Concrete Works

A. Factors for computing concrete mixture Item No. Descr


Class Proportion Cement(bagSand(cu.m) Gravel(cu.m) 800(1) Clearing and Grubbing
A-A 1:2:3 9.5 0.5 0.77 801(1) Removal of Stuctures and obstruction
A 1:2:4 9.0 0.42 0.84 802(1) Unsuitable Excavation
B 1:2.5:5 8.5 0.43 0.86 803(1)a Structure Excavation, Common Soil
C 1:3:6 7.5 0.44 0.88 804(1)a Embankment from Structure Excavation
D 1:3.5:7 6.0 0.45 0.91 804(1)b Embankment from Borrow
Add 10% waste Factor for aggregate 804(4) Gravel Fill
900(1)c1 Structural Concrete
Masonry works 900(1)c2 Structural Concrete(Footing, Slab on Fil
A. Qty. of cement and sand for mortar and plaster mixture per cu.m 900(1)c3 Structural Concrete(Footing Tie Beams)
Class Proportion Cement(bagSand(cu.m) 900(1)c4 Structural Concrete(Columns), Class A
A 1:2 13 0.95 900(1)c4 Structural Concrete(Columns), Class A
B 1:3 13 1 900(1)c5 Structural Concrete(Suspended Slab)
C 1:4 9 1 900(1)c6 Structural Concrete(Beams/Girder & LB
Average Thickness of Plaster 16mm 900(1)c6 Structural Concrete(Beams/Girder & LB
902(1)a1 Reinforcing Steel (Deformed) Grade 40
B. Qty. of cement and sand for CHB mortar per square meter 903(2) Forms and Falseworks (For Columns)
CHB Size No./sq.m Cement(bags) Sand(cu.m) 903(2) Forms and Falseworks (For Beams)
cm B C 1000(1) Soil Poisoning
10x20x40 12.5 0.525 0.334 0.04375 1002(8) Plumbing Fixtures
12.5x20x40 12.5 0.789 0.577 0.06407 1002(28) Cold Water Lines
15x20x40 12.5 1.013 0.759 0.08438 1002(29) Hot Water Lines
20x20x40 12.5 1.5 1.125 0.12500 1003(1) a1 Ceiling, 4.5mm Fiber Cement Board, Me
1004(a) Finishing Hardware, Lockset
Steel Reinforcement 1004(g) Finishing Hardware, Hinges
Standard weight per meter of plain and deformed round steel bars 1005(1) Residential Casement
Size(mm) Wt.(kg/m) Wt.(kg/6m) 1005(4) Awning Window
8 0.395 2.37 1005(7) Window Accessories
10 0.616 3.696 1006(5) Fire Rated Fire Exit Door
12 0.888 5.328 1008(1) Aluminum Window
13 1.042 6.252 1009(1)a Jalousie Windows Glass
16 1.578 9.468 1010(1) Frame (Wooden Jambs)
20 2.466 14.796 1010(2)a Doors, Hollow Core Flush Type Wood
25 3.853 23.118 1010(2)b Doors(Panel)
28 4.833 28.998 1013(2)a Fabricated Metal Roofing Accessory, Ga
30 5.549 33.294 1013(2)b Fabricated Metal Roofing Accessory, Ga
School DPWH 1014(1)a2 Prepainted Metal Sheets(Rib Type) Sho
Plain Cement Floor Finish/Topping 1014(1)b1 Prepainted Metal Sheets(Rib Type) Lon
Area:_____________sq.m 1016(1)a Waterproofing(Cement base)
1. Portland Cement Area x.450 x.450 bags 1017(3)c3 Gutter Drain with Strainer
2. Sand Area x.025 x.025 cu.m 1018(1) Glazed Tiles and Trims
1018(2) Unglazed Tiles
150mm THK(6") CHB 1021(1)a Cement Floor Finish(Plain)
Area:____________sq.m 1021(3)a Floor Topping(Plain)
1. CHB Area x12.5 x12.5 pcs 1027(1) Cement Plaster Finish
2. Portland Cement Area x0.759 x0.759 bags 1032(1)a Painting Works, (Masonry/Concrete)
3. Sand Area x0.084 x0.084 cu.m 1032(1)b Painting Works(Wood)
4. RSB 10mmø x 6.0m Area x0.538 x1.985 kgs 1032(1)c Painting Works(Steel)
5. #16 G.I. Tie Wire Area x.040 x.026 kgs 1038(1) Reflective Insulation
1041(1)b Gypsum Board for Ceilings
100mm THK(4") CHB 1043(2) PVC Doors and Frames
Area:____________sq.m 1046(2)a1 CHB Non-Load Bearing(incl. RSB) 100m
1. CHB Area x12.5 x12.5 pcs 1046(2)b CHB Non-Load Bearing(incl. RSB) 150m
2. Portland Cement Area x0.525 x0.3912 bags 1047(8) Structural Steel Roof Framing
3. Sand Area x0.044 x0.0313 cu.m 1100(30) Conduits, Boxes & Fittings
4. RSB 10mmø x 6.0m Area x0.538 x1.985 kgs 1101(42) Wires and Wiring Devices
5. #16 G.I. Tie Wire Area x.040 x.026 kgs 1102(27) Power Load Center, Switchgear and Pa
1103(1) Lighting and Fixtures
Plastering
Area:___________sq.m
1. Portland Cement Area x.328
2. Sand Area x.027

Concreting Works
Volume:________cu.m
1. Portland Cement Volume x9.5 bags
2. Sand(S-1) Volume x.50 cu.m
3. Gravel(G-1) Volume x1.0 cu.m
4. Good Lumber(4uses) Volume x70/4 x70/4 bd.ft
5. Asstd. CW Nails Volume x.7 x.7 kgs
6. 13mm THK Marine Plywood Volume x1.6/4 x1.6/4 pcs
7. Concrete Epoxy Volume

Useful productivity outputs


Earthworks
Clearing and Grubbing
a) Undergrowth & trees 12" diameter 136.00 sq.m/MD
b) Undergrowth & Small Bushes 272.00 sq.m/MD

Structure Excavation
a) Common Earth 1.00 cu.m/MD
b) Sand 5.17 cu.m/MD
c) Clay 4.15 cu.m/MD
d) Rock 2.58 cu.m/MD

Embankment
a) Backfilling 8.30 cu.m/MD
b) Spreading Tamping and Grading 14.21 cu.m/MD

Termite Control
Termite Control Works
a) Soil Poisoning - Cordoning 20.40 sq.m/MD
b) Soil Poisoning - Drenching 34.00 sq.m/MD

Formworks
A. Formworks Installation sq.m/MD
a) Wall on Ground 3.4 sq.m/MD
b) Wall above ground 2.86 sq.m/MD
c) Beams 2.18 sq.m/MD
d) Columns 2.86 sq.m/MD
e) Suspended Slab sq.m/MD
1.0m up 2.04 sq.m/MD

B. Formworks Fabrication 6.26 sq.m/MD

C. Stripping of Formworks
a) Wall on Ground 27.2 sq.m/MD
b) Wall above ground 5.24 sq.m/MD
c) Beams 6.60 sq.m/MD
d) Columns 7.96 sq.m/MD
e) Suspended Slab
1.0m up 6.26 sq.m/MD 4.70

Reinforcement
a) Fabrication (Cut&Bend) 68.00 kg/MD

b) Placing
Ftg & Foundations 95.74 kg/MD
Slab on grade 95.74 kg/MD
Columns,Beams,RC Walls 85 kg/MD

Concreting
Place,Finish & Cure Concrete
a) Ftg. & Foundation 3.32 cu.m/MD
b) Slab on grade 1.89 cu.m/MD
c) Columns/beams 1.02 cu.m/MD
d) RC Walls 0.94 cu.m/MD
e) Structural Slabs(6") 0.88 cu.m/MD
2.415
Concrete Mixing
a) Manual/Hand Mixing 0.41 cu.m/MD
b) One-bagger Mixing 3.81 cu.m/MD

Masonry Works
CHB Laying
a) CHB 4" 5.10 sq.m/MD
b) CHB 6" 4.25 sq.m/MD
2.605
Fabricated Materials and Hardwares
Hardwares and accessories
Loose Pin/Barrel Bolts 15.00 pcs/MD

Steel Windows
Casement Type 1.00 set/MD
Awning Type 1.00 set/MD
Jalousie Windows
Glass Jalousie 2.70 sq.m/MD
Wood Jalousie 2.70 sq.m/MD

Wooden Doors and Windows


Doors
Flush Door 1.46 sq.m/MD
Panel Door 1.89 sq.m/MD

Windows
Casement Type 1.92 sq.m/MD
Jalousie Type 1.92 sq.m/MD

Frames and Locksets


Wood Door Jambs
Wood Window Jambs
Steel Door Jambs
Steel Window Jamb
Door Lockset

Finishes
Ceramic Tiles
Glazed Tiles 2.24 sq.m/MD
Unglazed Tiles 1.56 sq.m/MD

Painting/Varnishing Works
A. Painting
Plain Cement Paint Exterior 16.73 sq.m/MD
Plain Cement Paint Interior 16.73 sq.m/MD
Galvanized Metal 13.94 sq.m/MD
Wood Paint 23.05 sq.m/MD
B. Varnishing
Plain Varnish Paint 15.78 sq.m/MD

Waterproofing Works
Cement - Base Integral 5.00 sq.m/MD

Plumbing Works L.s


Plumbing Fixtures L.s

Floor Finish
Plain Cement Floor Tiles/Topping 9.52 sq.m/MD
Plain Cement Floor Finish w/ color 4.83 sq.m/MD

Plaster Finish
Cement Plaster Finish 9.5 sq.m/MD

cost of materials x 38% = labor cost


ITEM GUIDELINES
Description Unit Day / Worker Hour / Worker
nd Grubbing sq.m
of Stuctures and obstruction L.s
e Excavation cu.m
Excavation, Common Soil cu.m 1.00 0.13
ment from Structure Excavation cu.m 8.30 1.04
ment from Borrow cu.m 8.30 1.04
cu.m 9.46 1.18
Concrete cu.m 5.60 0.70
Concrete(Footing, Slab on Fill, & Vault), Class A, 28 days cu.m 0.41 0.05
Concrete(Footing Tie Beams), Class A, 28 days cu.m 0.27 0.03
Concrete(Columns), Class A, 28 days cu.m 0.27 0.03
Concrete(Columns), Class A, 28 days w/ Formworks cu.m 0.30 0.04
Concrete(Suspended Slab) cu.m
Concrete(Beams/Girder & LB), Class A, 28 days cu.m 0.27 0.03
Concrete(Beams/Girder & LB), Class A, 28 days w/ Formworks cu.m 0.27 0.03
ng Steel (Deformed) Grade 40 kgs 56.20 7.03
d Falseworks (For Columns) sq.m 2.70 0.34
d Falseworks (For Beams) sq.m 2.12 0.27
ning liter 10.80 1.35
Fixtures L.s 8.00 1.00
er Lines L.s 5.60 0.70
r Lines L.s 5.60 0.70
5mm Fiber Cement Board, Metal Frame sq.m 5.64 0.71
Hardware, Lockset set 4.25 0.53
Hardware, Hinges pair 7.50 0.94
al Casement sq.m
Window sq.m
Accessories L.S
d Fire Exit Door sq.m
Window sq.m 2.47 0.31
Windows Glass sq.m 2.70 0.34
ooden Jambs) Lin.m 2.50 0.31
ollow Core Flush Type Wood sq.m
nel) sq.m
d Metal Roofing Accessory, Gauge 26, Ridge/Hip Rolls ln.m 21.25 2.66
d Metal Roofing Accessory, Gauge 26, Flashing ln.m 21.25 2.66
d Metal Sheets(Rib Type) Short Span sq.m
d Metal Sheets(Rib Type) Long Span sq.m 5.55 0.69
ofing(Cement base) sq.m
ain with Strainer set
les and Trims sq.m 2.24 0.28
Tiles sq.m 1.56 0.20
loor Finish(Plain) sq.m
ping(Plain) sq.m
laster Finish sq.m 9.50 1.19
Works, (Masonry/Concrete) sq.m 16.73 2.09
Works(Wood) sq.m 23.05 2.88
Works(Steel) sq.m 13.94 1.74
Insulation sq.m 14.00 1.75
Board for Ceilings sq.m
rs and Frames set
-Load Bearing(incl. RSB) 100mm sq.m 5.10 0.67
-Load Bearing(incl. RSB) 150mm sq.m
Steel Roof Framing kg. 45.33 5.67
Boxes & Fittings ls 17.50 2.19
d Wiring Devices ls 150.00 18.75
ad Center, Switchgear and Panelboards ls 2.00 0.25
nd Fixtures ls 4.00 0.50
1. FOOTING TIE BEAM

Member/Structure Flr. Level Gride Line Length (m) Width (m)

Columns GF -Roof Beam 6.5 1.2


Beams FB2 3.7 1
FB5 1.2 1
FB3 2.7 1
Canopy 2.7 0.6
2.7 1.5
29.92 1
33.1 1
Sets Volume (m2)

26 202.80
24 88.80
12 14.40
46 124.20
10 16.20
2 8.10
1 29.92
1 33.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
517.52
AÑOSA COMMERCIAL BAR QUANTIFIER
COMMERCIAL LENGTHS (m)
BAR Ø UNIT WT. TOTAL WEIGHT (KG.)
6 7.5 9 10.5 12 15
10 mm 1319 42 0 0 0 0 0.616 5,069.06
12 mm 441 158 0 0 0 0 0.888 3,401.93
16 mm 506 54 0 0 0 0 1.579 5,433.34
20 mm 0 0 0 0 0 0 2.466 -
25 mm 0 0 0 0 0 0 3.854 -
28 mm 0 0 0 0 0 0 4.834 -
32 mm 0 0 0 0 0 0 6.313 -
36 mm 0 0 0 0 0 0 7.991 -
TOTAL 13,904.33

Member/Structure Flr. Level Gride Line Bar Description Bar Ø Cut Length # Pcs. Sets Total Pcs.

Footing (F-2) 12 2.5 2 3 6


Stiffener Footing 12 0.6 8 4 32
Stair Footing Longitudinal Bars 12 1.5 2 2 4
Transverse Bars 12 0.4 6 2 12
Column (C-1) GF-2ndF Main Bar 16 6 6 24 144
Column (C-1) 2ndF-RL 16 3 6 24 144
Column Ties GF-RL Ties 10 1.2 62 24 1488
Stiffener Column Main Bar 12 3 4 4 16
Stiffener Column (Ties) Ties 10 1 17 4 68
0
Ground Tie Beam Foundation 12 Main Bar TB 12 7.5 2 2 4
Main Bar TB 12 3 2 2 4
Main Bar BB 12 6 2 2 4
Main Bar BB 12 4.6 2 2 4
10-11/A-B,C-D,I-J,K-L Main Bar TB 12 4.6 2 8 16
Main Bar BB 12 4.6 2 8 16
A,B,C,D,J,K,L Main Bar TB 12 7.5 2 7 14
Main Bar TB 12 2 2 7 14
Main Bar BB 12 6 2 7 14
Main Bar BB 12 3.7 2 7 14
I Main Bar TB 12 6.6 2 1 2
Main Bar BB 12 6.6 2 1 2
12 Stirrups 10 0.6 62 2 124
10,11 Stirrups 10 0.6 26 8 208
A,B,C,D,I,J,K,L Stirrups 10 0.6 20 23 460
0
Floor Tie Beam 12 Main Bar TB 12 7.5 2 2 4
Main Bar TB 12 3 2 2 4
Main Bar BB 12 6 2 2 4
Main Bar BB 12 4.6 2 2 4
10-11/A-B,C-D,I-J,K-L Main Bar TB 12 4.6 2 8 16
Main Bar BB 12 4.6 2 8 16
A,B,C,D,J,K,L Main Bar TB 12 7.5 2 7 14
Main Bar TB 12 2 2 7 14
Main Bar BB 12 6 2 7 14
Main Bar BB 12 3.7 2 7 14
I Main Bar TB 12 6.6 2 1 2
Main Bar BB 12 6.6 2 1 2
12 Stirrups 10 0.6 59 2 118
10,11 Stirrups 10 0.6 25 8 200
A,B,C,D,I,J,K,L Stirrups 10 0.6 19 23 437
0
FB-2 & FB-5 2nd Floor 10,11,12 TB 16 6 4 6 24
BB 16 6 4 6 24
FB-2 ETB 16 1.5 3 12 36
FB-2 & FB-5 ETB 16 2 3 12 36
FB-2 EBB 16 2 3 12 36
FB-5 EBB 16 0.75 3 6 18
FB-3 A,B,C,D,J,K,L TB 16 6 2 7 14
TB 16 3.75 2 7 14
BB 16 6 2 7 14
BB 16 3.75 2 7 14
FB-3 I TB 16 7.5 2 1 2
BB 16 7.5 2 1 2
ETB 16 1.5 3 9 27
ETB 16 2 3 15 45
ETB 16 0.75 3 7 21
FB-2 Stirrups 10 1 36 12 432
FB-3 Stirrups 10 1 28 23 644
FB-5 Stirrups 10 1 18 6 108
0
RB-2 & RB-5 Roof Level 10,11,12 TB 16 6 4 6 24
BB 16 6 4 6 24
RB-2 ETB 16 1.5 3 12 36
RB-2 & RB-5 ETB 16 2 3 12 36
RB-2 EBB 16 2 3 12 36
RB-5 EBB 16 0.75 3 6 18
RB-3 A,B,C,D,J,K,L TB 16 6 2 7 14
TB 16 3.75 2 7 14
BB 16 6 2 7 14
BB 16 3.75 2 7 14
RB-3 I TB 16 7.5 2 1 2
BB 16 7.5 2 1 2
ETB 16 1.5 3 9 27
ETB 16 2 3 15 45
ETB 16 0.75 3 7 21
RB-2 Stirrups 10 1 36 12 432
RB-3 Stirrups 10 1 28 23 644
RB-5 Stirrups 10 1 18 6 108
0
LB Roof Level Stirrups 10 1 7 19 133
0
Landing Beam Stair Landing TB 16 3.5 2 4 8
ETB 16 1.5 3 8 24
BB 16 3.5 2 4 8
EBB 16 1.5 3 4 12
Stirrups 10 0.8 28 4 112
0
Stair GF-SF Vertical Bars 12 1 10 2 20
Horizontal Bars 10 1.4 3 2 6
Bottom Bars 16 3.5 10 2 20
Bottom Bars 16 2 10 2 20
Cross Ties 10 1.4 11 2 22
Cross Ties 10 1.4 7 2 14
Temp Bars 10 1.4 28 2 56
Step Bars 10 1 5 26 130
0
Canopy 2F Transverse Bars 12 1 15 12 180
Temp Bars 10 2.8 3 12 36
Transverse Bars 12 1 20 5 100
Temp Bars 10 3.7 3 5 15
Transverse Bars 12 1 7 2 14
Temp Bars 10 1.2 3 2 6
0
Canopy RF Transvers Bars 12 1.75 53 4 212
Temp Bars 10 6 6 4 24
Transvers Bars 12 1.75 63 2 126
Temp Bars 10 6 6 2 12
Transverse Bars 12 1.75 28 1 28
Temp Bars 10 6 3 1 3
0
Gutter RF Long Bars 12 6 16 4 64
Cross Bars 10 1 38 4 152
Long Bars 12 6 16 2 32
Cross Bars 10 1 42 2 84
Long Bars 12 6 8 1 8
Cross Bars 10 1 18 1 18
0
Slab on Fill 10 6 6 11 66
10 3 8 11 88
10 1.5 16 2 32
10 6 4 2 8
10 2 4 2 8
0
Supended Slab S-1 2ndF J-K/9-10 Temp Bars 10 1.8 10 1 10
Bend Bars 12 2 4 1 4
ETB 12 0.6 8 1 8
ETB 12 0
0
B-D/9-10 Temp Bars 10 5.8 10 1 10
Bend Bars 12 6 4 1 4
ETB 12 0.65 3 1 3
ETB 12 1.85 4 1 4
ETB 12 1.5 36 1 36
ETB 12 2 36 1 36
0
A-L/10-12 Temp Bars 10 6 40 1 40
Temp Bars 10 4.5 40 1 40
0
Bend Bars 12 6 40 1 40
12 4.8 40 1 40
0
Temp Bars 10 6 60 1 60
Temp Bars 10 3.5 24 1 24
Bend Bars 12 6 24 1 24
Bend Bars 12 3.5 4 1 4
ETB 12 1.2 39 1 39
ETB 12 1 9 1 9
0
Landing Slab Temp Bars 10 3.3 6 2 12
10 1.5 10 2 20
Bend Bars 12 3.3 2 2 4
12 1.5 5 2 10
ETB 12 1.5 2 2 4
12 0.55 5 2 10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Computation for Ties/Stirrups

b = 200 b
h = 300 h
dc = 40 dc
db = 10 db

r = 40.0000 r
k = 180.0000 k
x = 20.0000 x
y = 120.0000 y

Lms = 280.0000 Lms


Lb = 212.0575 Lb

L bend = 282.7433 L bend


L extension = 60.0000 L extension

For 90 degree bend For 90 degree bend


Lb = 70.6858 Lb
Lh = 261.3717 Lh

Length of tie/stirrup = 753.4292 Length of tie/stirrup

Hooks for Columns/Beams


TOTAL WEIGHT (KG.)

5,069.06
3,401.93
5,433.34
-
-
-
-
-
13,904.33

Commercial
Length
7.5
6
6
6
6
6
6
6
6
0
7.5
6
6
6
6
6
7.5
6
6
7.5
7.5
7.5
6
6
6
0
7.5
6
6
6
6
6
7.5
6
6
7.5
7.5
7.5
6
6
6
0
6
6
6
6
6
6
6
7.5
6
7.5
7.5
7.5
6
6
6
6
6
6
0
6
6
6
6
6
6
6
7.5
6
7.5
7.5
7.5
6
6
6
6
6
6
0
6
0
7.5
6
7.5
6
7.5
0
6
6
7.5
6
6
6
6
6
0
6
6
6
7.5
6
6
0
7.5
6
7.5
6
7.5
6
0
6
6
6
6
6
6
0
6
6
6
6
6
0
7.5
6
6
0
0
6
6
6
7.5
6
6
0
6
6
0
6
6
0
6
7.5
6
7.5
6
6
0
7.5
6
7.5
6
6
7.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
=
=
=
=

=
=
=
=

=
=

=
=

=
=

=
2
4
1
1
144
72
298
8
12
0
4
2
4
4
16
16
14
5
14
7
2
2
13
21
46
0
4
2
4
4
16
16
14
5
14
7
2
2
12
20
44
0
24
24
9
12
12
3
14
7
14
7
2
2
7
15
3
72
108
18
0
24
24
9
12
12
3
14
7
14
7
2
2
7
15
3
72
108
18
0
23
0
4
6
4
3
13
0
4
2
10
7
6
4
14
22
0
30
18
17
8
3
2
0
53
24
32
12
7
3
0
64
26
32
14
8
3
0
66
44
8
8
3
0
3
2
1
0
0
10
4
1
1
9
12
0
40
40
0
40
40
0
60
12
24
2
8
2
0
6
5
2
3
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
200
250
40
10

40.0000
180.0000
20.0000
70.0000

180.0000
212.0575

282.7433
60.0000

106.0288
332.0575

724.1150
1. C- Purlins 1.2mm x 50 x 100 x 6m
Description Length(m) Pcs.
28.7 6
31.7 5
19.7 3
6 3
10.7 9
3 2

TOTAL PCS.

2. Carrying Channel 0.8 x 5m


Description Length(m) Pcs.
3.8 106
3.4 6
2.2 6
1.3 62
2.8 20
4.8 10
1.8 14

TOTAL PCS.

3. Ceiling Joist Double Furring 20 x 50 x 5m


Description Length(m) Pcs.
2.8 314
1.3 48

TOTAL PCS.

4. Wall Angle 0.4 x 2.4 m


Description Length(m) Pcs.
13.2 34
8.2 18
15.2 3
11.2 6
10.2 4
5.2 2
6.32 2
8.2 2
12.2 1
12.4 2
10 2
TOTAL PCS.

5. Furring Hanger 20 x 50 x5m


Description Length(m) Pcs.
442 0.3

TOTAL PCS.

6. W Clip
Description Pcs. Sets
18 34
6 18
26 2
12 6
24 3
44 1

TOTAL PCS.

7. Ficem Board 4.5 x 1.2 x2.4


Description Area of Ceiling Area of Board
682 2.88
TOTAL PCS.
Pcs. (Commercial Length 6m) are = 682 sq.m
29
27
10
3
17
1
0
0
0
0
87

Pcs. (Commercial Length 5m)


81
5
3
17
12
10
6
0
0
0
134

Pcs. (Commercial Length 5m)


176
13
0
0
0
0
0
0
0
0
189

Pcs. (Commercial Length 5m)


187
62
19
28
17
5
6
7
6
11
9
357

Pcs. (Commercial Length 5m)


27
0
0
0
0
0
0
0
0
0
0
27

Total
612
108
52
72
72
44
0
0
0
0
0
960

Total
237
0
0
0
0
0
0
0
0
0
0
237
Republic of the Philippines
NUEVA VIZCAYA STATE UNIVERSITY
Bambang Campus

INDIVIDUAL PROJECT PROGRAM OF WORK

LOCATION OF PROJECT
NVSU - Bambang Campus
PROJECT DESCRIPTION
Extension of Ladies Dormitory

% OF
ITEM NO ITEM OF WORK
TOTAL
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF!


#REF! #REF! #REF!
TOTAL PERCENTAGE #REF!
Engineering Services

Prepared and Submitted by:

Engr. CHERRY D. QUIDIT Engr. JOSEPH CRIS R. ABLA


Electrical, TWG Director, PPSDS - Bambang

Recommending Approval:

Engr. ARACELI V. DOMAGAS, Ph. D.


Campus Administrator

Approved:
ANDRES Z. TAGUIAM, Ed. D.
University President
s
RSITY

OF WORK

SOURCE OF FUND
CALENDAR DAYS TO COMPLETE:
EQUIPMENT TO BE USED: Bar Cutter/Bender
Concrete Mixer, Concrete Vibrator,
Welding Machine, Grinding/Cutter Portable

QUANTITY UNIT UNIT COST TOTAL COST

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
TOTAL PROJECT COST #REF!
#REF!
GRAND TOTAL PROJECT COST 5,000,000.00

Engr. JOSEPH CRIS R. ABLAO


Director, PPSDS - Bambang

GERALDINE T. EBREO, Ph.D.


VP for Administration and Finance