Sei sulla pagina 1di 1

PLANT NORTH

MA 2.000M
FGL / ROAD
1
17
0.300M
FGL / ROAD
1

GN
LEVEL S 160.000M
1 LEVEL
E 0.741M B601
NOTE - 2
S 000.000
1 S 51.668M E 000.000

ET
E 0.741M E 0.000M
UNDER GROUND ELECTRICAL CORRIDOR SCRUBBER 15B
012-T-03 012-T-01A/B
UNIT

IC 14
18

012-P-03A/B 012-P-02A/B
20 012-P-01A/B
012-E-01 D-1074
19
HCL STORAGE

D-840A D-840B
21

E 10.000M

NO
13

WEIGHT BRIDGE
C 010-T-01

010-P-01A/B
UP
11B
FIRE WATER
1

RT
D-840C D-840D PUMP HOUSE

V1 V2 DG SET CUT OUT

BOILER
D1 W2 W2 W2
08C 08A
008-T-01
011-E-01
17
E 20.000M

H ELECTROLYSER 008-P-01A/B
C Transformer
L

COMP.
UP

007-U-01 006-E-01 D-840E D-840F

NITROGEN PLANT
+ _
2U 2V 2W

PIPE RACK

ADU
P-1044A/B P-1045A/B 22

OPERATOR
C
L
08A

ROOM
D-1040
E 30.000M

N2 PLANT
RECTIFIER CONTROL PANEL

UNIT
N2
016-V-01 014-V-03
CAUSTIC STORAGE

D-1042
P-1042
PMCC-EMCC DCS CONSOLS
P-1034A
PP-1042 TOILET

EXISTING SANITATION COLLECTOR


0.000M

CHILLER UNIT
08D MCC ROOM 08B 07 008-P-02A/B D-320A D-320B
1
FGL / ROAD

009-P-01A/B P--294A/B
D-290
ALUMINIUM PARTITION P-1034B
12B 17 LEVEL
MV PANEL APFC PDB EMLDB MLDB
T-280
DC BC
B/R
DCS ROOM

ENGINEER ROOM-2 ENGINEER ROOM-1


11C
UPS
B/R
DCS PANEL

U-1030
E 40.000M
FALSE FLOORING
DC BC UPS
WORKING SPACE P-1034C D-320C D-320D

12A 23
17
P-1034D

W2 W2 HYPO STORAGE 15A

015-E-02
005-P-01A/B
015-P-03 D-1060
D-1020A/B
015-E-01 015-P-01A/B
06 T-160A/B/C
05C 015-P-02A/B 024-P-01A/B D-790A D-790B D-790C D-790D E 50.000M
024-T-01 P-1034E
015-T-01
10 11A

UP
005-T-01 09 D-1050

015-T-02A 015-T-02B
12C
D-790E D-790F D-790G D-790H
D-1040
PROCESS

D-160
WATER
17 PUMP HOUSE
E 60.000M

ETP

W1 W2
P-144 PP-144 D-140
1
16 E 70.000M

FILTER PRESS
ST-160
TOILET CHEMICAL STORE

AREA
F-140B
02C S 110.000M RETAINING WALL S 51.668M S 51.668M

PT-145
E 67.587M 1 E 67.587M 1 E 59.403M 1

D-101
OFFICE / ELECTRICAL
05A 17 ROOM 03D

F-140A
E 80.000M

D-120

P-124
002-X-01

05B 03B 003-F-01B 03A 002-T-02

P-134A/B
D-070 D-50

D-130
003-F-01A
02B 01 CAPACITY ~ 6000 MT
P-074A/B P-054A/B
002-X-02
17 002-T-01
002-P-01A/B
E 90.000M
003-P-02A/B 009-P-02A/B 003-P-01A/B 002-P-02A/B

003-E-01

003-P-03
003-T-02
009-T-01 03C 003-T-01 002-T-04
04A 002-T-05
001-T-01B

001-P-01A/B

001-T-03A/B
04B

001-T-02
02A
S 110.000M
UP
E 105.123M 1
002-T-03 001-T-01A E 100.000M

ROAD
0.000M 1
2.000M 15m
1 1 FGL / ROAD E 110.000M
FGL / ROAD LEVEL GATE
LEVEL

W2 W2 E 120.000M

S 170.000M

S 160.000M

S 150.000M

S 140.000M

S 130.000M

S 120.000M

S 110.000M

S 100.000M

S 40.000M
S 90.000M

S 80.000M

S 70.000M

S 60.000M

S 50.000M

S 30.000M

S 20.000M

S 10.000M

S 0.000M
D1 D2

KEY PLAN THIS AREA


W2

W2

RS

D1 D1

D1

W1
D B

V1
W2 V1

D1 V2
D2
W2 W2 RS W2 W2 W2 W2
W1

W2 W2

W2 W2

W2 W2

W2 W2

D1 W2 W2 W2

A
W2 W2 W2 W2 W2 W2 W2 W2 W2
D1

ISSUED FOR CONSTRUCTION

2 18.10.19 ISSUED FOR CONSTRUCTION JS YT M.K.S.


1 15.07.19 GENERALLY REVISED B.C. YT M.K.S.
0 08.01.19 ISSUED FOR APPROVAL B.C. AS M.K.S.
REV DATE DESCRIPTION DRAWN CHECKED APPROVED
' ' CHERIFIENNE
SOCIETE ' D'ENGRAIS ET
CLIENT:
DE PRODUITS CHIMIQUES

PROJECT: 50 MTPD CAPACITY (CL2 BASIS) CHLOR ALKALI PLANT

D1 D1
W2 W2 W2 W2 W2 W2 TITLE: G.A, LAYOUT & ELEVATION OF UTILITY SHED

PROJECT No. SCALE DRAWING NO. SHEET REV.


D2
9650 1:100 9650-11-CDD-000-0026 5 2

ENGINEERING & TURN KEY CONTRACTOR


NUBERG ENGINEERING LTD.
A-38H, SECTOR-64, NOIDA - 201301 U.P (INDIA)

This drawing is the property of Nuberg Engineering Ltd & should be used only in reference to contracts
of proposals of the company reproduction of this drawing or unauthorized use is prohibited

PLOTTED ON: 19 October 2019 06:02:31 SHEET SIZE-A1 (841 x 594)

Potrebbero piacerti anche