Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
4.2 TOP STRESS, FOR CENTER LIFT MOMENT, AT L DIRECTION TOP STRESS, FOR CENTER LIFT MOMENT, AT B DIRECTION
f = ML / St = 0.042 ksi f = MB / St = 0.044 ksi
> ft,allow [Satisfactory] > ft,allow [Satisfactory]
Then f Then f
< fc,allow [Satisfactory] < fc,allow [Satisfactory]
4.3 BOTTOM STRESS, FOR CENTER LIFT MOMENT, AT L DIRECTION BOTTOM STRESS, FOR CENTER LIFT MOMENT, AT B DIRECTION
f = - ML / Sb = -0.044 ksi f = - MB / Sb = -0.047 ksi
> ft,allow [Satisfactory] > ft,allow [Satisfactory]
Then f Then f
< fc,allow [Satisfactory] < fc,allow [Satisfactory]
5. CHECK DIFFERENTIAL DEFLECTIONS
5.1 RELATIVE STIFFNESS LENGTH AT L DIRECTION RELATIVE STIFFNESS LENGTH AT B DIRECTION
b = (Ec I DnsL / Es d )1/4 / 12 = 5.054 ft b = (Ec I DnsB / Es d )1/4 / 12 = 4.629 ft
0.5
Where Ec = (0.5) 57000 (fc') = 1561009 psi Where Ec = (0.5) 57000 (fc')0.5 = 1561009 psi
Es = 1000 psi, soil Es = 1000 psi, soil
I = 23442 in4 I = 11636 in4
6.2 ALLOWABLE CONCRETE SHEAR STRESS, AT L DIRECTION ALLOWABLE CONCRETE SHEAR STRESS, AT B DIRECTION
vc = 2 (fc')0.5 = 0.110 ksi vc = 2 (fc')0.5 = 0.110 ksi
6.3 SHEAR STRESS OF RIBBED FOUNDATION, AT L DIRECTION SHEAR STRESS OF RIBBED FOUNDATION, AT B DIRECTION
v = V B / (n h b) = 0.020 ksi < vc v = V L / (n h b) = 0.011 ksi < vc
[Satisfactory] [Satisfactory]
(cont'd)
7. CHECK SOIL BEARING
7.1 APPLIED LOADING
SLAB WEIGHT 150 L B t = 95675 lbs BEAM BEARING AREA (b)(Total Length) = 396 ft2
ADDED DL DL L B = 105243 lbs SOIL PRESSURE q = Total Load / THE AREA = 1179 psf
LIVE LOAD LL L B = 138729 lbs < qallow
BEAM WEIGHT 150 (h-t) b (Total Length) = 247 lbs [Satisfactory]
PERIMETER LOAD P (2L + 2B) = 126390 lbs