Sei sulla pagina 1di 114

Project Name Location Status Type of PPP Project Brief Project Capacity Project Authority Name Project Concessionaire

Project Brief Project Capacity Project Authority Name Project Concessionaire Name

Construction of Dhola-Sadia Ghats bridges in length Operation and Design-Build- The project involves construction of 12.9 mtr wide bridge Ministry of Road
of 9.15 km Assam Maintenance Stage Finance-Operate- across Brahmaputra river along with two lane connecting 9.1 KM (Kilometer) Transport and Highways Navayuga Dhola Infra Projects Private Limited
Transfer (DBFOT) roads from Dhola to Sadia in Tinsukia district.

Six laning of Kishangarh -Udaipur- Ahmedabad This project involves Six laning of Kishangarh -Udaipur-
Operation and 555.0 KM Ministry of Road
section of NH 79A, NH79, NH 76 and NH 8 under Rajasthan Maintenance Stage Not Available Ahmedabad section of NH 79A, NH79, NH 76 and NH 8 (Kilometer) Transport and Highways Not Available
NHDP Phase V, length 555.50 km under NHDP Phase V, length 555.50 km

Design-Build- This project involves 2 laning with paved shoulder  of


2 laning with paved shoulder of Jabalpur-Mandala- 177.75 KM Ministry of Road
Madhya Pradesh Under Construction Finance-Operate- Jabalpur-Mandala-Chilpi section  from 3.4 to 192.4 km of Not Available
Chilpi section from 3.4 to 192.4 km under NHDP - IV (Kilometer) Transport and Highways
Transfer (DBFOT) NH-12A in MP under NHDP - IV

Design-Build- This project involves Two-laning with Paved Side Shoulders


2 laning with Paved Side Shoulders of Nagaur- Finance-Operate- of Nagaur-Jodhpur section of NH-65 from km 166.26 to km 134.64 KM Ministry of Road
Jodhpur of NH-65 from km 166.26 to km 296.07 on Rajasthan Under Construction Transfer (DBFOT) 296.07 in the State of Rajasthan under NH (O) on DBFOT (Kilometer) Transport and Highways Not Available
DBFOT (Toll) basis.*
Toll (Toll) basis.

2/4 laning of NH 12 from km 256.55 to km This project involves Two/Four laning of NH 12 from km
Build-Operate- Ministry of Road
346.539(Kota-Jhalwar section) on BOT(Toll) basis Rajasthan Under Construction 256.550 to km 346.539 (Kota-Jhalwar section) in the State Not Available Not Available
Transfer (BOT) Toll Transport and Highways
basis * of Rajasthan under NHDP Phase III on BOT(Toll) basis basis 

2/4 laning of section between Madurai to Operation and Build-Operate- This project involves 2/4 laning of section between Madurai 115.11 KM Ministry of Road
Ramanathapuram and 2 lane with paved shoulders Tamil Nadu to Ramanathapuram and 2 lane with paved shoulders from Not Available
Maintenance Stage Transfer (BOT) Toll (Kilometer) Transport and Highways
from 79.34 - 118.795 km of NH 49 79.34 - 118.795 km of NH 49

4/6 laning of Maharashtra/Goa Border to Panaji- This project involves Four/Six laning of Maharashtra/Goa
Build-Operate- Border Km 475.040 to Panaji-Goa/Karnataka Border km 611 Ministry of Road
Goa/Karnataka Border to be executed as BOT(Toll) Goa Under Construction Transfer (BOT) Toll of section NH 17 in the state of Goa to be executed as BOT Not Available Transport and Highways Not Available
on DBFO pattern*
(Toll) on DBFO pattern under NHDP Phase III

This project involves Six laning (including Construction of


6 laning(and Construction of additional 4 lane Bridge additional 4 lane Bridge across River Narmada) of
Build-Operate- Ministry of Road
across River Narmada) of Vadodara-Surat Section of Gujarat Under Construction Vadodara-Surat Section of NH-8 from 192.000 to Km Not Available Not Available
Transfer (BOT) Transport and Highways
NH-8 on BOT(Toll) basis 198.000 in the State of Gujarat under NHDP Phase-V on
BOT (Toll) basis.

This project involves Six/ Eight laning of JNPT Port Road


Project ofn Mumbai JNPT Port Road Company  Ltd.
6/8 laning of JNPT Port Road Project at NH 4B (A1 -
Operation and (MJPRCL) from km 3.60 to km 27.27  at NH 4B (A1 - E 43.912 KM Ministry of Road
E section), NH-4B (D-G section), SH-54 and on Amra Maharashtra Maintenance Stage Not Available section), km 0.0 to km 4.492 at NH-4B (D-G section), km 5.3 (Kilometer) Transport and Highways Not Available
Marg to km 14. 85 on SH-54 and km 0.000 to km 6.200 on Amra
Marg

8/6 Laning of Delhi Meerut Expressway from Km. This project involves eight/six Laning of Delhi Meerut
8.36- Km. 27.74 (UP Border to Dasna) oh NH-24 on Uttar Pradesh Under Construction Hybrid Annuity Expressway from Km. 8.360 to Km. 27.740 (UP Border to Not Available Ministry of Road Not Available
HAM(Package II)* Mode (HAM) Dasna) oh NH-24 on Hybrid Annuity Mode (Package II) Transport and Highways

Chandikole - Paradeep Section, km 0.000 to 76.618  Build-Operate- The project involves development of road between 76.618 KM Ministry of Road
of NH - 5A  under NHDP V on BOT (Toll)* Odisha Under Construction Transfer (BOT) Toll Chandikole - Paradeep Section, km 0.000 to 76.618  of NH - (Kilometer) Transport and Highways Not Available
5A  under NHDP V on BOT (Toll)

Delhi-Meerut Expressway and other connecting roads


Delhi-Meerut Expressway and other connecting Design-Build- including 6/8 laning of NH-24 from km 0.000 to km 49.23,
150.147 KM Ministry of Road
roads including 6/8 laning of NH24, NH58,NH235 on Multi State/ Centre Under Construction Finance-Operate- NH-58 from km 6.800 to km52.528 and  NH-235 from km Not Available
(Kilometer) Transport and Highways
DBFOT(Toll) basis* Transfer (DBFOT) 0.360 to km 8.800 on DBFOT  (Toll) basis in the State of
Delhi and Uttar Pradesh

The project involves development of Eastern Peripheral


Operation and Build-Operate- 134.946 KM Ministry of Road
Eastern Peripheral Expressway (NH No. NE-II) Haryana Expressway of NH No. NE-II from 0 to 135 km in the states Not Available
Maintenance Stage Transfer (BOT) Toll (Kilometer) Transport and Highways
of Haryana and UP

Four laining with PSS of Kaithal to Rajasthan Border


Operation and Build-Operate- The project involves upgradation of Kaithal-Rajasthan 166.25 KM Ministry of Road
section of NH 152/65 from km 33.250 to km 243.58 Multi State/ Centre IRB Infrastructure Developers Ltd-Indian
Maintenance Stage Transfer (BOT) Toll Border section from 0.5 km to 166.3 km under NHDP-IV. (Kilometer) Transport and Highways
under NHDP IV

Four laning of Ambala - Kaithal section of NH-65 Operation and Build-Operate- Four laning of Ambala - Kaithal section of NH-65 including 95.383 KM Ministry of Road
including Ambala Bypass inHaryana on BOT (Toll) Haryana Ambala Bypass in the State of Haryana on BOT (Toll) project Not Available
Maintenance Stage Transfer (BOT) Toll (Kilometer) Transport and Highways
project on DBFOT (Toll) basis on DBFOT (Toll) basis under NHDP Phase II

Design-Build- Four laning of Barhi Hazaribagh section from km 0.00 to km


Four laning of Barhi to Hazaribagh section of NH 33 Operation and Finance-Operate- 40.500 of NH 33 in the state of Jharkhand on design, built, 40.5 KM Ministry of Road
in Jharkhand  Jharkhand Maintenance Stage Transfer (DBFOT) finance, operate and transfer (DBFOT) toll basis under (Kilometer) Transport and Highways Abhijeet Hazaribagh Toll Road Limited
Toll NHDP Phase III project

Four laning of Goa/Karnataka border-Panaji, Goa Build-Operate- This project involves four laning of Goa/Karnataka border- Ministry of Road
Goa Under Construction Not Available Not Available
stretch of NH 4A of Goa* Transfer (BOT) Panaji, Goa stretch of NH 4A of Goa Transport and Highways
Four laning of Godhara to Gujarat/MP border Design-Build- This project involves four laning of Godhara to Gujarat/MP
Operation and Ministry of Road
section of NH 59 in the State of Gujarat under NHDP Gujarat Finance-Operate- border section of NH 59 in the State of Gujarat under NHDP Not Available Not Available
Maintenance Stage Transport and Highways
Phase III on DBFOT pattern Transfer (DBFOT) Phase III on DBFOT pattern

The project envisages four laning of NH-66 (erstwhile NH-


Four laning of Kalmath-Zarap section in length of Maharashtra Operation and Hybrid Annuity 17) on Kalmath to Zarap section from 406.0 km to 450.2 km 44.2 KM Ministry of Road DBL Kalmath Zarap Highways Limited
44.2 km in Sindhudurg district Maintenance Stage Mode (HAM) in Sindhudurg district under NHDP-IV on Hybrid Annuity (Kilometer) Transport and Highways
Mode (HAM)

Four laning of Karaikkudi-Ramanathapuram section This project involves four laning of Karaikkudi-
Operation and Build-Operate- 100.0 KM Ministry of Road
of NH-210 (101 kms)inTamil Nadu under NHDP Tamil Nadu Ramanathapuram section of NH-210 (101 kms)in the State Not Available
Phase III on BOT basis. Maintenance Stage Transfer (BOT) of Tamil Nadu under NHDP Phase III on BOT basis. (Kilometer) Transport and Highways

Four laning of Kashedi-Khavati to Parshuram Ghat in The project envisages four laning of Kashedi-Khavati to
Hybrid Annuity Parshuram Ghat of NH-66 (erstwhile-17) from 161.6 km to 43.8 KM Ministry of Road
length in Ratnagiri district # Maharashtra Pre-construction Stage Kalyan Toll Infrastructure Limited
Mode (HAM) 205.4 km in Ratnagiri district on Hybrid Annuity Mode (Kilometer) Transport and Highways
*
(HAM)

Four laning of Khagaria-Bhaktiarpur section of NH31 Build-Operate- This project involves four laning of Khagaria-Bhaktiarpur Ministry of Road
Bihar Under Construction Not Available Not Available
in the state of Bihar* Transfer (BOT) section of NH31 in the state of Bihar Transport and Highways

Four Laning of Lucknow Sultanpur Section of NH-56 Uttar Pradesh Operation and Hybrid Annuity This project involves four Laning of Lucknow Sultanpur Not Available Ministry of Road Not Available
on Hybrid Annuity Mode Maintenance Stage Mode (HAM) Section of NH-56 on Hybrid Annuity Mode Transport and Highways

Four laning of Lucknow-Sultanpur Section of NH 56 Operation and Hybrid Annuity This project involves four laning of Lucknow-Sultanpur 125.9 KM Ministry of Road
Uttar Pradesh Dilip Buildcon Limited
from KM 11.5 to KM 135 under NHDP IV Maintenance Stage Mode (HAM) Section of NH 56 from KM 11.5 to KM 135 under NHDP IV (Kilometer) Transport and Highways

Four laning of Nagapatnam-Thanjavur section of NH This project involves Four laning of Nagapatnam-Thanjavur
67 from km 1.600 to km 80.00 in Tamil Nadu on BOT Tamil Nadu Operation and Build-Operate- section of NH 67 from km 1.600 to km 80.00 in the state of 78.4 KM Ministry of Road Madhucon Projects Ltd
Maintenance Stage Transfer (BOT) Toll (Kilometer) Transport and Highways
(Toll) basis Tamil Nadu under NHDP Phase IIIA on BOT (Toll) basis

Design-Build-
Four laning of Nagina Kashipur Section of NH 74 Multi State/ Centre Operation and Finance-Operate- This project involves Four laning of Nagina Kashipur Section 98.793 KM Ministry of Road PNC Infratech
from KM 71.614 to KM 170.407 under NHDP IV Maintenance Stage of NH 74 from KM 71.614 to KM 170.407 under NHDP IV (Kilometer) Transport and Highways
Transfer (DBFOT)

The project envisages four laning of Parshuram Ghat-


Four laning of Parshuram Ghat-Arawali section in Hybrid Annuity Arawali Section of NH-17 (New NH-66) from 205.40 km to 35.9 KM Ministry of Road
length of 35.9 km in Ratnagiri district # Maharashtra Pre-construction Stage Ghatak Enterprises
Mode (HAM) 241.30 km in Ratnagiri district under NHDP-IV on Hybrid (Kilometer) Transport and Highways
*
Annuity Mode (HAM)

Four laning of Shivpuri - Dewas section of NH3 from This project involves Four laning of Shivpuri - Dewas section
Operation and Build-Operate- Ministry of Road
km 15.623 to km 566.45 in Madhya Pradesh on BOT Madhya Pradesh Maintenance Stage Transfer (BOT) of NH3 from km 15.623 to km 566.45 in the State of Not Available
Transport and Highways
Not Available
(Toll) basis. Madhya Pradesh under NHDP Phase IV on BOT (Toll) basis.

This project involves Four laning of Sultanpur-Varanasi


Four laning of Sultanpur-Varanasi Section of NH-56 Design-Build-
Operation and Section of NH-56 from km 134.700 to km 271.300 in the 146.225 KM Ministry of Road
from km 134.700 to km 271.300 in Uttar Pradesh on Uttar Pradesh Finance-Operate- M/s Gayatri Projects Limited, Hyderabad
Maintenance Stage State of Uttar Pradesh under NHDP - IV on DBFOT (Toll) (Kilometer) Transport and Highways
DBFOT (Toll) basis. Transfer (DBFOT) basis.

This project involves Four Laning of Vijaywada-


Four Laning of Vijaywada-Machilipatnam section of Operation and Ministry of Road
Andhra Pradesh Not Available Machilipatnam section of NH 9 under NHDP Phase III, Not Available Dilip Buildcon Ltd.
NH 9 under NHDP Phase III, length 64.611 km Maintenance Stage Transport and Highways
length 64.611 km

Four laning of Zirakpur to Patiala section of NH 64 Operation and This project involves four laning of Zirakpur to Patiala 50.7 KM Ministry of Road
Punjab Not Available Not Available
under VGF Scheme, length 50.70 km Maintenance Stage section of NH 64 under VGF Scheme, length 50.70 km (Kilometer) Transport and Highways

Four laning with paved side shoulders of a section Operation and Build-Operate- This project involves Four laning with paved side shoulders 80.6 KM Ministry of Road
Odisha Not Available
betwwen Jharpokharia Baleshwar Maintenance Stage Transfer (BOT) Toll of a section betwwen Jharpokharia Baleshwar (Kilometer) Transport and Highways

Tjis project involves Four laning with PSS of Amritsar to


Bathinda section  of NH - 15 from km 103.000 to km
Four laning with PSS of Amritsar to Bathinda section  Operation and Build-Operate- 287.500 in the State of Punjab  on BOT (Toll) basis under 174.64 KM Ministry of Road
of NH - 15 from km 103 to km 287.5 in Punjab under Punjab Maintenance Stage Transfer (BOT) NHDP - IV  (Kilometer) Transport and Highways Not Available
NHDP - IV 
Four laning with PSS of Amritsar to Bathinda section  of NH
- 15 from km 103 to km 287.5 in Punjab under NHDP - IV 

This project involves four-laning a section between Yadgiri-


Four-laning a section between Yadgiri-Warangal Operation and Design-Build- Warangal section of NH 202 from km 54.000 to km 150.000 99.103 KM Ministry of Road
section of NH 202 from km 54.000 to km 150.000 in Andhra Pradesh Maintenance Stage Finance-Operate- in the State of Andhra Pradesh under NHDP-IV on DBFOT (Kilometer) Transport and Highways M/s Larsen & Toubro Limited
AP on BOT (Toll) basis Transfer (DBFOT) basis
This project involves four-laning of a section under NHDP-
Four-laning of a section under NHDP-IV, between Operation and Build-Operate- IV, between Hubli - Hospet section of NH 63 from km 143.29 KM Ministry of Road
Karnataka M/s BSCPL - KNR (JV)
Hubli - Hospet section of NH 63 on BOT (Toll) basis. Maintenance Stage Transfer (BOT) Toll 129+249 to km 267+000 in the State of Karnataka on BOT (Kilometer) Transport and Highways
(Toll) basis.

Four-Laning of Hospet, Bellary Section of NH-63 Operation and Build-Operate- This project involves Four-Laning of Hospet, Bellary Section 95.0 KM Ministry of Road
Karnataka M/s Gammon India Limited
under NHDP Phase IV, length 95.44 km Maintenance Stage Transfer (BOT) Toll of NH-63 under NHDP Phase IV, length 95.44 km (Kilometer) Transport and Highways

Four/Six Laning of Gujarat/Maharashtra Border-


Operation and Build-Operate- The project involves four/six laning of Gujarat/Maharashtra 133.0 KM Ministry of Road
Surat-Hazira Port Section of NH 6 under NHDP Phase Multi State/ Centre Soma Isolux Surat Hazira Tollway Private Limited
Maintenance Stage Transfer (BOT) Toll Border to Surat-Hazira Port Section of NH-6 under NHDP-III (Kilometer) Transport and Highways
III

Four/six laning of Raipur-Bilaspur section of NH 200 Build-Operate- This project involves Four/six laning of Raipur-Bilaspur 126.525 KM Ministry of Road
from km 0.000 to km 127.650 in Chhattisgarh on BoT Chhattisgarh Pre-construction Stage section of NH 200 from km 0.000 to km 127.650 in the State Dilip Buildcon Limited
Transfer (BOT) Toll (Kilometer) Transport and Highways
(Toll) basis* of Chhattisgarh under NHDP Phase IV B on BoT (Toll) basis

Construction of Hubli to Dharwar Bypass road of 30 KM 30.0 KM Ministry of Road


Hubli-Dharwar Bypass* Karnataka Under Construction Not Available stretch road in Karnataka (Kilometer) Transport and Highways Bharat Forge Ltd

Parwanoo-Solan section of NH 22 in the State of Build-Operate- This project involves development of Parwanoo-Solan
Himachal Pradesh on BOT (Annuity) under NHDP Himachal Pradesh Operation and Transfer (BOT) section of NH 22 in the State of Himachal Pradesh on BOT 39.41 KM Ministry of Road GR Infra Projects Ltd
Phase III Maintenance Stage Annuity (Annuity) under NHDP Phase III (Kilometer) Transport and Highways

The project envisages widening of existing road to two-lane


Build-Operate- NH standards along with improvement and realignment in
Road Upgradation (Potin-Pangin) Project # 407.0 KM Ministry of Road SREI Infrastructure Finance-ECI Engineering &
Arunachal Pradesh Pre-construction Stage Transfer (BOT) lenght of 407 km from Potin to Pangin via Yachuli, Ziro,
* Annuity Daporizo, Aalong (Part of Trans Arunachal Highway) section (Kilometer) Transport and Highways Construction Company Limited (JV)
of NH-229.

Six laning of Indore-Dewas section of NH 3 from Km This project involves Six laning of Indore-Dewas section of
577.55 to km 610.00 and Km 0.00 to Km 12.60 inMP Madhya Pradesh Operation and Build-Operate- NH 3 from Km 577.55 to km 610.00 and Km 0.00 to Km 45.0 KM Ministry of Road Not Available
Maintenance Stage Transfer (BOT) (Kilometer) Transport and Highways
under NHDP V on BOT basis 12.60 in the State of MP under NHDP V on BOT basis

Design-Build-
The project involves two laning on NH standards along with
Two laning Nechipu to Hoj via Seppa, Saggali in Finance-Operate- 311.0 KM Ministry of Road
length of 311 km* Arunachal Pradesh Under Construction Transfer (DBFOT) improvement and realignment from Nechipu to Hoj via (Kilometer) Transport and Highways Sushee IVRCL Arunachal Highways Limited
Annuity Seppa, Saggali in Arunachal Pradesh.

Two laning of Zojila Tunnel of 14.083 km length on Build-Operate- This project involves Two laning of Zojila Tunnel of 14.083 14.083 KM Ministry of Road
NH - 1D in the State of Jammu & Kashmir on BOT Jammu & Kashmir Under Construction Transfer (BOT) km length on NH - 1D in the State of Jammu & Kashmir on Not Available
annuity basis* Annuity BOT annuity basis (Kilometer) Transport and Highways

Two laning with Pave shoulder from Varanasi to This project involves Two laning with Pave shoulder from
Gorakhpur section Km 2 to Km 208 of NH 29 in the Uttar Pradesh Under Construction Not Available Varanasi to Gorakhpur section Km 2 to Km 208 of NH 29 in Not Available Ministry of Road Not Available
Transport and Highways
State of UP * the State of UP 

Two laning with pave shoulder on Raigarh - Saraipalli This project involves Two laning with pave shoulder on Ministry of Road
from 3.800 to Km 90.460 on NH 216 in the State of Chhattisgarh Under Construction Not Available Raigarh - Saraipalli from 3.800 to Km 90.460 on NH 216 in Not Available Not Available
Transport and Highways
Chattisgarh* the State of Chattisgarh

Two laning Z-Morh Tunnel section of NH-I on BOT Design-Build- 34.0 KM Ministry of Road
(Annuity) in Sonamarg, Srinagar, Jammu and Jammu & Kashmir Under Construction Finance-Operate- Two Laning of Srinagar - Sonamarg - Gumri section of NH 1 (Kilometer) Transport and Highways Srinagar Sonmarg Tunnelway Limited
Kashmir * Transfer (DBFOT)

Four Laning of Panikoili-Rimuli Section of NH 215 Build-Operate- The project involves four/six laning of Panikhoili-Keonjhar- 106.0 KM Ministry of Road
Odisha Under Construction Sai Matarani Tollways Limited
under NHDP Phase III, length 163 km Transfer (BOT) Toll Rimoli under NHDP-III A /DL4/20 in Kendujhargarh district. (Kilometer) Transport and Highways

Four Laning of Nelamangala Junction on NH-4 with Operation and Build-Operate- 4/6-laning of Neelmangla Junction on NH-4 with NH-48 to 80.0 KM Ministry of Road
NH-48 to Devihalli under NHDP phase III A on BOT Karnataka Devihalli (km.28/200 to km.110/000) in Karnataka under Lanco Devihalli Highways Private Limited
basis Maintenance Stage Transfer (BOT) Toll NHDP-III A (Kilometer) Transport and Highways

Construction of four laned road from Pune-Sholapur Pkg-


Four laning of Pune-Sholapur section of NH 9 under Maharashtra Operation and Build-Operate- II(Approved Length I & II 110 Km of NH-9 under NHDP 110.0 KM Ministry of Road IL & FS Transportation Network Ltd
NHDP Phase III, length 110.05 km  Package II Maintenance Stage Transfer (BOT) (Kilometer) Transport and Highways
Phase-III

Four laning of Haryana/Punjab Border to Jind This project involves four laning of Haryana/Punjab Border
Build-Operate- to Jind Section of NH-71 from Km 239.000 to Km 307.000 in 69.35 KM Ministry of Road
Section of NH-71 from Km 239.000 to Km 307.000 in Haryana Under Construction Not Available
Haryana on BOT (Toll) basis Transfer (BOT) Toll the State of Haryana under NHDP Phase-III on BOT (Toll) (Kilometer) Transport and Highways
basis.

Kharpada Bridge Project Maharashtra Operation and Not Available Construction of 2 lane Kharpada Bridge of 1.4 KM on River 1.4 KM (Kilometer) Ministry of Road IRB Infrastructure Developers Ltd
Maintenance Stage Patalgnanga Transport and Highways

This project involves four-laning of Ghaghar Bridge (Indo


4 laning of Ghaghar Bridge(Indo Nepal Border) to Operation and Build-Operate- Nepal Border) to Varanasi section from Km 121.800 to Km 177.652 KM Ministry of Road
Varanasi section from Km 121.8 to Km 298.45 of NH Uttar Pradesh Not Available
233 in UP on BOT (Toll) basis Maintenance Stage Transfer (BOT) 298.450 of NH 233 in the State of Uttar Pradesh under (Kilometer) Transport and Highways
NHDP IV on BOT (Toll) basis
This project involves Four-laning of Jabalpur- Kanti- Rewa
Four-laning of Jabalpur- Kanti- Rewa Section of NH-7 Build-Operate- 65.0 KM Ministry of Road
Madhya Pradesh Under Construction Section of NH-7 from km 242.30 to km 465.50 in the State M/s Larsen & Toubro Ltd. Mumbai
from km 242.30 to km 465.50 in MP on BOT (Toll) Transfer (BOT) Toll (Kilometer) Transport and Highways
of Madhya Pradesh under NHDP Phase IV on BOT (Toll)

Four laning of Kundapur to Suratkal section ( Km 284 to


Four laning of Kundapur to Suratkal section and Build-Operate- 358) and Mangalore-Kerala border section (km 375.300 to 90.28 KM Ministry of Road
Mangalore-Kerala border section of NH 17 on BOT Karnataka Under Construction Not Available
Basis Transfer (BOT) 376.700 and from Km3.700 to 17.200) of NH 17 Under (Kilometer) Transport and Highways
NHDP Phase III on BOT Basis

Design, Engineering, Finance, Construction, Operation and


Maintenance of four laning of Bijapur-Hungund section of
Design, Engineering, Finance, Construction, Operation and Design-Build- NH 13 from km 202 to km 299 in the State of Karnataka 97.0 KM Ministry of Road
Operation and Maintenance of 4 laning of Bijapur- Karnataka Finance-Operate- under NHDP Phase III through DBFOT basisDesign, Not Available
Maintenance Stage (Kilometer) Transport and Highways
Hungund section of NH13 on DBFOT Transfer (DBFOT) Engineering, Finance, Construction, Operation and
Maintenance of four laning of Bijapur-Hungund section of
NH 13

Two /Four laning with PSS of Gadu to Dwaraka Design-Build- This project involves Two /Four laning with PSS of Gadu to
Operation and Ministry of Road
section on NH 8E from km 263.000 to km 473.000 Gujarat Finance-Operate- Dwaraka section on NH 8E from km 263.000 to km 473.000 Not Available Not Available
Maintenance Stage Transport and Highways
inGujarat on DBFOT pattern Transfer (DBFOT) in the State of Gujarat on DBFOT pattern

Two laning with PSS a section, between Kerala Build-Operate- This project involves Two laning with PSS a section, 150.041 KM Ministry of Road
Border to Kollegal section of NH-212 inKarnataka on Karnataka Under Construction Transfer (BOT) Toll between Kerala Border to Kollegal section of NH-212 in the (Kilometer) Transport and Highways Not Available
BOT (Toll) basis under NHDP-IV state of Karnataka on BOT (Toll) basis under NHDP-IV

This project involves Two-laning with PSS section, between


Two-laning with PSS section, between Bijapur,
Rajasthan Operation and Build-Operate- Bijapur, Gulbarga, Homnabad section of NH 218 from Km 220.47 KM Ministry of Road Not Available
Gulbarga, Homnabad section of NH 218 from Km Maintenance Stage Transfer (BOT) Toll 195.000 to Km 418.000 in the State of Karnataka on BOT (Kilometer) Transport and Highways
195 to Km 418 on BOT (Toll) (Toll)

Design-Build-
Two/ four laning of Obedullaganj -Shahganj Finance-Operate- This project involves Two/ four laning of Obedullaganj Ministry of Road
Junction, Budhni- Betul Section of NH 69  under Madhya Pradesh Under Construction -Shahganj Junction, Budhni- Betul Section of NH 69  under Not Available Not Available
Transfer (DBFOT) Transport and Highways
NHDP-IV, length  121.36 km NHDP-IV, length  121.36 km
Toll

This project involves Rehabilitation , strengthening and Four


Rehabilitation, strengthening and 4 laning of Build-Operate- laning of Ramban to Banihal section of NH 1A from km 151 32.1 KM Ministry of Road
Ramban to Banihal section of NH 1A in Jammu and Jammu & Kashmir Under Construction Transfer (BOT) to km 187 on BOT (Annuity) basis on DBFO pattern in the (Kilometer) Transport and Highways Not Available
Kashmir Annuity
state of Jammu and Kashmir

This project involves rehabilitation, strengthening and Four


Rehabilitation, strengthening and Four laning of Build-Operate-
laning of Udhampur to Ramban section of NH 1A from km 40.07 KM Ministry of Road
Udhampur to Ramban section of NH 1A from km 67 Jammu & Kashmir Under Construction Transfer (BOT) 67 to km 89 & km 130 to km 151 in the state of Jammu and (Kilometer) Transport and Highways Not Available
to km 89 & km 130 to km 151 Annuity Kashmir

This project involves Two laning with paved shoulder from


2 laning from 0 to km7.95( Katni Bypass) & 4.6 to Operation and Design-Build- km 0.000 to km7.950 ( Katni Bypass) & km 4.600 to km 234.0 KM Ministry of Road
245km of Katni-Shahdol-Anooppur to MP/CG Border Madhya Pradesh Finance-Operate- 245.000  of Katni -  Shahdol - Anooppur to MP/CG Border Not Available
Maintenance Stage (Kilometer) Transport and Highways
section on NH-78 Transfer (DBFOT) section on NH-78 in the State of Madhya Pradesh on
DBFOT 

Four laning of Phagwara-Rupnagar of NH-344A in Hybrid Annuity This project involves Four laning of Phagwara-Rupnagar of 80.82 KM Ministry of Road
Punjab on Hybrid Annuity Mode (total 80.82 KM) Punjab Under Construction Mode (HAM) NH-344A in Punjab on Hybrid Annuity Mode (total 80.82 (Kilometer) Transport and Highways Not Available
KM)

Design-Build- This project involves Two laning with paved shoulder / Four
2 laning with paved shoulder/4 laning of Tamil
Operation and Finance-Operate- laning of Tamil Nadu / Karnataka Border to Bangalore 191.89 KM Ministry of Road
Nadu/Karnataka Border to Bangalore section of NH- Karnataka Not Available
Maintenance Stage Transfer (DBFOT) section of NH-209 from km 266.530 to km 458.52  in the (Kilometer) Transport and Highways
209 on DBFOT (Toll) basis Toll State of Karnataka under NHDP Ph IV on DBFOT (Toll) basis

This project involves two / Four laning of Vikravandi to


2/4 laning of Vikravandi-Meensuruti Section of NH- Build-Operate- Meensuruti Section of NH - 45C from km 0 .000 to km 164.22 KM Ministry of Road
45C and 2 laning with PSS from Meensuruti 93.5km Tamil Nadu Under Construction 93.500 and two laning with PSS from Meensuruti, km Not Available
to Thanjavur 164.614km Transfer (BOT) Toll 93.500 to Thanjavur km 164.614 in the State of Tamil Nadu (Kilometer) Transport and Highways
under NHDP - IV  on BOT (Toll) Basis. 

4 laning of Chandikhole-Dubari-Talchar Secton of NH This project involves four laning of Chandikhole - Dubari -
132.5 KM Ministry of Road
200, 301.89-428.03km including km 8.5- km 15.75 in Odisha Under Construction Not Available Talchar Secton of NH 200, km 301.89 to km 428.03 Not Available
Orissa including km 8.500 to km 15,.75  in the State of Orissa (Kilometer) Transport and Highways

This project involves four laning of Jorhat-Demow section


4 laning of Jorhat-Demow section from Km 453 to Build-Operate-
534.8 (part of Nagaon-Dirbugah section) of NH 37 in Assam Operation and Transfer (BOT) from Km 453 to 534.8 (part of Nagaon-Dirbugah section) of Not Available Ministry of Road Not Available
Maintenance Stage NH 37 in the State of Assam under SARDP-NE Phase A on Transport and Highways
Assam on BOT (Annuity) basis Annuity
BOT (Annuity) basis

Construction of Access Controlled Highways from Operation and Build-Operate- The project involves construction of Access Controlled Ministry of Road
Km. 10/0 to Km. 29/5 of Bangolore section of NH-4 Karnataka Highways from km 10 to km 29.5 of Bangalore section of Not Available Not Available
inKarnataka on BOT basis Maintenance Stage Transfer (BOT) NH-4 in the state of Karnataka on BOT basis. Transport and Highways
Four laning of Baihata Chariali to Tejpur Section of This project involves four laning of Baihata Chariali to
Operation and Build-Operate- Ministry of Road
NH-52 (Km 0.00 to km 130.00) inAssam under NHDP Assam Tejpur Section of NH-52 (Km 0.00 to km 130.00) in the State Not Available Not Available
Maintenance Stage Transfer (BOT) Transport and Highways
Phase III on BOT basis. of Assam under NHDP Phase III on BOT basis.

This project involves Four laning of PSS of Sangrur -


Four laning of PSS of Sangrur - Punjab/Haryana
border section of NH - 71 in Punjab on BOT (Toll) Punjab Operation and Build-Operate- Punjab/Haryana border section of NH - 71 from km 181.805 Not Available Ministry of Road Not Available
basis Maintenance Stage Transfer (BOT) Toll (Sangrur) to km 238.695 (Punjab/Haryana border) in the Transport and Highways
State of Punjab on BOT (Toll) basis under NHDP - IV

this project involves Four/Two-laning of Baharagora to


Four/Two-laning of Baharagora to Sambalpur
Operation and Build-Operate- Sambalpur Section from km 200.00 to 566.000 Section of 368.2 KM Ministry of Road
Section from km 200.00 to 566.000 Section of NH-6 Odisha Not Available
in Orissa on BOT (Toll) basis Maintenance Stage Transfer (BOT) Toll NH-6 in the State of Orissa under NHDP, IV on BOT (Toll) (Kilometer) Transport and Highways
basis

Four laning of Kazhakkuttam to Mukkola section in Build-Operate- This project involves four laning of Kazhakkuttam to 26.798 KM Ministry of Road
the State of Kerala Kerala Under Construction Transfer (BOT) Toll Mukkola section in the State of Kerala (Kilometer) Transport and Highways Not Available

Four laning of Kuttipuram-Edapally section of NH17 Build-Operate- This project involves Four laning of Kuttipuram-Edapally Ministry of Road
Kerala Under Construction Not Available Not Available
in the state of Kerala Transfer (BOT) section of NH17 in the state of Kerala Transport and Highways

Design-Build-
Four laning of Mangwan to  Satna to Bela section of Madhya Pradesh Under Construction Finance-Operate- This project involves Four laning of Mangwan to  Satna to Not Available Ministry of Road Not Available
NH 75 under VGF Scheme, length 48.04 km Transfer (DBFOT) Bela section of NH 75 under VGF Scheme, length 48.04 km Transport and Highways
Toll

Four laning of Patna-Buxar section of NH 30 in the Bihar Under Construction Build-Operate- This project involves Four laning of Patna-Buxar section of Not Available Ministry of Road Not Available
state of Bihar Transfer (BOT) NH 30 in the state of Bihar Transport and Highways

Four Laning of Trivandrum, Kerala/ Tamil Nadu Build-Operate- This project involves Four Laning of Trivandrum, Kerala/ Ministry of Road
border including Trivandrum by-pass (Package I) Kerala Under Construction Transfer (BOT) Tamil Nadu border including Trivandrum by-pass (Package I) Not Available Transport and Highways Not Available

Design-Build-
Four-laning of Bhuban-Dubari-Chandikhole section This project involves four-laning of Bhuban-Dubari-
of NH-200 in Odisha under NHDP-III on DBFOT (Toll) Odisha Operation and Finance-Operate- Chandikhole section of NH-200 in Odisha under NHDP-III on 62.185 KM Ministry of Road Not Available
Maintenance Stage Transfer (DBFOT) (Kilometer) Transport and Highways
basis. Toll DBFOT (Toll) basis.

Four-laning with PSS of Jabalpur-Bhopal section of This project involves four-laning with PSS of Jabalpur-
Operation and Build-Operate- 294.21 KM Ministry of Road
NH-12 from km 10.400 to km 301.800 under NHDP Madhya Pradesh Bhopal section of NH-12 from km 10.400 to km 301.800 Not Available
Phase III on BOT (Toll) basis Maintenance Stage Transfer (BOT) Toll under NHDP Phase III on BOT (Toll) basis (Kilometer) Transport and Highways

Six laning of Dankuni - Baleshwar section of NH 6 in Operation and This project involves Six laning of Dankuni - Baleshwar 111.0 KM Ministry of Road
West Bengal Not Available Not Available
West Bengal  Maintenance Stage section of NH 6 in West Bengal  (Kilometer) Transport and Highways

Design-Build-
Development of two lane Road of Beawer- Gomti Finance-Operate- The project involves upgradation of Beawar-Gomti section 118.9 KM Ministry of Road
Rajasthan Under Construction IL&FS Transportation Networks Limited
section of NH 8 Transfer (DBFOT) of NH-8 from 58.2 km to 177.1 km (Kilometer) Transport and Highways
Toll

Operation and Construction of 0.69 KM stretch bridge constructed in 0.69 KM Ministry of Road
Koratalaiyar Bridge Tamil Nadu Maintenance Stage Not Available chennai, Tamil nadu (Kilometer) Transport and Highways Zoom Developers

Nardana ROB Maharashtra Operation and Not Available Costrction of Nardana Railway Over Bridge of 13 KM length. 13.0 KM Ministry of Road Ayushajay Construction Pvt. Ltd.
Maintenance Stage (Kilometer) Transport and Highways

0.03 KM Ministry of Road


Nasirabad ROB Maharashtra Completed Not Available Nasirabad Railway Over Bridge of spam 30m in Maharashtra (Kilometer) Transport and Highways Ashoka Vastushilp Pvt. Ltd

Thane Bhiwandi Bypass Maharashtra Completed Build-Operate- This project involved construction of 4 lane bypass from 24.0 KM Ministry of Road Ideal Road Builders Limited (IRBL)
Transfer (BOT) Thane to Bhiwandi on BOT basis (Kilometer) Transport and Highways

Build-Operate- Construction of 12 m wide permanent bridges in length of


Operation and 30 km at Debang vally along with approaches connecting 30.0 KM Ministry of Road
Bridges (Arunachal Pradesh) Project Arunachal Pradesh Transfer (BOT) Not Available
Maintenance Stage Annuity Bojanir and Meka and over Lohit River connecting Digaru (Kilometer) Transport and Highways
and Chowkham NH-52 in Arunachal Pradesh

Build-Operate- The project involved construction of two lane Neelambur


Bypass (Neelambur) Project Tamil Nadu Operation and Transfer (BOT) bypass at Coimbatore. This bypass was expected to ease 28.0 KM Ministry of Road L&T Transportation Infrastructure Limited
Maintenance Stage (Kilometer) Transport and Highways
Annuity the traffic congestion in Coimbatore city.

Construction of railway over bridge on NH-6 at Operation and Build-Operate- The project involved construction of railway over bridge on Ministry of Road
Maharashtra 2.7 KM (Kilometer) Fekari Infrastructure Private Limited
Fekari in Jalgaon district Maintenance Stage Transfer (BOT) NH-6 at Fekari in Jalgaon district. Transport and Highways
Construction of two lane Wainganga bridge in length Operation and Build-Operate- The project involved construction of two lane Wainganga 13.0 KM Ministry of Road
of 13 Km Maharashtra Maintenance Stage Transfer (BOT) bridge on NH-6 in Maharashtra. (Kilometer) Transport and Highways Abhijeet Ashoka Infrastructure Limited
Project Name Location

Six laning of Dankuni - Baleshwar section of NH 6


West Bengal
in West Bengal 
Status Type of PPP

Operation and Maintenance Stage Not Available


Project Brief Project Capacity

This project involves Six laning of Dankuni -


111.0 KM (Kilometer)
Baleshwar section of NH 6 in West Bengal 
Project Authority Name Project Concessionaire Name

Ministry of Road Transport and Highways Not Available


Project Name Location Status

8/6 Laning of Delhi Meerut Expressway from


Km. 8.36- Km. 27.74 (UP Border to Dasna) oh Uttar Pradesh Under Construction
NH-24 on HAM(Package II)*

Four Laning of Lucknow Sultanpur Section of


Uttar Pradesh Operation and Maintenance Stage
NH-56 on Hybrid Annuity Mode

Four laning of Lucknow-Sultanpur Section of NH


Uttar Pradesh Operation and Maintenance Stage
56 from KM 11.5 to KM 135 under NHDP IV

Four laning of Sultanpur-Varanasi Section of


NH-56 from km 134.700 to km 271.300 in Uttar Uttar Pradesh Operation and Maintenance Stage
Pradesh on DBFOT (Toll) basis.

Two laning with Pave shoulder from Varanasi to


Gorakhpur section Km 2 to Km 208 of NH 29 in Uttar Pradesh Under Construction
the State of UP *

4 laning of Ghaghar Bridge(Indo Nepal Border)


to Varanasi section from Km 121.8 to Km Uttar Pradesh Operation and Maintenance Stage
298.45 of NH 233 in UP on BOT (Toll) basis
Type of PPP Project Brief

This project involves eight/six Laning of Delhi


Meerut Expressway from Km. 8.360 to Km. 27.740
Hybrid Annuity Mode (HAM)
(UP Border to Dasna) oh NH-24 on Hybrid Annuity
Mode (Package II)

This project involves four Laning of Lucknow


Hybrid Annuity Mode (HAM) Sultanpur Section of NH-56 on Hybrid Annuity
Mode

This project involves four laning of Lucknow-


Hybrid Annuity Mode (HAM) Sultanpur Section of NH 56 from KM 11.5 to KM
135 under NHDP IV

This project involves Four laning of Sultanpur-


Design-Build-Finance-Operate- Varanasi Section of NH-56 from km 134.700 to km
Transfer (DBFOT) 271.300 in the State of Uttar Pradesh under NHDP -
IV on DBFOT (Toll) basis.

This project involves Two laning with Pave shoulder


Not Available from Varanasi to Gorakhpur section Km 2 to Km 208
of NH 29 in the State of UP 

This project involves four-laning of Ghaghar Bridge


Build-Operate-Transfer (BOT) (Indo Nepal Border) to Varanasi section from Km
121.800 to Km 298.450 of NH 233 in the State of
Uttar Pradesh under NHDP IV on BOT (Toll) basis
Project Capacity Project Authority Name Project Concessionaire Name

Ministry of Road Transport


Not Available Not Available
and Highways

Ministry of Road Transport


Not Available Not Available
and Highways

Ministry of Road Transport


125.9 KM (Kilometer) Dilip Buildcon Limited
and Highways

Ministry of Road Transport M/s Gayatri Projects Limited,


146.225 KM (Kilometer)
and Highways Hyderabad

Ministry of Road Transport


Not Available Not Available
and Highways

177.652 KM (Kilometer) Ministry of Road Transport Not Available


and Highways
Project Name Location Status

2/4 laning of section between Madurai to


Tamil Operation and Maintenance
Ramanathapuram and 2 lane with paved shoulders
from 79.34 - 118.795 km of NH 49 Nadu Stage

Four laning of Karaikkudi-Ramanathapuram section of Tamil Operation and Maintenance


NH-210 (101 kms)inTamil Nadu under NHDP Phase III
Nadu Stage
on BOT basis.

Four laning of Nagapatnam-Thanjavur section of NH Tamil Operation and Maintenance


67 from km 1.600 to km 80.00 in Tamil Nadu on BOT
(Toll) basis Nadu Stage

2/4 laning of Vikravandi-Meensuruti Section of NH-


Tamil
45C and 2 laning with PSS from Meensuruti 93.5km to Nadu Under Construction
Thanjavur 164.614km

Tamil Operation and Maintenance


Koratalaiyar Bridge
Nadu Stage

Tamil Operation and Maintenance


Bypass (Neelambur) Project
Nadu Stage
Type of PPP

Build-Operate-Transfer (BOT) Toll

Build-Operate-Transfer (BOT)

Build-Operate-Transfer (BOT) Toll

Build-Operate-Transfer (BOT) Toll

Not Available

Build-Operate-Transfer (BOT)
Annuity
Project Brief

This project involves 2/4 laning of section between Madurai to Ramanathapuram and 2 lane
with paved shoulders from 79.34 - 118.795 km of NH 49

This project involves four laning of Karaikkudi-Ramanathapuram section of NH-210 (101 kms)in
the State of Tamil Nadu under NHDP Phase III on BOT basis.

This project involves Four laning of Nagapatnam-Thanjavur section of NH 67 from km 1.600 to


km 80.00 in the state of Tamil Nadu under NHDP Phase IIIA on BOT (Toll) basis

This project involves two / Four laning of Vikravandi to Meensuruti Section of NH - 45C from km
0 .000 to km 93.500 and two laning with PSS from Meensuruti, km 93.500 to Thanjavur km
164.614 in the State of Tamil Nadu under NHDP - IV  on BOT (Toll) Basis. 

Construction of 0.69 KM stretch bridge constructed in chennai, Tamil nadu

The project involved construction of two lane Neelambur bypass at Coimbatore. This bypass
was expected to ease the traffic congestion in Coimbatore city.
Project Concessionaire
Project Capacity Project Authority Name Adress
Name

115.11 KM Ministry of Road Transport and


Not Available
(Kilometer) Highways

100.0 KM Ministry of Road Transport and


Not Available
(Kilometer) Highways

Corporate Office
Madhucon House
Road No.36, Jubilee Hills
Hyderabad TS 500033
78.4 KM Ministry of Road Transport and Administrative Office
Madhucon Projects Ltd
(Kilometer) Highways Madhucon Projects Limited
Flat No. 307 & 308, Third
Floor, Corporate Sewa Park,
M.G. Road
Gurgaon 122 002 India

164.22 KM Ministry of Road Transport and


(Kilometer) Highways Not Available

0.69 KM Ministry of Road Transport and


Zoom Developers
(Kilometer) Highways

L&T House, N.M. Marg,


28.0 KM Ministry of Road Transport and L&T Transportation Ballard Estate,
(Kilometer) Highways Infrastructure Limited Mumbai, Maharashtra - 400
001
Contact No. Email Website

91 4023556001 / 04 hyinfo@madhucon.com info@madhucon.com


http://www.madhucon.com/

Tel: +91 22 igrc@larsentoubro.com https://www.larsentoubro.com/


67525656
Contact Name

Sri N Seethaiah - Managing


Director
Project Name Location Status

Six laning of Kishangarh -Udaipur-


Ahmedabad section of NH 79A, Operation and
Rajasthan
NH79, NH 76 and NH 8 under NHDP Maintenance Stage
Phase V, length 555.50 km

2 laning with Paved Side Shoulders of


Nagaur-Jodhpur of NH-65 from km
Rajasthan Under Construction
166.26 to km 296.07 on DBFOT (Toll)
basis.*

2/4 laning of NH 12 from km 256.55


to km 346.539(Kota-Jhalwar section) Rajasthan Under Construction
on BOT(Toll) basis basis *

Two-laning with PSS section,


between Bijapur, Gulbarga, Operation and
Rajasthan
Homnabad section of NH 218 from Maintenance Stage
Km 195 to Km 418 on BOT (Toll)

Development of two lane Road of


Rajasthan Under Construction
Beawer- Gomti section of NH 8
Type of PPP Project Brief

This project involves Six laning of


Kishangarh -Udaipur- Ahmedabad
Not Available section of NH 79A, NH79, NH 76 and NH
8 under NHDP Phase V, length 555.50
km

This project involves Two-laning with


Paved Side Shoulders of Nagaur-Jodhpur
Design-Build-Finance-Operate-Transfer (DBFOT) Toll section of NH-65 from km 166.26 to km
296.07 in the State of Rajasthan under
NH (O) on DBFOT (Toll) basis.

This project involves Two/Four laning of


NH 12 from km 256.550 to km 346.539
Build-Operate-Transfer (BOT) Toll (Kota-Jhalwar section) in the State of
Rajasthan under NHDP Phase III on
BOT(Toll) basis basis 

This project involves Two-laning with


PSS section, between Bijapur, Gulbarga,
Build-Operate-Transfer (BOT) Toll Homnabad section of NH 218 from Km
195.000 to Km 418.000 in the State of
Karnataka on BOT (Toll)

The project involves upgradation of


Design-Build-Finance-Operate-Transfer (DBFOT) Toll Beawar-Gomti section of NH-8 from
58.2 km to 177.1 km
Project Authority Project Concessionaire
Project Capacity
Name Name

Ministry of Road
555.0 KM
Transport and Not Available
(Kilometer)
Highways

Ministry of Road
134.64 KM
Transport and Not Available
(Kilometer)
Highways

Ministry of Road
Not Available Transport and Not Available
Highways

Ministry of Road
220.47 KM
Transport and Not Available
(Kilometer)
Highways

118.9 KM Ministry of Road IL&FS Transportation


Transport and
(Kilometer) Networks Limited
Highways
Adress

The IL&FS Financial Centre, Plot C22, G Block


Bandra Kurla Complex,
Bandra East, Mumbai 400 051
Maharashtra, INDIA
ITNL Delhi Office
3rd Floor, Ambience Corporate Tower,
Ambience Mall, Ambience Island,
NH-8 Gurgaon - 122 002
Contact No.

22-26533333,91-124-4716400
Email

Itnlinvestor@ilfsindia.com
Website

http://www.itnlindia.com/
Contact Name
Type of
Project Name Location Status
PPP
Four laning of Zirakpur to Patiala section
Operation and Maintenance Not
of NH 64 under VGF Scheme, length Punjab
50.70 km Stage Available

Four laning with PSS of Amritsar to Build-


Bathinda section  of NH - 15 from km Operation and Maintenance Operate-
Punjab
103 to km 287.5 in Punjab under NHDP - Stage Transfer
IV  (BOT)

Hybrid
Four laning of Phagwara-Rupnagar of
Annuity
NH-344A in Punjab on Hybrid Annuity Punjab Under Construction
Mode
Mode (total 80.82 KM)
(HAM)

Build-
Four laning of PSS of Sangrur - Operation and Maintenance Operate-
Punjab/Haryana border section of NH - Punjab
Stage Transfer
71 in Punjab on BOT (Toll) basis
(BOT) Toll
Project Brief Project Capacity Project Authority Name

This project involves four laning of


50.7 KM Ministry of Road
Zirakpur to Patiala section of NH 64
under VGF Scheme, length 50.70 km (Kilometer) Transport and Highways

Tjis project involves Four laning with PSS


of Amritsar to Bathinda section  of NH -
15 from km 103.000 to km 287.500 in
the State of Punjab  on BOT (Toll) basis
174.64 KM Ministry of Road
under NHDP - IV 
Four laning with PSS of Amritsar to (Kilometer) Transport and Highways
Bathinda section  of NH - 15 from km
103 to km 287.5 in Punjab under NHDP -
IV 

This project involves Four laning of


Phagwara-Rupnagar of NH-344A in 80.82 KM Ministry of Road
Punjab on Hybrid Annuity Mode (total (Kilometer) Transport and Highways
80.82 KM)

This project involves Four laning of PSS


of Sangrur - Punjab/Haryana border
section of NH - 71 from km 181.805 Ministry of Road
(Sangrur) to km 238.695 Not Available
Transport and Highways
(Punjab/Haryana border) in the State of
Punjab on BOT (Toll) basis under NHDP -
IV
Project Concessionaire Name

Not Available

Not Available

Not Available

Not Available
Project Name Location

Chandikole - Paradeep Section, km 0.000 to 76.618 


Odisha
of NH - 5A  under NHDP V on BOT (Toll)*

Four laning with paved side shoulders of a section


Odisha
betwwen Jharpokharia Baleshwar

Four Laning of Panikoili-Rimuli Section of NH 215


Odisha
under NHDP Phase III, length 163 km

4 laning of Chandikhole-Dubari-Talchar Secton of NH


200, 301.89-428.03km including km 8.5- km 15.75 in Odisha
Orissa

Four/Two-laning of Baharagora to Sambalpur Section


from km 200.00 to 566.000 Section of NH-6 in Orissa Odisha
on BOT (Toll) basis

Four-laning of Bhuban-Dubari-Chandikhole section


of NH-200 in Odisha under NHDP-III on DBFOT (Toll) Odisha
basis.
Status Type of PPP

Under Construction Build-Operate-Transfer (BOT) Toll

Operation and Maintenance Stage Build-Operate-Transfer (BOT) Toll

Under Construction Build-Operate-Transfer (BOT) Toll

Under Construction Not Available

Operation and Maintenance Stage Build-Operate-Transfer (BOT) Toll

Design-Build-Finance-Operate-Transfer
Operation and Maintenance Stage
(DBFOT) Toll
Project Authority
Project Brief Project Capacity
Name

The project involves development of road between Ministry of Road


Chandikole - Paradeep Section, km 0.000 to 76.618  of NH 76.618 KM (Kilometer) Transport and
- 5A  under NHDP V on BOT (Toll) Highways

This project involves Four laning with paved side shoulders Ministry of Road
80.6 KM (Kilometer) Transport and
of a section betwwen Jharpokharia Baleshwar Highways

Ministry of Road
The project involves four/six laning of Panikhoili-Keonjhar-
106.0 KM (Kilometer) Transport and
Rimoli under NHDP-III A /DL4/20 in Kendujhargarh district.
Highways

This project involves four laning of Chandikhole - Dubari - Ministry of Road


Talchar Secton of NH 200, km 301.89 to km 428.03 132.5 KM (Kilometer) Transport and
including km 8.500 to km 15,.75  in the State of Orissa Highways

this project involves Four/Two-laning of Baharagora to


Ministry of Road
Sambalpur Section from km 200.00 to 566.000 Section of
NH-6 in the State of Orissa under NHDP, IV on BOT (Toll) 368.2 KM (Kilometer)
Transport and
Highways
basis

This project involves four-laning of Bhuban-Dubari- Ministry of Road


Chandikhole section of NH-200 in Odisha under NHDP-III 62.185 KM (Kilometer) Transport and
on DBFOT (Toll) basis. Highways
Project
Adress Contact No.
Concessionaire Name

Not Available

Not Available

Sai Matarani Tollways


SPV- Gayatri
Limited

Not Available

Not Available

Not Available
Email Website Contact Name
Project Name Location

Delhi-Meerut Expressway and other connecting roads


including 6/8 laning of NH24, NH58,NH235 on Multi State/ Centre
DBFOT(Toll) basis*

Four laining with PSS of Kaithal to Rajasthan Border


section of NH 152/65 from km 33.250 to km 243.58 Multi State/ Centre
under NHDP IV

Four laning of Nagina Kashipur Section of NH 74 from


KM 71.614 to KM 170.407 under NHDP IV Multi State/ Centre

Four/Six Laning of Gujarat/Maharashtra Border-Surat-


Hazira Port Section of NH 6 under NHDP Phase III Multi State/ Centre
Status Type of PPP

Under Construction Design-Build-Finance-Operate-Transfer (DBFOT)

Operation and Maintenance Stage Build-Operate-Transfer (BOT) Toll

Operation and Maintenance Stage Design-Build-Finance-Operate-Transfer (DBFOT)

Operation and Maintenance Stage Build-Operate-Transfer (BOT) Toll


Project Brief Project Capacity

Delhi-Meerut Expressway and other connecting roads including 6/8


laning of NH-24 from km 0.000 to km 49.23, NH-58 from km 6.800 to
150.147 KM (Kilometer)
km52.528 and  NH-235 from km 0.360 to km 8.800 on DBFOT  (Toll)
basis in the State of Delhi and Uttar Pradesh

The project involves upgradation of Kaithal-Rajasthan Border section


166.25 KM (Kilometer)
from 0.5 km to 166.3 km under NHDP-IV.

This project involves Four laning of Nagina Kashipur Section of NH 74


from KM 71.614 to KM 170.407 under NHDP IV 98.793 KM (Kilometer)

The project involves four/six laning of Gujarat/Maharashtra Border to


Surat-Hazira Port Section of NH-6 under NHDP-III 133.0 KM (Kilometer)
Project Authority Name Project Concessionaire Name

Ministry of Road Transport and Highways Not Available

Ministry of Road Transport and Highways IRB Infrastructure Developers Ltd-Indian

Ministry of Road Transport and Highways PNC Infratech

Ministry of Road Transport and Highways Soma Isolux Surat Hazira Tollway Private Limited
Adress Contact No.

3/22-D, Civil Lines, Bypass Road NH-2


Khandari, Agra - 282002, Uttar Pradesh, India
NBCC Plaza, Tower II, 4th Floor,
Pushp Vihar ( Near Saket)
New Delhi-110 017, India
Email Website

www.pncinfratech.com
Contact Name

Tapan Jain (CS)


Project Name Location

6/8 laning of JNPT Port Road Project at NH 4B (A1 - E section), NH-4B (D- Maharashtra
G section), SH-54 and on Amra Marg

Four laning of Kalmath-Zarap section in length of 44.2 km in Sindhudurg Maharashtra


district

Four laning of Kashedi-Khavati to Parshuram Ghat in length in Ratnagiri


district # Maharashtra
*

Four laning of Parshuram Ghat-Arawali section in length of 35.9 km in


Ratnagiri district # Maharashtra
*

Four laning of Pune-Sholapur section of NH 9 under NHDP Phase III,


Maharashtra
length 110.05 km  Package II

Kharpada Bridge Project Maharashtra

Nardana ROB Maharashtra

Nasirabad ROB Maharashtra

Thane Bhiwandi Bypass Maharashtra

Construction of railway over bridge on NH-6 at Fekari in Jalgaon district Maharashtra

Construction of two lane Wainganga bridge in length of 13 Km Maharashtra


Status Type of PPP

Operation and Maintenance Stage Not Available

Operation and Maintenance Stage Hybrid Annuity Mode (HAM)

Pre-construction Stage Hybrid Annuity Mode (HAM)

Pre-construction Stage Hybrid Annuity Mode (HAM)

Operation and Maintenance Stage Build-Operate-Transfer (BOT)

Operation and Maintenance Stage Not Available

Operation and Maintenance Stage Not Available

Completed Not Available

Completed Build-Operate-Transfer (BOT)

Operation and Maintenance Stage Build-Operate-Transfer (BOT)

Operation and Maintenance Stage Build-Operate-Transfer (BOT)


Project Brief Project Capacity

This project involves Six/ Eight laning of JNPT Port Road


Project ofn Mumbai JNPT Port Road Company  Ltd.
(MJPRCL) from km 3.60 to km 27.27  at NH 4B (A1 - E 43.912 KM (Kilometer)
section), km 0.0 to km 4.492 at NH-4B (D-G section), km
5.3 to km 14. 85 on SH-54 and km 0.000 to km 6.200 on
Amra Marg

The project envisages four laning of NH-66 (erstwhile NH-


17) on Kalmath to Zarap section from 406.0 km to 450.2 44.2 KM (Kilometer)
km in Sindhudurg district under NHDP-IV on Hybrid
Annuity Mode (HAM)

The project envisages four laning of Kashedi-Khavati to


Parshuram Ghat of NH-66 (erstwhile-17) from 161.6 km
43.8 KM (Kilometer)
to 205.4 km in Ratnagiri district on Hybrid Annuity Mode
(HAM)

The project envisages four laning of Parshuram Ghat-


Arawali Section of NH-17 (New NH-66) from 205.40 km to
35.9 KM (Kilometer)
241.30 km in Ratnagiri district under NHDP-IV on Hybrid
Annuity Mode (HAM)

Construction of four laned road from Pune-Sholapur Pkg-


II(Approved Length I & II 110 Km of NH-9 under NHDP 110.0 KM (Kilometer)
Phase-III

Construction of 2 lane Kharpada Bridge of 1.4 KM on


River Patalgnanga 1.4 KM (Kilometer)

Costrction of Nardana Railway Over Bridge of 13 KM


13.0 KM (Kilometer)
length.
Nasirabad Railway Over Bridge of spam 30m in
0.03 KM (Kilometer)
Maharashtra
This project involved construction of 4 lane bypass from
24.0 KM (Kilometer)
Thane to Bhiwandi on BOT basis
The project involved construction of railway over bridge 2.7 KM (Kilometer)
on NH-6 at Fekari in Jalgaon district.
The project involved construction of two lane Wainganga
13.0 KM (Kilometer)
bridge on NH-6 in Maharashtra.
Project Authority Name Project Concessionaire Name

Ministry of Road Transport and Highways Not Available

Ministry of Road Transport and Highways DBL Kalmath Zarap Highways Limited

Ministry of Road Transport and Highways Kalyan Toll Infrastructure Limited

Ministry of Road Transport and Highways Ghatak Enterprises

Ministry of Road Transport and Highways IL & FS Transportation Network Ltd

Ministry of Road Transport and Highways IRB Infrastructure Developers Ltd

Ministry of Road Transport and Highways Ayushajay Construction Pvt. Ltd.

Ministry of Road Transport and Highways Ashoka Vastushilp Pvt. Ltd

Ministry of Road Transport and Highways Ideal Road Builders Limited (IRBL)

Ministry of Road Transport and Highways Fekari Infrastructure Private Limited

Ministry of Road Transport and Highways Abhijeet Ashoka Infrastructure Limited


Adress Contact No.

C/O Dilip Buildcon Ltd. Plot no. 5, Inside Govind Narayan


Singh GateChuna Bhatti, Kolar Road, Bhopal-462016, (0755)-4029999
Madhya Pradesh

Kalyan Toll Infrastructure Ltd.


'Vidya Deep', 15/3, Manoramaganj, (0731) 2496931/32/33/34
Indore - 452001 (M.P.)

The IL&FS Financial Centre, Plot C22, G Block


Bandra Kurla Complex,
Bandra East, Mumbai 400 051
Maharashtra, INDIA 22-26533333,91-124-
ITNL Delhi Office 4716400
3rd Floor, Ambience Corporate Tower,
Ambience Mall, Ambience Island,
NH-8 Gurgaon - 122 002

IRB Complex,
Chandivali Farm, Chandivali Village, 91-22-6640 4200
Andheri (East), Mumbai – 400 072
3/3 South Tukoganj, Near Gokuldas Hospital, Indore
91-731-2513713
452001 (M.P.)
Email Website Contact Name

db@dilipbuildcon.co.in

kalyangroup@kalyangroup.in http://kalyangroup.in
Mr. R.K. Garg
Managing Director

Itnlinvestor@ilfsindia.com http://www.itnlindia.com/

MR. Ajay P. Deshmukh


info@irb.co.in https://www.irb.co.in/
Chief Executive Officer
Infrastructure
info@ayushajay.com Mr.
http://www.ayushajay.com/ Ajay Agrawal -
Managing Director
Project Name
2 laning with paved shoulder of Jabalpur-Mandala-Chilpi section from 3.4
to 192.4 km under NHDP - IV

Four laning of Shivpuri - Dewas section of NH3 from km 15.623 to km


566.45 in Madhya Pradesh on BOT (Toll) basis.

Six laning of Indore-Dewas section of NH 3 from Km 577.55 to km 610.00


and Km 0.00 to Km 12.60 inMP under NHDP V on BOT basis

Four-laning of Jabalpur- Kanti- Rewa Section of NH-7 from km 242.30 to


km 465.50 in MP on BOT (Toll)

Two/ four laning of Obedullaganj -Shahganj Junction, Budhni- Betul


Section of NH 69  under NHDP-IV, length  121.36 km

2 laning from 0 to km7.95( Katni Bypass) & 4.6 to 245km of Katni-Shahdol-


Anooppur to MP/CG Border section on NH-78

Four laning of Mangwan to  Satna to Bela section of NH 75 under VGF


Scheme, length 48.04 km
Four-laning with PSS of Jabalpur-Bhopal section of NH-12 from km 10.400
to km 301.800 under NHDP Phase III on BOT (Toll) basis
Location Status

Madhya Pradesh Under Construction

Madhya Pradesh Operation and Maintenance Stage

Madhya Pradesh Operation and Maintenance Stage

Madhya Pradesh Under Construction

Madhya Pradesh Under Construction

Madhya Pradesh Operation and Maintenance Stage

Madhya Pradesh Under Construction

Madhya Pradesh Operation and Maintenance Stage


Type of PPP
Design-Build-Finance-Operate-Transfer
(DBFOT)

Build-Operate-Transfer (BOT)

Build-Operate-Transfer (BOT)

Build-Operate-Transfer (BOT) Toll

Design-Build-Finance-Operate-Transfer
(DBFOT) Toll

Design-Build-Finance-Operate-Transfer
(DBFOT)

Design-Build-Finance-Operate-Transfer
(DBFOT) Toll

Build-Operate-Transfer (BOT) Toll


Project Brief
This project involves 2 laning with paved shoulder  of Jabalpur-Mandala-Chilpi
section  from 3.4 to 192.4 km of NH-12A in MP under NHDP - IV
This project involves Four laning of Shivpuri - Dewas section of NH3 from km 15.623
to km 566.45 in the State of Madhya Pradesh under NHDP Phase IV on BOT (Toll)
basis.

This project involves Six laning of Indore-Dewas section of NH 3 from Km 577.55 to


km 610.00 and Km 0.00 to Km 12.60 in the State of MP under NHDP V on BOT basis

This project involves Four-laning of Jabalpur- Kanti- Rewa Section of NH-7 from km
242.30 to km 465.50 in the State of Madhya Pradesh under NHDP Phase IV on BOT
(Toll)
This project involves Two/ four laning of Obedullaganj -Shahganj Junction, Budhni-
Betul Section of NH 69  under NHDP-IV, length  121.36 km

This project involves Two laning with paved shoulder from km 0.000 to km7.950
( Katni Bypass) & km 4.600 to km 245.000  of Katni -  Shahdol - Anooppur to MP/CG
Border section on NH-78 in the State of Madhya Pradesh on DBFOT 

This project involves Four laning of Mangwan to  Satna to Bela section of NH 75
under VGF Scheme, length 48.04 km
This project involves four-laning with PSS of Jabalpur-Bhopal section of NH-12 from
km 10.400 to km 301.800 under NHDP Phase III on BOT (Toll) basis
Project Capacity Project Authority Name

177.75 KM (Kilometer) Ministry of Road Transport and Highways

Not Available Ministry of Road Transport and Highways

45.0 KM (Kilometer) Ministry of Road Transport and Highways

65.0 KM (Kilometer) Ministry of Road Transport and Highways

Not Available Ministry of Road Transport and Highways

234.0 KM (Kilometer) Ministry of Road Transport and Highways

Not Available Ministry of Road Transport and Highways

294.21 KM (Kilometer) Ministry of Road Transport and Highways


Project Concessionaire Name

Not Available

Not Available

Not Available

M/s Larsen & Toubro Ltd. Mumbai

Not Available

Not Available

Not Available

Not Available
Project Name Location

Four laning of Kazhakkuttam to Mukkola


Kerala
section in the State of Kerala

Four laning of Kuttipuram-Edapally


Kerala
section of NH17 in the state of Kerala

Four Laning of Trivandrum, Kerala/ Tamil


Nadu border including Trivandrum by- Kerala
pass (Package I)
Status Type of PPP

Under Construction Build-Operate-Transfer (BOT) Toll

Under Construction Build-Operate-Transfer (BOT)

Under Construction Build-Operate-Transfer (BOT)


Project Brief Project Capacity Project Authority Name
This project involves four laning of
Ministry of Road Transport and
Kazhakkuttam to Mukkola section in 26.798 KM (Kilometer)
the State of Kerala Highways

This project involves Four laning of


Ministry of Road Transport and
Kuttipuram-Edapally section of NH17 Not Available
Highways
in the state of Kerala

This project involves Four Laning of


Trivandrum, Kerala/ Tamil Nadu Not Available Ministry of Road Transport and
border including Trivandrum by-pass Highways
(Package I)
Project Concessionaire Name

Not Available

Not Available

Not Available
Project Name Location

Four-laning of a section under NHDP-IV,


between Hubli - Hospet section of NH 63 Karnataka
on BOT (Toll) basis.

Four-Laning of Hospet, Bellary Section of


NH-63 under NHDP Phase IV, length 95.44 Karnataka
km

Hubli-Dharwar Bypass* Karnataka

Four Laning of Nelamangala Junction on


NH-4 with NH-48 to Devihalli under NHDP Karnataka
phase III A on BOT basis

Four laning of Kundapur to Suratkal


section and Mangalore-Kerala border Karnataka
section of NH 17 on BOT Basis
Design, Engineering, Finance,
Construction, Operation and Maintenance
Karnataka
of 4 laning of Bijapur-Hungund section of
NH13 on DBFOT

Two laning with PSS a section, between


Kerala Border to Kollegal section of NH-
Karnataka
212 inKarnataka on BOT (Toll) basis under
NHDP-IV

2 laning with paved shoulder/4 laning of


Tamil Nadu/Karnataka Border to
Karnataka
Bangalore section of NH-209 on DBFOT
(Toll) basis

Construction of Access Controlled


Highways from Km. 10/0 to Km. 29/5 of
Bangolore section of NH-4 inKarnataka on Karnataka
BOT basis
Status Type of PPP

Operation and Maintenance Stage Build-Operate-Transfer (BOT) Toll

Operation and Maintenance Stage Build-Operate-Transfer (BOT) Toll

Under Construction Not Available

Operation and Maintenance Stage Build-Operate-Transfer (BOT) Toll

Under Construction Build-Operate-Transfer (BOT)


Design-Build-Finance-Operate-
Operation and Maintenance Stage
Transfer (DBFOT)

Under Construction Build-Operate-Transfer (BOT) Toll

Design-Build-Finance-Operate-
Operation and Maintenance Stage
Transfer (DBFOT) Toll

Operation and Maintenance Stage Build-Operate-Transfer (BOT)


Project Brief Project Capacity

This project involves four-laning of a


section under NHDP-IV, between Hubli -
Hospet section of NH 63 from km 129+249 143.29 KM (Kilometer)
to km 267+000 in the State of Karnataka on
BOT (Toll) basis.

This project involves Four-Laning of


Hospet, Bellary Section of NH-63 under 95.0 KM (Kilometer)
NHDP Phase IV, length 95.44 km

Construction of Hubli to Dharwar Bypass


30.0 KM (Kilometer)
road of 30 KM stretch road in Karnataka

4/6-laning of Neelmangla Junction on NH-4


with NH-48 to Devihalli (km.28/200 to 80.0 KM (Kilometer)
km.110/000) in Karnataka under NHDP-III A

Four laning of Kundapur to Suratkal section


( Km 284 to 358) and Mangalore-Kerala
border section (km 375.300 to 376.700 and 90.28 KM (Kilometer)
from Km3.700 to 17.200) of NH 17 Under
NHDP Phase III on BOT Basis
Design, Engineering, Finance, Construction,
Operation and Maintenance of four laning
of Bijapur-Hungund section of NH 13 from
km 202 to km 299 in the State of Karnataka
under NHDP Phase III through DBFOT 97.0 KM (Kilometer)
basisDesign, Engineering, Finance,
Construction, Operation and Maintenance
of four laning of Bijapur-Hungund section
of NH 13

This project involves Two laning with PSS a


section, between Kerala Border to Kollegal
150.041 KM (Kilometer)
section of NH-212 in the state of Karnataka
on BOT (Toll) basis under NHDP-IV

This project involves Two laning with paved


shoulder / Four laning of Tamil Nadu /
Karnataka Border to Bangalore section of
191.89 KM (Kilometer)
NH-209 from km 266.530 to km 458.52  in
the State of Karnataka under NHDP Ph IV
on DBFOT (Toll) basis

The project involves construction of Access


Controlled Highways from km 10 to km
Not Available
29.5 of Bangalore section of NH-4 in the
state of Karnataka on BOT basis.
Project Authority Name Project Concessionaire Name

Ministry of Road Transport and Highways M/s BSCPL - KNR (JV)

Ministry of Road Transport and Highways M/s Gammon India Limited

Ministry of Road Transport and Highways Bharat Forge Ltd

Ministry of Road Transport and Highways Lanco Devihalli Highways Private Limited

Ministry of Road Transport and Highways Not Available


Ministry of Road Transport and Highways Not Available

Ministry of Road Transport and Highways Not Available

Ministry of Road Transport and Highways Not Available

Ministry of Road Transport and Highways Not Available


Adress Contact No.

Registered and Corporate Office:


M.No: 8-2-502/1/A, JIVI Towers,
Road No.7, Banjara Hills,
40-23307704, 23394875,
Hyderabad - 500 034.
23303663, 23307831, 23304732.
INDIA.
40-40268759 / 61 / 62
KNR House, 3rd & 4th Floor Plot No: 113 & 114, Phase-
1, Kavuri Hills, Jubilee Hills Road No.36, Hyderabad -
500 033

Hamilton House JN Heredia Rd, Ballard Estate


22-2270 5562
Mumbai 400001. India.

Pune Cantonment, Mundhwa Pune - 411 036. INDIA 91-20-67042777

397, Udyog Vihar III, Sector 20, Gurugram, Haryana


91-124-4741 000/ 044
122016
Email Website

info@bscpl.net http://www.bscpl.net/http://www.knrcl.com/
info@knrcl.com

marketing@gammonindia.com http://www.gammonindia.com/

info@bharatforge.com https://www.bharatforge.com

info@lancogroup.com http://www.lancogroup.com/
Contact Name Status

Mr. Bollineni Seenaiah,


Managing Director
Mr. K. Narasimha Reddy
Managing Director

Mr. Abhijit Rajan


(President)

Mr. Ajit B. Desai


(Chief Executive Officer)

Mr. Anurag Choudhry


(Whole-Time Director
designated as Executive
Director and Chief Financial
Officer)

Ms. Niki Shingade


(Company Secretary)

Mr. B N Kalyani
Chairman & Managing
Director

G Venkatesh Babu
Managing Director
Project Name Location Status

Four laning of Barhi to


Hazaribagh section of NH 33 in Jharkhand Operation and Maintenance Stage
Jharkhand 
Type of PPP Project Brief Project Capacity

Four laning of Barhi Hazaribagh section


from km 0.00 to km 40.500 of NH 33 in the
Design-Build-Finance-Operate-
state of Jharkhand on design, built, finance, 40.5 KM (Kilometer)
Transfer (DBFOT) Toll
operate and transfer (DBFOT) toll basis
under NHDP Phase III project
Project Authority Name Project Concessionaire Name Adress Contact No.

Landmark Building 6th Fl,


Ministry of Road Transport Abhijeet Hazaribagh Toll Road
Wardha Road Nagpur, 91-71-2711-3400
and Highways Limited
440010 India
Contact
Email Website Status
Name
Project Name Location Status

Two laning of Zojila Tunnel of 14.083 km


length on NH - 1D in the State of Jammu Jammu & Kashmir Under Construction
& Kashmir on BOT annuity basis*

Two laning Z-Morh Tunnel section of NH-


I on BOT (Annuity) in Sonamarg, Jammu & Kashmir Under Construction
Srinagar, Jammu and Kashmir *

Rehabilitation, strengthening and 4


laning of Ramban to Banihal section of Jammu & Kashmir Under Construction
NH 1A in Jammu and Kashmir

Rehabilitation, strengthening and Four


laning of Udhampur to Ramban section
of NH 1A from km 67 to km 89 & km 130 Jammu & Kashmir
Under Construction
to km 151
Type of PPP Project Brief Project Capacity

This project involves Two laning of Zojila


Build-Operate-Transfer (BOT) Tunnel of 14.083 km length on NH - 1D in 14.083 KM (Kilometer)
Annuity the State of Jammu & Kashmir on BOT
annuity basis

Design-Build-Finance-Operate- Two Laning of Srinagar - Sonamarg -


34.0 KM (Kilometer)
Transfer (DBFOT) Gumri section of NH 1

This project involves Rehabilitation ,


strengthening and Four laning of Ramban
Build-Operate-Transfer (BOT) to Banihal section of NH 1A from km 151
32.1 KM (Kilometer)
Annuity to km 187 on BOT (Annuity) basis on
DBFO pattern in the state of Jammu and
Kashmir

This project involves rehabilitation,


strengthening and Four laning of
Build-Operate-Transfer (BOT)
Udhampur to Ramban section of NH 1A 40.07 KM (Kilometer)
Annuity
from km 67 to km 89 & km 130 to km
151 in the state of Jammu and Kashmir
Project Authority Project Concessionaire
Adress Contact No.
Name Name

Ministry of Road
Transport and Not Available
Highways

ITNL, 8th Floor,


Plot C 22, G Block,
The IL&FS
Ministry of Road
Srinagar Sonmarg Financial Centre,
Transport and 9898014702
Tunnelway Limited BKC, Bandra (East),
Highways
Mumbai,
Maharashtra -
400051

Ministry of Road
Transport and Not Available
Highways

Ministry of Road
Transport and Not Available
Highways
Email Website Contact Name Status

ashutosh.chandwar@ilfsindia.com
Ashutosh
Chandwar
Project Name Location Status Type of PPP

Parwanoo-Solan section of NH 22
in the State of Himachal Pradesh Operation and Build-Operate-Transfer
Himachal Pradesh
on BOT (Annuity) under NHDP Maintenance Stage (BOT) Annuity
Phase III
Project Brief Project Capacity Project Authority Name

This project involves development of


Parwanoo-Solan section of NH 22 in the State Ministry of Road Transport
39.41 KM (Kilometer)
of Himachal Pradesh on BOT (Annuity) under and Highways
NHDP Phase III
Project Concessionaire Name Adress Contact No.
G R INFRAPROJECTS LIMITED
2nd Floor, Novus Tower, Plot No
18, Sector 18, Gurugram,
GR Infra Projects Ltd Haryana -122015, India +91-124-6435000
Email Website Contact Name Status

info@grinfra.com https://grinfra.com/
Vinod Kumar Agarwal
Managing Director
Project Name Location Status

Eastern Peripheral Expressway (NH No. NE-II) Haryana Operation and Maintenance Stage

Four laning of Ambala - Kaithal section of NH-65


including Ambala Bypass inHaryana on BOT (Toll) Haryana Operation and Maintenance Stage
project on DBFOT (Toll) basis

Four laning of Haryana/Punjab Border to Jind


Section of NH-71 from Km 239.000 to Km 307.000 in Haryana Under Construction
Haryana on BOT (Toll) basis
Type of PPP Project Brief

The project involves development of Eastern Peripheral


Build-Operate-Transfer (BOT) Toll Expressway of NH No. NE-II from 0 to 135 km in the states of
Haryana and UP

Four laning of Ambala - Kaithal section of NH-65 including


Build-Operate-Transfer (BOT) Toll Ambala Bypass in the State of Haryana on BOT (Toll) project on
DBFOT (Toll) basis under NHDP Phase II

This project involves four laning of Haryana/Punjab Border to


Build-Operate-Transfer (BOT) Toll Jind Section of NH-71 from Km 239.000 to Km 307.000 in the
State of Haryana under NHDP Phase-III on BOT (Toll) basis.
Project Concessionaire
Project Capacity Project Authority Name
Name

Ministry of Road Transport and


134.946 KM (Kilometer) Not Available
Highways

Ministry of Road Transport and


95.383 KM (Kilometer) Not Available
Highways

Ministry of Road Transport and


69.35 KM (Kilometer) Not Available
Highways
Project Name Location Status Type of PPP Project Brief Project Capacity Project Authority Project Concessionaire Name Adress Contact No. Email Website Contact Name Status
Name

ECI Engineering & Construction


Plot No – 70, Anshu Colors, Vijay Kaza,
3rd Floor,Road No.1,Jubilee Hills, Managing Director
The project envisages widening of existing road to two-lane NH standards Ministry of Road Hyderabad, 500033. Phone: 040-24786101 (ECI)
Road Upgradation (Potin-Pangin) Project # Arunachal Pradesh Pre-construction Stage Build-Operate-Transfer (BOT) Annuity along with improvement and realignment in lenght of 407 km from Potin to 407.0 KM SREI Infrastructure Finance-ECI Engineering Fax: 040-24786100 https://www.srei.com/ Debared
* Pangin via Yachuli, Ziro, Daporizo, Aalong (Part of Trans Arunachal Highway) (Kilometer) Transport and & Construction Company Limited (JV) Srei Infrastructure Finance Limited +91 33 6160 7734, eci@eciecc.comcorporate@srei.com
http://www.eciecc.com/ MR. RAKESH
section of NH-229. Highways Vishwakarma 86C, Topsia Road (South), BHUTORIA
Kolkata, West Bengal,700046, Chief Executive
Officer

Sushee Infra & Mining Limited Mr.


The project involves two laning on NH standards along with improvement Ministry of Road Plot No. 246/A , MLA Colony Phone: +91-40-4433 7879 M.LAKSHMIKANTH
Two laning Nechipu to Hoj via Seppa, Saggali in length Arunachal Pradesh Under Construction Design-Build-Finance-Operate-Transfer (DBFOT) 311.0 KM Sushee IVRCL Arunachal Highways Limited Road No. 12 , Banjara Hills
of 311 km* Annuity and realignment from Nechipu to Hoj via Seppa, Saggali in Arunachal (Kilometer) Transport and Fax:+91-40-2330 0044 info@susheeinfra.com http://www.susheeinfra.com/ REDDY: Managing
Pradesh. Highways Hyderabad – 500034 Email: Director
Telangana, India

Construction of 12 m wide permanent bridges in length of 30 km at Debang Ministry of Road


Bridges (Arunachal Pradesh) Project Arunachal Pradesh Operation and Maintenance Stage Build-Operate-Transfer (BOT) Annuity vally along with approaches connecting Bojanir and Meka and over Lohit 30.0 KM (Kilometer) Transport and Not Available
River connecting Digaru and Chowkham NH-52 in Arunachal Pradesh Highways
Project Name Location Status

Construction of Dhola-Sadia Ghats Operation and


Assam
bridges in length of 9.15 km Maintenance Stage

4 laning of Jorhat-Demow section from


Km 453 to 534.8 (part of Nagaon- Operation and
Assam
Dirbugah section) of NH 37 in Assam Maintenance Stage
on BOT (Annuity) basis

Four laning of Baihata Chariali to


Tejpur Section of NH-52 (Km 0.00 to Assam Operation and
km 130.00) inAssam under NHDP Maintenance Stage
Phase III on BOT basis.
Type of PPP Project Brief Project Capacity

The project involves construction of


12.9 mtr wide bridge across
Design-Build-Finance-Operate-
Brahmaputra river along with two lane 9.1 KM (Kilometer)
Transfer (DBFOT)
connecting roads from Dhola to Sadia
in Tinsukia district.

This project involves four laning of


Jorhat-Demow section from Km 453 to
Build-Operate-Transfer (BOT) 534.8 (part of Nagaon-Dirbugah
Not Available
Annuity section) of NH 37 in the State of Assam
under SARDP-NE Phase A on BOT
(Annuity) basis

This project involves four laning of


Baihata Chariali to Tejpur Section of
Build-Operate-Transfer (BOT) NH-52 (Km 0.00 to km 130.00) in the Not Available
State of Assam under NHDP Phase III
on BOT basis.
Project Concessionaire
Project Authority Name Adress Contact No. Email
Name

Plot No. 379,


Tel: +91 40 2333
Road No. 10,
9990
Jubilee Hills,
Ministry of Road Transport Navayuga Dhola Infra Fax: +91 40 2333
Hyderabad - 500 nec@navayuga.com
and Highways Projects Private Limited 7789
033

Ministry of Road Transport


Not Available
and Highways

Ministry of Road Transport Not Available


and Highways
Website Contact Name Status

C. Sridhar -
Managing Director,
http://www.navayuga.com/index.html
Navayuga
Engineering Co Ltd
Project Name Location Status

Four Laning of Vijaywada-Machilipatnam


Andhra Operation and
section of NH 9 under NHDP Phase III, length
Pradesh Maintenance Stage
64.611 km

Four-laning a section between Yadgiri-


Andhra Operation and
Warangal section of NH 202 from km 54.000
Pradesh Maintenance Stage
to km 150.000 in AP on BOT (Toll) basis
Project Authority
Type of PPP Project Brief Project Capacity
Name

This project involves Four


Laning of Vijaywada- Ministry of Road
Not Available Machilipatnam section of NH Not Available Transport and
9 under NHDP Phase III, length Highways
64.611 km

This project involves four-


laning a section between
Yadgiri-Warangal section of Ministry of Road
Design-Build-Finance- 99.103 KM
NH 202 from km 54.000 to km Transport and
Operate-Transfer (DBFOT) (Kilometer)
150.000 in the State of Andhra Highways
Pradesh under NHDP-IV on
DBFOT basis
Project Concessionaire Name Adress Contact No.

Plot No. 5,
Inside Govind Narayan Singh Gate,
Kolar Road, Janki Nagar,
Dilip Buildcon Ltd. Chuna Bhatti, 755 - 402 - 9999
Bhopal , Madhya Pradesh
INDIA - 462016

Mount Poonamallee Road,


Manapakkam, P.B.No.979, Chennai –
600 089
91-44-22526000,
M/s Larsen & Toubro Limited
22528000
Email Website Contact Name Status

Dilip Suryavanshi -
Chairman & Managing
contactus@dbl.co.in http://www.dilipbuildcon.com
Director

S N Subrahmanyan - Chief
info@lntecc.com https://www.lntecc.com/ Executive Officer &
Managing Director
Project Name Location

Four laning of Khagaria-Bhaktiarpur section of NH31 in


Bihar
the state of Bihar*

Four laning of Patna-Buxar section of NH 30 in the state


Bihar
of Bihar
Status Type of PPP

Under Construction Build-Operate-Transfer (BOT)

Under Construction Build-Operate-Transfer (BOT)


Project Brief

This project involves four laning of Khagaria-Bhaktiarpur


section of NH31 in the state of Bihar

This project involves Four laning of Patna-Buxar section of


NH 30 in the state of Bihar
Project Capacity

Not Available

Not Available
Project Authority Name

Ministry of Road Transport and Highways

Ministry of Road Transport and Highways


Project Concessionaire Name

Not Available

Not Available
Project Name Location

Four/six laning of Raipur-Bilaspur section of NH 200 from km


Chhattisgarh
0.000 to km 127.650 in Chhattisgarh on BoT (Toll) basis*

Two laning with pave shoulder on Raigarh - Saraipalli from


Chhattisgarh
3.800 to Km 90.460 on NH 216 in the State of Chattisgarh*
Status Type of PPP

Pre-construction Stage Build-Operate-Transfer (BOT) Toll

Under Construction Not Available


Project Brief Project Capacity

This project involves Four/six laning of Raipur-


Bilaspur section of NH 200 from km 0.000 to
126.525 KM (Kilometer)
km 127.650 in the State of Chhattisgarh
under NHDP Phase IV B on BoT (Toll) basis

This project involves Two laning with pave


shoulder on Raigarh - Saraipalli from 3.800 to
Not Available
Km 90.460 on NH 216 in the State of
Chattisgarh
Project Authority Name Project Concessionaire Name Adress
Plot No. 5,
Inside Govind Narayan
Singh Gate,
Kolar Road, Janki Nagar,
Chuna Bhatti,
Ministry of Road Transport and Highways Dilip Buildcon Limited Bhopal , Madhya
Pradesh
INDIA - 462016

Ministry of Road Transport and Highways Not Available


Contact No. Email Website Contact Name Status

Dilip Suryavanshi -
91 - 755 - 402 - 9999 contactus@dbl.co.in http://www.dilipbuildcon.com/ Chairman & Managing
Director
Project Name Location

4/6 laning of Maharashtra/Goa Border to


Panaji-Goa/Karnataka Border to be Goa
executed as BOT(Toll) on DBFO pattern*

Four laning of Goa/Karnataka border-


Goa
Panaji, Goa stretch of NH 4A of Goa*
Status Type of PPP Project Brief

This project involves Four/Six


laning of Maharashtra/Goa Border
Km 475.040 to Panaji-
Goa/Karnataka Border km 611 of
Under Construction Build-Operate-Transfer (BOT) Toll
section NH 17 in the state of Goa
to be executed as BOT (Toll) on
DBFO pattern under NHDP Phase
III

This project involves four laning of


Under Construction Build-Operate-Transfer (BOT) Goa/Karnataka border-Panaji, Goa
stretch of NH 4A of Goa
Project Capacity Project Authority Name

Ministry of Road Transport and


Not Available
Highways

Ministry of Road Transport and


Not Available
Highways
Project Concessionaire Name

Not Available

Not Available
Project Name Location Status

6 laning(and Construction of
additional 4 lane Bridge across River
Gujarat Under Construction
Narmada) of Vadodara-Surat
Section of NH-8 on BOT(Toll) basis

Four laning of Godhara to


Gujarat/MP border section of NH Operation and Maintenance
Gujarat
59 in the State of Gujarat under Stage
NHDP Phase III on DBFOT pattern

Two /Four laning with PSS of Gadu


to Dwaraka section on NH 8E from Operation and Maintenance
Gujarat
km 263.000 to km 473.000 Stage
inGujarat on DBFOT pattern
Type of PPP Project Brief

This project involves Six laning (including Construction of additional 4 lane


Bridge across River Narmada) of Vadodara-Surat Section of NH-8 from
Build-Operate-Transfer (BOT)
192.000 to Km 198.000 in the State of Gujarat under NHDP Phase-V on BOT
(Toll) basis.

Design-Build-Finance-Operate- This project involves four laning of Godhara to Gujarat/MP border section of
Transfer (DBFOT) NH 59 in the State of Gujarat under NHDP Phase III on DBFOT pattern

Design-Build-Finance-Operate- This project involves Two /Four laning with PSS of Gadu to Dwaraka section on
NH 8E from km 263.000 to km 473.000 in the State of Gujarat on DBFOT
Transfer (DBFOT)
pattern
Project Capacity Project Authority Name Project Concessionaire Name

Not Available Ministry of Road Transport and Highways Not Available

Not Available Ministry of Road Transport and Highways Not Available

Not Available Ministry of Road Transport and Highways Not Available

Potrebbero piacerti anche