO St 3 standard with a profile of no less than 25 microns.
c) For large defects;
The defects which are larger than 50cm X 50cm dimensions shall be spot blasted either by vacuum
blasting, or other suitable blasting equipment,
d) The edge to the sound surrounding paint shall be feathered back at least 3 centimeters and the
surrounding paint abraded as far as the touch-up overlap will be painted according to Painting
Specification.
e) Blast cleaning shall be made in a covered area, provided by Contractor, to prevent dust spread
on the surrounding areas. For blast cleaning the approval of Owner is required.
f) After blasting all spent abrasive or grit must be removed by vacuum cleaner or by air blowing and
brush

5.1.3 TOUCH UP REPAIR APPLICATION PROCEDURE;


* For the minor coating damages not exposing to steel substrate / (áreas below 50cmx 50cm)
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of midcoat or topcoat according to the depth of the damage through the paint film.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 8/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

 If the damage is only on the topcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and only topcoat may be applied.
 If the damage penetrates down to midcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and application of mid coat & topcoat may proceed.Care should be
taken to minimize overlapping of midcoat on top of topcoat.

* For the minor coating damages exposing to steel substrate / Rusted áreas (below 50cmx50cm);

1. Removal of oil, grase, weld fumes (on the welding seams) etc. and any other posible contamination.
Weld fumes to be removed by fresh water washing.
2. Min. St 2 – St 3 (ISO 8501-1) surface preparation standard to be achieved over the damaged / rusted
spot local area.
3. Feathering the edges of existing undamaged coating (Sharp edges of intact coating should be
feathered), followed by application of repair paint system.

4. Roughening the undamaged paint film around the damaged area to have a good adhesion on overlap
areas
5. Application of Surface tolerant mastic epoxy in specified DFT as primer. (RESIST 78 or BARRIER 80
may not be applied on top of St2 – St 3 – ISO 8501-1 mechanically prepared surfaces.)
Care should be taken to prevent overlapping of JOTAMASTIC 80 on intact HARDTOP XP film.
For areas Sa 2½ (ISO 8501-1) blasting is not possible due to site conditions after erection, surface
tolerant mastic epoxy which may be applied on top of mecanical surface preparation as primer prefered
instead of RESIST 78 & BARRIER 80 for minor touch-up applications.
After surface tolerant mastic epoxy application on the damaged area midcoat (PENGUARD EXPRESS
XT) and final coat (HARDTOP XP) application may proceed.
Minor touch-up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 9/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

Airless spraying during windy conditions may promote dry- spray formation and uneven thickness. If a
situation may arise it should be rectified prior to following coat application. Site HSE rules has to be
followed.
All coating works has to be carried out according to the project specifications and instructions stated in
technical data sheets and Application Guide of the products.
Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.

Paint application shouldn’t be done under the circumferences determined below:


 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.
 If ambient or surface temperature is below/above the temperature that the manufacturer
defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.

5.2 REPAIR WORKS FOR SYSTEM 2-2 (PIPING & INLINE COMPONENTS)

5.2.1 PAINT SYSTEM 2.2 – (temp. between 101 °C to 200 °C); 
 Primer: INORGANIC ZINC .……………………………….….75 mµ
 Intermediate: SILICONE ACRYLIC ………………………….40 mµ
 Finish: SILICONE ACRYLIC ……………………...……...…..40 mµ
SPECIFIED TOUCH UP SYSTEM FOR SYS 2.2; 
 Primer: PHENOLIC EPOXY………………………….….…..125 mµ
 Intermediate: SILICONE ACRYLIC ………………..…….…..40 mµ
 Finish: SILICONE ACRYLIC……………………….……...…..40 mµ
C. SPECIFIED SYSTEM by JOTUN MANUFACTURER ; 
 RESIST 78……………………………….………………..........75 mµ
 SOLVALIT MIDTHERM ALU ……...……………………….....40 mµ
 SOLVALIT MIDTHERM ALU ………………………………….40 mµ
D. RECOMMENDED TOUCH UP REPAIR SYSTEM by JOTUN; 

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 10/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

 EPOXY HR…………………….……………...…………….…125 mµ
 SOLVALIT MIDTHERM ALU ……...……………………….....40 mµ
 SOLVALIT MIDTHERM ALU ………………………………….40 mµ
 
5.2.2 SURFACE PREPARATION

a) On the surfaces to be painted, all grease, oils and salts and other contaminants shall be cleaned
according to SSPC SP1 and high pressure fresh water washing.
b) For small defects;
Small defects defined as less than 50cm X 50cm dimensions can be power tool cleaned to a
minimum of ISO St 3 standard with a profile of no less than 25 microns.
c) For large defects;
The defects which are larger than 50cm X 50cm dimensions shall be spot blasted either by vacuum
blasting, or other suitable blasting equipment,
d) The edge to the sound surrounding paint shall be feathered back at least 3 centimeters and the
surrounding paint abraded as far as the touch-up overlap will be painted according to Painting
Specification.
e) Blast cleaning shall be made in a covered area, provided by Contractor, to prevent dust spread
on the surrounding areas. For blast cleaning the approval of Owner is required.
f) After blasting all spent abrasive or grit must be removed by vacuum cleaner or by air blowing and
brush

5.2.3 TOUCH UP REPAIR APPLICATION PROCEDURE;


* For the minor coating damages not exposing to steel substrate / (áreas below 50cmx 50cm)
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of midcoat or topcoat according to the depth of the damage through the paint film.
 If the damage is only on the topcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and only topcoat may be applied.
 If the damage penetrates down to midcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and application of mid coat & topcoat may proceed.Care should be
taken to minimize overlapping of midcoat on top of topcoat.

* For the minor coating damages exposing to steel substrate / Rusted áreas (below 50cmx50cm);

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 11/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

1. Removal of oil, grase, weld fumes (on the welding seams) etc. and any other posible contamination.
Weld fumes to be removed by fresh water washing.
2. Min. St 2 – St 3 (ISO 8501-1) surface preparation standard to be achieved over the damaged / rusted
spot local area.
3. Feathering the edges of existing undamaged coating (Sharp edges of intact coating should be
feathered), followed by application of repair paint system.

4. Roughening the undamaged paint film around the damaged area to have a good adhesion on overlap
areas
5. Application of EPOXY HR in specified DFT as primer. (RESIST 78 may not be applied on top of St2 –
St 3 – ISO 8501-1 mechanically prepared surfaces.)
Care should be taken to prevent overlapping EPOXY HR on intact SOLVALITT ALU film
For Areas, Sa 2½ (ISO 8501-1) blasting may not be so practical due to site conditions after erection, thus
EPOXY HR which may be applied on top of mecanical surface preparation as primer prefered instead
of RESIST 78 for minor TU applications.
After EPOXY HR application on the damaged area following specified coats ( 2 X SOLVALIT MIDTHERM
ALU) application may proceed.
Minor touch-up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.
Airless spraying during windy conditions may promote dry- spray formation and uneven thickness. If a
situation may arise it should be rectified prior to following coat application. Site HSE rules has to be
followed.
All coating works has to be carried out according to the project specifications and instructions stated in
technical data sheets and Application Guide of the products.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 12/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.

Paint application shouldn’t be done under the circumferences determined below:


 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.
 If ambient or surface temperature is below/above the temperature that the manufacturer
defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.

5.3 REPAIR WORKS FOR SYSTEM 2-3 (PIPING & INLINE COMPONENTS)

5.3.1 PAINT SYSTEM 2.3 – (temp. between 201 °C to 400 °C); 
 Primer: INORGANIC ZINC .……………………………….….75 mµ
 Intermediate: SILICONE ALUMINIUM……………………….25 mµ
 Finish: SILICONE ALUMINIUM…………………...……...…..25 mµ
SPECIFIED TOUCH UP SYSTEM FOR SYS 2.3; 
 Primer: MULTIPOLYMERIC MATRIX COATING….….…..100 mµ
 Intermediate: SILICONE ALUMINIUM…...………..…….…..25 mµ
 Finish: SILICONE ALUMINIUM …………….…….……...…..25 mµ
E. SPECIFIED SYSTEM by JOTUN MANUFACTURER ; 
 RESIST 78……………………………….………………..........75 mµ
 SOLVALIT ALU ……...………………………..…………….....25 mµ
 SOLVALIT ALU ……………………………………………..….25 mµ
F. RECOMMENDED TOUCH UP REPAIR SYSTEM by JOTUN; 
 JOTATEMP 650……………….……………...…………….…100 mµ
 SOLVALIT ALU ……...………………...…………………….....25 mµ
 SOLVALIT ALU ………………………………………...……….25 mµ
 

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 13/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

5.3.2 SURFACE PREPARATION

a) On the surfaces to be painted, all grease, oils and salts and other contaminants shall be cleaned
according to SSPC SP1 and high pressure fresh water washing.
b) For small defects;
Small defects defined as less than 50cm X 50cm dimensions can be power tool cleaned to a
minimum of ISO St 3 standard with a profile of no less than 25 microns.
c) For large defects;
The defects which are larger than 50cm X 50cm dimensions shall be spot blasted either by vacuum
blasting, or other suitable blasting equipment,
d) The edge to the sound surrounding paint shall be feathered back at least 3 centimeters and the
surrounding paint abraded as far as the touch-up overlap will be painted according to Painting
Specification.
e) Blast cleaning shall be made in a covered area, provided by Contractor, to prevent dust spread
on the surrounding areas. For blast cleaning the approval of Owner is required.
f) After blasting all spent abrasive or grit must be removed by vacuum cleaner or by air blowing and
brush
 
5.3.3 TOUCH UP REPAIR APPLICATION PROCEDURE;
* For the minor coating damages not exposing to steel substrate / (áreas below 50cmx 50cm)
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of midcoat or topcoat according to the depth of the damage through the paint film.
 If the damage is only on the topcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and only topcoat may be applied.
 If the damage penetrates down to midcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and application of mid coat & topcoat may proceed.Care should be
taken to minimize overlapping of midcoat on top of topcoat.

* For the minor coating damages exposing to steel substrate / Rusted áreas (below 50cmx50cm);

1. Removal of oil, grase, weld fumes (on the welding seams) etc. and any other posible contamination.
Weld fumes to be removed by fresh water washing.
2. Min. St 2 – St 3 (ISO 8501-1) surface preparation standard to be achieved over the damaged / rusted
spot local area.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 14/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

3. Feathering the edges of existing undamaged coating (Sharp edges of intact coating should be
feathered), followed by application of repair paint system.

4. Roughening the undamaged paint film around the damaged area to have a good adhesion on overlap
areas
5. Application of JOTATEMP 650 in specified DFT as primer. (RESIST 78 may not be applied on top of
St2 – St 3 – ISO 8501-1 mechanically prepared surfaces.)
Care should be taken to prevent overlapping JOTATEMP 650 on intact SOLVALITT ALU film
For Areas, Sa 2½ (ISO 8501-1) blasting may not be so practical due to site conditions after erection, thus
JOTATEMP 650 which may be applied on top of mechanical surface preparation as primer prefered
instead of RESIST 78 for minor touch up applications.

After JOTATEMP 650 application on the damaged area following specified coats (2 X SOLVALIT ALU)
application may proceed.
Minor touch-up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.
Airless spraying during windy conditions may promote dry- spray formation and uneven thickness. If a
situation may arise it should be rectified prior to following coat application. Site HSE rules has to be
followed.
All coating works has to be carried out according to the project specifications and instructions stated in
technical data sheets and Application Guide of the products.
Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 15/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

Paint application shouldn’t be done under the circumferences determined below:


 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.
 If ambient or surface temperature is below/above the temperature that the manufacturer
defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.

5.4 REPAIR WORKS FOR SYSTEM 2-4 (PIPING & INLINE COMPONENTS)

5.4.1 PAINT SYSTEM 2.4 – (temp. between 401 °C to 600 °C); 
 Primer:SILICONE PRIMER.……………………………….….25 mµ
 Finish: SILICONE ALUMINIUM…………………...……...…..25 mµ
SPECIFIED TOUCH UP SYSTEM FOR SYS 2.4; 
 Primer: MULTIPOLYMERIC MATRIX COATING….….……50 mµ
 Finish: SILICONE ALUMINIUM …………….…….……...…..25 mµ
G. SPECIFIED SYSTEM by JOTUN MANUFACTURER ; 
 SOLVALIT ALU ……...………………………..…………….....25 mµ
 SOLVALIT ALU ……………………………………………..….25 mµ
H. RECOMMENDED TOUCH UP REPAIR SYSTEM by JOTUN; 
 JOTATEMP 650……………….……………...………….….….50 mµ
 SOLVALIT ALU ………………………………………...……….25 mµ
 
5.4.2 SURFACE PREPARATION

a) On the surfaces to be painted, all grease, oils and salts and other contaminants shall be cleaned
according to SSPC SP1 and high pressure fresh water washing.
b) For small defects;
Small defects defined as less than 50cm X 50cm dimensions can be power tool cleaned to a
minimum of ISO St 3 standard with a profile of no less than 25 microns.
c) For large defects;
The defects which are larger than 50cm X 50cm dimensions shall be spot blasted either by vacuum
blasting, or other suitable blasting equipment,

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 16/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

d) The edge to the sound surrounding paint shall be feathered back at least 3 centimeters and the
surrounding paint abraded as far as the touch-up overlap will be painted according to Painting
Specification.
e) Blast cleaning shall be made in a covered area, provided by Contractor, to prevent dust spread
on the surrounding areas. For blast cleaning the approval of Owner is required.
f) After blasting all spent abrasive or grit must be removed by vacuum cleaner or by air blowing and
brush
 
5.4.3 TOUCH UP REPAIR APPLICATION PROCEDURE;
* For the minor coating damages not exposing to steel substrate / (áreas below 50cmx 50cm)
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of midcoat or topcoat according to the depth of the damage through the paint film.
 If the damage is only on the topcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and only topcoat may be applied.
* For the minor coating damages exposing to steel substrate / Rusted áreas (below 50cmx50cm);

1. Removal of oil, grase, weld fumes (on the welding seams) etc. and any other posible contamination.
Weld fumes to be removed by fresh water washing.
2. Min. St 2 – St 3 (ISO 8501-1) surface preparation standard to be achieved over the damaged / rusted
spot local area.
3. Feathering the edges of existing undamaged coating (Sharp edges of intact coating should be
feathered), followed by application of repair paint system.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 17/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

4. Roughening the undamaged paint film around the damaged area to have a good adhesion on overlap
areas
5. Application of JOTATEMP 650 in specified DFT as primer. (SOLVALITT ALU may not be applied on
top of St2 – St 3 – ISO 8501-1 mechanically prepared surfaces.)
Care should be taken to prevent overlapping JOTATEMP 650 on intact SOLVALITT ALU film
For Areas, Sa 2½ (ISO 8501-1) blasting may not be so practical due to site conditions after erection, thus
JOTATEMP 650 which may be applied on top of mechanical surface preparation as primer prefered
instead of SOLVALITT ALU for minor TU applications.
After JOTATEMP 650 application on the damaged area following specified coats ( 1 X SOLVALIT ALU)
application may proceed.
Minor touch-up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.
Airless spraying during windy conditions may promote dry- spray formation and uneven thickness. If a
situation may arise it should be rectified prior to following coat application. Site HSE rules has to be
followed.
All coating works has to be carried out according to the project specifications and instructions stated in
technical data sheets and Application Guide of the products.
Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.

Paint application shouldn’t be done under the circumferences determined below:


 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.
 If ambient or surface temperature is below/above the temperature that the manufacturer
defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.

5.5 REPAIR WORKS FOR 2.5 (FOR INSULATED SERVICES)

5.5.1 PAINT SYSTEM 2.5 – (temp. up to 150 °C); 
SPECIFIED SYSTEM (SYS 2.5 up to 150 ° C)
 EPOXY HR………………200 mµ

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 18/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

SPECIFIED TOUCH UP SYSTEM FOR SYS 2.5; 
 EPOXY HR 200 mµ

5.5.2 SURFACE PREPARATION

a) On the surfaces to be painted, all grease, oils and salts and other contaminants shall be cleaned
according to SSPC SP1 and high pressure fresh water washing.
b) For small defects;
Small defects defined as less than 50cm X 50cm dimensions can be power tool cleaned to a
minimum of ISO St 3 standard with a profile of no less than 25 microns.
c) For large defects;
The defects which are larger than 50cm X 50cm dimensions shall be spot blasted either by vacuum
blasting, or other suitable blasting equipment,
d) The edge to the sound surrounding paint shall be feathered back at least 3 centimeters and the
surrounding paint abraded as far as the touch-up overlap will be painted according to Painting
Specification.
e) Blast cleaning shall be made in a covered area, provided by Contractor, to prevent dust spread
on the surrounding areas. For blast cleaning the approval of Owner is required.
f) After blasting all spent abrasive or grit must be removed by vacuum cleaner or by air blowing and
brush

5.5.3 TOUCH UP REPAIR APPLICATION PROCEDURE;


* For the minor coating damages not exposing to steel substrate / (áreas below 50cmx 50cm)
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of the same paint according to the depth of the damage through the paint film.
* For the minor coating damages exposing to steel substrate / Rusted áreas (below 50cmx50cm);
1. Removal of oil, grease, weld fumes (on the welding seams) etc. and any other possible contamination.
Weld fumes to be removed by Fresh water washing.
2. Min. St 2 – St 3 (ISO 8501-1) surface preparation standard to be achieved over the damaged / rusted
spot / minor local area.
3. Feathering the edges of existing undamaged coating. (Sharp edges of intact coating should be
feathered.)

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 19/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

4. Roughening the undamaged paint film around the damaged area to have a good adhesion on overlap
areas
5. Application of EPOXY HR in specified DFT.
Minor touch up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.
All coating works has to be carried out according to the project specifications and instructions stated in
TDS and Application Guide of the products.
Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.
Paint application shouldn’t be done under the circumferences determined below:
 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.
 If ambient or surface temperature is below/above the temperature that the manufacturer
defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.

5.6 REPAIR WORKS FOR SYSTEM 2-6 (FOR INSULATED SERVICES)

5.6.1 PAINT SYSTEM 2.6 – (temp. up to 600 °C); 
 Primer:SILICONE PRIMER.……………………………….….25 mµ
 Finish: SILICONE ALUMINIUM…………………...……...…..25 mµ
SPECIFIED TOUCH UP SYSTEM FOR SYS 2.6; 

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 20/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

 Primer: MULTIPOLYMERIC MATRIX COATING….….……50 mµ


 Finish: SILICONE ALUMINIUM …………….…….……...…..25 mµ
I. SPECIFIED SYSTEM by JOTUN MANUFACTURER ; 
 SOLVALIT ALU ……...………………………..…………….....25 mµ
 SOLVALIT ALU ……………………………………………..….25 mµ
J. RECOMMENDED TOUCH UP REPAIR SYSTEM by JOTUN; 
 JOTATEMP 650……………….……………...………….….….50 mµ
 SOLVALIT ALU ………………………………………...……….25 mµ
5.6.2 SURFACE PREPARATION

g) On the surfaces to be painted, all grease, oils and salts and other contaminants shall be cleaned
according to SSPC SP1 and high pressure fresh water washing.
h) For small defects;
Small defects defined as less than 50cm X 50cm dimensions can be power tool cleaned to a
minimum of ISO St 3 standard with a profile of no less than 25 microns.
i) For large defects;
The defects which are larger than 50cm X 50cm dimensions shall be spot blasted either by vacuum
blasting, or other suitable blasting equipment,
j) The edge to the sound surrounding paint shall be feathered back at least 3 centimeters and the
surrounding paint abraded as far as the touch-up overlap will be painted according to Painting
Specification.
k) Blast cleaning shall be made in a covered area, provided by Contractor, to prevent dust spread
on the surrounding areas. For blast cleaning the approval of Owner is required.
l) After blasting all spent abrasive or grit must be removed by vacuum cleaner or by air blowing and
brush
 
5.6.3 TOUCH UP REPAIR APPLICATION PROCEDURE;
* For the minor coating damages not exposing to steel substrate / (áreas below 50cmx 50cm)
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of midcoat or topcoat according to the depth of the damage through the paint film.
 If the damage is only on the topcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and only topcoat may be applied.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 21/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

* For the minor coating damages exposing to steel substrate / Rusted áreas (below 50cmx50cm);

1. Removal of oil, grase, weld fumes (on the welding seams) etc. and any other posible contamination.
Weld fumes to be removed by fresh water washing.
2. Min. St 2 – St 3 (ISO 8501-1) surface preparation standard to be achieved over the damaged / rusted
spot local area.
3. Feathering the edges of existing undamaged coating (Sharp edges of intact coating should be
feathered), followed by application of repair paint system.

4. Roughening the undamaged paint film around the damaged area to have a good adhesion on overlap
areas
5. Application of JOTATEMP 650 in specified DFT as primer. (SOLVALITT ALU may not be applied on
top of St2 – St 3 – ISO 8501-1 mechanically prepared surfaces.)
Care should be taken to prevent overlapping JOTATEMP 650 on intact SOLVALITT ALU film
For Areas, Sa 2½ (ISO 8501-1) blasting may not be so practical due to site conditions after erection, thus
JOTATEMP 650 which may be applied on top of mechanical surface preparation as primer prefered
instead of SOLVALITT ALU for minor TU applications.
After JOTATEMP 650 application on the damaged area following specified coats ( 1 X SOLVALIT ALU)
application may proceed.
Minor touch-up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.
Airless spraying during windy conditions may promote dry- spray formation and uneven thickness. If a
situation may arise it should be rectified prior to following coat application. Site HSE rules has to be
followed.
All coating works has to be carried out according to the project specifications and instructions stated in
technical data sheets and Application Guide of the products.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 22/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.

Paint application shouldn’t be done under the circumferences determined below:


 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.
 If ambient or surface temperature is below/above the temperature that the manufacturer
defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.
5.7 REPAIR WORKS FOR 2.9 (PIPE SUPPORTS)

5.7.1 PAINT SYSTEM 2.9 – (temp. up to 205 °C); 
 Primer:EPOXY PHENOLIC.………………………………….200 mµ
 Finish: SILICONE ACRYLIC……….……………...……...…..25 mµ
SPECIFIED TOUCH UP SYSTEM FOR SYS 2.9; 
K. Primer:EPOXY PHENOLIC.………………………………….200 mµ
L. Finish: SILICONE ACRYLIC……….……………...……...…..25 mµ
M. SPECIFIED SYSTEM by JOTUN MANUFACTURER ; 
 EPOXY HR…………...………………………..……………....200 mµ
 SOLVALIT MIDTHERM……………………………………..….25 mµ
N. RECOMMENDED TOUCH UP REPAIR SYSTEM by JOTUN; 
 EPOXY HR …………………….……………...…………….…200 mµ
 SOLVALIT MIDTHERM...……………………………...……….25 mµ
5.7.2 SURFACE PREPARATION

g) On the surfaces to be painted, all grease, oils and salts and other contaminants shall be cleaned
according to SSPC SP1 and high pressure fresh water washing.
h) For small defects;
Small defects defined as less than 50cm X 50cm dimensions can be power tool cleaned to a
minimum of ISO St 3 standard with a profile of no less than 25 microns.
i) For large defects;

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 23/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

The defects which are larger than 50cm X 50cm dimensions shall be spot blasted either by vacuum
blasting, or other suitable blasting equipment,
j) The edge to the sound surrounding paint shall be feathered back at least 3 centimeters and the
surrounding paint abraded as far as the touch-up overlap will be painted according to Painting
Specification.
k) Blast cleaning shall be made in a covered area, provided by Contractor, to prevent dust spread
on the surrounding areas. For blast cleaning the approval of Owner is required.
l) After blasting all spent abrasive or grit must be removed by vacuum cleaner or by air blowing and
brush

5.7.3 TOUCH UP REPAIR APPLICATION PROCEDURE;


* For the minor coating damages not exposing to steel substrate / (áreas below 50cmx 50cm)
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of the same paint according to the depth of the damage through the paint film.
* For the minor coating damages exposing to steel substrate / Rusted áreas (below 50cmx50cm);
1. Removal of oil, grease, weld fumes (on the welding seams) etc. and any other possible contamination.
Weld fumes to be removed by Fresh water washing.
2. Min. St 2 – St 3 (ISO 8501-1) surface preparation standard to be achieved over the damaged / rusted
spot / minor local area.
3. Feathering the edges of existing undamaged coating. (Sharp edges of intact coating should be
feathered.)

4. Roughening the undamaged paint film around the damaged area to have a good adhesion on overlap
areas
5. Application of EPOXY HR in specified DFT.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 24/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

Care should be taken to prevent overlapping EPOXY HR on intact SOLVALITT MIDTHERM film
After EPOXY HR application on the damaged area following specified coats (1 X SOLVALIT MIDTHERM)
application may proceed.
Minor Touch-up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.
All coating works has to be carried out according to the project specifications and instructions stated in
TDS and Application Guide of the products.
Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.
Paint application shouldn’t be done under the circumferences determined below:
 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.
 If ambient or surface temperature is below/above the temperature that the manufacturer
defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.

5.8 REPAIR WORKS FOR SYSTEM 2-10 (PIPE SUPPORTS)

5.8.1 PAINT SYSTEM 2.10 – (temp. between 205 °C to 600 °C); 
 Primer:SILICONE PRIMER.……………………………….….25 mµ
 Finish: SILICONE ALUMINIUM…………………...……...…..25 mµ
SPECIFIED TOUCH UP SYSTEM FOR SYS 2.10; 
 Primer: MULTIPOLYMERIC MATRIX COATING….….……50 mµ
 Finish: SILICONE ALUMINIUM …………….…….……...…..25 mµ
O. SPECIFIED SYSTEM by JOTUN MANUFACTURER ; 
 SOLVALIT ALU ……...………………………..…………….....25 mµ
 SOLVALIT ALU ……………………………………………..….25 mµ
P. RECOMMENDED TOUCH UP REPAIR SYSTEM by JOTUN; 
 JOTATEMP 650……………….……………...………….….….50 mµ
 SOLVALIT ALU ………………………………………...……….25 mµ

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 25/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

 
5.8.2 SURFACE PREPARATION

m) On the surfaces to be painted, all grease, oils and salts and other contaminants shall be cleaned
according to SSPC SP1 and high pressure fresh water washing.
n) For small defects;
Small defects defined as less than 50cm X 50cm dimensions can be power tool cleaned to a
minimum of ISO St 3 standard with a profile of no less than 25 microns.
o) For large defects;
The defects which are larger than 50cm X 50cm dimensions shall be spot blasted either by vacuum
blasting, or other suitable blasting equipment,
p) The edge to the sound surrounding paint shall be feathered back at least 3 centimeters and the
surrounding paint abraded as far as the touch-up overlap will be painted according to Painting
Specification.
q) Blast cleaning shall be made in a covered area, provided by Contractor, to prevent dust spread
on the surrounding areas. For blast cleaning the approval of Owner is required.
r) After blasting all spent abrasive or grit must be removed by vacuum cleaner or by air blowing and
brush
 
5.8.3 TOUCH UP REPAIR APPLICATION PROCEDURE;
* For the minor coating damages not exposing to steel substrate / (áreas below 50cmx 50cm)
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of midcoat or topcoat according to the depth of the damage through the paint film.
 If the damage is only on the topcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and only topcoat may be applied.
* For the minor coating damages exposing to steel substrate / Rusted áreas (below 50cmx50cm);

1. Removal of oil, grase, weld fumes (on the welding seams) etc. and any other posible contamination.
Weld fumes to be removed by fresh water washing.
2. Min. St 2 – St 3 (ISO 8501-1) surface preparation standard to be achieved over the damaged / rusted
spot local area.
3. Feathering the edges of existing undamaged coating (Sharp edges of intact coating should be
feathered), followed by application of repair paint system.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 26/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

4. Roughening the undamaged paint film around the damaged area to have a good adhesion on overlap
areas
5. Application of JOTATEMP 650 in specified DFT as primer. (SOLVALITT ALU may not be applied on
top of St2 – St 3 – ISO 8501-1 mechanically prepared surfaces.)
Care should be taken to prevent overlapping JOTATEMP 650 on intact SOLVALITT ALU film
For Areas, Sa 2½ (ISO 8501-1) blasting may not be so practical due to site conditions after erection, thus
JOTATEMP 650 which may be applied on top of mechanical surface preparation as primer prefered
instead of SOLVALITT ALU for minor TU applications.
After JOTATEMP 650 application on the damaged area following specified coats ( 1 X SOLVALIT ALU)
application may proceed.
Minor touch-up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.
Airless spraying during windy conditions may promote dry- spray formation and uneven thickness. If a
situation may arise it should be rectified prior to following coat application. Site HSE rules has to be
followed.
All coating works has to be carried out according to the project specifications and instructions stated in
technical data sheets and Application Guide of the products.
Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.

Paint application shouldn’t be done under the circumferences determined below:


 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 27/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

 If ambient or surface temperature is below/above the temperature that the manufacturer


defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.

5.9 REPAIR WORKS FOR SYSTEM 2-23 – COATED GALVANIZED STEEL (FOR JETTY AREA)

5.9.1 PAINT SYSTEM 2.23 – (GALVANIZED STEEL @ JETTY AREAS); 
 Primer: EPOXY.……………………………….…………….….- ≥40 mµ
 Intermediate: EPOXY ………………………………………….- (Note-2) with a total DFT of 280 micron
 Finish: ALIPHATIC ACRYLIC POLYURETHANE.……...…..- (Note-2) with a total DFT of 280 micron
Note-1: Only paints systems tested and approved for compliance to ISO 12944-Part 6 (Laboratory
Performance Test Methods) shall be used. Paint systems shall be in accordance with requirements
of ISO 12944-5 (Protective Paint Systems) other than corresponds to generic description for paint
products type as indicated in System 2-23 above. Paint Manufacturers having approved systems
shall provide details with description of paint brand names in approved paint systems. Test reports
shall be submitted as proof of compliance
Note-2: Paint coats shall be specified and applied by Painting Contractor with the thicknesses (partial
and total) as they have been tested and approved to ISO 12944-6 performances tests, according to
their relevant test reports.

SPECIFIED TOUCH UP SYSTEM FOR SYS 2.23; 
 Primer: EPOXY…………………………………………………..50 mµ
 Intermediate: EPOXY ………………….……………….……..150 mµ
 Finish: ALIPHATIC ACRYLIC POLYURETHANE.……...…..50 mµ
Note: Galvanized surfaces shall be repaired as per ASTM A 780
Q. SPECIFIED SYSTEM by JOTUN MANUFACTURER (SYS 2.23 over Galvanized Steel); 
 PENGUARD PRIMER…………………….………………........50 mµ
 PENGUARD UNIVERSAL…..…...…………………………...150 mµ
 HARDTOP XP……………………………………………….…...50 mµ
R. RECOMMENDED TOUCH UP REPAIR SYSTEM by JOTUN; 
 BARRIER 90 for galv.repair.……….…………….............……90 mµ
 PENGUARD PRIMER…………….……….………………........50 mµ

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 28/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

 PENGUARD UNIVERSAL…..…...…………………….……...150 mµ
 HARDTOP XP……………………………………………….……50 mµ
5.9.2 TOUCH UP REPAIR APPLICATION PROCEDURE;
* For the minor coating damages not exposing to steel substrate / Galvanize
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of midcoat or topcoat according to the depth of the damage through the paint film.
 If the damage is only on the topcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and only topcoat (HARDTOP XP) may be applied.

 If the damage penetrates down to midcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and application of mid coat & topcoat may proceed.Care should be
taken to minimize overlapping of midcoat on top of topcoat.

* For the minor coating damages exposing to steel substrate / Rusted áreas (Damaged Galv.);

1. Removal of oil, grase, weld fumes (on the welding seams) etc. and any other posible contamination.
Weld fumes to be removed by fresh water washing.
2. Surface preparation of the area to be treated as per the Application Guide of BARRIER 90. Pls refer
to Application Guide for a detailed reference.
3. Feathering the edges of existing undamaged coating (Sharp edges of intact coating should be
feathered)

4. Application of BARRIER 90 in specified DFT. BARRIER 90 should not overlap on top of intact /
undamaged coating.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 29/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

5. After BARRIER 90 application, standard specified system (PENGUARD PRIMER + PENGUARD


UNIVERSAL + HARDTOP XP) application may proceed. Care should be taken to prevent overlapping of
each coat on top of subsequent coat)
Minor touch-up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.
Airless spraying during windy conditions may promote dry- spray formation and uneven thickness. If a
situation may arise it should be rectified prior to following coat application. Site HSE rules has to be
followed.
All coating works has to be carried out according to the project specifications and instructions stated in
technical data sheets and Application Guide of the products.
Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.

Paint application shouldn’t be done under the circumferences determined below:


 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.
 If ambient or surface temperature is below/above the temperature that the manufacturer
defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.

5.10 REPAIR WORKS FOR COATED GALVANIZED STEEL @ PROCESS AREA

5.10.1 PAINT SYSTEM FOR Overcoated GALV. STEEL @ PROCESS AREAS; 
 Primer: EPOXY.……………………………….…………….….- mµ
 Finish: ALIPHATIC ACRYLIC POLYURETHANE.……...…..- mµ
Note-5: Only paints systems tested and approved for compliance to ISO 12944-Part 6 (Laboratory
Performance Test Methods) shall be used. Paint systems shall be in accordance with requirements
of ISO 12944-5 (Protective Paint Systems) other than corresponds to generic description for paint
products type as indicated in System 2-23 above. Paint Manufacturers having approved systems
shall provide details with description of paint brand names in approved paint systems. Test reports
shall be submitted as proof of compliance
Note-6: Paint coats shall be specified and applied by Painting Contractor with the thicknesses (partial
and total) as they have been tested and approved to ISO 12944-6 performances tests, according to
their relevant test reports.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 30/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

SPECIFIED TOUCH UP SYSTEM FOR SYS 2.23; 
 Primer: EPOXY…………………………………………………..50 mµ
 Finish: ALIPHATIC ACRYLIC POLYURETHANE.……...…..50 mµ
Note: Galvanized surfaces shall be repaired as per ASTM A 780

S. SPECIFIED SYSTEM by JOTUN MANUFACTURER (Galvanized Steel @ Process Areas); 
 PENGUARD PRIMER…………………….………………........50 mµ
 HARDTOP XP……………………………………………….…...50 mµ
T. RECOMMENDED TOUCH UP REPAIR SYSTEM by JOTUN; 
 BARRIER 90 for galv.repair.……….…………….............……90 mµ
 PENGUARD PRIMER…………….……….………………........50 mµ
 HARDTOP XP……………………………………………….……50 mµ

5.10.2 TOUCH UP REPAIR APPLICATION PROCEDURE;


* For the minor coating damages not exposing to steel substrate / Galvanize
1. Removal of all kind of contamination if any (Oil, grease, dust etc.)
2. Roughening the damaged area and paint film around the damaged areas by using sand paper
3. Application of midcoat or topcoat according to the depth of the damage through the paint film.
 If the damage is only on the topcoat; Roughening the damaged area and paint film around the
damaged areas using sand paper and only topcoat (HARDTOP XP) may be applied.

 If the damage penetrates down to primer / galvanized surface; Roughening the damaged area and
paint film around the damaged areas using sand paper and application of primer & topcoat may
proceed. Care should be taken to minimize overlapping of primer on top of topcoat.

* For the minor coating damages exposing to steel substrate / Rusted áreas (Damaged Galv.);

1. Removal of oil, grase, weld fumes (on the welding seams) etc. and any other posible contamination.
Weld fumes to be removed by fresh water washing.
2. Surface preparation of the area to be treated as per the Application Guide of BARRIER 90. Pls refer
to Application Guide for a detailed reference.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 31/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

3. Feathering the edges of existing undamaged coating (Sharp edges of intact coating should be
feathered)

4. Application of BARRIER 90 in specified DFT. BARRIER 90 should not overlap on top of intact /
undamaged coating.
5. After BARRIER 90 application standard specified system (PENGUARD PRIMER + HARDTOP XP)
application may proceed. Care should be taken to prevent overlapping of PENGUARD PRIMER on top
of HARDTOP XP)
Minor touch-up repair applications should be carried out using brushes. While using brushes more coats
will be required in order to achieve specified DFT.
Airless spraying during windy conditions may promote dry- spray formation and uneven thickness. If a
situation may arise it should be rectified prior to following coat application. Site HSE rules has to be
followed.
All coating works has to be carried out according to the project specifications and instructions stated in
technical data sheets and Application Guide of the products.
Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
Depending on site conditions different situations which are not stated in this procedure may occur during
application operations, if such a situation may arise it will be evaluated additionally.

Paint application shouldn’t be done under the circumferences determined below:


 If the surface is wet.
 If relative humidity is above the maximum value that the paint manufacturer recommended.
 If ambient or surface temperature is below/above the temperature that the manufacturer
defined.
 If the velocity of wind is more than 24 km/h.
 If there is extreme dust around.

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
STAR RAFİNERİ, A.Ş. CONTRACT Nº UNIT Nº
AEGEAN REFINERY PROJECT (ARP) STAR-C-01 000
CONTRACTOR DOC No: SH/OF
2248-000-A-EE-0190470 32/32
PAINTING REPAIR PROCEDURE
STAR DOCUMENT No.
FOR PIPING AND INLINE
000-A-EE-0190470
COMPONENTS
REV 0 1

6. GENERAL APPLICATION CONDITIONS

1) Minimum and maximum time, required to be waited between each coat during application,
defined in product technical data sheets should be obeyed.
2) Paint application shouldn’t be applied under the conditions determined below:
i) If the surface is wet.
ii) If relative humidity is above the maximum value defined in product technical data sheets.
iii) If ambient or surface temperature is below/above the temperature defined in product
technical data sheets.
iv) If application environment is extremely dusty.
v) If the velocity of wind is more than 24 km/h.
3) Minor touch-up repair applications should be carried out using brushes. While using brushes more
coats will be required in order to achieve specified DFT.
4) Airless spraying during windy conditions may promote dry- spray formation and uneven thickness. If
a situation may arise it should be rectified prior to following coat application. Site HSE rules has to
be followed.
5) All coating works has to be carried out according to the project specifications and instructions stated
in technical data sheets and Application Guide of the products.
6) Applicators and all related parties are fully responsible to follow all information stated in TDS and
Application Guide documents of the products stated in the paint systems.
7) Depending on site conditions different situations which are not stated in this procedure may occur
during application operations, if such a situation may arise it will be evaluated additionally.
8) Weld fumes to be removed by Fresh water washing.

7. ATTACHMENTS AND TEMPLATES

TEMPLATES NAME REVISION


(FORMS)CODE

IF-PAI-100 Daily Ambient Conditions Record Form 0

IF-PAI-111 Paint Application Inspection Report 3

This document is the property of TSGI Mühendislik İnşaat Limited Company. Its reproduction without a written permission is strictly forbidden.
OWNER CONTRACT UNIT
STAR RAFINERI A.S. (STAR) STAR-C-01 XXX

PROJECT QC CODE
AEGEAN REFINERY PROJECT (ARP)

DOCUMENT TITLE N°

SITE QUALITY CONTROL PAINTING AND COATING DATE: _____________


Construction organization PLAN

DAILY AMBIENT CONDITIONS RECORD FORM


Ambient Relative Dew Point Steel Surface
Working Shift Period Time Temperature (0C) Humidity (%Rh) Temperature (0C) Temperature (0C)
START
MID-POINT
END
START
MID-POINT
END
START
MID-POINT
END
START
MID-POINT
END
START
MID-POINT
END
START
MID-POINT
END
START
MID-POINT
END
START
MID-POINT
END
START
MID-POINT
END
NOTES: INSPECTION NOTIFICATION REFERENCE

NFI No.:

CONSTRUCTION ORGANIZATION CONTRACTOR OWNER / PMC REPRESENTATIVE


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE

Date Date Date

Form Code: IF-PAI-100_Rev.0


Code: 000-A-EE-0190420-R3 Page 9 of 13
OWNER CONTRACT UNIT
STAR RAFINERI A.S. (STAR) STAR-C-01 XXX

PROJECT QC CODE
AEGEAN REFINERY PROJECT (ARP)

DOCUMENT TITLE N°

SITE QUALITY CONTROL PAINTING AND COATING DATE: _____________


Construction organization PLAN

PAINT APPLICATION INSPECTION REPORT


CODE/SPECIFICATION IDENTIFICATION OF MONITORING AND MEASURING DEVICES
Surface Profile (Roughness) Gauge_____________________ DFT Gauge:______________________________

Paint System : ____________________________ Primer Intermediate Top Coat Repair / Touch-up

Paint Brand Name: _______________________ Colour: ____________ Batch No.: ______________ Manufacture Date: _______________

Thinner Brand Name: _________________________ Batch No.: _______________________ Manufacture Date: ____________________
PAINTING APPLICATION & AMBIENT CONDITION
Application by: Brush/ Roller Conventional (Air) Spray Airless Spray Nozzle Size: _________ Pressure: _________
Ambient Relative Dew Point Steel Surface
Working Shift Period Time Temperature (0C) Humidity (%Rh) Temperature (0C) Temperature (0C)
START
MID-POINT
END
SURFACE PREPARATION
Abrasive Brand: _____________________ Abrassive Type & Size:___________________ Abrassive Batch No.:__________________

Cleaning Method: Blasting Hand Tool Cleaning Power Tool Cleaning

Blasting Nozzle Pressure ____________ Blasting Nozzle Orifice Size _____________ Blasting Air Cleanliness Test_________________
Surface Cleanliness: Sa 2 ½ / SSPC SP 10 St 2 / SSPC SP 2 St 3 / SSPC SP 3 Sweep Blast / SSPC SP 7
Surface Condition: Visual Check_____________ Roughness____________(µm) Chloride Test Result ________________
PAINT THICKNESS CHECK (See Notes Below)
DFT
DFT Req. DFT Actual (µm) Result
Drawing/ ISO/ Area Item/ Spool Average
(µm)
1 2 3 4 5 (µm) Accept Reject

NOTES: INSPECTION NOTIFICATION REFERENCE


Minimum of 5 separate spot measurements (average of 3 gage readings for each spot) spaced
NFI No.:
randomly over each 10m² (100ft²) to be measured.

CONSTRUCTION ORGANIZATION CONTRACTOR OWNER / PMC REPRESENTATIVE


NAME NAME NAME

SIGNATURE SIGNATURE SIGNATURE

Date Date Date

Form Code: IF-PAI-111_Rev.3


Code: 000-A-EE-0190420_R3
Page 12 of 14

Potrebbero piacerti anche