TYPE OF GEOGRIDS I

DFH= 7.90m DFH= 7.50m DFH= 7.50m DFH= 7.50m DFH= 7.50m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L4=3980 R2L3=7735 R2L2=3980 R2L1=4365 R2WW1=1750
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL TGL
L 1 =13.00m L 1 =12.00m L 1 =12.00m L 1 =12.00m

H=7539

H=7440

H=7246

H=7147

H=7038

H=7038
H=6988

H=6988
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =11.50m L 2 =10.60m L 2 =10.60m L 2 =10.60m
L 3 =10.00m L 3 = 9.00m L 3 = 9.00m L 3 = 9.00m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 = 8.50m L 4 = 7.50m L 4 = 7.50m L 4 = 7.50m
L 5 = 7.00m L 5 TO 8 = 6.20m L 5 TO 8 = 6.20m L 5 TO 8 = 6.20m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 10= 6.60m L 9 = 6.60m L 9 = 6.60m L 9 = 6.60m TGL
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure L 1 =12.00m
L 2 =10.60m
=443kN/m² =427kN/m² =427kN/m² =427kN/m² L 3 = 9.00m
LEGEND L 4 = 7.50m
TOW - TOP OF WALL L 5 TO 8 = 6.20m
L 9 = 6.60m
B.O.L. - BOTTOM OF LEVELING PAD Factored bearing Pressure
O.G.L. - ORIGINAL GROUND LEVEL
=427kN/m²
F.R.L. - FINISH ROAD LEVEL
LR - LENGTH OF REINFORCEMENT
(AS PER DESIGN)
DFH - DESIGN FOR FACING HEIGHT
H - FACING HEIGHT

600 400
T4B T2A T2A T2B
(TOP OF LEVELING PAD TO TOP OF WALL) T4C T4C

800

600
T4D T4E

600

600
T6B CT2E CT2E

R2L - RAMP 2 LEFT SIDE T6C


T6CL

800
800

800

800

800
F4 F4 F4 F4
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800
800

800

800

800
F4 F4 F4 F4 F4 CF2 CF2

& CENTRE LINE OF LEVELING PAD REQUIRED

800
800

800

800

800
F4

H=6988
FOR LAYING OF CENTER LINE OF LEVELING

H=7038
F5 F4 F4 F4 F4L
PAD (FIG.1)

800
800

800

800

800
F6 F5 F5 F5 F5 CF2 CF2
RSW - REINFORCED SOIL WALL

800
TGL - TECHGRID GEOGRID LENGTH
800

800

800

800
F6 F6 F6 F6 F6L F6
L - LAYER O.G.L. O.G.L. O.G.L.

800
800

800

800

800
LO 180 F6 F6 F6 F6 F6 CF2 CF2

COPING CENTER LINE OF COPING

800
(HEIGHT VARIES)
800

800

800

800
LAYER 3 F7 F6 F6 F6 F6L F6

400
400

400

400

400
B4 B3 B3 B3 B3 CB1 CB1

1750
FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.250
PANEL AS PER DESIGN

LO=130.00 LO=126.32 LO=124.74 LO=121.23 LO=121.23 LO=121.23 LO=121.23

LAYER 1 ⌒19660 ⌒400 400 1750


CENTER LINE OF 2150
LEVELING PAD
LEVELING PAD
150

350 FIG.1 1.575 1.575 SSH 1.575 1.575 SSH


NOTE:
217.888

217.388

217.388

217.388
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 218.963 218.963 218.963
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.722

212.080

212.080

212.080
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
360.000

340.000

340.000

340.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR I
AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 1 OF 16
TYPE OF GEOGRIDS II I
DFH= 8.30m DFH= 8.30m DFH= 8.30m DFH= 7.90m DFH= 7.90m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L9=3980 R2L8=3980 R2L7=7960 R2L6=3980 R2L5=3980
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL TGL TGL
L 1 =13.40m L 1 =13.40m L 1 =13.40m L 1 =13.00m L 1 =13.00m

H=8136

H=8037

H=7937

H=7738

H=7639

H=7539
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =11.90m L 2 =11.90m L 2 =11.90m L 2 =11.50m L 2 =11.50m
L 3 =10.50m L 3 =10.50m L 3 =10.50m L 3 =10.00m L 3 =10.00m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 = 9.20m L 4 = 9.20m L 4 = 9.20m L 4 = 8.50m L 4 = 8.50m
L 5 = 7.80m L 5 = 7.80m L 5 = 7.80m L 5 = 7.00m L 5 = 7.00m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 10= 6.90m L 6 TO 10= 6.90m L 6 TO 10= 6.90m L 6 TO 10= 6.60m L 6 TO 10= 6.60m
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure

=463kN/m² =463kN/m² =463kN/m² =443kN/m² =443kN/m²


LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL
LR - LENGTH OF REINFORCEMENT
(AS PER DESIGN)
DFH - DESIGN FOR FACING HEIGHT T2A T4C T2B

800
T4D T4E T4E

600

600

800 400
H - FACING HEIGHT

600 400
T6C T6C T6D T4F T4A
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800

800
F4 F4 T6A
R2L - RAMP 2 LEFT SIDE

800

800

800

800

800
F4 F4 F4 F4 F4 F4
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800

800

800

800
F4 F4 F4 F4 F4 F4
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F5 F5 F5 F5 F5 F5
PAD (FIG.1)

800

800

800

800

800
F6 F6 F6 F6 F6 F6
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH

800

800

800

800

800
F6 F6 F6 F6 F6 F6
L - LAYER

800

800

800

800

800
LO 180 F6 F6 F6 F6 F6 F6
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800

800

800

800
LAYER 3 400
F7 F7 F7 F7 F7 F7

400

400

400

400
B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=140.35 LO=138.77 LO=135.26 LO=133.51 LO=131.75
LAYER 1 ⌒23880
CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 1.575 SSH


NOTE:
218.388

217.888
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 219.963
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.430

211.722
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
380.000

360.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR II I
AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 2 OF 16
TYPE OF GEOGRIDS III II
DFH= 9.10m DFH= 8.70m DFH= 8.70m DFH= 8.70m DFH= 8.30m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L14=7960 R2L13=3980 R2L12=3980 R2L11=3980 R2L10=4205
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL TGL TGL
L 1 =14.20m L 1 =13.70m L 1 =13.70m L 1 =13.70m L 1 =13.40m

H=8740

H=8540

H=8440

H=8341

H=8241

H=8136
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.30m L 2 =12.90m L 2 =12.90m L 2 =12.90m L 2 =11.90m
L 3 =12.50m L 3 =11.30m L 3 =11.30m L 3 =11.30m L 3 =10.50m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =10.50m L 4 = 9.80m L 4 = 9.80m L 4 = 9.80m L 4 = 9.20m
L 5 = 8.90m L 5 = 9.00m L 5 = 9.00m L 5 = 9.00m L 5 = 7.80m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 11= 7.50m L 6 = 8.00m L 6 = 8.00m L 6 = 8.00m L 6 TO 10= 6.90m
Factored bearing Pressure
L 7 TO 11= 7.20m L 7 TO 11= 7.20m L 7 TO 11= 7.20m Factored bearing Pressure
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure
=503kN/m² =463kN/m²
LEGEND =483kN/m² =483kN/m² =483kN/m²
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL
LR - LENGTH OF REINFORCEMENT
T4E T4E

600
(AS PER DESIGN)

800 400

600 400

600 400
DFH - DESIGN FOR FACING HEIGHT T6C T6C T4F T6D T4A T4B T2A T4C

800

800
T6A T6B
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800

800

800

800
F4 F4 F4 F4 F4 F4
R2L - RAMP 2 LEFT SIDE

800

800

800

800

800
F4 F4 F4 F4 F4 F4
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800

800

800

800
F5 F5 F5 F5 F5 F4
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F6 F6 F6 F6 F6 F5
PAD (FIG.1)

800

800

800

800

800
F6 F6 F6 F6 F6 F6
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH

800

800

800

800

800
F7 F7 F6 F6 F6 F6
L - LAYER

800

800

800

800

800
LO 180 F8 F8 F7 F7 F7 F6
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800

800

800

800
LAYER 3 F8 F8 F8 F8 F8 F7
400

400

400

400

400
B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=149.30 LO=147.54 LO=145.79 LO=144.04 LO=140.35
LAYER 1 ⌒24105
CENTER LINE OF
LEVELING PAD ⌒114885
LEVELING PAD
150

350 FIG.1 1.575 SSH


NOTE:

218.888
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 220.463
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.368

4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS


SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
400.000

6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE


A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR III II
AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 3 OF 16
TYPE OF GEOGRIDS IV III
DFH= 9.50m DFH= 9.50m DFH= 9.50m DFH= 9.10m DFH= 9.10m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L19=6195 R2L18=3980 R2L17=3980 R2L16=7735 R2L15=3980
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL TGL TGL
L 1 =14.20m L 1 =14.20m L 1 =14.20m L 1 =14.20m L 1 =14.20m

H=9353

H=9214

H=9125

H=9035

H=8841

H=8740
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.50m L 2 =13.50m L 2 =13.50m L 2 =13.30m L 2 =13.30m
L 3 =12.80m L 3 =12.80m L 3 =12.80m L 3 =12.50m L 3 =12.50m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =12.00m L 4 =12.00m L 4 =12.00m L 4 =10.50m L 4 =10.50m
L 5 = 9.50m L 5 = 9.50m L 5 = 9.50m L 5 = 8.90m L 5 = 8.90m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 12= 7.90m L 6 TO 12= 7.90m L 6 TO 12= 7.90m L 6 TO 11= 7.50m L 6 TO 11= 7.50m
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure

=519kN/m² =519kN/m² =519kN/m² =503kN/m² =503kN/m²


LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL

800 400

600 400

600 400
LR - LENGTH OF REINFORCEMENT
T4F T6D T4F T4A T4B T4C T2A T4C T2A T2B

800
T6A T4D

600
(AS PER DESIGN) T6B
DFH - DESIGN FOR FACING HEIGHT

800

800

800

800

800
F4 F4 F4 F4 F4 F4 F4
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800

800

800

800
F4 F4 F4 F4 F4 F4
R2L - RAMP 2 LEFT SIDE

800

800

800

800

800
F5 F5 F5 F5 F4 F4 F4
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800

800

800

800
F6 F6 F6 F5 F5 F5
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F6 F6 F6 F6 F6 F6 F6
PAD (FIG.1)

800

800

800

800

800
F6 F6 F6 F6 F6 F6
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH 800

800

800

800

800
F7 F7 F7 F7 F7 F7 F7
L - LAYER
800

800

800

800

800
LO 180 F8 F8 F8 F8 F8 F8
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800

800

800

800
LAYER 3 F8 F8 F8 F8 F8 F8 F8
400

400

400

400

400
B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=161.58 LO=159.82 LO=158.07 LO=154.39 LO=152.81
LAYER 1 ⌒25870
CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 1.575 SSH


NOTE:

219.388
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 220.963
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.

211.377
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.

420.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR IV III
AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 4 OF 16
TYPE OF GEOGRIDS V IV
DFH= 9.90m DFH= 9.90m DFH= 9.90m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L22=9030 R2L21=3980 R2L20=7960
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL
L 1 =14.00m L 1 =14.00m L 1 =14.00m

H=9811

H=9616

H=9530

H=9353
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.50m L 2 =13.50m L 2 =13.50m
L 3 =12.50m L 3 =12.50m L 3 =12.50m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =11.80m L 4 =11.80m L 4 =11.80m
L 5 = 9.50m L 5 = 9.50m L 5 = 9.50m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 12= 8.20m L 6 TO 12= 8.20m L 6 TO 12= 8.20m
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure

=539kN/m² =539kN/m² =539kN/m²


LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL T1AR
T4C T2A T4C T2A T2B

800
T4D T4E T4E

600

600
CT2C

LR - LENGTH OF REINFORCEMENT
T6C T6C

800

800

800
(AS PER DESIGN) F2R F4 F4 F4
DFH - DESIGN FOR FACING HEIGHT

800

800

800
CF2 F4 F4 F4 F4 F4
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800

800
F2R F4 F4 F4 F4 F4
R2L - RAMP 2 LEFT SIDE

800

800

800
F5 F5 F5 F5 F5
R2LWW- RAMP 2 LEFT WING WALL CF2

LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800

800
F2R F6 F6 F6 F6 F6
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING CF2 F6 F6 F6 F6 F6
PAD (FIG.1)

800

800

800
F2R F7 F7 F7 F7 F7
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH

800

800

800
CF2 F8 F8 F8 F8 F8
L - LAYER

800

800

800
LO 180 F2R F8 F8 F8 F8 F8
COPING O.G.L.
CENTER LINE OF COPING
(HEIGHT VARIES)

800

800

800
LAYER 3 CF2 F8 F8 F8 F8 F8

400

400

400
B1R B4 B4 B4 B4 B4
880
FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200
PANEL AS PER DESIGN

LO=168.42 LO=168.42 LO=166.84 LO=163.33
LAYER 1
⌒400 ⌒20570
CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 1.575 1.575 SSH


NOTE:
220.161

219.826
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 221.736 221.401
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.517

211.545
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
456.150

440.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR V IV
AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 5 OF 16
TYPE OF GEOGRIDS VI
DFH= 11.90m DFH= 11.50m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2WW3=16076 R2WW2=4055
TGL TGL
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID

H=11660

H=11401
L 1 = 11.50m L 1 = 11.10m

H=6290
H=6240

H=9908
H=9958
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 = 10.70m L 2 = 10.30m
L 3 = 9.90m L 3 = 9.50m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 = 8.70m
L 4 = 9.10m L 5 TO 13 = 8.10m
L 5 TO 14 = 8.40m L 14 =11.70m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 15 =10.90m
Factored bearing Pressure
Factored bearing Pressure
=527.00 kN/m²
=542.00 kN/m² TGU- 150
LEGEND TGU- 150

600 400
T1A TGU- 100
T4CR

800
TOW - TOP OF WALL T6AL
TGU- 150 TGU- 150
B.O.L. - BOTTOM OF LEVELING PAD T3B T5C

800

800
F4
O.G.L. - ORIGINAL GROUND LEVEL TGU- 200 TGU- 150
F.R.L. - FINISH ROAD LEVEL T3A T6CL

800

800
F4 F4L F4R CT2C
TGU- 200 TGU- 200
LR - LENGTH OF REINFORCEMENT
T3F

800

800
(AS PER DESIGN) T3E F4 F4 F4
TGU- 250 TGU- 250
DFH - DESIGN FOR FACING HEIGHT

800

800
T3D F4 F4 F4L F4R F4L CF2
H - FACING HEIGHT TGU- 300 TGU- 250
T3C

800

800
(TOP OF LEVELING PAD TO TOP OF WALL)

H=11660
F4 F4 F4 F4

H=11401
TGU- 300 TGU- 300
R2L - RAMP 2 LEFT SIDE
T4CR

800

800
F5 F5 F5 F4L F4R F4L
R2LWW- RAMP 2 LEFT WING WALL CF2

H=9811
TGU- 250 TGU- 250
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800
CT3C
F6 F6 F6 F6 F6
TGU- 250 TGU- 250
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800
FOR LAYING OF CENTER LINE OF LEVELING F4R F6 F6 F6 F4L F4R F4L CF2
TGU- 300 TGU- 300
PAD (FIG.1)

800

800
CF2 F7 F7 F7 F7 F6
RSW - REINFORCED SOIL WALL TGU- 300 TGU- 300

800

800
TGL - TECHGRID GEOGRID LENGTH F4R F8 F8 F8 F4L F4R F4L CF2
TGU- 300 TGU- 300
L - LAYER

800

800
LO 180 CF2 F8 F8 F8 F8 F8
O.G.L. TGU- 300 O.G.L. O.G.L.
TGU- 300 O.G.L.
COPING CENTER LINE OF COPING

800

800
(HEIGHT VARIES) LAYER 3 F4R F8 F8 F8 F4L F4R F4L CF2
TGU- 300 TGU- 300

400

400
CB1 B4 B4 B4 B4 B4
953 953 913 913
FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.250 B.O.L. 210.250 B.O.L. 210.200
PANEL AS PER DESIGN

LO=107.19 LO=201.93 LO=196.49 LO=168.42
400 16076 4055 400
LAYER 1
CENTER LINE OF 16476 4455
LEVELING PAD
LEVELING PAD
150

350 FIG.1 5.825 0.000 SSH 0.000 1.575 SSH


NOTE:
216.505

222.060

221.801

220.161
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 222.330 222.060 221.801 221.736
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.625

211.576

211.511

211.517
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
482.350

470.700

459.300

456.150
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR VI
AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 6 OF 16
VII
TYPE OF GEOGRIDS
DFH= 7.10m DFH= 6.70m DFH= 6.70m DFH= 6.70m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L26=6195 R2L25=7735 R2L24=3980 R2L23=5763
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL TGL
L 1 =11.60m L 1 =10.00m L 1 =10.00m L 1 =10.00m

H=6835

H=6658

H=6436

H=6321

H=6155
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =10.00m L 2 = 9.40m L 2 = 9.40m L 2 = 9.40m
L 3 = 9.00m L 3 = 7.80m L 3 = 7.80m L 3 = 7.80m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 TO 8 = 5.90m L 4 = 5.80m L 4 = 5.80m L 4 = 5.80m
L 9 = 6.10m L 5 TO 7 = 5.60m L 5 TO 7 = 5.60m L 5 TO 7 = 5.60m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 8 = 6.10m L 8 = 6.10m L 8 = 6.10m
Factored bearing Pressure
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure
=407kN/m²
=387kN/m² =387kN/m² =387kN/m²
LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL
LR - LENGTH OF REINFORCEMENT
(AS PER DESIGN)
DFH - DESIGN FOR FACING HEIGHT
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

600 400
R2L - RAMP 2 LEFT SIDE T2A T2A
T4B T4B T4C T4C T2B

800
T4D T4E T4EL

600

600
R2LWW- RAMP 2 LEFT WING WALL T6B

LO - DISTANCE BETWEEN CENTRE LINE OF COPING T6C

800

800

800

800
CT3C
F4 F4 F4 F4 F4
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F4 F4 F4 F4 F4 F4L

H=6155
PAD (FIG.1)

800

800

800

800
F5 F5 F4 F4 F4 F4 CF2
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH

800

800

800

800
F6 F5 F5 F5 F5 F5L
L - LAYER

800

800

800

800
LO 180 F6 F6 F6 F6 F6 F6 CF2
O.G.L.
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800

800

800
LAYER 3 F6 F6 F6 F6 F6 F6L
400

400

400

400
B3 B3 B3 B3 B3 B3 CB1

1158
FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200
PANEL AS PER DESIGN

LO=115.96 LO=112.28 LO=110.70 LO=107.19 LO=107.19

LAYER 1 ⌒23273 ⌒400


CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 5.825 5.825 SSH


NOTE:

216.947

216.505
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 222.772 222.330
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.557

211.625
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
500.000

482.350
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR
VII
AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 7 OF 16
VIII VII
TYPE OF GEOGRIDS
DFH= 7.50m DFH= 7.50m DFH= 7.50m DFH= 7.10m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L30=8185 R2L29=3980 R2L28=5745 R2L27=3980
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL TGL
L 1 =12.00m L 1 =12.00m L 1 =12.00m L 1 =11.60m

H=7470

H=7230

H=7114

H=6949

H=6835
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =10.60m L 2 =10.60m L 2 =10.60m L 2 =10.00m
L 3 = 9.00m L 3 = 9.00m L 3 = 9.00m L 3 = 9.00m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 = 7.50m L 4 = 7.50m L 4 = 7.50m L 4 TO 8 = 5.90m
L 5 TO 8 = 6.20m L 5 TO 8 = 6.20m L 5 TO 8 = 6.20m L 9 = 6.10m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 9 = 6.60m L 9 = 6.60m L 9 = 6.60m Factored bearing Pressure
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure
=407kN/m²
=427kN/m² =427kN/m² =427kN/m²
LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL
LR - LENGTH OF REINFORCEMENT
(AS PER DESIGN)
DFH - DESIGN FOR FACING HEIGHT
H - FACING HEIGHT
T2A T2A T2B
(TOP OF LEVELING PAD TO TOP OF WALL) T4C T4C

800
T4D T4E

600

600

800 400
R2L - RAMP 2 LEFT SIDE T4F
T6C T6C T6D

800

800

800
F4 F4 F4
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800

800

800
F4 F4 F4 F4 F4
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F4 F4 F4 F4 F4 F4
PAD (FIG.1)

800

800

800

800
F5 F5 F5 F5 F5
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH

800

800

800

800
F6 F6 F6 F6 F6 F6
L - LAYER

800

800

800

800
LO 180 F6 F6 F6 F6 F6
COPING CENTER LINE OF COPING
(HEIGHT VARIES)

800

800

800

800
LAYER 3 F6 F6 F6 F6 F6 F6

400

400

400

400
B3 B3 B3 B3 B3

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=126.32 LO=124.74 LO=121.23 LO=119.47
LAYER 1 ⌒21890
CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 5.825 SSH


NOTE:

217.447
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 223.272
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.

211.741
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.

520.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR
VIII VII
AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 8 OF 16
IX VIII
TYPE OF GEOGRIDS
DFH= 8.30m DFH= 8.30m DFH= 8.30m DFH= 7.90m DFH= 7.90m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L35=5970 R2L34=3980 R2L33=6195 R2L32=3980 R2L31=5745
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL TGL TGL
L 1 =13.40m L 1 =13.40m L 1 =13.40m L 1 =13.00m L 1 =13.00m

H=8270

H=8093

H=7966

H=7768

H=7641
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =11.90m L 2 =11.90m L 2 =11.90m L 2 =11.50m L 2 =11.50m
L 3 =10.50m L 3 =10.50m L 3 =10.50m L 3 =10.00m L 3 =10.00m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 = 9.20m L 4 = 9.20m L 4 = 9.20m L 4 = 8.50m L 4 = 8.50m
L 5 = 7.80m L 5 = 7.80m L 5 = 7.80m L 5 = 7.00m L 5 = 7.00m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 10= 6.90m L 6 TO 10= 6.90m L 6 TO 10= 6.90m L 6 TO 10= 6.60m L 6 TO 10= 6.60m
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure

=463kN/m² =463kN/m² =463kN/m² =443kN/m² =443kN/m²


LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL
LR - LENGTH OF REINFORCEMENT
(AS PER DESIGN)
DFH - DESIGN FOR FACING HEIGHT T2A T4C T2A T2B

800
T4D T4E T4E

600

600

800 400
H - FACING HEIGHT

600 400
T6C T6D T4F T4B
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800

800
F4 F4 F4 T6B T6B
R2L - RAMP 2 LEFT SIDE

800

800

800

800

800
F4 F4 F4 F4 F4 F4
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800

800

800

800
F4 F4 F4 F4 F4 F4 F4
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F5 F5 F5 F5 F5 F5
PAD (FIG.1)

800

800

800

800

800
F6 F6 F6 F6 F6 F6 F6
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH 800

800

800

800

800
F6 F6 F6 F6 F6 F6
L - LAYER
800

800

800

800

800
LO 180 F6 F6 F6 F6 F6 F6 F6
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800

800

800

800
LAYER 3 F7 F7 F7 F7 F7 F7
400

400

400

400

400
B4 B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=140.35 LO=138.77 LO=135.26 LO=133.51 LO=130.00
LAYER 1 ⌒25870
CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 5.825 5.825 SSH


NOTE:
218.531

217.956
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 224.356 223.781
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
213.544

212.177
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
560.000

540.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
IX VIII
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 9 OF 16
X IX
TYPE OF GEOGRIDS
DFH= 9.10m DFH= 9.10m DFH= 9.10m DFH= 8.70m DFH= 8.70m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L40=3995 R2L39=3980 R2L38=7960 R2L37=3980 R2L36=5745
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL TGL TGL
L 1 =14.20m L 1 =14.20m L 1 =14.20m L 1 =13.70m L 1 =13.70m

H=8898

H=8820

H=8742

H=8539

H=8429

H=8270
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.30m L 2 =13.30m L 2 =13.30m L 2 =12.90m L 2 =12.90m
L 3 =12.50m L 3 =12.50m L 3 =12.50m L 3 =11.30m L 3 =11.30m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =10.50m L 4 =10.50m L 4 =10.50m L 4 = 9.80m L 4 = 9.80m
L 5 = 8.90m L 5 = 8.90m L 5 = 8.90m L 5 = 9.00m L 5 = 9.00m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 11= 7.50m L 6 TO 11= 7.50m L 6 TO 11= 7.50m L 6 = 8.00m L 6 = 8.00m
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure
L 7 TO 11= 7.20m L 7 TO 11= 7.20m
Factored bearing Pressure Factored bearing Pressure
=503kN/m² =503kN/m² =503kN/m²
LEGEND =483kN/m² =483kN/m²
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL
LR - LENGTH OF REINFORCEMENT
T2A T4C T2B

800
T4D T4E T4E

600

600
(AS PER DESIGN)

800 400

600 400
DFH - DESIGN FOR FACING HEIGHT T6C T6C T6D T4F T4B

800

800

800
F4 F4 T6B T6B
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800

800

800

800
F4 F4 F4 F4 F4 F4
R2L - RAMP 2 LEFT SIDE

800

800

800

800

800
F4 F4 F4 F4 F4 F4 F4
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800

800

800

800
F5 F5 F5 F5 F5 F5
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F6 F6 F6 F6 F6 F6 F6
PAD (FIG.1)

800

800

800

800

800
F6 F6 F6 F6 F6 F6
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH 800

800

800

800

800
F7 F7 F7 F7 F6 F6 F6
L - LAYER
800

800

800

800

800
LO 180 F8 F8 F8 F8 F7 F7
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800

800

800

800
LAYER 3 F8 F8 F8 F8 F8 F8 F8
400

400

400

400

400
B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=154.39 LO=152.81 LO=149.30 LO=147.54 LO=144.04
LAYER 1 ⌒25660
CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 5.825 SSH


NOTE:

219.048
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 224.873
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.334

4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS


SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
580.000

6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE


A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
X IX
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 10 OF 16
XI X
TYPE OF GEOGRIDS
DFH= 9.50m DFH= 9.50m DFH= 9.50m DFH= 9.10m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L44=7960 R2L43=5745 R2L42=6195 R2L41=5955
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL TGL
L 1 =14.20m L 1 =14.20m L 1 =14.20m L 1 =14.20m

H=9331

H=9211

H=9124

H=9016

H=8898
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.50m L 2 =13.50m L 2 =13.50m L 2 =13.30m
L 3 =12.80m L 3 =12.80m L 3 =12.80m L 3 =12.50m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =12.00m L 4 =12.00m L 4 =12.00m L 4 =10.50m
L 5 = 9.50m L 5 = 9.50m L 5 = 9.50m L 5 = 8.90m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 12= 7.90m L 6 TO 12= 7.90m L 6 TO 12= 7.90m L 6 TO 11= 7.50m
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure

=519kN/m² =519kN/m² =519kN/m² =503kN/m²


LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL

800 400

600 400

600 400
LR - LENGTH OF REINFORCEMENT
T6D T4F T6D T4F T4A T4B T4B T4C T2A T4C

800
(AS PER DESIGN) T6A T6A T6B
DFH - DESIGN FOR FACING HEIGHT

800

800

800

800
F4 F4 F4 F4 F4 F4
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800

800

800
F4 F4 F4 F4 F4 F4 F4
R2L - RAMP 2 LEFT SIDE

800

800

800

800
F5 F5 F5 F5 F5 F4
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800

800

800
F6 F6 F6 F6 F6 F5 F5
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F6 F6 F6 F6 F6 F6
PAD (FIG.1)

800

800

800

800
F6 F6 F6 F6 F6 F6 F6
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH
800

800

800

800
F7 F7 F7 F7 F7 F7
L - LAYER
800

800

800

800
LO 180 F8 F8 F8 F8 F8 F8 F8
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800

800

800
LAYER 3 F8 F8 F8 F8 F8 F8
400

400

400

400
B4 B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=161.58 LO=159.82 LO=158.07 LO=154.39
LAYER 1 ⌒25855
CENTER LINE OF
LEVELING PAD 246135
LEVELING PAD
150

350 FIG.1 5.825 SSH


NOTE:

219.428
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 225.253
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.

211.392
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.

600.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
XI X
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 11 OF 16
XII XI
TYPE OF GEOGRIDS
DFH= 9.90m DFH= 9.90m DFH= 9.90m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L47=3995 R2L46=7960 R2L45=14155
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL TGL
L 1 =14.00m L 1 =14.00m L 1 =14.00m

H=9643

H=9605

H=9510

H=9331
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.50m L 2 =13.50m L 2 =13.50m
L 3 =12.50m L 3 =12.50m L 3 =12.50m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =11.80m L 4 =11.80m L 4 =11.80m
L 5 = 9.50m L 5 = 9.50m L 5 = 9.50m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 12= 8.20m L 6 TO 12= 8.20m L 6 TO 12= 8.20m
Factored bearing Pressure Factored bearing Pressure Factored bearing Pressure

=539kN/m² =539kN/m² =539kN/m²


LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL
F.R.L. - FINISH ROAD LEVEL T4C T2A T2B T2B

800
T4D T4D T4E T4E T4E T4E

600

600
LR - LENGTH OF REINFORCEMENT
T6C T6C T6C

800

800

800
(AS PER DESIGN) F4 F4 F4
DFH - DESIGN FOR FACING HEIGHT

800

800

800
F4 F4 F4 F4 F4 F4 F4
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800

800
F4 F4 F4 F4 F4 F4
R2L - RAMP 2 LEFT SIDE

800

800

800
F5 F5 F5 F5 F5 F5 F5
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800

800
F6 F6 F6 F6 F6 F6
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F6 F6 F6 F6 F6 F6 F6
PAD (FIG.1)

800

800

800
F7 F7 F7 F7 F7 F7
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH
800

800

800
F8 F8 F8 F8 F8 F8 F8
L - LAYER
800

800

800
LO 180 F8 F8 F8 F8 F8 F8
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800

800
LAYER 3 F8 F8 F8 F8 F8 F8 F8
400

400

400
B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=168.42 LO=166.84 LO=163.33
LAYER 1 ⌒26110
CENTER LINE OF
LEVELING PAD ⌒246135
LEVELING PAD
150

350 FIG.1 5.825 5.825 SSH


NOTE:
219.968

219.730
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 225.793 225.555
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.408

211.399
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
640.000

620.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
XII XI
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 12 OF 16
XIII XII
TYPE OF GEOGRIDS
DFH= 10.30m DFH= 9.90m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L49=3995 R2L48=21875
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL
L 1 =14.20m L 1 =14.00m

H=9839

H=9817

H=9643
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.50m L 2 =13.50m
L 3 =12.80m L 3 =12.50m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =12.00m L 4 =11.80m
L 5 =10.00m L 5 = 9.50m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 13= 8.50m L 6 TO 12= 8.20m
Factored bearing Pressure Factored bearing Pressure

=559kN/m² =539kN/m²
LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL

600 400
F.R.L. - FINISH ROAD LEVEL T4B T2A T4C T2A T4C T2A T4C T2A T4C T2A T4C T2A

800
T6B
LR - LENGTH OF REINFORCEMENT

800

800
(AS PER DESIGN) F4 F4 F4 F4 F4 F4 F4
DFH - DESIGN FOR FACING HEIGHT

800

800
F4 F4 F4 F4 F4 F4
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800
F5 F4 F4 F4 F4 F4 F4
R2L - RAMP 2 LEFT SIDE

800

800
F6 F5 F5 F5 F5 F5
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800
F6 F6 F6 F6 F6 F6 F6
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800
FOR LAYING OF CENTER LINE OF LEVELING F6 F6 F6 F6 F6 F6
PAD (FIG.1)

800

800
F7 F7 F7 F7 F7 F7 F7
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH 800

800
F8 F8 F8 F8 F8 F8
L - LAYER
800

800
LO 180 F8 F8 F8 F8 F8 F8 F8
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800
LAYER 3 F8 F8 F8 F8 F8 F8
400

400
B4 B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=172.11 LO=168.42
LAYER 1 ⌒25870
CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 5.825 SSH


NOTE:
220.141

1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF


DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 225.966
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.439

4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS


SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
660.000

6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE


A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
XIII XII
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 13 OF 16
XIV XIII
TYPE OF GEOGRIDS
DFH= 10.30m DFH= 10.30m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L51=9740 R2L50=15905
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL
L 1 =14.20m L 1 =14.20m

H=9932

H=9910

H=9839
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.50m L 2 =13.50m
L 3 =12.80m L 3 =12.80m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =12.00m L 4 =12.00m
L 5 =10.00m L 5 =10.00m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 13= 8.50m L 6 TO 13= 8.50m
Factored bearing Pressure Factored bearing Pressure

=559kN/m² =559kN/m²
LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL

600 400

600 400
F.R.L. - FINISH ROAD LEVEL T6A T4A T6A T4A T6A T4B
T6B
T4B
T6B
T4B
T6B
T4B
T6B
LR - LENGTH OF REINFORCEMENT

800

800
(AS PER DESIGN) F4 F4 F4 F4 F4 F4
DFH - DESIGN FOR FACING HEIGHT

800

800
F4 F4 F4 F4 F4 F4 F4
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800
F5 F5 F5 F5 F5 F5
R2L - RAMP 2 LEFT SIDE

800

800
F6 F6 F6 F6 F6 F6 F6
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800

800
F6 F6 F6 F6 F6 F6
& CENTRE LINE OF LEVELING PAD REQUIRED

800

800
FOR LAYING OF CENTER LINE OF LEVELING F6 F6 F6 F6 F6 F6 F6
PAD (FIG.1)

800

800
F7 F7 F7 F7 F7 F7
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH 800

800
F8 F8 F8 F8 F8 F8 F8
L - LAYER
800

800
LO 180 F8 F8 F8 F8 F8 F8
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800

800
LAYER 3 F8 F8 F8 F8 F8 F8 F8
400

400
B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=173.86 LO=172.11
LAYER 1 ⌒25645
CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 5.825 SSH


NOTE:

220.250
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 226.075
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.

211.516
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.

680.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
XIV XIII
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 14 OF 16
XV XIV
TYPE OF GEOGRIDS
DFH= 10.30m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2L52=23880
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL
L 1 =14.20m

H=9925

H=9932
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.50m
L 3 =12.80m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =12.00m
L 5 =10.00m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID L 6 TO 13= 8.50m
Factored bearing Pressure

=559kN/m²
LEGEND
TOW - TOP OF WALL
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL

600 400
F.R.L. - FINISH ROAD LEVEL T6A T4A T6A T4A T6A T4A T6A T4A T6A T4A T6A T4A
LR - LENGTH OF REINFORCEMENT

800
(AS PER DESIGN) F4 F4 F4 F4 F4 F4
DFH - DESIGN FOR FACING HEIGHT

800
F4 F4 F4 F4 F4 F4
H - FACING HEIGHT
(TOP OF LEVELING PAD TO TOP OF WALL)

800
F5 F5 F5 F5 F5 F5
R2L - RAMP 2 LEFT SIDE

800
F6 F6 F6 F6 F6 F6
R2LWW- RAMP 2 LEFT WING WALL
LO - DISTANCE BETWEEN CENTRE LINE OF COPING

800
F6 F6 F6 F6 F6 F6
& CENTRE LINE OF LEVELING PAD REQUIRED

800
FOR LAYING OF CENTER LINE OF LEVELING F6 F6 F6 F6 F6 F6
PAD (FIG.1)

800
F7 F7 F7 F7 F7 F7
RSW - REINFORCED SOIL WALL
TGL - TECHGRID GEOGRID LENGTH

800
F8 F8 F8 F8 F8 F8
L - LAYER

800
LO 180 F8 F8 F8 F8 F8 F8
COPING CENTER LINE OF COPING
(HEIGHT VARIES)
800
LAYER 3 F8 400
F8 F8 F8 F8 F8

B4 B4 B4 B4 B4 B4

FACING OF TECHGRID GEOGRID B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200


PANEL AS PER DESIGN

LO=173.86
LAYER 1 ⌒23880
CENTER LINE OF
LEVELING PAD
LEVELING PAD
150

350 FIG.1 5.825 SSH


NOTE:

220.294
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 226.119
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.

211.678
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.

700.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
XV XIV
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)
DIVISION, 502, 5TH FLOOR, DDA-5 BUILDING, DISTRICT
CENTER JANAKPURI NEW DELHI - 110058
E-MAIL: info@sispl.com
12.08.19
SCALE : NTS
SHEET 15 OF 16
XV
TYPE OF GEOGRIDS
DFH= 9.90m DFH= 10.30m DFH= 10.30m
TGU-100 (kN/m) - TECHGRID U-100 GEOGRID R2WW4=1750 R2L54=17703 R2L53=3980
TGU-150 (kN/m) - TECHGRID U-150 GEOGRID TGL TGL
L 1 =14.20m L 1 =14.20m

H=9788

H=9788
H=9838

H=9838

H=9913

H=9925
TGU-200 (kN/m) - TECHGRID U-200 GEOGRID L 2 =13.50m L 2 =13.50m
L 3 =12.80m L 3 =12.80m
TGU-250 (kN/m) - TECHGRID U-250 GEOGRID L 4 =12.00m L 4 =12.00m
L 5 =10.00m L 5 =10.00m
TGU-300 (kN/m) - TECHGRID U-300 GEOGRID TGL L 6 TO 13= 8.50m L 6 TO 13= 8.50m
L 1 =14.00m
L 2 =13.50m Factored bearing Pressure Factored bearing Pressure
L 3 =12.50m
L 4 =11.80m
L 5 = 9.50m =559kN/m² =559kN/m²
LEGEND L 6 TO 12= 8.20m
Factored bearing Pressure
TOW - TOP OF WALL
=539kN/m²
B.O.L. - BOTTOM OF LEVELING PAD
O.G.L. - ORIGINAL GROUND LEVEL

600 400

600 400
T4BR
F.R.L. - FINISH ROAD LEVEL T4C T4B T4B T4B T4B T4A

800
CT3B CT3B T6B T6B T6B T6B T6A
LR - LENGTH OF REINFORCEMENT

800

800

800
(AS PER DESIGN) F4R F4 F4 F4 F4 F4
DFH - DESIGN FOR FACING HEIGHT

800

800

800
F4 CF2 CF2 F4 F4 F4 F4 F4
H - FACING HEIGHT

800
(TOP OF LEVELING PAD TO TOP OF WALL)

800

800
F5R F5 F5 F5 F5 F5
R2L - RAMP 2 LEFT SIDE

800

800

800
F5 F6 F6 F6 F6 F6
R2LWW- RAMP 2 LEFT WING WALL CF2 CF2
H=9788

H=9838
H=9838
LO - DISTANCE BETWEEN CENTRE LINE OF COPING
800

800

800
F6R F6 F6 F6 F6 F6
& CENTRE LINE OF LEVELING PAD REQUIRED
800

800

800
FOR LAYING OF CENTER LINE OF LEVELING F6 CF2 CF2 F6 F6 F6 F6 F6
PAD (FIG.1)
800

800

800
F6R F7 F7 F7 F7 F7
RSW - REINFORCED SOIL WALL
800

TGL - TECHGRID GEOGRID LENGTH

800

800
F8 CF2 CF2 F8 F8 F8 F8 F8
L - LAYER
800

800

800
LO 180 O.G.L. O.G.L. O.G.L.
F6R F8 F8 F8 F8 F8
COPING CENTER LINE OF COPING
800

(HEIGHT VARIES)

800

800
LAYER 3 F8 CF2 CF2 F8 F8 F8 F8 F8
400

400

400
B3R B4 B4 B4 B4 B4
1383
FACING OF TECHGRID GEOGRID B.O.L. 210.250 B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200 B.O.L. 210.200
PANEL AS PER DESIGN

LO=168.42 LO=172.11 LO=172.11 LO=172.11 LO=173.86
LAYER 1 1750 400 ⌒400 ⌒21283
CENTER LINE OF 2150
LEVELING PAD
LEVELING PAD
150

350 FIG.1 5.825 5.825 5.825 5.825 SSH


NOTE:
220.188

220.188

220.188

220.273
1. FOLLOWING NOTES SHALL BE READ IN CONJUCTION WITH GAD TOP OF
DWG NO.TFI/RW-121BJ/01 & MATERIAL SPECIFICATION WALL
DWGNO.TFI/RW-121/08.
2. ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS
FRL @ Shoulder
UNLESS OTHERWISE SPECIFIED. 226.013 226.013 226.013 226.098
3. GEOGRID REINFORCEMENT IS FROM BOTTOM TO TOP. THE BOTTOM edge
MOST LAYER IS GIVEN No.1 IN DRAWINGS.
211.683

211.683

211.683

211.679
4. DIMENSION ARE NOT TO BE SCALED ONLY WRITTEN DIMENSIONS
SHALL BE FOLLOWED.
OGL
5. FACTORED BEARING PRESSURE HAS BEEN SHOWN IN THE
DRAWING. IT SHALL BE CONFIRMED AT SITE BEFORE START OF
LAYING OF LEVELING PAD.
740.000

740.000

740.000

720.000
6. SAFE BEARING CAPACITY OF FOUNDATION SOIL SHALL HAVE
A MINIMUM FOS OF 2.5 WITH RESPECT TO THE ULTIMATE BEARING CHAINAGE
CAPACITY OF SOIL.
7. UNSUITABLE / FILLED-UP SOIL SHALL BE REMOVED AND REPLACED
WITH APPROVED QUALITY COMPACTED FILL BELOW LEVELING PAD.
XV
8 CUTTING LENGTH OF GEOGRID AT THE SITE (L)= 2 X LR AUTHORITY: EPC CONTRACTOR: PROOF CONSULTANT:
(WRAPPING LENGTH). L-SECTION AND GEOGRID REINFORCEMENT REV: A
NATIONAL HIGHWAYS AUTHORITY OF INDIA GR INFRA PROJECTS LTD. BK LAYOUT FOR RAMP 2 LEFT SIDE RSW OF
9 F.R.L, E.G.L, CAMBER etc. SHOWN IN THIS DRAWING MUST BE VERIFIED (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVERNMENT OF INDIA) GR HOUSE, HIRAN MAGRI SECTOR -11,
UDAIPUR (RAJASTHAN) - 313001 UT RAMP 1 & 2 @ IC 31+343 SIZE: A3

FROM FINALLY REVIEWED PLAN & PROFILE DRAWING. A 12.08.19 FOR APPROVAL BK UT BK SV PROJECT: AUTHORITY ENGINEER: BK
M/S CENTER DE ESTUDIOS DE MERERIALES Y SABZ INFRA SOLUTION PVT. LTD.
10. EXECUTION OF SERVICE ROAD SHALL BE CARRIED OUT BEFORE REV DATE DESCRIPTION DESIGN AND CONSTRUCTION OF DELHI-MEERUT EXPRESSWAY FROM
DASNA TO MEERUT - KM 27.740 OF NH - 24 TO KM 51.975 OF NH - 58
CONTROL DE OBRA, SA IN ASSOCIATION WITH L-15 PRATAP NAGAR NEW DELHI-110007 SV
VAISHNAVI INFRATECH SERVICE PVT. LTD. MOBILE:-9212222997 DATE
START OF RS WALL EXECUTION. (DESIGN CHAINAGE 28+000 TO 59+777) IN THE STATE OF UTTAR
PRADESH ON EPC BASIC (LENGTH 31.777 KMS)