Sei sulla pagina 1di 60

Concrete Details Month of April - 2017

Sr. Grade of Vehicle


no Date Plant Location Name of Structure Concrete No Driver Name

1 4/25/2017 Kharwarnagar Plant M-25 3115 RamCharan


2 4/25/2017 Kharwarnagar Plant M-25 0658 Madan
3 4/25/2017 Kharwarnagar Plant M-25 5305 Champu
nth of April - 2017
Total Batch
Challan Batch Out Report
No No Time Quantity Qty Cum Qty Received Remarks
(Per Day)
Y/N
18425 525 15.19 6.00 6.00
18426 526 15.43 6.00 12.00
18427 527 16.03 6.00 18.00 18.00

m-25 =18.00 cum


Concrete Details Month of May
Sr. Grade of Vehicle
Date Plant Location Name of Structure Driver Name
no Concrete No
1 5/3/2017 M-15 5305 Champu
3 5/4/2017 Kharwarnagar Plant Drain M-25 3115 RamCharan
4 5/4/2017 Kharwarnagar Plant Drain M-25 0658 Madan
5 5/5/2017 Kharwarnagar Plant Drain M-15 9457 Tapan
6 5/5/2017 Kharwarnagar Plant Drain M-15 0658 Madan
7 5/6/2017 Kharwarnagar Plant Drain M-25 3115 RamCharan
11 5/6/2017 Vav Plant Drain M-25 5305 Champu
12 5/6/2017 Vav Plant Drain M-25 5305 Champu
13 5/6/2017 Vav Plant Drain M-25 5305 Champu
14 5/6/2017 Vav Plant Drain M-25 5305 Champu
15 5/6/2017 Vav Plant Drain M-25 5305 Champu
16 5/8/2017 Vav Plant Drain M-25 5305 Champu
17 5/8/2017 Vav Plant Drain M-25 3115 RamCharan
18 5/8/2017 Vav Plant Drain M-25 5305 Champu
19 5/8/2017 Vav Plant Drain M-25 3115 RamCharan
20 5/9/2017 Vav Plant Drain M-15 9457 Tapan
21 5/9/2017 Vav Plant Drain M-15 5305 Champu
22 5/9/2017 Vav Plant Drain M-15 5305 Champu
23 5/10/2017 Vav Plant Drain M-15 0658 Madan
24 5/10/2017 Vav Plant Drain M-15 0658 Madan
25 5/10/2017 Vav Plant Drain M-15 5305 Champu
26 5/10/2017 Vav Plant Drain M-15 0658 Madan
27 5/11/2017 Vav Plant Drain M-15 0345 RamCharan
28 5/11/2017 Vav Plant Drain M-15 5305 Champu
29 5/11/2017 Vav Plant Drain M-15 3115 RamCharan
30 5/11/2017 Vav Plant Drain M-15 5305 Champu
32 5/12/2017 Vav Plant Drain M-25 5305 Champu
33 5/12/2017 Vav Plant Drain M-15 5305 Champu
34 5/12/2017 Vav Plant Drain M-15 5305 Champu
35 5/13/2017 Vav Plant Drain M-25 5305 Champu
36 5/13/2017 Vav Plant Drain M-25 9457 Tapan
37 5/13/2017 Vav Plant Drain M-15 5305 Champu
38 5/14/2017 Vav Plant Drain M-25 5305 Champu
39 5/14/2017 Vav Plant Drain M-25 5305 Champu
40 5/14/2017 Vav Plant Drain M-25 5305 Champu
41 5/14/2017 Vav Plant Drain M-25 5305 Champu
42 5/15/2017 Vav Plant Drain M-15 5305 Champu
43 5/15/2017 Vav Plant Drain M-15 5305 Champu
44 5/15/2017 Vav Plant Drain M-15 5305 Champu
45 5/15/2017 Vav Plant Drain M-15 5305 Champu
46 5/16/2017 Vav Plant Drain M-25 5305 Champu
47 5/16/2017 Vav Plant Drain M-25 9457 Tapan
48 5/16/2017 Vav Plant Drain M-15 5305 Champu
49 5/16/2017 Vav Plant Drain M-25 9457 Tapan
50 5/16/2017 Vav Plant Drain M-25 0658 Madan
51 5/17/2017 Vav Plant Drain M-25 0658 Madan
52 5/17/2017 Vav Plant Drain M-25 5305 Champu
53 5/17/2017 Vav Plant Drain M-25 0658 Madan
54 5/17/2017 Vav Plant Drain M-15 9457 Tapan
55 5/17/2017 Vav Plant Drain M-15 0658 Madan
56 5/17/2017 Vav Plant Drain M-25 9457 Tapan
57 5/17/2017 Vav Plant Drain M-15 0658 Madan
58 5/17/2017 Vav Plant Drain M-15 5305 Champu
59 5/17/2017 Vav Plant Drain M-25 9457 Tapan
60 5/17/2017 Vav Plant Drain M-15 5305 Champu
61 5/18/2017 Vav Plant Drain M-25 5305 Champu
62 5/18/2017 Vav Plant Drain M-25 5305 Champu
63 5/19/2017 Vav Plant Drain M-25 5305 Champu
64 5/19/2017 Vav Plant Drain M-25 9457 Tapan
65 5/19/2017 Vav Plant Drain M-25 0658 Madan
66 5/19/2017 Vav Plant Drain M-15 5305 Champu
67 5/19/2017 Vav Plant Drain M-25 9457 Tapan
68 5/19/2017 Vav Plant Drain M-15 5305 Champu
69 5/20/2017 Vav Plant Drain M-15 5305 Champu
70 5/20/2017 Vav Plant Drain M-25 9457 Tapan
71 5/20/2017 Vav Plant Drain M-25 5305 Champu
72 5/20/2017 Vav Plant Drain M-25 9457 Tapan
73 5/20/2017 Vav Plant Drain M-25 5305 Champu
74 5/20/2017 Vav Plant Drain M-25 3115 RamCharan
75 5/22/2017 Vav Plant Drain M-25 5305 Champu
76 5/22/2017 Vav Plant Drain M-25 3115 RamCharan
77 5/22/2017 Vav Plant Drain M-25 9457 Tapan
78 5/22/2017 Vav Plant Drain M-25 3115 RamCharan
79 5/22/2017 Vav Plant Drain M-25 3115 RamCharan
80 5/23/2017 Vav Plant Drain M-25 3115 RamCharan
81 5/23/2017 Vav Plant Drain M-25 5305 Champu
82 5/23/2017 Vav Plant Drain M-25 0658 Madan
83 5/23/2017 Vav Plant Drain M-25 3115 RamCharan
84 5/24/2017 Vav Plant Drain M-25 5305 Champu
85 5/24/2017 Vav Plant Drain M-25 5305 Champu
86 5/24/2017 Vav Plant Drain M-25 3115 RamCharan
87 5/24/2017 Vav Plant GEB POL M-25 3115 RamCharan
88 5/24/2017 Vav Plant Drain M-25 5305 Champu
89 5/25/2017 Vav Plant Drain M-15 5305 Champu
90 5/25/2017 Vav Plant Drain M-25 3115 RamCharan
91 5/25/2017 Vav Plant Drain M-25 5305 Champu
92 5/25/2017 Vav Plant GEB POL M-15 700
93 5/25/2017 Vav Plant Drain M-25 3115 RamCharan
94 5/25/2017 Vav Plant Drain M-25 5305 Champu
95 5/25/2017 Vav Plant GEB POL M-15 700
96 5/25/2017 Vav Plant Drain M-15 5305 Champu
97 5/25/2017 Vav Plant Drain M-25 3115 RamCharan
98 5/26/2017 Vav Plant Drain M-25 3115 RamCharan
99 5/26/2017 Vav Plant Drain M-25 3115 Tapan
100 5/26/2017 Vav Plant Drain M-25 5305 RamCharan
101 5/26/2017 Vav Plant Drain M-25 5305 RamCharan
102 5/26/2017 Vav Plant Drain M-15 3115 Tapan
103 5/26/2017 Vav Plant Drain M-25 3115 Tapan
105 5/27/2017 Vav Plant Drain M-25 3115 RamCharan
106 5/27/2017 Vav Plant GEB POL M-15 700
107 5/27/2017 Vav Plant Drain M-25 3115 RamCharan
108 5/27/2017 Vav Plant Drain M-25 3115 RamCharan
109 5/27/2017 Vav Plant Drain M-25 5305 Tapan
110 5/27/2017 Vav Plant Drain M-15 5305 Tapan
111 5/27/2017 Vav Plant Drain M-15 3115 RamCharan
112 5/28/2017 Vav Plant Drain M-25 3115 RamCharan
113 5/28/2017 Vav Plant GEB POL M-15 700
116 5/29/2017 Vav Plant Drain M-25 3115 RamCharan
117 5/29/2017 Vav Plant Drain M-25 5305 Tapan
118 5/29/2017 Vav Plant Drain M-25 3115 Tapan
119 5/30/2017 Vav Plant Drain M-25 5305 Tapan
120 5/30/2017 Vav Plant Drain M-15 3115 RamCharan
121 5/30/2017 Vav Plant Drain M-15 3115 RamCharan
122 5/30/2017 Vav Plant Drain M-15 700 Tractor
123 5/30/2017 Vav Plant Drain M-25 5305 Tapan
124 5/30/2017 Vav Plant Drain M-25 3115 RamCharan
125 5/30/2017 Vav Plant Drain M-25 3115 RamCharan
126 5/31/2017 Vav Plant Drain M-25 3115 RamCharan
133 5/31/2017 Vav Plant Drain M-25 5305 Tapan
134 5/31/2017 Vav Plant Drain M-25 5305 Tapan
135 5/31/2017 Vav Plant Drain M-25 3115 RamCharan
136 5/31/2017 Vav Plant Drain M-25 3115 RamCharan
137 5/31/2017 Vav Plant Drain M-25 5305 Tapan
s Month of May - 2017
Challan Batch Out Total Qty Batch Report
Quantity Cum Qty Remarks
No No Time (Per Day) Received Y/N
0.50 0.50 0.50 N
18433 551 08.46 7.00 8.50
18434 552 09.16 7.00 15.00 15.50
18438 555 10.31 6.00 21.50
18439 556 15.07 5.50 11.50 27.00
18442 557 10.40 6.00 33.00
0.50 34.75
1.00 35.75
1.00 36.75
4.00 40.75
11 18.58 1.00 8.75 41.75
12 15.51 7.00 48.75
13 17.38 7.00 55.75
14 18.00 3.50 59.25
15 18.44 1.50 19.00 60.75
16 15.48 7.00 67.75
17 16.32 7.00 74.75
18 18.42 2.00 16.00 76.75
19 10.35 2.00 78.75
20 10.44 2.00 80.75
21 12.13 3.00 83.75
22 15.39 7.00 14.00 90.75
24 12.09 7.00 97.75
25 15.59 7.00 104.75
26 16.09 7.00 111.75
27 16.54 7.00 28.00 118.75
29 10.50 6.00 125.25
30 16.05 7.00 132.25
31 18.22 3.00 16.50 135.25
32 9.12 6.00 141.25
33 12.25 1.50 142.75
34 15.41 7.00 14.50 149.75
35 9.00 2.50 152.25
36 9.27 0.50 152.75
36 9.28 1.00 153.75
37 9.54 3.00 7.00 156.75
38 15.22 4.00 160.75
39 15.31 2.00 162.75
40 17.24 1.00 163.75
41 17.58 5.00 12.00 168.75
6.00 174.75
43 9.31 6.00 180.75
44 11.02 6.00 186.75
45 15.45 6.00 192.75
46 16.25 6.00 30.00 198.75
47 9.08 6.00 204.75
48 10.28 6.00 210.75
49 10.53 6.00 216.75
50 11.54 6.00 222.75
51 15.18 4.50 227.25
52 15.45 6.00 233.25
53 16.20 2.00 235.25
54 17.08 3.00 238.25
55 17.40 2.00 240.25
56 18.33 1.00 42.50 241.25
57 10.06 4.50 245.75
58 0.50 5.00 246.25
59 3.25 249.50
60 11.11 6.00 255.50
61 15.16 6.00 261.50
62 15.41 6.00 267.50
63 16.43 6.00 273.50
64 17.18 4.00 31.25 277.50
65 9.16 4.25 281.75
66 6.00 287.75
67 10.39 6.00 293.75
68 11.47 1.50 17.75 295.25
69 15.35 6.00 301.25
70 17.36 6.00 307.25
1 71 9.40 6.00 313.25 Y
2 72 10.08 6.00 319.25 Y
4 74 15.11 6.00 325.25 Y
5 75 15.37 6.00 331.25 Y
6 76 19.01 3.00 334.25
8 81 10.07 5.00 339.25
9 82 15.43 0.50 339.75
10 83 16.09 6.00 345.75
11 84 17.20 4.50 350.25
12 85 9.46 6.00 356.25 Y
13 86,87 12.03 5.00 361.25 Y
14 3.00 364.25 Y
88 15.16
15 3.00 367.25 N
16 89 16.09 5.00 22.00 372.25 Y
17 90,91,92 3.50 375.75 Y
18 93 10.03 6.00 381.75 Y
19 94 11.10 5.50 387.25
20 . 1.00 388.25
21 96 16.07 3.00 391.25 Y
22 97 16.37 5.00 396.25 Y
23 1.00 397.25
24 99 17.37 2.50 399.75 Y
25 100 18.08 2.00 29.50 401.75 Y
26 5.00 406.75
35 101 10.08 3.00 409.75
27 103 15.28 5.00 414.75 Y
28 105 18.01 0.50 415.25 Y
29 106 18.42 5.50 420.75 Y
30 104 16.38 6.00 20.00 426.75 Y
31 107 8.56 435.31 Y
32 1.50 436.81
33 111 15.14 2.50 439.31 Y
34 108 10.27 5.00 444.31 Y
35 101 10.08 3.00 447.31 Y
36 112 16.06 6.00 453.31 Y
37 113 17.41 2.50 29.06 455.81 Y
38 114 9.48 6.00 461.81 Y
- 1.00 7.00 462.81
39 116 9.45 6.00 468.81
40 117 11.00 5.50 474.31
41 118 11.39 3.00 14.50 477.31
42 119 9.13 6.00 483.31
43 120 9.34 7.00 490.31
44 2.00 492.31 Tundi
45 1.00 493.31
46 123 15.11 6.00 499.31
47 6.00 505.31
48 125-127 17.51 6.00 34.00 511.31
49 128 9.34 6.00 517.31
51 130 10.37 6.00 544.31
52 131-133 15.19 5.25 549.56
53 134 15.45 1.50 551.06
54 135 17.25 6.00 557.06
55 136 18.04 1.00 46.75 558.06
0.5
Concrete De

Sr. Grade of
Date Location Chainage Side Name of Structure Vehicle No
no Concrete

1 16 June 17 VUP 239+050 RHS A1 P4 PILE M-35 3115


2 16 June 17 VUP 239+050 RHS A1 P4 PILE M-35 9457
3 16 June 17 VUP 239+050 RHS A1 P4 PILE M-35 3115
4 16 June 17 VUP 239+050 RHS A1 P4 PILE M-35 9457
5 17 June 17 250+540 to 250+560 LHS Drain WALL M-25 5305
6 17 June 17 250+760 to 250+770 RHS Drain WALL M-25 5305
7 17 June 17 250+550 to 250+560 LHS Drain WALL M-25 9457
5 19 June 17 VUP 239+050 RHS A1 P2 PILE M-35 5305
6 19 June 17 VUP 239+050 RHS A1 P2 PILE M-35 3115
7 19 June 17 VUP 239+050 RHS A1 P2 PILE M-35 5305
8 19 June 17 VUP 239+050 RHS A1 P2 PILE M-35 3115
9 20 June 17 250+410 to 250+430 LHS Drain WALL M-25 3115
10 20 June 17 250+540 to 250+530 LHS Drain WALL M-25 5305
11 20 June 17 250+540 to 250+530 LHS Drain WALL M-25 3115
12 20 June 17 250+410 to 250+430 LHS Drain WALL M-25 3115
13 21 June 17 251+860 to 251+880 LHS Drain WALL M-25 3115
14 21 June 17 251+860 to 251+880 LHS Drain WALL M-25 5305
15 21 June 17 250+430 to 250+450 LHS Drain WALL M-25 5305
16 21 June 17 251+550 to 251+560 LHS Drain WALL M-25 9457
17 22 June 17 250+860 to 250+880 LHS Drain RAFT M-25 5305
18 22 June 17 251+050 to 251+060 LHS Drain WALL M-25 5305
19 23 June 17 VUP 239+050 RHS A1 P6 PILE M-35 5305
20 23 June 17 VUP 239+050 RHS A1 P6 PILE M-35 3115
21 23 June 17 VUP 239+050 RHS A1 P6 PILE M-35 5305
22 23 June 17 VUP 239+050 RHS A1 P6 PILE M-35 3115
23 25 June 17 250+370 to 250+400 LHS Drain WALL M-25 5305
24 25 June 17 VUP 239+050 RHS A1 P3 PILE M-35 3115
25 25 June 17 VUP 239+050 RHS A1 P3 PILE M-35 5305
26 25 June 17 VUP 239+050 RHS A1 P3 PILE M-35 9457
27 27 June 17 250+380 to 250+400 LHS Drain WALL M-25 3115
28 28 June 17 VUP 239+050 RHS A1 P5 PILE M-35 5305
29 28 June 17 VUP 239+050 RHS A1 P5 PILE M-35 9457
30 28 June 17 VUP 239+050 RHS A1 P5 PILE M-35 5305
31 28 June 17 VUP 239+050 RHS A1 P5 PILE M-35 658
32 29 June 17 250+340 to 250+360 LHS Drain WALL M-25 5305
33 30 June 17 VUP 239+050 RHS A1 P1 PILE M-35 658
34 30 June 17 VUP 239+050 RHS A1 P1 PILE M-35 5305
35 30 June 17 VUP 239+050 RHS A1 P1 PILE M-35 658
30 June 17 250+330 to 250+350 LHS Drain WALL M-25 3115
Concrete Details Month of JUNE - 2017
Slump @ Slump @
Challan Time Time Time
Driver Name Plant in Site in Qty. in M3
No Dispatch Arrive Unlode
MM MM

Ramcharan 123 2:00 AM 155 2:30 AM 145 2:55 AM 6.00


Nanjibhai 124 2:34 AM 160 3:10 AM 135 3:35 AM 6.00
Ramcharan 125 3:40 AM 155 4:15 AM 140 4:45 AM 3.00
Nanjibhai 126 5:38 AM 150 6:20 AM 140 7:00 AM 3.50
Tapan 127 140 100 6.00
Tapan 128 135 95 2.50
Nanjibhai 129 140 100 1.50
Tapan 131 4:34 PM 180 5:15 PM 160 5:45 PM 6.00
Ramcharan 132 4:54 PM 175 5:40 PM 165 6:15 PM 6.00
Tapan 133 6:00 PM 175 6:45 PM 160 7:25 PM 3.00
Ramcharan 134 7:19 PM 165 8:00 PM 155 8:30 PM 0.50
Ramcharan 135 145 110 5.00
Tapan 136 145 120 6.00
Ramcharan 137 140 110 6.00
Ramcharan 138 135 100 1.50
Ramcharan 139 140 120 6.00
Tapan 140 150 125 3.00
Tapan 141 140 110 5.00
Nanjibhai 142 140 110 5.00
Tapan 143 145 115 5.00
Tapan 144 145 110 6.00
Tapan 145 4:00 PM 175 4:45 PM 145 5:20 PM 4.00
Ramcharan 146 5:30 PM 170 6:15 PM 150 6:50 PM 6.00
Tapan 147 6:25 PM 170 7:15 PM 155 8:00 PM 5.00
Ramcharan 148 9:00 PM 160 9:40 PM 150 10:10 PM 1.50
Tapan 149 145 115 4.50
Ramcharan 150 9:44 PM 165 10:30 PM 145 11:00 PM 6.00
Tapan 151 10:20 PM 165 11:00 PM 150 11:36 PM 6.00
Nanjibhai 152 10:40 PM 160 11:25 PM 140 12:20 PM 4.00
Ramcharan 156 140 110 4.50
Tapan 158 2:20 PM 175 12:05 PM 145 3:30 PM 6.00
Nanjibhai 159 2:55 PM 175 3:40 PM 140 4:20 PM 6.00
Tapan 160 4:10 PM 170 4:55 PM 140 5:30 PM 3.00
Ramcharan 161 5:55 PM 170 6:40 PM 135 7:05 PM 1.00
Tapan 162 145 120 4.50
Ramcharan 163 3:15 PM 175 4:00 PM 150 4:25 PM 6.00
Tapan 164 4:07 PM 170 4:50 PM 145 5:30 PM 6.00
Ramcharan 166 4:32 PM 170 5:15 PM 140 6:15 PM 3.50
Madan 165 135 100 3.50
Total Qty
Cum. Qty.
(Per
in M3
Remarks
Day)

6.00
12.00
15.00
18.50 18.50
24.50
27.00
28.50
34.50
40.50
43.50
15.50 44.00
49.00
55.00
61.00
62.50
68.50
71.50
76.50
81.50
86.50
92.50
96.50
102.50
107.50
16.50 109.00
113.50
119.50
125.50
16.00 129.50
4.50 134.00
140.00
146.00
149.00
16.00 150.00
4.50 154.50
160.50
166.50
15.50 170.00
173.50
Concrete Details M
Sr. Grade of
Date Location Chainage Side Name of Structure Vehicle No
no Concrete

1 09 July 17 250+440 to 250+460 LHS Drain WALL M-25 5305


2 09 July 17 250+440 to 250+460 LHS Drain WALL M-25 658
3 11 July 17 VUP 239+050 RHS A2 P1 PILE M-35 658
4 11 July 17 VUP 239+050 RHS A2 P1 PILE M-35 5305
5 11 July 17 VUP 239+050 RHS A2 P1 PILE M-35 658
6 14 July 17 VUP 239+050 RHS A2 P3 PILE M-35 658
7 14 July 17 VUP 239+050 RHS A2 P3 PILE M-35 5305
5 14 July 17 VUP 239+050 RHS A2 P3 PILE M-35 658
6 15 July 17 VUP 239+050 RHS PILE HEAD M-35 5305
7 29 July 17 VUP 239+050 RHS A2PILE CAP PCC M-15 5305
8 30 July 17 VUP 239+050 RHS A2 P6 PILE M-35 3115
9 30 July 17 VUP 239+050 RHS A2 P6 PILE M-35 5305
10 30 July 17 VUP 239+050 RHS A2 P6 PILE M-35 3115
Concrete Details Month of JUNE - 2017
Slump @
Challan Time Time Slump @ Time Qty. in Total Qty
Driver Name Plant in
No Dispatch Arrive Site in MM Unlode M3 (Per Day)
MM

Tapan 178 4:50 PM 135 4:50 PM 110 3.00


Ramcharan 179 130 105 4.00
Ramcharan 196 3:17 PM 175 3:55 PM 140 4:30 PM 6.00
Tapan 197 3:50 PM 175 4:35 PM 145 5:15 PM 6.00
Ramcharan 198 4:50 PM 170 5:30 PM 150 6:15 PM 4.25 16.25
Ramcharan 202 5:30 PM 170 6:15 PM 145 6:30 PM 6.50
Tapan 203 5:55 PM 170 6:40 PM 150 7:10 PM 6.50
Ramcharan 204 7:40 PM 165 8:20 PM 155 9:05 PM 3.00 16.00
Tapan 206 4:50 PM 170 4:50 PM 150 4:50 PM 1.75
Tapan 233 4:50 PM 150 4:50 PM 110 4:50 PM 3.00
Madan 246 11:50 PM 170 12:40 AM 155 1:10 AM 6.00
Ramcharan 247 12:20 AM 165 1:00 AM 150 1:50 AM 6.00
Madan 248 1:50 AM 160 2:40 AM 145 3:20 AM 4.50 16.50
Cum. Qty. Remark
in M3 s

6.00
10.00
16.00
22.00
26.25
32.75
39.25
42.25
44.00
47.00
53.00
59.00
63.50
Concrete Details Mont
Grade of Vehicle
Sr. no Date Location Chainage Side Name of Structure
Concrete No

1 02 August 17 VUP 239+050 RHS A2 P4 PILE M-35 3115


2 02 August 17 VUP 239+050 RHS A2 P4 PILE M-35 658
3 02 August 17 VUP 239+050 RHS A2 P4 PILE M-35 3115
4 04 August 17 VUP 239+050 RHS A2 P2 PILE M-35 5305
5 04 August 17 VUP 239+050 RHS A2 P2 PILE M-35 3115
6 04 August 17 VUP 239+050 RHS A2 P2 PILE M-35 5305
7 06 August 17 VUP 239+050 RHS A2 P5 PILE M-35 5305
5 06 August 17 VUP 239+050 RHS A2 P5 PILE M-35 3115
6 06 August 17 VUP 239+050 RHS A2 P5 PILE M-35 5305
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
oncrete Details Month of August - 2017
Slump @ Slump @ Total Qty
Challan Time Time Time Qty. in
Driver Name Plant in Site in (Per
No Dispatch Arrive Unlode M3
MM MM Day)

Madan 254 4:35 PM 170 5:15 PM 145 5:50 PM 6.00


Ramcharan 255 5:30 PM 170 6:15 PM 150 6:55 PM 6.00
Madan 256 6:20 PM 165 7:00 PM 155 7:40 PM 3.50 15.50
Tapan 263 4:29 PM 170 5:10 PM 140 5:40 PM 6.00
Madan 264 5:02 PM 170 5:40 PM 145 6:25 PM 6.00
Tapan 265 6:20 PM 170 7:00 PM 150 7:40 PM 3.50 15.50
Tapan 267 2:00 PM 175 2:40 PM 145 3:10 PM 6.00
Madan 268 2:45 PM 170 3:30 PM 150 4:15 PM 6.00
Tapan 269 3:20 PM 170 4:05 PM 155 4:50 PM 4.00 16.00
Cum. Qty. in Remark
M3 s

6.00
12.00
15.50
6.00
12.00
15.50
6.00
12.00
16.00
Concrete Details Month of
Sr. Grade of Vehicle
Date Location Chainage Side Name of Structure
no Concrete No

1 15 September 17 VUP 239+050 RHS A2 PILE CAP M-35 5305


2 15 September 17 VUP 239+050 RHS A2 PILE CAP M-35 3115
3 15 September 17 VUP 239+050 RHS A2 PILE CAP M-35 658
4 15 September 17 VUP 239+050 RHS A2 PILE CAP M-35 5305
5 15 September 17 VUP 239+050 RHS A2 PILE CAP M-35 3115
6 15 September 17 VUP 239+050 RHS A2 PILE CAP M-35 658
7 15 September 17 VUP 239+050 RHS A2 PILE CAP M-35 5305
5 15 September 17 VUP 239+050 RHS A2 PILE CAP M-35 3115
6 15 September 17 VUP 239+050 RHS A2 PILE CAP M-35 658
7 29 September 17 VUP 239+050 RHS A1 PILE CAP M-35 658
8 29 September 17 VUP 239+050 RHS A1 PILE CAP M-35 5305
9 29 September 17 VUP 239+050 RHS A1 PILE CAP M-35 3115
10 29 September 17 VUP 239+050 RHS A1 PILE CAP M-35 658
11 29 September 17 VUP 239+050 RHS A1 PILE CAP M-35 5305
12 29 September 17 VUP 239+050 RHS A1 PILE CAP M-35 3115
13 29 September 17 VUP 239+050 RHS A1 PILE CAP M-35 5305
14 29 September 17 VUP 239+050 RHS A1 PILE CAP M-35 3115
15 29 September 17 VUP 239+050 RHS A1 PILE CAP M-35 5305
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
ncrete Details Month of September- 2017
Slump @ Slump @ Total Qty
Challan Time Time Time Qty. in
Driver Name Plant in Site in (Per
No Dispatch Arrive Unlode M3
MM MM Day)

Champu 336 2:31 PM 150 3:10 PM 115 3:35 PM 6.00


Madan 337 2:53 PM 155 3:40 PM 120 4:00 PM 6.00
Ramcharan 338 3:20 PM 150 4:05 PM 110 4:30 PM 6.00
Champu 339 4:15 PM 150 5:00 PM 110 5:35 PM 6.00
Madan 340 4:55 PM 150 5:40 PM 115 6:00 PM 6.00
Ramcharan 341 6:20 PM 145 7:05 PM 115 7:35 PM 6.00
Champu 342 6:50 PM 145 7:40 PM 115 8:10 PM 6.00
Madan 343 7:25 PM 140 8:10 PM 120 8:35 PM 6.00
Ramcharan 344 8:20 PM 135 8:55 PM 120 9:20 PM 3.00 51.00
Ramcharan 366 4:45 PM 145 5:16 PM 100 5:30 PM 6.00
Tapan 367 5:06 PM 140 5:45 PM 100 5:56 PM 6.00
Madan 368 5:21 PM 140 5:55 PM 100 6:10 PM 6.00
Ramcharan 369 6:25 PM 140 7:05 PM 95 7:15 PM 6.00
Tapan 370 6:38 PM 135 7:10 PM 95 7:20 PM 6.00
Madan 371 6:54 PM 135 7:25 PM 95 7:35 PM 6.00
Tapan 372 8:20 PM 130 8:50 PM 90 9:00 PM 6.00
Madan 373 8:41 PM 130 9:10 PM 90 9:25 PM 6.00
Tapan 374 9:48 PM 130 10:30 PM 90 10:45 PM 3.50 51.50
Cum. Qty. Remark
in M3 s

6.00
12.00
18.00
24.00
30.00
36.00
42.00
48.00
51.00
57.00
63.00
69.00
75.00
81.00
87.00
93.00
99.00
102.50
102.50
102.50
Concrete Details Month
Grade of
Sr. no Date Location Chainage Side Name of Structure Vehicle No
Concrete

1 07 October 17 VUP 239+050 RHS A2 PIER 1-2-3 1st LIFT M-35 5305
2 08 October 17 HPC 258+700 RHS HEAD WALL PCC M-15 5305
3 10 October 17 VUP 239+050 RHS A2 PIER -3 2nd LIFT M-35 658
4 10 October 17 HPC 258+700 RHS HEAD WALL 1st Lift M-20 5305
5 12 October 17 VUP 239+050 RHS A2 PIER 1-2 2nd LIFT M-35 5305
6 13 October 17 HPC 258+700 LHS/RHS H.Wall /Chamber Pcc M-15 658
7 15 October 17 VUP 239+050 RHS A1 PIER 1-2-3 1st LIFT M-35 5305
8 16 October 17 HPC 258+700 LHS Head Wall 2nd Lift M-20 5305
9 16 October 17 VUP 239+050 RHS A1 PIER -3 2nd LIFT M-35 5305
10 17 October 17 VUP 239+050 RHS A1 PIER -3 2nd LIFT M-35 658
11 18 October 17 VUP 239+050 RHS A1 PIER 1-2 2nd LIFT M-35 5305
12 28 October 17 YARD 251+950 RHS RE Panal M-35 658
13 29 October 17 YARD 251+950 RHS RE Panal M-35 658
14 30 October 17 YARD 251+950 RHS RE Panal M-35 5305
15 31 October 17 YARD 251+950 RHS RE Panal M-35 5305
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
crete Details Month of October- 2017
Slump @ Slump @ Total Qty Cum.
Challan Time Time Time Qty. in
Driver Name Plant in Site in (Per Qty. in
No Dispatch Arrive Unlode M3
MM MM Day) M3

Raju 375 3:00 PM 155 3:45 PM 115 4:50 PM 6.25 6.25


Tapan 375 8:40 PM 110 8:40 PM 75 1.75 1.75
Ramcharan 381 4:25 PM 150 5:10 PM 90 5:30 PM 2.25 2.25
Tapan 382 6:41 PM 110 7:00 PM 70 5.50 5.50
Tapan 385 12:48 PM 150 1:30 PM 90 2:10 PM 4.00 4.00
Ramcharan 387 5:23 PM 100 5:45 PM 60 2.60 2.60
Tapan 390 10:25 AM 155 11:05 PM 105 12:10 PM 6.00 6.00
Tapan 391 1:54 PM 160 2:20 PM 80 7.00 7.00
Tapan 392 5:20 PM 155 6:00 PM 120 6:20 PM 2.25 2.25
Ramcharan 394 9:50 AM 155 10:30 AM 120 10:50 AM 2.25 2.25
Tapan 395 5:50 PM 155 6:30 PM 90 7:20 PM 4.25 4.25
Ramcharan 396 5:06 PM 90 5:15 PM 75 5:55 PM 6.00 6.00
Ramcharan 398 5:00 PM 95 5:10 PM 75 5:50 PM 6.00 6.00
Tapan 399 5:40 PM 90 5:50 PM 70 5:35 PM 5.50 5.50
Tapan 401 6:32 PM 95 6:40 PM 75 7:30 PM 6.00 23.50 6.00
Remark
s
Concrete Details Month
Grade of Vehicle
Sr. no Date Location Chainage Side Name of Structure
Concrete No

1 01 November 17 YARD 251+950 RHS RE Panal M-35 5305


2 02 November 17 YARD 251+950 RHS RE Panal M-35 5305
3 03 November 17 YARD 251+950 RHS RE Panal M-35 5305
4 04 November 17 YARD 251+950 RHS RE Panal M-35 5305
5 04 November 17 VUP 239+050 RHS A2 P2 PILE M-35 658
6 04 November 17 VUP 239+050 RHS A2 P2 PILE M-35 3115
7 04 November 17 VUP 239+050 RHS A2 P2 PILE M-35 658
8 05 November 17 YARD 251+950 RHS RE Panal M-35 5305
9 06 November 17 YARD 251+950 RHS RE Panal M-35 5305
10 06 November 17 YARD 251+950 RHS RE Panal M-35 5305
11 07 November 17 VUP 239+050 RHS A2 P2 PILE M-35 5305
12 07 November 17 VUP 239+050 RHS A2 P2 PILE M-35 658
13 07 November 17 VUP 239+050 RHS A2 P2 PILE M-35 5305
14 07 November 17 YARD 251+950 RHS RE Panal M-35 658
15 08 November 17 YARD 251+950 RHS RE Panal M-35 5305
16 09 November 17 HPC 258+700 RHS Pipe Bedding Pcc M-15 5305
17 09 November 17 VUP 239+050 LHS A2 P6 PILE M-35 658
18 09 November 17 VUP 239+050 LHS A2 P6 PILE M-35 5305
19 09 November 17 VUP 239+050 LHS A2 P6 PILE M-35 658
20 09 November 17 YARD 251+950 RHS RE Panal M-35 3115
21 10 November 17 HPC 258+700 RHS Chamber Raft M-35 3115
22 10 November 17 YARD 251+950 RHS RE Panal M-35 5305
23 11 November 17 YARD 251+950 RHS RE Panal M-35 658
24 11 November 17 VUP 239+050 LHS A2 P3 PILE M-35 658
25 11 November 17 VUP 239+050 LHS A2 P3 PILE M-35 3115
26 11 November 17 VUP 239+050 LHS A2 P3 PILE M-35 658
27 12 November 17 HPC 258+700 RHS Pipe Bedding Pcc M-15 5305
28 12 November 17 HPC 258+700 RHS Pipe Bedding Pcc M-15 5305
29 12 November 17 YARD 251+950 RHS RE Panal M-35 658
30 12 November 17 YARD 251+950 RHS RE Panal M-35 658
31 13 November 17 VUP 239+050 LHS A2 P1 PILE M-35 3115
32 13 November 17 VUP 239+050 LHS A2 P1 PILE M-35 5305
33 13 November 17 VUP 239+050 LHS A2 P1 PILE M-35 658
35 14 November 17 HPC 263+570LHS Head Wall Pcc M-15 658
35 14 November 17 HPC 258+700 RHS Head Wall 2nd LIFT M-20 5305
36 14 November 17 YARD 251+950 RHS RE Panal M-35 3115
37 14 November 17 YARD 251+950 RHS RE Panal M-35 658
38 15 November 17 HPC 263+570 LHS Chamber PCC M-15 5305
39 15 November 17 HPC 258+700 LHS Head Wall 3rd LIFT M-20 5305
40 15 November 17 YARD 251+950 RHS RE Panal M-35 658
41 15 November 17 VUP 239+050 LHS A2 P5 PILE M-35 5305
42 15 November 17 VUP 239+050 LHS A2 P5 PILE M-35 3115
43 15 November 17 VUP 239+050 LHS A2 P5 PILE M-35 658
44 16 November 17 HPC 263+570 RHS Head Wall 1st LIFT M-20 5305
45 16 November 17 YARD 251+950 RHS RE Panal M-35 658
46 17 November 17 HPC 258+700 LHS Pipe Craddle Pcc M-15 3115
47 17 November 17 VUP 239+050 LHS A1 P5 PILE M-35 5305
48 17 November 17 VUP 239+050 LHS A1 P5 PILE M-35 658
49 17 November 17 VUP 239+050 LHS A1 P5 PILE M-35 5305
50 17 November 17 YARD 251+950 RHS RE Panal M-35 3115
51 18 November 17 HPC 258+700 LHS Head Wall Final LIFT M-20 658
52 18 November 17 HPC 258+700 LHS Head Wall Final LIFT M-20 658
53 18 November 17 YARD 251+950 RHS RE Panal M-35 658
54 19 November 17 HPC 258+700 LHS Head Wall LIFT M-20 5305
55 19 November 17 HPC 258+700 LHS Head Wall lst LIFT M-20 658
56 19 November 17 YARD 251+950 RHS RE Panal M-35 5305
57 19 November 17 VUP 239+050 LHS A1 P1 PILE M-35 3115
58 19 November 17 VUP 239+050 LHS A1 P1 PILE M-35 658
59 19 November 17 VUP 239+050 LHS A1 P1 PILE M-35 5305
60 20 November 17 HPC 263+570 RHS Pipe Bedding Pcc M-15 5305
61 20 November 17 YARD 251+950 RHS RE Panal M-35 3115
62 21 November 17 YARD 251+950 RHS RE Panal M-35 658
63 22 November 17 250+490 to 250+515 LHS Drain Slab M 25 3115
64 22 November 17 250+490 to 250+515 LHS Drain Slab M 25 5305
65 22 November 17 VUP 239+050 LHS A1 P4 PILE M-35 3115
66 22 November 17 VUP 239+050 LHS A1 P4 PILE M-35 5305
67 22 November 17 VUP 239+050 LHS A1 P4 PILE M-35 658
68 22 November 17 241+360 to 241+415 RHS Drain Pcc M 15 3115
69 22 November 17 241+360 to 241+415 RHS Drain Pcc M 15 3115
70 22 November 17 YARD 251+950 RHS RE Panal M-35 5305
71 23 November 17 HPC 258+700 LHS Head Wall 2nd LIFT M-20 5305
72 23 November 17 YARD 251+950 RHS RE Panal M-35 658
73 24 November 17 VUP 239+050 LHS A1 P6 PILE M-35 5305
74 24 November 17 VUP 239+050 LHS A1 P6 PILE M-35 658
75 24 November 17 VUP 239+050 LHS A1 P6 PILE M-35 3115
76 24 November 17 250+540 to 250+515 LHS Drain Slab M 25 5305
77 24 November 17 250+540 to 250+515 LHS Drain Slab M 25 658
78 24 November 17 YARD 251+950 RHS RE Panal M-35 5305
79 25 November 17 250+430 to 250+480 LHS Drain Pcc M 15 658
80 25 November 17 250+430 to 250+480 LHS Drain Pcc M 15 658
81 25 November 17 YARD 251+950 RHS RE Panal M-35 5305
82 26 November 17 HPC 258+700 LHS Head Wall FinalLIFT M-20 658
83 26 November 17 250+380 to 250+400 RHS Drain Slab M 25 5305
84 26 November 17 250+380 to 250+400 RHS Drain Slab M 25 5305
85 26 November 17 250+390 to 250+430 LHS Drain Pcc M 15 658
86 26 November 17 VUP 239+050 LHS A1 P3 PILE M-35 658
87 26 November 17 VUP 239+050 LHS A1 P3 PILE M-35 5305
88 26 November 17 VUP 239+050 LHS A1 P3 PILE M-35 3115
89 26 November 17 YARD 251+950 RHS RE Panal M-35 658
90 27 November 17 HPC 263+570 RHS Head Wall First/ 2nd LIFT M-20 658
91 27 November 17 YARD 251+950 RHS RE Panal M-35 658
92 28 November 17 VUP 239+050 LHS A2 PILE CAP Pcc M-15 658
93 28 November 17 250+540 to 250+515 LHS Drain Slab M 25 5305
94 28 November 17 250+540 to 250+515 LHS Drain Slab M 25 658
95 28 November 17 250+540 to 250+515 LHS Drain Slab M 25 5305
96 28 November 17 250+540 to 250+515 LHS Drain Slab M 25 658
97 28 November 17 VUP 239+050 LHS A1 P2 PILE M-35 3115
98 28 November 17 VUP 239+050 LHS A1 P2 PILE M-35 658
99 28 November 17 VUP 239+050 LHS A1 P2 PILE M-35 5305
100 28 November 17 YARD 251+950 RHS RE Panal M-35 3115
101 28 November 17 YARD 251+950 RHS RE Panal M-35 3115
102 29 November 17 YARD 251+950 RHS RE Panal M-35 2649
103 29 November 17 YARD 251+950 RHS RE Panal M-35 5305
104 30 November 17 241+360 to 241+385 RHS Drain Raft M 25 658
105 30 November 17 250+400 to 250+480 LHS Drain Raft M 25 5305
106 30 November 17 250+400 to 250+480 LHS Drain Raft M 25 3115
107 30 November 17 250+585 to 250+615 LHS Drain Slab M 25 5305
108 30 November 17 250+585 to 250+615 LHS Drain Slab M 25 658
109 29 November 17 YARD 251+950 RHS RE Panal M-35 2649
110 29 November 17 YARD 251+950 RHS RE Panal M-35 5305
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
ete Details Month of November- 2017
Slump @ Slump @ Total Qty Cum.
Driver Challan Time Time Time Qty. in
Plant in Site in (Per Qty. in
Name No Dispatch Arrive Unlode M3
MM MM Day) M3

Tapan 404 9:45 AM 80 9:45 AM 70 9:45 AM 6.00 6.00


Tapan 406 6:34 PM 85 6:45 PM 65 7:35 PM 6.00 12.00
Tapan 407 5:31 PM 80 5:40 PM 65 6:35 PM 6.00 18.00
Tapan 409 4:34 PM 70 4:45 PM 65 5:35 AM 6.00 24.00
Ramcharan 410 6:04 PM 180 6:44 PM 140 7:04 PM 7.00 31.00
Madan 411 6:27 PM 170 7:14 PM 130 7:44 PM 7.00 38.00
Ramcharan 412 8:10 PM 170 8:55 PM 150 9:30 PM 1.50 15.50 39.50
Tapan 413 11:05 AM 80 11:15 AM 75 11:55 AM 6.00 45.50
Tapan 414 8:45 AM 90 8:55 AM 70 9:35 AM 6.00 51.50
Tapan 418 9:40 PM 85 9:50 PM 65 10:30 PM 6.00 57.50
Tapan 423 3:00 PM 175 3:40 PM 130 4:00 PM 6.00 63.50
Ramcharan 424 3:10 PM 170 3:55 PM 150 4:30 PM 6.00 69.50
Tapan 425 4:24 PM 170 5:15 PM 140 5:40 PM 2.00 14.00 71.50
Ramcharan 427 6:00 PM 90 6:10 PM 75 6:54 PM 6.00 77.50
Tapan 430 3:25 PM 95 3:35 PM 70 4:20 PM 6.00 83.50
Tapan 431 4:08 PM 95 4:25 PM 60 3.33 86.83
Ramcharan 431 4:44 PM 180 5:30 PM 140 5:50 PM 6.00 92.83
Tapan 433 6:02 PM 175 6:50 PM 145 7:20 PM 6.00 98.83
Ramcharan 434 6:40 PM 175 7:25 PM 150 7:50 PM 3.00 15.00 101.83
Nanji bhai 435 7:15 PM 90 7:25 PM 75 8:15 PM 6.00 107.83
Tapan 436 11:00 AM 100 11:15 AM 65 1.80 109.63
Tapan 437 3:55 PM 100 3:05 PM 65 3:55 PM 6.00 115.63
Ramcharan 443 11:35 AM 95 11:45 AM 65 12:25 PM 6.00 121.63
Ramcharan 444 4:55 PM 170 5:45 PM 135 6:05 PM 6.00 127.63
Champu 445 5:14 PM 175 6:00 PM 140 6:34 PM 6.00 133.63
Ramcharan 446 6:58 PM 175 7:44 PM 145 8:10 PM 3.25 15.25 136.88
Tapan 447 9:09 AM 125 9:25 AM 60 4.00 140.88
Tapan 449 10:44 AM 120 11:05 AM 55 1.00 5.00 141.88
Ramcharan 452 12:30 PM 100 12:40 PM 65 1:35 PM 6.00 147.88
Ramcharan 459 12:22 PM 100 12:35 PM 70 1:25 PM 6.00 153.88
Champu 460 6:20 PM 185 7:00 PM 130 7:25 PM 6.00 159.88
Tapan 461 6:47 PM 180 7:25 PM 135 7:55 PM 6.00 165.88
Ramcharan 462 7:24 PM 180 8:10 PM 140 8:45 PM 3.25 15.25 169.13
Ramcharan 463 11:15 AM 115 11:44 AM 70 1.70 170.83
Tapan 464 3:56 PM 110 4:20 PM 65 3.80 174.63
Champu 465 4:49 PM 95 5:00 PM 60 5:50 PM 6.00 180.63
Ramcharan 466 5:37 PM 90 5:50 PM 60 6:20 PM 3.00 183.63
Tapan 467 10:38 AM 120 11:15 AM 70 1.00 184.63
Tapan 470 2:50 PM 100 3:10 PM 65 2.60 187.23
Ramcharan 471 5:49 PM 100 6:00 PM 70 6:45 PM 6.00 193.23
Tapan 472 7:30 PM 180 8:09 PM 140 4:25 PM 6.00 199.23
Champu 473 7:48 PM 185 8:29 PM 145 8:55 PM 6.00 205.23
Ramcharan 474 8:02 PM 185 8:40 PM 150 9:20 PM 3.50 15.50 208.73
Tapan 479 4:20 PM 120 4:55 PM 75 7.00 215.73
Ramcharan 482 6:28 PM 95 6:40 PM 65 7:30 PM 6.00 221.73
Champu 489 4:11 PM 120 4:30 PM 70 3.00 224.73
Tapan 491 6:45 PM 180 7:20 PM 140 8:00 PM 6.00 230.73
Ramcharan 492 7:10 PM 180 7:55 PM 145 8:30 PM 6.00 236.73
Tapan 494 9:30 PM 185 10:15 PM 150 10:40 PM 3.25 15.25 239.98
Mahesh 493 8:30 PM 95 8:40 PM 65 9:35 PM 7.00 246.98
Ramcharan 497 11:03 AM 140 11:20 AM 75 3.20 250.18
Ramcharan 499 12:50 PM 135 12:50 PM 70 0.50 250.68
Ramcharan 505 6:52 PM 95 7:00 PM 60 8:50 PM 7.00 257.68
Tapan 506 11:03 AM 130 11:23 AM 70 3.20 260.88
Ramcharan 507 1:50 PM 135 2:10 PM 75 1.50 262.38
Tapan 509 4:17 PM 95 4:30 PM 60 5:20 PM 7.00 269.38
Champu 510 7:08 PM 175 7:50 PM 145 8:10 PM 6.00 275.38
Ramcharan 511 7:27 PM 180 8:10 PM 150 8:45 PM 6.00 281.38
Tapan 512 7:41 PM 170 8:30 PM 140 9:10 PM 3.50 15.50 284.88
Tapan 518 3:55 PM 130 4:30 PM 75 4.00 288.88
Champu 519 4:35 PM 85 4:45 PM 55 5:30 PM 7.00 295.88
Ramcharan 530 5:50 PM 90 6:00 PM 60 6:41 PM 7.00 302.88
Champu 531 9:27 AM 130 9:53 AM 75 6.00 308.88
Tapan 533 10:54 AM 125 11:15 AM 70 1.50 310.38
Champu 536 3:48 PM 170 4:30 PM 140 4:50 PM 6.00 316.38
Tapan 537 4:10 PM 170 4:50 PM 145 5:20 PM 6.00 322.38
Ramcharan 539 4:30 PM 175 5:15 PM 135 5:40 PM 3.00 15.00 325.38
Champu 540 5:54 PM 120 6:25 PM 65 6.00 331.38
Tapan 543 7:45 PM 115 8:15 PM 60 4.00 335.38
Tapan 545 9:53 PM 90 10:00 PM 60 10:50 PM 7.00 342.38
Tapan 548 2:49 PM 135 3:10 PM 100 7.00 349.38
Ramcharan 573 6:25 PM 95 6:35 PM 70 7:25 PM 7.00 356.38
Tapan 552 5:19 PM 170 6:00 PM 140 6:20 PM 6.00 362.38
Ramcharan 553 5:40 PM 175 6:20 PM 145 6:50 PM 6.00 368.38
Champu 554 5:59 PM 180 6:40 PM 150 7:15 PM 3.25 15.25 371.63
Tapan 555 7:50 PM 125 8:15 PM 95 6.00 377.63
Ramcharan 556 8:59 PM 125 8:25 PM 95 2.00 379.63
Tapan 557 9:25 PM 90 9:35 PM 65 10:25 PM 7.00 386.63
Ramcharan 558 10:33 AM 140 10:54 AM 105 6.00 392.63
Ramcharan 559 2:54 PM 130 3:15 PM 95 6.00 398.63
Tapan 560 3:28 PM 90 3:40 PM 60 4:25 PM 7.00 405.63
Ramcharan 563 3:30 PM 135 3:50 PM 105 4.50 410.13
Tapan 564 4:45 PM 140 5:05 PM 110 7.00 417.13
Tapan 566 6:16 PM 140 6:40 PM 110 2.15 419.28
Ramcharan 565 5:26 PM 140 5:40 PM 115 6.00 425.28
Ramcharan 567 7:22 PM 170 7:55 PM 140 8:15 PM 6.00 431.28
Tapan 568 7:42 PM 175 8:20 PM 145 8:50 PM 6.00 437.28
Nanji bhai 569 7:58 PM 180 8:40 PM 150 9:10 PM 3.50 15.50 440.78
Ramcharan 570 10:15 PM 100 10:25 PM 80 11:20 PM 7.00 447.78
Ramcharan 580 12:43 PM 130 1:15 PM 75 5.00 452.78
Ramcharan 583 6:43 PM 100 6:55 AM 90 7.00 459.78
Ramcharan 586 3:28 PM 165 4:10 PM 130 4:40 PM 3.50 463.28
Tapan 587 4:53 PM 135 5:10 PM 110 6.00 469.28
Ramcharan 591 4:45 PM 140 5:05 PM 115 6.00 475.28
Tapan 593 8:41 PM 135 9:00 PM 120 6.00 481.28
Ramcharan 594 9:24 PM 130 9:45 PM 110 3.50 21.50 484.78
Bulkesh 588 5:59 PM 175 6:43 PM 140 7:00 PM 6.00 490.78
Ramcharan 589 6:12 PM 180 6:53 PM 145 7:20 PM 6.00 496.78
Tapan 590 6:24 PM 180 7:10 PM 150 7:40 PM 3.50 15.50 500.28
Bulkesh 592 8:24 PM 100 8:34 PM 85 9:25 PM 6.00 506.28
Bulkesh 595 9:45 PM 100 9:55 PM 90 10:40 PM 5.00 511.28
Shashi 598 6:25 PM 95 6:35 PM 85 7:25 PM 6.00 517.28
Tapan 599 6:50 PM 100 7:00 PM 90 7:45 PM 5.00 522.28
Ramcharan 601 3:10 PM 125 3:40 PM 80 6.00 528.28
Tapan 602 3:45 PM 130 4:05 PM 85 6.00 534.28
Bulkesh 603 4:28 PM 125 4:50 PM 80 2.00 536.28
Tapan 604 6:25 PM 130 6:45 PM 85 6.00 542.28
Ramcharan 605 7:55 PM 135 8:15 PM 90 1.50 543.78
Shashi 606 8:40 PM 95 8:50 PM 85 9:40 PM 6.00 549.78
Tapan 607 9:40 PM 95 9:50 PM 90 10:20 PM 5.00 554.78
554.78
Remark
s
Concrete Details Mon
Grade of Vehicle
Sr. no Date Location Chainage Side Name of Structure
Concrete No

1 01 December 17 250+400 to 250+430 LHS Drain Slab M 25 658


2 01 December 17 250+400 to 250+430 LHS Drain Slab M 25 2649
3 01 December 17 YARD 251+950 RHS RE Panal M-35 2649
4 01 December 17 YARD 251+950 RHS RE Panal M-35 658
5 02 December 17 241+380 to 241+400 RHS Drain Raft M 25 658
6 02 December 17 HPC 258+700 LHS Chamber Wall M-25 3115
7 02 December 17 HPC 258+700 LHS Chamber Wall M-25 5305
8 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 658
9 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 3115
10 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 5305
11 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 658
12 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 3115
13 02 December 17 VUP 239+050 RHS A2 Pier Cap M-35 5305
14 02 December 17 250+610 to 250+650 LHS Drain Slab M 25 2649
15 02 December 17 250+610 to 250+650 LHS Drain Slab M 25 5305
16 02 December 17 YARD 251+950 RHS RE Panal M-35 2649
17 02 December 17 YARD 251+950 RHS RE Panal M-35 5305
18 02 December 17 YARD 251+950 RHS RE Panal M-35 658
19 03 December 17 250+400 to 250+430 LHS Drain Raft M 25 3115
20 03 December 17 250+400 to 250+430 LHS Drain Raft M 25 5305
21 03 December 17 HPC 263+570 LHS Pipe Enasing pcc M-15 658
22 03 December 17 HPC 263+570 LHS Pipe Enasing pcc M-15 3115
23 03 December 17 HPC 263+570 LHS Pipe Enasing pcc M-15 658
24 03 December 17 250+440 to 250+460 LHS Drain Slab M 25 3115
25 03 December 17 250+440 to 250+460 LHS Drain Slab M 25 658
26 03 December 17 YARD 251+950 RHS RE Panal M-35 2649
27 03 December 17 YARD 251+950 RHS RE Panal M-35 3115
28 03 December 17 YARD 251+950 RHS RE Panal M-35 2649
29 03 December 17 YARD 251+950 RHS RE Panal M-35 658
30 04 December 17 YARD 251+950 RHS RE Panal M-35 5305
31 04 December 17 YARD 251+950 RHS RE Panal M-35 2649
32 04 December 17 YARD 251+950 RHS RE Panal M-35 2649
33 04 December 17 YARD 251+950 RHS RE Panal M-35 5305
34 04 December 17 243+380 to 243+420 LHS Drain Pcc M-15 658
35 04 December 17 243+380 to 243+420 LHS Drain Pcc M-15 3115
36 04 December 17 250+650 to 250+670 LHS Drain Slab M 25 658
37 04 December 17 250+650 to 250+670 LHS Drain Slab M 25 658
38 06 December 17 YARD 251+950 RHS RE Panal M-35 658
39 06 December 17 YARD 251+950 RHS RE Panal M-35 2649
40 06 December 17 YARD 251+950 RHS RE Panal M-35 5305
41 06 December 17 YARD 251+950 RHS RE Panal M-35 3115
42 07 December 17 YARD 251+950 RHS RE Panal M-35 2649
43 07 December 17 YARD 251+950 RHS RE Panal M-35 658
44 07 December 17 YARD 251+950 RHS RE Panal M-35 658
45 07 December 17 YARD 251+950 RHS RE Panal M-35 5305
46 08 December 17 250+380 to 250+400 LHS Drain Raft M 25 3115
47 08 December 17 250+670 to 250+690 LHS Drain Slab M 25 658
48 08 December 17 250+860 to 250+880 LHS Drain Slab M 25 658
49 08 December 17 YARD 251+950 RHS RE Panal M-35 3115
50 08 December 17 YARD 251+950 RHS RE Panal M-35 5305
51 09 December 17 250+460 to 250+480 LHS Drain Wall M 25 5305
52 09 December 17 250+470 to 250+500 RHS Drain Slab M 25 3115
53 09 December 17 250+470 to 250+500 RHS Drain Slab M 25 658
54 09 December 17 YARD 251+950 RHS RE Panal M-35 5305
55 09 December 17 YARD 251+950 RHS RE Panal M-35 658
56 09 December 17 YARD 251+950 RHS RE Panal M-35 3115
57 10 December 17 250+470 to 250+500 RHS Drain Slab M 25 658
58 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 5305
59 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 658
60 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 3115
61 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 5305
62 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 3115
63 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 658
64 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 5305
65 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 3115
66 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 658
67 10 December 17 VUP 239+050 LHS A2 Pile Cap M-35 5305
68 10 December 17 YARD 251+950 RHS RE Panal M-35 658
69 10 December 17 YARD 251+950 RHS RE Panal M-35 3115
70 11 December 17 250+470 to 250+500 RHS Drain Wall M 25 658
71 11 December 17 VUP 239+050 LHS A2 Pile Pcc M-15 3115
72 11 December 17 243+400 to 243+420 LHS Drain Raft M 25 5305
73 11 December 17 YARD 251+950 RHS RE Panal M-35 658
74 11 December 17 YARD 251+950 RHS RE Panal M-35 3115
75 11 December 17 YARD 251+950 RHS RE Panal M-35 658
76 11 December 17 YARD 251+950 RHS RE Panal M-35 3115
77 11 December 17 250+310 to 250+340 RHS Drain Pcc M-15 5305
78 12 December 17 HPC 263+570 LHS Head Wall 3rd Lift M-20 658
79 12 December 17 243+380 to 243+400 RHS Drain Raft M 25 3115
80 12 December 17 250+290 to 250+310 LHS Drain Pcc M-15 658
81 12 December 17 256+600 to 256+680 LHS Drain Pcc M-15 5305
82 12 December 17 YARD 251+950 RHS RE Panal M-35 658
83 12 December 17 YARD 251+950 RHS RE Panal M-35 5305
84 12 December 17 YARD 251+950 RHS RE Panal M-35 3115
85 13 December 17 250+710 to 250+740 LHS Drain Slab M 25 658
86 13 December 17 250+710 to 250+740 LHS Drain Slab M 25 2649
87 13 December 17 250+440 to 250+460 LHS Drain Wall M 25 5305
88 13 December 17 250+710 to 250+720 LHS Drain Pcc M-15 2649
89 13 December 17 250+830 to 250+840 LHS Drain Wall M 25 658
90 13 December 17 256+600 to 256+640 LHS Drain Pcc M-15 5305
91 13 December 17 243+360 to 243+380 LHS Drain Raft M 25 658
92 13 December 17 YARD 251+950 RHS RE Panal M-35 658
93 13 December 17 YARD 251+950 RHS RE Panal M-35 5305
94 13 December 17 YARD 251+950 RHS RE Panal M-35 3115
95 14 December 17 YARD 251+950 RHS RE Panal M-35 2649
96 14 December 17 YARD 251+950 RHS RE Panal M-35 3115
97 14 December 17 YARD 251+950 RHS RE Panal M-35 5305
98 14 December 17 YARD 251+950 RHS RE Panal M-35 1028
99 14 December 17 250+750 to 250+760 LHS Drain Slab M 25 658
100 15 December 17 YARD 251+950 RHS RE Panal M-35 5305
101 15 December 17 YARD 251+950 RHS RE Panal M-35 2649
102 15 December 17 YARD 251+950 RHS RE Panal M-35 3115
103 15 December 17 YARD 251+950 RHS RE Panal M-35 1028
104 15 December 17 250+460 to 250+490 LHS Drain Slab M 25 1028
105 15 December 17 250+460 to 250+490 LHS Drain Slab M 25 3115
106 15 December 17 243+360 to 243+380 LHS Drain Pcc M-15 658
107 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 3115
108 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 5305
109 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 1028
110 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 658
111 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 3115
112 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 5305
113 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 1028
114 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 658
115 16 December 17 VUP 239+050 LHS A1 Pile Cap M-35 5305
116 16 December 17 250+780 to 250+800 LHS Drain Slab M 25 3115
117 16 December 17 250+780 to 250+800 LHS Drain Slab M 25 1028
118 16 December 17 YARD 251+950 RHS RE Panal M-35 658
119 16 December 17 YARD 251+950 RHS RE Panal M-35 2649
120 16 December 17 YARD 251+950 RHS RE Panal M-35 1028
122 17 December 17 250+440 to 250+460 LHS Drain Wall M 25 5305
123 17 December 17 250+530 to 250+550 LHS Drain Slab M 25 658
124 17 December 17 250+530 to 250+550 LHS Drain Slab M 25 1028
125 17 December 17 250+530 to 250+550 LHS Drain Slab M 25 1028
126 17 December 17 VUP 239+050 LHS A2 Pier -1/2/3 1st Lift M-35 658
127 17 December 17 250+300 to 250+360 LHS Drain Raft M 25 5305
128 17 December 17 243+360 to 243+380 LHS Drain Raft M 25 658
129 17 December 17 YARD 251+950 RHS RE Panal M-35 2649
130 17 December 17 YARD 251+950 RHS RE Panal M-35 1028
131 17 December 17 YARD 251+950 RHS RE Panal M-35 2649
132 17 December 17 YARD 251+950 RHS RE Panal M-35 3115
133 18 December 17 250+810 to 250+820 LHS Drain Slab M 25 658
134 18 December 17 250+290 to 250+310 LHS Drain Raft M 25 5305
135 18 December 17 250+840 to 250+860 LHS Drain Raft M 25 1028
136 18 December 17 256+360 to 256+380 LHS Drain Raft M 25 3115
137 18 December 17 250+820 to 250+835 LHS Drain Pcc M-15 658
138 18 December 17 241+360 to 241+380 RHS Drain Wall M 25 5305
139 18 December 17 VUP 239+050 LHS A2 Pier -3 2nd Lift M-35 658
140 18 December 17 YARD 251+950 RHS RE Panal M-35 2649
141 18 December 17 YARD 251+950 RHS RE Panal M-35 1028
142 18 December 17 YARD 251+950 RHS RE Panal M-35 3115
143 18 December 17 YARD 251+950 RHS RE Panal M-35 2649
144 18 December 17 YARD 251+950 RHS RE Panal M-35 5305
145 19 December 17 250+420 to 250+440 LHS Drain Wall M 25 658
146 19 December 17 256+640 to 256+660 LHS Drain Raft M 25 3115
147 19 December 17 250+710 & 250+820 LHS Drain Raft M 25 5305
148 19 December 17 243+340 to 243+370 LHS Drain Raft M 25 3115
149 19 December 17 VUP 239+050 LHS A2 Pier -1/2 2nd Lift M-35 1028
150 19 December 17 250+440 to 250+460 LHS Drain Slab M 25 658
151 19 December 17 YARD 251+950 RHS RE Panal M-35 2649
152 19 December 17 YARD 251+950 RHS RE Panal M-35 3115
153 19 December 17 YARD 251+950 RHS RE Panal M-35 3115
154 19 December 17 YARD 251+950 RHS RE Panal M-35 5305
155 19 December 17 YARD 251+950 RHS RE Panal M-35 658
156 20 December 17 256+620 to 256+640 LHS Drain Raft M 25 5305
157 20 December 17 YARD 251+950 RHS RE Panal M-35 5305
158 20 December 17 YARD 251+950 RHS RE Panal M-35 2649
159 20 December 17 YARD 251+950 RHS RE Panal M-35 3115
160 20 December 17 YARD 251+950 RHS RE Panal M-35 1028
161 20 December 17 YARD 251+950 RHS RE Panal M-35 2649
162 21 December 17 256+600 to 256+650 LHS Drain Pcc M-15 5305
163 21 December 17 250+400 to 250+420 LHS Drain Wall M 25 1028
164 21 December 17 250+400 to 250+420 LHS Drain Wall M 25 5305
165 21 December 17 250+360 & 250+770 LHS Drain Pcc M-15 2649
166 21 December 17 256+500 to 256+550 RHS Drain Pcc M-15 658
167 21 December 17 250+420 to 250+440 LHS Drain Slab M 25 1028
168 21 December 17 YARD 251+950 RHS RE Panal M-35 2649
169 21 December 17 YARD 251+950 RHS RE Panal M-35 1028
170 21 December 17 YARD 251+950 RHS RE Panal M-35 5305
171 21 December 17 YARD 251+950 RHS RE Panal M-35 658
172 21 December 17 YARD 251+950 RHS RE Panal M-35 2649
173 21 December 17 Box Culvert 257+700 RHS PCC M-15 3115
174 22 December 17 256+550 to 256+600 RHS Drain Pcc M-15 1028
175 22 December 17 243+400 to 243+420 LHS Drain Wall M 25 5305
176 22 December 17 250+550 to 250+570RHS Drain Slab M 25 1028
177 22 December 17 250+550 to 250+570 RHS Drain Slab M 25 2649
178 22 December 17 250+550 to 250+570 RHS Drain Slab M 25 2649
179 22 December 17 YARD 251+950 RHS RE Panal M-35 658
180 22 December 17 YARD 251+950 RHS RE Panal M-35 3115
181 22 December 17 YARD 251+950 RHS RE Panal M-35 658
182 22 December 17 YARD 251+950 RHS RE Panal M-35 2649
183 22 December 17 YARD 251+950 RHS RE Panal M-35 1028
184 23 December 17 250+390 to 250+400 LHS Drain Wall M 25 5305
185 23 December 17 256+550 to 256+600 RHS Drain Pcc M-15 3115
186 23 December 17 256+600 to 256+620 LHS Drain Raft M 25 658
187 23 December 17 VUP 239+050 LHS A1 Pier -1/2/3 1st Lift M-35 3115
188 23 December 17 250+390 to 250+400 LHS Drain Pcc M-15 3115
189 23 December 17 250+670 to 250+680 LHS Drain Wall M 25 5305
190 23 December 17 YARD 251+950 RHS RE Panal M-35 2649
191 23 December 17 250+400 to 250+420 LHS Drain Slab M 25 3115
192 23 December 17 256+580 to 256+600 LHS Drain Raft M 25 5305
193 23 December 17 250+590 to 250+610 RHS Drain Slab M 25 1028
194 24 December 17 256+520 to 256+560 LHS Drain Pcc M-15 658
195 24 December 17 243+400 to 243+410 LHS Drain Wall M 25 5305
196 24 December 17 250+380 to 250+400 LHS Drain Wall M 25 1028
197 24 December 17 250+360 to 250+380 LHS Drain Raft M 25 658
198 24 December 17 250+820 to 250+850 RHS Drain Slab M 25 658
199 24 December 17 250+360 to 250+380 LHS Drain Raft M 25 1028
199 24 December 17 256+650 to 256+700 RHS Drain Pcc M-15 1028
199 24 December 17 256+520 to 256+550 RHS Drain Raft M 25 658
199 24 December 17 YARD 251+950 RHS RE Panal M-35 2649
201 24 December 17 YARD 251+950 RHS RE Panal M-35 2649
202 24 December 17 YARD 251+950 RHS RE Panal M-35 2649
203 24 December 17 YARD 251+950 RHS RE Panal M-35 5305
204 24 December 17 YARD 251+950 RHS RE Panal M-35 1028
205 25 December 17 256+370 to 256+380 LHS Drain Wall M 25 5305
206 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 658
207 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 1028
208 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 5305
209 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 658
210 25 December 17 VUP 239+050 RHS A1 Pier Cap M-35 1028
211 26 December 17 243+390 to 243+400 LHS Drain Wall M 25 658
212 26 December 17 256+820 to 256+850 LHS Drain Raft M 25 5305
213 26 December 17 250+370 to 250+380 LHS Drain Wall M 25 1028
214 26 December 17 250+370 to 250+380 LHS Drain Wall M 25 658
215 26 December 17 VUP 239+050 LHS A1 Pier -3 2nd Lift M-35 5305
216 26 December 17 Box Culvert 257+700 RHS Raft M-30 1028
217 26 December 17 Box Culvert 257+700 RHS Raft M-30 1028
218 26 December 17 Box Culvert 257+700 RHS Raft M-30 658
219 26 December 17 Box Culvert 257+700 RHS Raft M-30 5305
220 26 December 17 YARD 251+950 RHS RE Panal M-35 2649
221 26 December 17 YARD 251+950 RHS RE Panal M-35 2649
222 26 December 17 YARD 251+950 RHS RE Panal M-35 2649
223 26 December 17 YARD 251+950 RHS RE Panal M-35 1028
224 26 December 17 YARD 251+950 RHS RE Panal M-35 658
225 26 December 17 256+540 to 256+580 RHS Drain Raft M 25 1028
226 26 December 17 256+540 to 256+580 RHS Drain Raft M 25 658
227 26 December 17 256+650 to 256+660 LHS Drain Wall M 25 5305
228 27 December 17 256+700 to 256+750 LHS Drain Pcc M-15 5305
229 27 December 17 250+620 to 250+630 RHS Drain Slab M 25 1028
230 27 December 17 250+620 to 250+630 RHS Drain Slab M 25 658
231 27 December 17 243+380 to 243+390 LHS Drain Wall M 25 5305
232 27 December 17 250+850 to 250+880 LHS Drain Slab M 25 658
233 27 December 17 250+350 to 250+360 LHS Drain Raft M 25 1028
234 27 December 17 250+510 to 250+600 RHS Drain Raft M 25 3115
235 27 December 17 VUP 239+050 LHS A1 Pier -1/2- 2nd Lift M-35 1028
236 27 December 17 256+680 LHS/250+850 RHS Drain Slab M 25 5305
237 27 December 17 YARD 251+950 RHS RE Panal M-35 658
238 27 December 17 YARD 251+950 RHS RE Panal M-35 658
239 27 December 17 YARD 251+950 RHS RE Panal M-35 3115
240 27 December 17 YARD 251+950 RHS RE Panal M-35 658
241 27 December 17 YARD 251+950 RHS RE Panal M-35 5305
242 27 December 17 YARD 251+950 RHS RE Panal M-35 5305
243 28 December 17 VUP 239+050 LHS A1 Pier -1/2- 2nd Lift M-35 1028
244 28 December 17 Box Culvert 257+700 RHS Hunch M-30 5305
245 28 December 17 250+350 to 250+360 LHS Drain Slab M 25 658
246 28 December 17 YARD 251+950 RHS RE Panal M-35 658
247 28 December 17 YARD 251+950 RHS RE Panal M-35 3115
248 28 December 17 YARD 251+950 RHS RE Panal M-35 5305
249 28 December 17 YARD 251+950 RHS RE Panal M-35 1028
250 29 December 17 250+380 to 250+400 LHS Drain Slab M 25 658
251 29 December 17 250+700 to 250+710 LHS Drain Wall M 25 3115
252 29 December 17 250+640 to 250+670 RHS Drain Slab M 25 1028
253 29 December 17 250+640 to 250+670 RHS Drain Slab M 25 3115
254 29 December 17 243+300 to 243+340 LHS Drain Raft M 25 5305
255 29 December 17 243+300 to 243+340 LHS Drain Raft M 25 658
256 29 December 17 243+300 to 243+340 LHS Drain Raft M 25 5305
257 29 December 17 256+400 to 256+440 LHS Drain Pcc M 15 658
258 29 December 17 256+580 to 256+630 RHS Drain Raft M 25 1028
259 29 December 17 256+580 to 256+630 RHS Drain Raft M 25 3115
260 29 December 17 256+640 to 256+650 LHS Drain Wall M 25 1028
261 29 December 17 250+520 to 250+540 RHS Drain Wall M 25 3115
262 29 December 17 241+300 to 241+340 RHS Drain Wall M 25 658
263 29 December 17 243+270 to 243+300 LHS Drain Pcc M 15 5305
264 29 December 17 250+350 to 250+360 LHS Drain Wall M 25 1028
265 29 December 17 256+530 to 256+550 LHS Drain Raft M 25 3115
266 29 December 17 250+680 to 250+700 RHS Drain Slab M 25 658
267 29 December 17 YARD 251+950 RHS RE Panal M-35 2649
268 29 December 17 YARD 251+950 RHS RE Panal M-35 1028
269 29 December 17 YARD 251+950 RHS RE Panal M-35 658
270 29 December 17 YARD 251+950 RHS RE Panal M-35 5305
271 30 December 17 256+520 to 256+540 RHS Drain Wall M 25 5305
272 30 December 17 250+250 to 250+275 LHS Drain Pcc M 15 1028
273 30 December 17 256+620 to 256+650 RHS Drain Wall M 25 3115
274 30 December 17 256+660 to 256+690 RHS Drain Pcc M 15 1028
275 30 December 17 256+670 & 256+630 LHS Drain Wall/Raft M 25 3115
276 30 December 17 YARD 251+950 RHS RE Panal M-35 5305
277 30 December 17 YARD 251+950 RHS RE Panal M-35 5305
278 30 December 17 YARD 251+950 RHS RE Panal M-35 1028
279 30 December 17 YARD 251+950 RHS RE Panal M-35 658
280 31 December 17 250+700 to 250+725 LHS Drain Slab M 25 3115
281 31 December 17 250+740 to 250+750 LHS Drain Slab/Wall M 25 5305
282 31 December 17 243+270 to 243+300 LHS Drain Raft M 25 1028
283 31 December 17 256+230 to 256+240 LHS Drain Wall M 25 3115
284 31 December 17 250+320 to 250+332 LHS Drain Wall M 25 3115
285 31 December 17 243+350 to 243+380 LHS Drain Wall M 25 1028
286 31 December 17 YARD 251+950 RHS RE Panal M-35 5305
287 31 December 17 YARD 251+950 RHS RE Panal M-35 658
288 31 December 17 YARD 251+950 RHS RE Panal M-35 5305
289 31 December 17 YARD 251+950 RHS RE Panal M-35 658
290 31 December 17 250+250 to 250+270 LHS Drain Raft M 25 3115
291
292
293
294
295
296
297
298
299
300
301
302
303
304
crete Details Month of December- 2017
Slump Slump @
Challan Time Qty. in Total Qty
Driver Name @ Plant Time Arrive Site in Time Unlode
(Per Day)
No Dispatch in MM MM M3

Ramcharan 608 09:34:00 AM 145 09:55:00 AM 120 6.00


Shashi 610 10:22:00 AM 135 10:44:00 AM 115 2.00 8.00
Shashi 616 09:03:00 PM 100 09:14:00 PM 90 6.00
Bulkesh 617 10:33:00 PM 100 10:44:00 PM 95 6.50 12.50
Ramcharan 619 09:43:00 AM 135 10:14:00 AM 100 3.50
Bulkesh 620 12:26:00 PM 145 12:46:00 AM 105 2.50
Tapan 621 03:08:00 PM 140 03:34:00 PM 100 0.75 3.25
Ramcharan 623 04:14:00 PM 160 05:05:00 PM 130 05:15:00 PM 6.00
Bulkesh 624 04:37:00 PM 160 05:30:00 PM 125 05:50:00 PM 6.00
Tapan 625 04:55:00 PM 160 05:45:00 PM 130 06:15:00 PM 6.00
Ramcharan 627 06:15:00 PM 165 07:00:00 PM 130 07:20:00 PM 6.00
Bulkesh 628 07:03:00 PM 160 07:44:00 PM 130 08:15:00 PM 6.50
Tapan 631 08:20:00 PM 160 08:55:00 PM 135 09:00:00 PM 1.00 31.50
Shashi 626 05:53:00 PM 135 05:14:00 PM 110 6.00
Tapan 629 07:21:00 PM 130 07:44:00 PM 100 2.00 8.00
Shashi 630 08:07:00 PM 95 08:20:00 PM 85 09:00:00 PM 6.00
Tapan 632 08:50:00 PM 90 09:00:00 PM 80 09:40:00 PM 6.50
Ramcharan 633 09:44:00 PM 100 09:54:00 PM 90 10:35:00 PM 6.75 19.25
Bulkesh 634 09:44:00 AM 130 10:05:00 AM 110 6.00
Tapan 635 10:32:00 AM 125 10:52:00 AM 105 2.00 8.00
Ramcharan 636 11:32:00 AM 125 11:55:00 AM 95 6.00
Bulkesh 637 11:47:00 AM 120 12:10:00 PM 90 3.00
Ramcharan 639 01:09:00 PM 120 01:40:00 PM 85 3.00 12.00
Bulkesh 640 03:51:00 PM 130 03:51:00 PM 100 6.00
Ramcharan 643 04:49:00 PM 125 05:10:00 PM 95 1.00 7.00
Shashi 642 04:37:00 PM 95 04:50:00 PM 80 05:30:00 PM 6.00
Bulkesh 644 05:20:00 PM 95 05:31:00 PM 85 06:05:00 PM 7.00
Shashi 645 05:51:00 PM 100 06:00:00 PM 90 06:40:00 PM 6.00
Ramcharan 646 07:10:00 PM 100 07:21:00 PM 95 08:00:00 PM 3.50 22.50
Tapan 649 02:32:00 PM 95 02:40:00 PM 65 03:10:00 PM 6.00
Shashi 650 03:06:00 PM 95 03:15:00 PM 70 03:45:00 PM 5.00
Shashi 654 06:31:00 PM 100 06:40:00 PM 90 07:10:00 PM 6.00
Tapan 656 06:58:00 PM 100 07:10:00 PM 95 07:45:00 PM 5.50 22.50
Ramcharan 651 03:36:00 PM 130 04:00:00 PM 100 6.00
Bulkesh 652 05:54:00 PM 125 06:20:00 PM 95 6.00 12.00
Ramcharan 655 06:58:00 PM 135 07:21:00 PM 100 6.00
Ramcharan 657 08:13:00 PM 140 08:35:00 PM 105 2.00 8.00
Ramcharan 658 04:21:00 PM 90 04:32:00 PM 65 05:12:00 PM 6.00
Shashi 659 06:48:00 PM 95 07:00:00 PM 70 07:40:00 PM 6.00
Tapan 660 08:24:00 PM 100 08:35:00 PM 80 09:20:00 PM 6.00
Bulkesh 661 09:13:00 PM 100 09:25:00 PM 85 10:10:00 PM 4.50 22.50
Shashi 666 06:30:00 PM 90 06:40:00 PM 65 07:21:00 PM 6.00
Ramcharan 669 08:32:00 PM 95 08:40:00 PM 70 09:20:00 PM 6.00
Ramcharan 670 09:47:00 PM 100 10:00:00 PM 80 10:44:00 PM 6.00
Tapan 671 10:33:00 PM 100 10:45:00 PM 85 11:30:00 PM 4.50 22.50
Bulkesh 673 01:59:00 PM 130 02:23:00 PM 85 5.50
Ramcharan 674 04:07:00 PM 135 04:30:00 PM 90 6.00
Ramcharan 675 05:24:00 PM 130 05:44:00 PM 95 6.00
Bulkesh 676 05:49:00 PM 95 06:00:00 PM 75 06:40:00 PM 6.00
Tapan 677 07:26:00 PM 100 07:35:00 PM 80 08:20:00 PM 7.00 13.00
Tapan 679 03:56:00 PM 140 04:20:00 PM 105 6.00
Bulkesh 680 04:33:00 PM 135 04:53:00 PM 100 6.00
Ramcharan 681 05:24:00 PM 130 05:44:00 PM 95 6.00 12.00
Tapan 682 06:50:00 PM 95 07:00:00 PM 75 07:45:00 PM 6.00
Ramcharan 683 07:30:00 PM 95 07:40:00 PM 80 08:26:00 PM 7.00
Bulkesh 684 07:54:00 PM 100 08:05:00 PM 85 08:45:00 PM 7.00 20.00
Ramcharan 685 09:27:00 AM 125 09:44:00 AM 110 1.50
Tapan 686 11:41:00 AM 165 12:20:00 PM 130 12:45:00 PM 6.00
Ramcharan 687 12:01:00 PM 160 12:36:00 PM 130 12:50:00 PM 6.00
Bulkesh 688 12:28:00 PM 160 01:10:00 PM 125 01:20:00 PM 6.00
Tapan 689 01:20:00 PM 165 01:55:00 PM 125 02:10:00 PM 6.00
Bulkesh 690 01:49:00 PM 165 02:30:00 PM 130 02:45:00 PM 6.00
Ramcharan 691 02:25:00 PM 160 03:05:00 PM 130 03:20:00 PM 6.00
Tapan 692 02:49:00 PM 165 03:30:00 PM 135 03:40:00 PM 6.00
Bulkesh 693 03:22:00 PM 160 04:05:00 PM 130 04:15:00 PM 6.00
Ramcharan 694 03:56:00 PM 160 04:35:00 PM 130 04:45:00 PM 3.00
Tapan 695 05:20:00 PM 155 05:54:00 PM 120 05:55:00 PM 0.75 51.75
Ramcharan 696 06:59:00 PM 95 07:10:00 PM 80 07:55:00 PM 6.50
Bulkesh 697 07:30:00 PM 90 07:40:00 PM 75 08:25:00 PM 6.00 12.50
Ramcharan 698 10:53:00 AM 140 11:15:00 AM 115 4.35
Madan 699 11:12:00 AM 155 11:55:00 AM 105 12:35:00 PM 3.50
Tapan 700 11:51:00 AM 140 12:15:00 PM 110 5.50
Ramcharan 701 02:55:00 PM 90 03:05:00 PM 70 03:45:00 PM 6.50
Madan 702 03:19:00 PM 90 03:30:00 PM 70 04:15:00 PM 6.00
Ramcharan 704 05:36:00 PM 95 05:45:00 PM 75 06:30:00 PM 6.00
Madan 706 07:00:00 PM 95 07:10:00 PM 80 07:50:00 PM 2.50 21.00
Tapan 705 06:58:00 PM 140 07:25:00 PM 115 3.50
Ramcharan 708 11:13:00 AM 130 11:45:00 AM 95 3.25
Madan 710 02:00:00 PM 140 02:30:00 PM 110 4.50
Ramcharan 712 02:23:00 PM 130 02:45:00 PM 110 5.00
Tapan 713 02:50:00 PM 135 03:10:00 PM 110 6.00
Ramcharan 714 06:45:00 PM 90 06:55:00 PM 75 07:30:00 PM 6.00
Tapan 715 07:09:00 PM 95 07:20:00 PM 80 08:00:00 PM 7.00
Madan 716 07:55:00 PM 100 08:05:00 PM 85 08:50:00 PM 7.00 20.00
Ramcharan 717 08:55:00 AM 135 09:20:00 AM 115 6.00
Shashi 718 09:36:00 AM 130 09:55:00 AM 110 2.00 8.00
Tapan 720 11:38:00 AM 140 11:55:00 AM 115 4.50
Shashi 721 12:24:00 PM 135 12:45:00 PM 110 2.50
Ramcharan 723 02:40:00 PM 140 03:00:00 PM 105 4.00
Tapan 724 03:08:00 PM 135 03:30:00 PM 110 6.00
Ramcharan 727 05:30:00 PM 140 06:05:00 PM 110 4.50
Ramcharan 728 07:09:00 PM 90 07:19:00 PM 75 07:55:00 PM 7.00
Tapan 729 07:47:00 PM 95 08:00:00 PM 80 08:45:00 PM 7.00
Madan 730 08:08:00 PM 100 08:20:00 PM 90 09:00:00 PM 6.50 20.50
Ladura 732 04:35:00 PM 90 04:45:00 PM 70 05:30:00 PM 6.00
Madan 734 05:48:00 PM 95 06:00:00 PM 75 06:45:00 PM 7.00
Tapan 735 06:56:00 PM 95 07:05:00 PM 75 07:45:00 PM 6.50
Shashi 736 07:07:00 PM 100 07:15:00 PM 90 07:25:00 PM 1.50 21.00
Ramcharan 733 05:18:00 PM 130 05:38:00 PM 105 5.20
Tapan 740 04:42:00 PM 85 04:50:00 PM 75 05:30:00 PM 7.00
Ladura 744 06:42:00 PM 95 06:52:00 PM 80 07:30:00 PM 6.00
Madan 745 07:02:00 PM 95 07:10:00 PM 85 05:40:00 PM 6.00
Shashi 746 07:48:00 PM 95 08:00:00 PM 85 08:10:00 PM 1.50 20.50
Shashi 741 05:15:00 PM 130 05:35:00 PM 105 6.00
Madan 743 05:54:00 PM 135 06:18:00 PM 110 2.00 8.00
Ramcharan 742 05:40:00 PM 140 06:10:00 PM 110 6.00
Madan 748 11:15:00 AM 170 11:55:00 AM 130 12:10:00 PM 6.00
Tapan 749 11:34:00 AM 160 12:15:00 PM 125 12:25:00 PM 6.00
Shashi 750 12:02:00 PM 160 12:40:00 PM 125 12:50:00 PM 6.00
Ramcharan 751 12:21:00 PM 165 01:00:00 PM 125 01:10:00 PM 6.00
Madan 752 12:42:00 PM 165 01:20:00 PM 125 01:30:00 PM 6.00
Tapan 753 12:57:00 PM 160 01:40:00 PM 120 01:50:00 PM 6.00
Shashi 755 01:22:00 PM 165 02:00:00 PM 125 02:10:00 PM 6.00
Ramcharan 756 01:42:00 PM 160 02:20:00 PM 120 02:30:00 PM 6.00
Tapan 758 03:19:00 PM 160 04:00:00 PM 120 04:30:00 PM 5.00 53.00
Madan 757 02:39:00 PM 130 03:00:00 PM 105 6.00
Shashi 759 03:48:00 PM 135 04:09:00 PM 110 1.50 7.50
Ramcharan 760 04:17:00 PM 90 04:25:00 PM 80 05:10:00 PM 6.00
Ladura 761 09:47:00 PM 95 10:00:00 PM 85 10:45:00 PM 6.00
Shashi 762 10:10:00 PM 95 10:20:00 PM 85 10:50:00 PM 3.25 15.25
Tapan 763 09:20:00 AM 140 09:40:00 AM 110 4.50
Ramcharan 765 11:06:00 AM 130 11:25:00 AM 100 6.00
Shashi 766 11:24:00 AM 135 11:45:00 AM 100 2.00
Shashi 768 12:39:00 PM 130 12:00:00 PM 90 2.50 10.50
Ramcharan 767 12:25:00 PM 170 01:05:00 PM 130 05:10:00 PM 6.00
Tapan 771 04:22:00 PM 135 04:41:00 PM 110 7.00
Ramcharan 773 05:16:00 PM 140 05:40:00 PM 110 6.00
Ladura 772 04:54:00 PM 85 05:05:00 PM 75 05:45:00 PM 6.00
Shashi 774 05:36:00 PM 90 05:45:00 PM 80 06:25:00 PM 4.80
Ladura 775 08:39:00 PM 95 08:50:00 PM 85 09:25:00 PM 6.00
Madan 776 08:59:00 PM 95 09:10:00 PM 85 09:45:00 PM 5.00 21.80
Ramcharan 777 09:25:00 AM 135 09:45:00 AM 115 4.50
Tapan 778 02:53:00 PM 140 02:15:00 PM 105 6.00
Shashi 779 03:40:00 PM 140 04:00:00 PM 110 6.00
Madan 780 03:13:00 PM 135 03:35:00 PM 105 6.00
Ramcharan 781 03:58:00 PM 135 04:25:00 PM 105 3.00
Tapan 782 04:30:00 PM 140 05:05:00 PM 100 4.50
Ramcharan 784 05:41:00 PM 165 06:25:00 PM 125 07:15:00 PM 2.50
Ladura 785 06:12:00 PM 85 06:25:00 PM 70 07:15:00 PM 6.00
Shashi 786 06:37:00 PM 90 06:48:00 PM 75 07:30:00 PM 4.80
Madan 787 07:51:00 PM 95 08:00:00 PM 80 08:45:00 PM 6.00
Ladura 788 08:25:00 PM 95 08:35:00 PM 85 12:15:00 PM 5.00
Tapan 789 08:50:00 PM 95 09:00:00 PM 85 09:25:00 PM 3.00 24.80
Ramcharan 791 03:13:00 PM 140 03:35:00 PM 110 6.00
Madan 792 03:37:00 PM 135 04:00:00 PM 105 6.00
Tapan 793 04:36:00 PM 130 05:00:00 PM 95 6.00
Madan 794 05:30:00 PM 140 08:50:00 PM 90 6.00
Shashi 795 06:27:00 PM 170 07:05:00 PM 130 08:05:00 PM 3.75
Ramcharan 796 07:01:00 PM 130 07:20:00 PM 95 6.00
Ladura 797 07:38:00 PM 85 07:40:00 PM 65 08:20:00 PM 6.00
Madan 799 09:04:00 PM 90 09:15:00 PM 80 09:50:00 PM 6.00
Madan 800 09:25:00 PM 95 09:35:00 PM 85 10:15:00 PM 6.00
Tapan 801 09:52:00 PM 95 10:00:00 PM 85 10:40:00 PM 6.00
Ramcharan 802 10:07:00 PM 95 10:20:00 PM 85 10:50:00 PM 3.00 27.00
Tapan 807 02:52:00 PM 135 03:15:00 PM 100 6.00
Tapan 809 05:36:00 PM 85 05:45:00 PM 60 06:30:00 PM 6.00
Ladura 810 05:54:00 PM 85 06:07:00 PM 65 06:50:00 PM 6.00
Madan 811 06:38:00 PM 90 06:50:00 PM 70 07:30:00 PM 6.00
Shashi 812 08:04:00 PM 95 08:15:00 PM 85 08:50:00 PM 6.00
Ladura 813 08:58:00 PM 95 09:10:00 PM 85 09:20:00 PM 3.50 27.50
Tapan 815 11:23:00 AM 135 11:45:00 AM 95 6.00
Shashi 816 11:49:00 AM 140 12:10:00 PM 105 4.50
Tapan 820 03:57:00 PM 135 04:20:00 PM 95 4.00 8.50
Ladura 822 04:49:00 PM 140 05:10:00 PM 100 6.00
Ramcharan 823 06:02:00 PM 140 06:20:00 PM 105 6.00
Shashi 824 06:51:00 PM 135 07:10:00 PM 100 5.30
Ladura 825 07:36:00 PM 90 07:45:00 PM 80 08:25:00 PM 6.00
Shashi 826 08:02:00 PM 90 08:12:00 PM 80 08:50:00 PM 6.00
Tapan 827 08:20:00 PM 95 08:30:00 PM 85 09:22:00 PM 6.00
Ramcharan 829 09:38:00 PM 95 09:45:00 PM 85 10:25:00 PM 6.00
Ladura 830 09:58:00 PM 95 10:10:00 PM 85 10:35:00 PM 3.00 27.00
Madan 828 08:50:00 PM 140 09:10:00 PM 120 6.50
Shashi 831 08:55:00 AM 140 09:20:00 AM 110 6.00
Tapan 838 03:11:00 PM 140 03:40:00 PM 100 4.50
Shashi 840 03:57:00 PM 135 04:20:00 PM 100 6.00
Ladura 842 05:07:00 PM 130 05:25:00 PM 95 4.00
Ladura 845 06:30:00 PM 130 06:50:00 PM 95 4.00 14.00
Ramcharan 844 05:51:00 PM 90 06:00:00 PM 70 06:40:00 PM 6.00
Madan 846 06:58:00 PM 90 07:10:00 PM 75 07:40:00 PM 6.00
Ramcharan 847 07:18:00 PM 95 07:30:00 PM 85 08:10:00 PM 6.00
Ladura 848 08:12:00 PM 95 08:25:00 PM 85 09:05:00 PM 6.00
Shashi 849 08:27:00 PM 95 08:40:00 PM 85 08:55:00 PM 2.00 26.00
Tapan 850 09:07:00 PM 140 09:30:00 PM 120 6.00
Madan 851 09:31:00 AM 140 09:50:00 AM 120 6.00
Ramcharan 853 11:20:00 AM 130 11:34:00 AM 100 6.00
Madan 854 01:11:00 PM 160 01:50:00 PM 120 04:55:00 PM 6.00
Madan 855 01:49:00 PM 140 02:11:00 PM 120 0.50
Tapan 856 03:54:00 PM 145 04:15:00 PM 110 4.00
Ladura 859 05:44:00 PM 95 05:55:00 PM 85 06:45:00 PM 6.00
Madan 860 06:03:00 PM 135 06:25:00 PM 100 6.00
Tapan 861 06:41:00 PM 140 07:00:00 PM 105 6.00
Shashi 862 07:08:00 PM 140 07:18:00 PM 105 6.00
Ramcharan 863 11:01:00 AM 145 11:20:00 AM 115 5.50
Tapan 864 04:18:00 PM 140 04:45:00 PM 100 3.50
Shashi 865 04:40:00 PM 140 05:00:00 PM 110 4.50
Ramcharan 866 05:02:00 PM 130 05:25:00 PM 95 6.00
Ramcharan 868 06:37:00 PM 140 07:00:00 PM 115 6.00
Shashi 869 06:52:00 PM 130 07:11:00 PM 90 3.00
Shashi 871 08:48:00 PM 130 09:10:00 PM 105 6.00
Ramcharan 872 09:11:00 PM 130 09:30:00 PM 95 6.00
Ladura 867 05:34:00 PM 90 05:44:00 PM 70 06:30:00 PM 6.00
Ladura 870 07:20:00 PM 90 07:30:00 PM 75 08:15:00 PM 6.00
Ladura 873 09:50:00 PM 95 10:00:00 PM 85 10:40:00 PM 6.00
Tapan 874 10:15:00 PM 95 10:25:00 PM 85 11:05:00 PM 6.00
Shashi 875 11:58:00 PM 95 12:10:00 PM 85 12:24:00 PM 2.80 26.80
Tapan 877 10:39:00 AM 135 11:00:00 AM 105 3.50
Ramcharan 878 03:12:00 PM 170 03:50:00 PM 130 04:20:00 PM 6.00
Shashi 879 03:37:00 PM 165 04:20:00 PM 125 04:50:00 PM 6.00
Tapan 880 04:00:00 PM 165 04:38:00 PM 130 05:10:00 PM 6.00
Ramcharan 881 05:29:00 PM 160 06:10:00 PM 130 06:40:00 PM 6.00
Shashi 882 06:22:00 PM 165 07:10:00 PM 125 07:50:00 PM 6.00 30.00
Ramcharan 883 08:38:00 AM 140 09:05:00 AM 100 3.50
Tapan 884 09:02:00 AM 135 09:21:00 AM 100 6.00
Shashi 885 09:30:00 AM 140 09:50:00 AM 105 6.00
Ramcharan 890 11:54:00 AM 140 12:15:00 PM 100 2.00 8.00
Tapan 887 10:57:00 AM 165 11:41:00 AM 130 12:40:00 PM 2.25
Shashi 888 11:18:00 AM 150 11:39:00 AM 130 12:05:00 PM 6.00
Shashi 891 12:23:00 PM 155 12:43:00 PM 130 01:10:00 PM 6.00
Ramcharan 892 01:29:00 PM 155 01:53:00 PM 125 02:20:00 PM 6.00
Tapan 893 01:55:00 PM 160 02:15:00 PM 130 03:05:00 PM 3.00 21.00
Ladura 886 09:55:00 AM 90 10:05:00 AM 75 10:45:00 PM 6.00
Ladura 889 11:44:00 AM 90 11:55:00 AM 65 12:35:00 PM 6.00
Ladura 894 04:15:00 PM 95 04:25:00 PM 60 05:10:00 PM 6.00
Shashi 898 06:28:00 PM 95 06:38:00 PM 65 07:20:00 PM 6.00
Ramcharan 899 08:03:00 PM 95 08:15:00 PM 65 08:30:00 PM 1.00 25.00
Shashi 895 04:37:00 PM 135 05:03:00 PM 95 6.50
Ramcharan 896 05:00:00 PM 130 05:23:00 PM 90 6.50 13.00
Tapan 897 05:17:00 PM 140 05:43:00 PM 100 3.50
Tapan 900 09:13:00 PM 135 09:33:00 PM 105 6.00
Shashi 901 11:44:00 AM 130 12:05:00 PM 90 6.00
Ramcharan 903 12:34:00 PM 135 12:58:00 PM 90 1.50 7.50
Tapan 904 02:37:00 PM 140 03:08:00 PM 100 3.50
Ramcharan 905 03:02:00 PM 140 03:22:00 PM 95 6.00
Shashi 906 03:24:00 PM 135 03:45:00 PM 90 6.00
Madan 908 05:40:00 PM 135 06:04:00 PM 95 6.00
Shashi 909 05:19:00 PM 165 06:00:00 PM 125 3.75
Tapan 910 05:40:00 PM 130 06:00:00 PM 90 6.50
Ramcharan 907 04:38:00 PM 90 04:50:00 PM 65 6.00
Ramcharan 911 06:39:00 PM 90 06:50:00 PM 70 6.00
Madan 912 06:48:00 PM 95 07:00:00 PM 75 6.00
Ramcharan 913 09:32:00 PM 95 09:43:00 PM 75 6.00
Tapan 914 10:06:00 PM 95 10:15:00 PM 80 1.00
Tapan 915 11:00:00 PM 95 11:10:00 PM 80 0.50 25.50
Shashi 916 10:05:00 PM 165 10:40:00 PM 125 0.30
Tapan 917 10:58:00 PM 160 11:20:00 PM 130 2.70
Ramcharan 919 04:06:00 PM 135 04:25:00 PM 100 4.00
Ramcharan 920 09:35:00 PM 95 09:45:00 PM 85 7.00
Madan 921 09:53:00 PM 95 10:05:00 PM 85 7.00
Tapan 922 10:10:00 PM 100 10:20:00 PM 90 7.00
Shashi 923 10:56:00 PM 100 11:05:00 PM 90 4.50 25.50
Ramcharan 924 08:40:00 AM 140 09:04:00 AM 120 3.50
Madan 925 08:57:00 AM 145 09:20:00 AM 125 3.50
Shashi 926 09:53:00 AM 140 10:20:00 AM 115 6.00
Madan 929 11:24:00 AM 140 11:44:00 AM 115 2.00 8.00
Tapan 927 10:27:00 AM 135 10:54:00 AM 100 6.00
Ramcharan 924 11:44:00 AM 140 11:44:00 AM 105 2.00
Tapan 932 02:04:00 PM 135 02:35:00 PM 95 2.50 10.50
Ramcharan 928 11:11:00 AM 135 11:34:00 AM 100 6.50
Shashi 930 11:47:00 AM 140 12:15:00 PM 100 6.00
Madan 931 12:13:00 PM 140 12:35:00 PM 100 2.00 8.00
Shashi 934 02:37:00 PM 130 02:57:00 PM 90 3.00
Madan 935 02:57:00 PM 135 03:15:00 PM 90 3.00
Ramcharan 936 03:19:00 PM 140 03:45:00 PM 90 4.00
Tapan 937 03:58:00 PM 145 04:23:00 PM 95 4.50
Shashi 939 05:01:00 PM 140 05:20:00 PM 90 2.50
Madan 940 05:25:00 PM 135 05:45:00 PM 90 6.50
Ramcharan 942 06:34:00 PM 140 06:55:00 PM 95 4.00
Ladura 941 06:15:00 PM 95 06:25:00 PM 80 6.00
Shashi 943 07:27:00 PM 95 07:38:00 PM 85 6.00
Ramcharan 944 08:20:00 PM 100 08:30:00 PM 90 6.50
Tapan 945 09:00:00 PM 100 09:10:00 PM 95 7.00 25.50
Tapan 946 11:49:00 AM 135 12:08:00 PM 90 3.50
Shashi 947 12:19:00 PM 145 01:00:00 PM 110 6.00
Madan 948 02:58:00 PM 145 03:20:00 PM 90 6.00
Shashi 951 04:28:00 PM 145 04:48:00 PM 90 4.00
Madan 952 04:55:00 PM 140 05:18:00 PM 90 6.00
Tapan 950 03:46:00 PM 95 03:55:00 PM 70 6.00
Tapan 953 05:18:00 PM 95 05:28:00 PM 70 6.00
Shashi 954 06:32:00 PM 95 06:42:00 PM 75 6.50
Ramcharan 955 07:44:00 PM 100 07:55:00 PM 95 7.00 25.50
Madan 956 09:22:00 AM 135 09:44:00 AM 105 6.00
Tapan 957 09:50:00 AM 135 10:14:00 AM 100 6.00
Shashi 958 10:22:00 AM 140 10:54:00 AM 110 6.00
Madan 960 02:33:00 PM 145 02:54:00 PM 90 3.00
Madan 961 03:05:00 PM 135 03:24:00 PM 90 4.00
Shashi 962 03:51:00 PM 140 04:20:00 PM 90 6.00
Tapan 963 04:55:00 PM 90 05:05:00 PM 65 6.00
Ramcharan 964 05:36:00 PM 90 05:45:00 PM 65 6.00
Tapan 966 06:18:00 PM 95 06:28:00 PM 70 7.00
Ramcharan 967 10:00:00 PM 100 10:10:00 PM 85 6.50 25.50
Madan 965 05:52:00 PM 135 06:14:00 PM 100 6.00
Cum. Qty. Remark
in M3 s
6.00
8.00
14.00
20.50
24.00
26.50
27.25
33.25
39.25
45.25
51.25
57.75
58.75
64.75
66.75
72.75
79.25
86.00
92.00
94.00
100.00
103.00
106.00
112.00
113.00
119.00
126.00
132.00
135.50
141.50
146.50
152.50
158.00
164.00
170.00
176.00
178.00
184.00
190.00
196.00
200.50
206.50
212.50
218.50
223.00
228.50
234.50
240.50
246.50
253.50
259.50
265.50
271.50
277.50
284.50
291.50
293.00
299.00
305.00
311.00
317.00
323.00
329.00
335.00
341.00
344.00
344.75
351.25
357.25
361.60
365.10
370.60
377.10
383.10
389.10
391.60
395.10
398.35
402.85
407.85
413.85
419.85
426.85
433.85
439.85
441.85
446.35
448.85
452.85
458.85
463.35
470.35
477.35
483.85
489.85
496.85
503.35
504.85
510.05
517.05
523.05
529.05
530.55
536.55
538.55
544.55
550.55
556.55
562.55
568.55
574.55
580.55
586.55
592.55
597.55
603.55
605.05
611.05
617.05
620.30
624.80
630.80
632.80
635.30
641.30
648.30
654.30
660.30
665.10
671.10
676.10
680.60
686.60
692.60
698.60
701.60
706.10
708.60
714.60
719.40
725.40
730.40
733.40
739.40
745.40
751.40
757.40
761.15
767.15
773.15
779.15
785.15
791.15
794.15
800.15
806.15
812.15
818.15
824.15
827.65
833.65
838.15
842.15
848.15
854.15
859.45
865.45
871.45
877.45
883.45
886.45
892.95
898.95
903.45
909.45
913.45
917.45
923.45
929.45
935.45
941.45
943.45
949.45
955.45
961.45
967.45
967.95
971.95
977.95
983.95
989.95
995.95
1001.45
1004.95
1009.45
1015.45
1021.45
1024.45
1030.45
1036.45
1030.45
1036.45
1042.45
1048.45
1051.25
1054.75
1060.75
1066.75
1072.75
1078.75
1084.75
1088.25
1094.25
1100.25
1102.25
1104.50
1110.50
1116.50
1122.50
1125.50
1131.50
1137.50
1143.50
1149.50
1150.50
1157.00
1163.50
1167.00
1173.00
1179.00
1180.50
1184.00
1190.00
1196.00
1202.00
1205.75
1212.25
1218.25
1224.25
1230.25
1236.25
1237.25
1237.75
1238.05
1240.75
1244.75
1251.75
1258.75
1265.75
1270.25
1273.75
1277.25
1283.25
1285.25
1291.25
1293.25
1295.75
1302.25
1308.25
1310.25
1313.25
1316.25
1320.25
1324.75
1327.25
1333.75
1337.75
1343.75
1349.75
1356.25
1363.25
1366.75
1372.75
1378.75
1382.75
1388.75
1394.75
1400.75
1407.25
1414.25
1420.25
1426.25
1432.25
1435.25
1439.25
1445.25
1451.25
1457.25
1464.25
1470.75
1476.75
1476.75