NOTE:

REINFORCEMENT BARS ARE CALLED UP AS


FOLLOWING EXAMPLE:
2 - T16 - C01
88 - T16 - A00 - 200 (T1)
4 - T12 - C02

457 - T12 - C03 - 100


BA

BA
N

BA

BA
R

U
457 - T12 - C04 - 100 TY

R
M
BE

SP

PO
PE

AR
R

AC

SI
6 - T12 - F02 AN

K
O

TI
IN
F
D

O
G
LIFITING

BA

N
D
10 - T12 - F01 IA

R
HOOK

S
DECK SLAB REINFORCEMENT
Abbreviation of Bar Position
T1 = Top face outer layer reinforcement
T2 = Top face inner layer reinforcement
655
B1 = Bottom face outer layer reinforcement
DETAIL: E B2 = Bottom face inner layer reinforcement
SECTION : F E SCALE - 1:15
ALT= Alternate bar
F SCALE - 1:15

10 - T12 - F01

6 - T12 - F02

9 - T12 - B03

305 - T12 - B01 - 150

F 9 - T12 - B04
-
305 - T12 - B02 - 150

1 OF 4 - LIFITING HOOK

FOOTPATH SLAB REINF. DETAIL DETAIL: D


2 D SCALE - 1:15
SCALE - 1:15

REFERENCE DRAWINGS:
GENERAL NOTE-1 A-BR076-301
GENERAL NOTE-2 A-BR076-302
GENERAL NOTE-3 A-BR076-303
DECK CONCRETE OUTLINE FOR 45.721m SPAN TYPE-A BRIDGE C3-BR076-A450-01
REINFORCEMENT DETAIL FOR 45.721m SPAN TYPE-A BRIDGE C3-BR076-A450-02
NOTES :
DECK RAIL AND POST DETAIL FOR 45.721m SPAN TYPE-A BRIDGE C3-BR076-A450-04
1. ALL DIMENSION ARE IN METER UNLESS OTHERWISE SPECIFIED.
2. DESIGN TO BE UPDATED FOR FIELD CONFORMITY BEFORE/DURING
CONSTRUCTION PHASE.
TENDER PURPOSE ONLY
NOT FOR CONSTRUCTION

DESIGN REVIEW CONSULTANT DETAIL DESIGN CONSULTANT LEGEND


Existing Paved Road North
APPROVED BY SYLHET- TAMABIL ROAD (N2) REV DATE DSCRIPTION APPROVAL
Joint Venture of PROJECT DIRECTOR
Hifab International AB,Sweden Existing Feature Existing Structure DESIGN REVIEW PROJECT
STUP Consultants Pvt. Limited (STUP), India DESIGN REVIEW CONSULTANT REINFORCEMENT
in association with Design Centreline
DETAIL OF DECK
SARM Associates Limited (SARM), Bangladesh Edge of Carriageway New Structure
REVIEWED BY XX CONTRACT PACKAGE - 13 (228+300 - 238+100)
Destia Finnroad, Finland Slope 45.720m SPAN
DevConsultants Limited (DevCon), Bangladesh Power pole
Government of the People's Republic of Bangladesh BCL Associates Ltd, Bangladesh Design Toe DETAIL DESIGN CONSULTANT REINFORCEMENT DETAIL OF DECK TYPE-A BRIDGE
ROW Existing ROW IP Point AT CHAINAGE 234+230
Ministry of Road Transport and Bridges Engineering Science Ltd, Bangladesh SMVT Lane
BM DESIGNED BY T. Islam
Median
Roads and Highways Department (RHD) Devtec Nepal Pvt. Ltd, Nepal CHECKED BY XX DRAWING NO: C3-BR076-A450-03