Item Descripción Und. Metrado


01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACIÓN DE OBRA DE 2.40X3.60 M. und
01.02 ALMACEN DE OBRA gl
01.03 CERCO PERIMETRICO - MALLA RASCHEL ml
02 OBRAS PRELIMINARES
02.01 MOVILIZACIÓN Y DESMOBILIZACIÓN DE EQUIPOS gl
02.02 LIMPIEZA, ANTES Y DESPUES DE LA OBRA m2
02.03 TRAZO Y REPLANTEO m2
03 MOVIMIENTOS DE TIERRAS
03.01 EXCAVACIÓN MANUAL DE ZANJA m3
03.02 RELLENO CON MATERIAL PROPIO m3
03.03 ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIO 25 MT m3
03.04 ELIMINACION DE MATERIAL EXCEDENTE m3
03.05 RELLENO COMPACTADO CON AFIRMADO H = 10 CM m2
04 CONCRETO SIMPLE
04.01 SOLADO
04.01.01 SOLADO PARA ZAPATA C.H. 1:12 - e = 10 cm m2
04.02 CIMIENTO CORRIDO
04.02.01 CONCRETO PARA CIMIENTO CORRIDO C.H. 1:10 + 30% PG. m3
04.03 SOBRECIMIENTO
04.03.01 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO m2
04.03.02 CONCRETO PARA SOBRECIMIENTO f´c=140kg/cm2 P.M. 25% m3
04.04 PISOS
04.04.01 ENCOFRADO Y DESENCOFRADO m2
04.04.02 CONCRETO PARA FALSO PISO MEZCLA C.H. 1:8 e = 4" m2
04.05 VEREDA
04.05.01 CONCRETO EN VEREDAS f´c=175 kg/cm2 e = 10 cm PASTA 1:2 m2
04.05.02 ENCOFRADO Y DESENCOFRADO DE VEREDA m2
05 CONCRETO ARMADO
5.01
05.01.01
05.01.02
05.01.03
05.02
05.02.01
05.02.02
05.02.03
05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.06.02
05.06.03
05.07
05.07.01
05.07.02
05.07.03
05.07.04
05.08
05.08.01
05.08.02
05.08.03
05.09
05.09.01
05.09.02
05.09.03
06
06.01
06.02
07
7.01
7.02
7.03
7.04
7.05
7.06
7.07
08
8.01
09
09.01
09.02
10
10.01
10.02
10.03
11
11.01
11.02
11.03
12
12.01
12.02
13
13.01
14
14.01
14.02
15
15.01
16
16.01
16.02
16.03
16.04
16.05
17
17.01
17.02
17.03
17.04
17.05
17.06
17.07
17.08
17.09
18
18.01
18.01.01
18.01.02
18.01.03
18.01.04
18.01.05
18.02
18.02.01
18.02.02
18.02.03
18.02.04
18.02.05
18.02.06
18.02.07
18.02.08
18.02.09
18.02.10
18.02.11
18.02.12
19
19.01
19.01.01
19.01.02
19.01.03
19.01.04
19.01.05
19.01.06
19.01.07
19.02
19.02.01
19.02.02
19.02.03
19.02.04
19.02.05
19.02.06
19.02.07
19.02.08
19.02.09
19.02.10
19.02.11
19.02.12
19.02.13
19.02.14
20
20.01
20.02
20.03
21
21.01
22
22.01
22.02
22.03
23
23.01
23.01.01
23.01.02
23.01.03
23.01.04
23.01.05
23.01.06
23.01.07
23.01.08
23.02
23.02.01
23.02.02
24
24.01
24.02
24.03
25
25.01
25.01.01
25.01.02
25.01.03
25.02
25.02.01
25.02.02
25.02.03
25.02.04
25.02.05
25.02.06
26
26.01
26.02
27
27.01
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
ESTRUCTURAS
03 MOVIMIENTO DE TIERRAS
03.01 CORTE DE TERRENO MANUAL P/NIVELACION M2 44.80
1.00 16.00 7.00 0.40 44.80 44.80
03.02 EXCAVACION MANUAL DE ZANJA M3 64.79
03.02.01 EXCAVACION PARA SOLADOS DE 0.10M TERRENO NORMAL M3 1.46
En Z-1 1.00 1.20 1.00 0.10 0.12
En Z-2 3.00 1.20 1.20 0.10 0.43
En Z-3 3.00 1.20 1.20 0.10 0.43
En Z-4 1.00 1.20 1.20 0.10 0.14
En Z-5 1.00 1.20 1.00 0.10 0.12
En Z-6 1.00 1.20 1.10 0.10 0.13
En Z-7 1.00 0.90 0.90 0.10 0.08
03.02.02 EXCAVACION PARA ZAPATAS DE 1.10M TERRENO NORMAL M3 16.07
Z-1 1.00 1.20 1.00 1.10 1.32
Z-2 3.00 1.20 1.20 1.10 4.75
Z-3 3.00 1.20 1.20 1.10 4.75
Z-4 1.00 1.20 1.20 1.10 1.58
Z-5 1.00 1.20 1.00 1.10 1.32
Z-6 1.00 1.20 1.10 1.10 1.45
Z-7 1.00 0.90 0.90 1.10 0.89
03.02.03 EXCAVACION PARA VIGAS DE CIMENTACION 0.50M TERRENO NORMAL M3 0.70
EJE F-F ENTRE 1-2 0.98 0.25 0.50 0.12
EJE F-F ENTRE 2-4 0.22 0.25 0.50 0.03
EJE F-F ENTRE 4-6 1.00 0.25 0.50 0.13
EJE C-C ENTRE 1-2 1.00 0.25 0.50 0.13
EJE C-C ENTRE 2-6 2.40 0.25 0.50 0.30
03.02.04 EXCAVACION PARA CISTERNA 2.20M TERRENO NORMAL M3 6.47
1.40 2.10 2.20 6.47
03.02.05 EXCAVACION PARA CIMIENTO CORRIDO HASTA 1.00M TERRENO NORMAL M3 40.09
EJE 1-1 entre M-K 1.95 0.70 1.00 1.37
EJE 1-1 entre K-I 1.88 0.70 1.00 1.32
EJE 1-1 entre I-H 1.35 0.70 1.00 0.95
EJE 1-1 entre H-F 1.28 0.70 1.00 0.90
EJE 1-1 entre F-E 2.80 0.70 1.00 1.96
EJE 1-1 entre E-D 1.00 0.70 1.00 0.70
EJE 1-1 entre C-B 1.68 0.70 1.00 1.18
EJE 1-1 entre B-A 3.60 0.70 1.00 2.52
EJE 2-2 entre M-K 0.75 0.70 1.00 0.53
EJE 2-2 entre K-I 1.35 0.70 1.00 0.95
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
EJE 2-2 entre I-H 1.28 0.70 1.00 0.90
EJE 3-3 entre C-B 0.73 0.70 1.00 0.51
EJE 3-3 entre B-A 2.53 0.70 1.00 1.77
EJE 4-4 entre M-I 2.93 0.70 1.00 2.05
EJE 4-4 entre I-F 2.33 0.70 1.00 1.63
EJE 6-6 entre M-L 1.83 0.70 1.00 1.28
EJE 6-6 entre L-J 1.10 0.70 1.00 0.77
EJE 6-6 entre J-F 2.33 0.70 1.00 1.63
EJE 6-6 entre F-E 1.00 0.70 1.00 0.70
EJE 6-6 entre E-C 1.48 0.70 1.00 1.04
EJE 6-6 entre C-B 1.08 0.70 1.00 0.76
EJE 1-1 entre B-A 3.60 0.70 1.00 2.52
EJE M-M entre 1-4 3.03 0.70 1.00 2.12
EJE M-M entre 4-6 1.80 0.70 1.00 1.26
EJE L-L entre 4-6 1.88 0.70 1.00 1.32
EJE J-J entre 4-6 1.43 0.70 1.00 1.00
EJE I-I entre 1-2 1.88 0.70 1.00 1.32
EJE I-I entre 2-4 0.30 0.70 1.00 0.21
EJE H-H entre 1-2 1.88 0.70 1.00 1.32
EJE H-H entre 2-4 0.30 0.70 1.00 0.21
EJE A-A entre 1-4 2.38 0.70 1.00 1.67
EJE A-A entre 3-6 2.53 0.70 1.00 1.77
03.03 RELLENO COMPACTADO A MANO - MATERIAL PROPIO M3 8.89
03.03.01 EN ZAPATAS M3 5.58
En Z-1 2.00 1.20 0.43 0.50 0.52
1.00 0.17 0.15 0.50 0.01
En Z-2 3.00 1.20 0.95 0.50 1.71
En Z-3 2.00 1.20 0.95 0.50 1.14
1.00 0.78 0.95 0.50 0.37
En Z-4 2.00 1.20 0.48 0.50 0.58
En Z-5 1.00 1.20 0.43 0.50 0.26
1.00 0.23 0.51 0.50 0.06
1.00 0.43 0.83 0.50 0.18
En Z-6 1.00 0.83 0.85 0.50 0.35
1.00 0.23 0.85 0.50 0.10
En Z-7 1.00 0.60 0.38 0.50 0.11
1.00 0.24 0.53 0.50 0.06
1.00 0.65 0.38 0.50 0.12
1.00 0.25 0.10 0.50 0.01
03.03.02 EN VIGAS M3 0.14
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
EJE F-F ENTRE 1-2 0.98 0.25 0.10 0.02
EJE F-F ENTRE 2-4 0.22 0.25 0.10 0.01
EJE F-F ENTRE 4-6 1.00 0.25 0.10 0.03
EJE C-C ENTRE 1-2 1.00 0.25 0.10 0.03
EJE C-C ENTRE 2-6 2.40 0.25 0.10 0.06
03.03.03 EXCAVACION PARA CISTERNA 0.00M TERRENO NORMAL M3 0.00
0.00 0.00 0.00 0.00
03.03.04 EN CIMIENTOS M3 3.17
EJE 1-1 entre M-I 3.60 0.55 0.10 0.20
EJE 1-1 entre I-H 1.20 0.55 0.10 0.07
EJE 1-1 entre H-F 1.20 0.55 0.10 0.07
EJE 1-1 entre F-D 2.20 0.55 0.10 0.12
EJE 1-1 entre C-A 5.50 0.55 0.10 0.30
EJE 2-2 entre M-I 2.00 0.68 0.28 0.10 0.04
0.08 0.15 0.10 0.00
EJE 2-2 entre I-H 1.20 0.70 0.10 0.08
EJE 2-2 entre H-F 0.70 0.70 0.10 0.05
2.00 0.50 0.28 0.10 0.03
EJE 3-3 entre C-B 2.00 0.90 0.28 0.10 0.05
EJE 3-3 entre B-A 2.00 3.23 0.28 0.10 0.18
EJE 4-4 entre M-K 2.00 0.90 0.28 0.10 0.05
1.00 0.70 0.70 0.10 0.05
EJE 4-4 entre K-I 1.03 0.70 0.10 0.07
EJE 4-4 entre I-H 2.00 1.38 0.28 0.10 0.08
EJE 4-4 entre H-F 1.00 0.94 0.70 0.10 0.07
EJE 6-6 entre M-L 1.60 0.55 0.10 0.09
EJE 6-6 entre L-J 1.03 0.55 0.10 0.06
EJE 6-6 entre J-F 2.33 0.55 0.10 0.13
EJE 6-6 entre F-C 2.48 0.55 0.10 0.14
EJE 6-6 entre C-A 4.43 0.55 0.10 0.24
EJE M-M entre 1-4 3.03 0.55 0.10 0.17
EJE M-M entre 4-6 1.88 0.55 0.10 0.10
EJE L-L entre 4-6 2.00 1.88 0.28 0.10 0.11
EJE J-J entre 4-6 1.43 0.55 0.10 0.08
EJE I-I entre 1-2 2.00 1.88 0.28 0.10 0.11
EJE I-I entre 2-4 1.00 0.30 0.70 0.10 0.02
EJE H-H entre 1-2 2.00 1.88 0.28 0.10 0.11
EJE H-H entre 2-4 0.45 0.70 0.10 0.03
EJE A-A entre 1-4 2.38 0.70 0.10 0.17
EJE A-A entre 3-6 0.73 0.70 0.10 0.05
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
1.80 0.45 0.10 0.08
03.04 ACARREO DE MATERIAL EXC. DM=25M 130.91
Esponjamiento 30% AREA: 100.70 1.30 130.91
03.05 ELIMINACION MANUAL MATERIAL EXC. DM=30M 130.91
Esponjamiento 30% AREA: 100.70 1.30 130.91
03.06 RELLENO COMPACTADO CON AFIRMADO H = 10 CM M2 97.07
M2 97.07
area de cochera AREA: 13.93
area de sala AREA: 16.67
comedor AREA: 26.66
baño al costado de la sala AREA: 3.24
lavadero AREA: 3.42
cocina AREA: 8.65
pasadizo entre sala y dormitorio AREA: 2.70
dormitorio principal AREA: 14.65
baño del dormitorio principal AREA: 4.32
jardin AREA: 2.84
04 CONCRETO SIMPLE
04.01 SOLADO 1.46
04.01.01 SOLADO PARA ZAPATA C.H. 1:12 - e = 10 cm M2 1.46
En Z-1 1.00 1.20 1.00 0.10 0.12
En Z-2 3.00 1.20 1.20 0.10 0.43
En Z-3 3.00 1.20 1.20 0.10 0.43
En Z-4 1.00 1.20 1.20 0.10 0.14
En Z-5 1.00 1.20 1.00 0.10 0.12
En Z-6 1.00 1.20 1.10 0.10 0.13
En Z-7 1.00 0.90 0.90 0.10 0.08
04.02 CIMIENTO CORRIDO 34.19
04.02.01 CONCRETO PARA CIMIENTO CORRIDO C.H. 1:10 + 30% PG. M3 34.19
EJE 1-1 entre M-K 1.60 0.70 0.90 1.01
0.15 0.30 0.90 0.04
EJE 1-1 entre M-K-I 0.40 0.55 0.90 0.20
EJE 1-1 entre K-I 1.60 0.70 0.90 1.01
EJE 1-1 entre I-H 1.30 0.70 0.90 0.82
EJE 1-1 entre I 0.15 0.30 0.90 0.04
EJE 1-1 entre H 0.15 0.30 0.90 0.04
EJE 1-1 entre H-F 1.20 0.70 0.90 0.76
EJE 1-1 entre F-E 0.90 0.70 0.90 0.57
EJE 1-1 entre E 0.40 0.55 0.90 0.20
EJE 1-1 entre E-D 0.80 0.70 0.90 0.50
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
EJE 1-1 entre C-B 1.35 0.70 0.90 0.85
EJE 1-1 entre B 0.40 0.55 0.90 0.20
EJE 1-1 entre B-A 3.00 0.70 0.90 1.89
EJE 1-1 entre A 0.40 0.55 0.90 0.20
EJE 2-2 entre K-I 0.68 0.70 0.90 0.43
EJE 2-2 entre I 0.15 0.28 0.90 0.04
EJE 2-2 entre I-H 1.20 0.70 0.90 0.76
EJE 2-2 entre H 0.15 0.28 0.90 0.04
EJE 2-2 entre H-F 1.20 0.70 0.90 0.76
EJE 3-3 entre C-B 0.73 0.70 0.90 0.46
EJE 3-3 entre B-A 2.83 0.70 0.90 1.78
EJE 3-3 entre B-A 2.00 0.40 0.28 0.90 0.20
EJE 4-4 entre M 0.15 0.31 0.90 0.04
EJE 4-4 entre M-L 1.60 0.70 0.90 1.01
EJE 4-4 entre L 0.15 0.27 0.90 0.04
EJE 4-4 entre L-J 1.02 0.70 0.90 0.64
EJE 4-4 entre J-G 2.00 1.38 0.28 0.90 0.70
EJE 4-4 entre G-F 0.90 0.70 0.90 0.57
EJE 6-6 entre M-L 1.60 0.70 0.90 1.01
EJE 6-6 entre M 0.15 0.30 0.90 0.04
EJE 6-6 entre L 0.15 0.30 0.90 0.04
EJE 6-6 entre L-J 1.03 0.70 0.90 0.65
EJE 6-6 entre J-F 2.33 0.70 0.90 1.47
EJE 6-6 entre F-E 0.80 0.70 0.90 0.50
EJE 6-6 entre E 0.40 0.55 0.90 0.20
EJE 6-6 entre E-C 1.28 0.70 0.90 0.81
EJE 6-6 entre C-B 0.88 0.70 0.90 0.55
EJE 6-6 entre B 0.40 0.55 0.90 0.20
EJE 1-1 entre B-A 3.00 0.70 0.90 1.89
EJE 1-1 entre A 0.40 0.55 0.90 0.20
EJE M-M entre 1-4 2.63 0.70 0.90 1.66
EJE M-M entre 2-2 0.55 0.40 0.90 0.20
EJE M-M entre 4-6 1.88 0.70 0.90 1.18
EJE L-L entre 4-6 1.88 0.70 0.90 1.18
EJE J-J entre 4-6 1.43 0.70 0.90 0.90
EJE I-I entre 1-2 1.88 0.70 0.90 1.18
EJE I-I entre 2-4 0.30 0.70 0.90 0.19
EJE H-H entre 1-2 1.88 0.70 0.90 1.18
EJE H-H entre 2-4 0.30 0.70 0.90 0.19
EJE A-A entre 1-4 2.38 0.70 0.90 1.50
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
EJE A-A entre 3-5 0.73 0.70 0.90 0.46
EJE A-A entre 5 0.45 0.35 0.90 0.14
EJE A-A entre 5-6 1.42 0.70 0.90 0.89
04.04 PISOS 16.25
04.04.01 ENCOFRADO Y DESENCOFRADO M2 2.12
area de cochera 2.00 3.20 0.15 0.48
area de sala 2.00 3.10 0.15 0.47
comedor 2.00 1.00 0.15 0.15
baño al costado de la sala 2.00 0.70 0.15 0.11
lavadero 2.00 1.20 0.15 0.18
cocina 2.00 2.20 0.15 0.33
pasadizo entre sala y dormitorio 2.00 1.00 0.15 0.15
dormitorio principal 2.00 1.00 0.15 0.15
baño del dormitorio principal 2.00 0.70 0.15 0.11
jardin 2.00
04.04.02 CONCRETO PARA FALSO PISO MEZCLA C.H. 1:8 e = 4" M2 14.13
area de cochera AREA: 13.93 0.15 2.09
area de sala AREA: 16.67 0.15 2.50
comedor AREA: 26.66 0.15 4.00
baño al costado de la sala AREA: 3.24 0.15 0.49
lavadero AREA: 3.42 0.15 0.51
cocina AREA: 8.65 0.15 1.30
pasadizo entre sala y dormitorio AREA: 2.70 0.15 0.41
dormitorio principal AREA: 14.65 0.15 2.20
baño del dormitorio principal AREA: 4.32 0.15 0.65
jardin AREA: 2.84 0.00 0.00
04.05 VEREDA
04.05.01 CONCRETO EN VEREDAS f´c=175 kg/cm2 e = 10 cm PASTA 1:2 M2
04.05.02 ENCOFRADO Y DESENCOFRADO DE VEREDA M2

05 OBRAS DE CONCRETO ARMADO


05.01 ZAPATAS
05.01.01 ZAPATAS, ACERO FY=4200KG/CM2 Kg 151.62
1 Ver Metrado de Acero = 151.62 151.62

05.01.02 ZAPATAS, CONCRETO F'C=175 KG/CM2 M3 8.77


8.77
Z-1 1.00 1.20 1.00 0.60 0.72
Z-2 3.00 1.20 1.20 0.60 2.59
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
Z-3 3.00 1.20 1.20 0.60 2.59
Z-4 1.00 1.20 1.20 0.60 0.86
Z-5 1.00 1.20 1.00 0.60 0.72
Z-6 1.00 1.20 1.10 0.60 0.79
Z-7 1.00 0.90 0.90 0.60 0.49
05.02 VIGAS DEARRIOSTRE
05.02.01 VIGA DEARRIOSTRE, ACERO FY=4200 KG/CM2 kg 204.77
1 Ver Metrado de Acero = 204.77 204.77

05.02.02 ENCOFRADO Y DESENCOFRADO VIGA DEARRIOSTRE m2 8.80


8.80
EJE F-F ENTRE 1-2 2.00 2.20 0.50 2.20
EJE F-F ENTRE 2-4 2.00 1.00 0.50 1.00
EJE F-F ENTRE 4-6 2.00 2.20 0.50 2.20
EJE C-C ENTRE 1-2 2.00 1.00 0.50 1.00
EJE C-C ENTRE 2-6 2.00 2.40 0.50 2.40
`01.03.02.03.02.03 VIGAS DEARRIOSTRE, CONCRETO F'C= 210 KG/CM2 m3 1.10
1.10
EJE F-F ENTRE 1-2 2.20 0.25 0.50 0.28
EJE F-F ENTRE 2-4 1.00 0.25 0.50 0.13
EJE F-F ENTRE 4-6 2.20 0.25 0.50 0.28
EJE C-C ENTRE 1-2 1.00 0.25 0.50 0.13
EJE C-C ENTRE 2-6 2.40 0.25 0.50 0.30

05.03 SOBRECIMIENTO ARMADO


05.03.01 SOBRECIMIENTO ARMADO, ACERO FY=4200 KG/CM2 kg 235.84
1 Ver Metrado de Acero = 235.84 235.84
05.03.02 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO ARMADO m2 46.55
46.55
EJE1-1
ENTRE M-K 2.00 1.60 0.40 1.28
ENTRE K-I 2.00 1.60 0.40 1.28
ENTRE I-H 2.00 1.20 0.40 0.96
ENTRE H-F 2.00 1.20 0.40 0.96
ENTRE F-E 2.00 1.75 0.40 1.40
ENTRE E-C 2.00 1.75 0.40 1.40
ENTRE C-B 2.00 1.35 0.40 1.08
ENTRE B-A 2.00 3.00 0.40 2.40
EJE 2-2
ENTRE K-I 2.00 0.60 0.40 0.48
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
ENTRE H-F 2.00 0.50 0.40 0.40
EJE3-3
ENTRE B-A 2.00 3.00 0.40 2.40
EJE 4-4
ENTRE M-L 2.00 0.88 0.40 0.70
ENTRE J-G 2.00 1.21 0.40 0.97
EJE 6-6
ENTRE M-L 2.00 1.60 0.40 1.28
ENTRE L-J 2.00 1.25 0.40 1.00
ENTRE J-F 2.00 2.55 0.40 2.04
ENTRE F.E 2.00 1.75 0.40 1.40
ENTRE E-C 2.00 1.75 0.40 1.40
ENTRE C-B 2.00 1.35 0.40 1.08
ENTRE B-A 2.00 3.00 0.40 2.40
EJE M-M
ENTRE 1-2 2.00 2.20 0.40 1.76
ENTRE 2-4 2.00 1.00 0.40 0.80
ENTRE 4-6 2.00 2.20 0.40 1.76
EJE L-L
ENTRE 4-6 2.00 2.20 0.40 1.76
EJE J-J
ENTRE 4-6 2.00 2.70 0.40 2.16
EJE I-I
ENTRE 1-2 2.00 2.20 0.40 1.76
EJE H -H
ENTRE 1-2 2.00 2.20 0.40 1.76
EJE A-A
ENTRE 1-2 2.00 2.00 0.40 1.60
EJE1-1
ENTRE M-K 4.00 0.15 0.40 0.24
ENTRE K-I 4.00 0.15 0.40 0.24
ENTRE I-H 4.00 0.15 0.40 0.24
ENTRE H-F 4.00 0.15 0.40 0.24
ENTRE F-E 4.00 0.15 0.40 0.24
ENTRE E-C 4.00 0.15 0.40 0.24
ENTRE C-B 4.00 0.15 0.40 0.24
ENTRE B-A 4.00 0.15 0.40 0.24
EJE 2-2
ENTRE K-I 4.00 0.15 0.40 0.24
ENTRE H-F 4.00 0.15 0.40 0.24
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
EJE3-3
ENTRE B-A 4.00 0.15 0.40 0.24
EJE 4-4
ENTRE M-L 4.00 0.15 0.40 0.24
ENTRE J-G 4.00 0.15 0.40 0.24
EJE 6-6
ENTRE M-L 4.00 0.15 0.40 0.24
ENTRE L-J 4.00 0.15 0.40 0.24
ENTRE J-F 4.00 0.15 0.40 0.24
ENTRE F.E 4.00 0.15 0.40 0.24
ENTRE E-C 4.00 0.15 0.40 0.24
ENTRE C-B 4.00 0.15 0.40 0.24
ENTRE B-A 4.00 0.15 0.40 0.24
EJE M-M
ENTRE 1-2 4.00 0.15 0.40 0.24
ENTRE 2-4 4.00 0.15 0.40 0.24
ENTRE 4-6 4.00 0.15 0.40 0.24
EJE L-L
ENTRE 4-6 4.00 0.15 0.40 0.24
EJE J-J
ENTRE 4-6 4.00 0.15 0.40 0.24
EJE I-I
ENTRE 1-2 4.00 0.15 0.40 0.24
EJE H -H
ENTRE 1-2 4.00 0.15 0.40 0.24
EJE A-A
ENTRE 1-2 4.00 0.25 0.40 0.40

05.03.03 SOBRECIMIENTO ARMADOE, CONCRETO F'C= 210 KG/CM2 m3 3.06


3.06
EJE1-1
ENTRE M-K 1.60 0.15 0.40 0.10
ENTRE K-I 1.60 0.15 0.40 0.10
ENTRE I-H 1.20 0.15 0.40 0.07
ENTRE H-F 1.20 0.15 0.40 0.07
ENTRE F-E 1.75 0.15 0.40 0.11
ENTRE E-C 1.75 0.15 0.40 0.11
ENTRE C-B 1.35 0.15 0.40 0.08
ENTRE B-A 3.00 0.15 0.40 0.18
EJE 2-2
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
ENTRE K-I 0.60 0.15 0.40 0.04
ENTRE H-F 0.50 0.15 0.40 0.03
EJE3-3
ENTRE B-A 3.00 0.15 0.40 0.18
EJE 4-4
ENTRE M-L 0.88 0.15 0.40 0.05
ENTRE J-G 1.21 0.15 0.40 0.07
EJE 6-6
ENTRE M-L 1.60 0.15 0.40 0.10
ENTRE L-J 1.25 0.15 0.40 0.08
ENTRE J-F 2.55 0.15 0.40 0.15
ENTRE F.E 1.75 0.15 0.40 0.11
ENTRE E-C 1.75 0.15 0.40 0.11
ENTRE C-B 1.35 0.15 0.40 0.08
ENTRE B-A 3.00 0.15 0.40 0.18
EJE M-M
ENTRE 1-2 2.20 0.15 0.40 0.13
ENTRE 2-4 1.00 0.15 0.40 0.06
ENTRE 4-6 2.20 0.15 0.40 0.13
EJE L-L
ENTRE 4-6 2.20 0.15 0.40 0.13
EJE J-J
ENTRE 4-6 2.70 0.15 0.40 0.16
EJE I-I
ENTRE 1-2 2.20 0.15 0.40 0.13
EJE H -H
ENTRE 1-2 2.20 0.15 0.40 0.13
EJE A-A
ENTRE 1-2 2.00 0.25 0.40 0.20
05.04 COLUMNAS
05.04.01 COLUMNAS, ACERO FY=4200 KG/CM2 kg 1231.24
0 Ver Metrado de Acero = 1231.24 1231.24

05.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 211.27


211.27
C-1
8 0.80 3.95 25.28
10 0.95 3.95 37.53
12 0.80 3.95 37.92
2 0.65 3.95 5.14
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
6 0.75 3.95 17.78
C-2
2 0.90 3.45 6.21
C-3 0.00
2 1.85 3.45 12.77
C-4
6 0.60 3.45 12.42
2 1.05 3.45 7.25
2 1.15 3.45 7.94
2 1.00 3.45 6.90
2 1.00 3.45 6.90
C-5
2 1.50 3.45 10.35
2 1.35 3.45 9.32
C-6
2 1.10 3.45 7.59
05.04.03 COLUMNAS, CONCRETO F'C=210 KG/CM2 m3 10.02
10.02
C-1 19 0.40 0.15 5.20 5.93
C-2 1 0.30 0.25 3.45 0.26
C-3 1 0.85 0.15 3.45 0.44
C-4 7 0.40 0.25 3.45 2.42
C-5 2.00 0.75 0.15 3.45 0.78
C-6 1.00 0.40 0.15 3.45 0.21
05.05 VIGAS DE CIMENTACION
05.05.01 VIGAS, ACERO FY=4200 KG/CM2 kg
1 Ver Metrado de Acero =
05.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2
Eje 1, 2, 3, 4 4 2
0 4 0.30
Eje A-A y C-C 0 4 12.50 0.45
Eje B-B 0 1 12.50 0.25
Viga Solera eje 1 2 2 2.35 0.25
Viga Solera eje 4 1 2 7.00 0.25
05.05.03 VIGAS, CONCRETO F'C=210 KG/CM2 m3
Eje 1, 2, 3, 4 0 4 0.30
Eje A-A y C-C 0 2 12.50 0.25 0.45
Eje B-B 0 1 12.50 0.25 0.25
Viga Solera eje 1 1 2 2.35 0.25 0.25
Viga Solera eje 4 1 1 7.00 0.25 0.25
HOJA DE METRADOS
PRESUPUESTO:
ITEM DESCRIPCION UND. CANT. L A H PARCIAL SUBTOTAL TOTAL
HOJA DE METRADOS DE ACERO
SUBPRESUPUESTO
ACERO
CLIENTE:
PART.
ELEMENTO

Nro DENOMINACION NºVECES Ø(") CANT. LONG. TOTAL


05.01.02 ACERO PARA ZAPATA F´y =4200 kg/cm2
ACERO EN ZAPATA
ZAPATA Z -1
ACERO LONGITUDINAL 1.00 1/2¨ 7.00 0.85 5.95

ACERO TRANVERSAL 1.00 1/2¨ 6.00 1.05 6.30

ZAPATA Z - 2
ACERO LONGITUDINAL 3.00 1/2¨ 7.00 1.05 22.05

ACERO TRANSVERSAL 3.00 1/2¨ 7.00 1.05 22.05

ZAPATA Z - 3
ACERO LONGITUDINAL 3.00 1/2¨ 7.00 1.05 22.05

ACERO TRANSVERSAL 3.00 1/2¨ 7.00 1.05 22.05

ZAPATA Z - 4
ACERO LONGITUDINAL 1.00 1/2¨ 7.00 1.05 7.35

ACERO TRANSVERSAL 1.00 1/2¨ 7.00 1.05 7.35

ZAPATA Z - 5
ACERO LONGITUDINAL 1.00 1/2¨ 7.00 0.85 5.95

ACERO TRANSVERSAL 1.00 1/2¨ 6.00 1.05 6.30

ZAPATA Z - 6
ACERO LONGITUDINAL 1.00 1/2¨ 7.00 0.85 5.95

ACERO TRANSVERSAL 1.00 1/2¨ 6.00 1.05 6.30

ZAPATA Z - 7
ACERO LONGITUDINAL 1.00 1/2¨ 6.00 0.75 4.50

ACERO TRANSVERSAL 1.00 1/2¨ 6.00 0.75 4.50

05.02.02 ACERO VIGA DE CIMENTACIÓN F´y =4200 kg/cm2


EJE F-F
Superior 1.00 5/8" 3.00 7.2 21.60
medio 1.00 1/2¨ 2.00 7.2 14.40
Inferior 1.00 5/8" 2.00 7.2 14.40
Estribo 1.00 3/8" 44.00 1.28 56.32

EJE c-c
Superior 1.00 5/8" 3.00 7.2 21.60
medio 1.00 1/2¨ 2.00 7.2 14.40
Inferior 1.00 5/8" 2.00 7.2 14.40
Estribo 1.00 3/8" 44.00 1.28 56.32

05.02.02 ACERO SOBRECIMIENTO ARMADO F´y =4200 kg/cm2


EJE 1-1
Superior 1.00 3/8" 2.00 16.68 33.36
Inferior 1.00 3/8" 2.00 16.68 33.36
Estribo
eje 1-1 entre M-K 1.00 3/8" 13.00 0.98 12.74
eje 1-1 entre K-I 1.00 3/8" 13.00 0.98 12.74
eje 1-1 entre I-H 1.00 3/8" 11.00 0.98 10.78
eje 1-1 entre H-F 1.00 3/8" 11.00 0.98 10.78
eje 1-1 entre F-E 1.00 3/8" 14.00 0.98 13.72
eje 1-1 entre E-C 1.00 3/8" 14.00 0.98 13.72
eje 1-1 entre C-B 1.00 3/8" 12.00 0.98 11.76
eje 1-1 entre B-A 1.00 3/8" 20.00 0.98 19.60
EJE 2-2
eje 2-2 entre K-I
Superior 1.00 3/8" 2.00 0.82 1.64
Inferior 1.00 3/8" 2.00 0.82 1.64
Estribo 1.00 3/8" 5.00 0.98 4.90

eje 2-2 entre H-F


Superior 1.00 3/8" 2.00 0.82 1.64
Inferior 1.00 3/8" 2.00 0.82 1.64
Estribo
eje 2-2 entre H-F 1.00 3/8" 4.00 0.98 3.92

eje 3-3 entre B-A


Superior 1.00 3/8" 2.00 4.45 8.90
Inferior 1.00 3/8" 2.00 4.45 8.90
Estribo
eje 3-3 entre B-A 1.00 3/8" 20.00 0.98 19.60

eje 4-4 entre M-L


Superior 1.00 3/8" 2.00 1.25 2.50
Inferior 1.00 3/8" 2.00 1.25 2.50
Estribo
eje 4-4 entre M-L 1.00 3/8" 4.00 0.98 3.92

eje 4-4 entre J-G


Superior 1.00 3/8" 2.00 1.56 3.12
Inferior 1.00 3/8" 2.00 1.56 3.12
Estribo
eje 4-4 entre J-G 1.00 3/8" 11.00 0.98 10.78

EJE 6-6
Superior 1.00 3/8" 2.00 16.68 33.36
Inferior 1.00 3/8" 2.00 16.68 33.36
Estribo
eje 6-6 entre M-L 1.00 3/8" 13.00 0.98 12.74
eje 6-6 entre L-J 1.00 3/8" 11.00 0.98 10.78
eje 6-6 entre J-F 1.00 3/8" 18.00 0.98 17.64
eje 6-6 entre F-E 1.00 3/8" 14.00 0.98 13.72
eje 6-6 entre E-C 1.00 3/8" 14.00 0.98 13.72
eje 6-6 entre C-B 1.00 3/8" 12.00 0.98 11.76
eje 6-6 entre B-A 1.00 3/8" 20.00 0.98 19.60

EJE M-M
Superior 1.00 3/8" 2.00 7.28 14.56
Inferior 1.00 3/8" 2.00 7.28 14.56
Estribo
eje M-M entre 1-2 1.00 3/8" 16.00 0.98 15.68
eje M-M entre 2-4 1.00 3/8" 5.00 0.98 4.90
eje M-M entre 4-6 1.00 3/8" 16.00 0.98 15.68

EJE L-L
Superior 1.00 3/8" 2.00 3.1 6.20
Inferior 1.00 3/8" 2.00 3.1 6.20
Estribo
eje L-L entre 4-6 1.00 3/8" 16.00 0.98 15.68

EJE J-J
Superior 1.00 3/8" 2.00 3.1 6.20
Inferior 1.00 3/8" 2.00 3.1 6.20
Estribo
eje J-J entre 4-6 1.00 3/8" 14.00 0.98 13.72

EJE I-I
Superior 1.00 3/8" 2.00 3.1 6.20
Inferior 1.00 3/8" 2.00 3.1 6.20
Estribo
eje I-I entre 1-2 1.00 3/8" 16.00 0.98 15.68

EJE H-H
Superior 1.00 3/8" 2.00 3.1 6.20
Inferior 1.00 3/8" 2.00 3.1 6.20
Estribo
eje H-H entre 1-2 1.00 3/8" 16.00 0.98 15.68

EJE A-A
Superior 1.00 3/8" 2.00 2.76 5.52
Inferior 1.00 3/8" 2.00 2.76 5.52
Estribo
eje A-A entre 5-6 1.00 3/8" 15.00 1.18 17.70

05.02.02 ACERO COLUMNAS F´y =4200 kg/cm2


C-1
Extremos 19.00 1/2" 4.00 4.15 315.40
Centro 19.00 1/2" 2.00 4.15 157.70
Estribos 19.00 1/4" 28.00 0.98 521.36

C-2
Extremos 1.00 1/2" 4.00 4.15 16.60
Centro 1.00 1/2" 2.00 4.15 8.30
Estribos 1.00 3/8" 28.00 1.08 30.24

C-3
Extremos 1.00 1/2" 4.00 4.55 18.20
Centro 1.00 1/2" 4.00 4.55 18.20
Estribos 1.00 1/4" 28.00 1.88 52.64

C-4
Extremos 7.00 5/8" 4.00 4.55 127.40
Centro 7.00 1/2" 2.00 4.55 63.70
Estribos 7.00 3/8" 28.00 1.18 231.28

C-5
Extremos 2.00 1/2" 4.00 4.55 36.40
Centro 2.00 1/2" 4.00 4.55 36.40
Estribos 2.00 1/4" 28.00 1.68 94.08

C-6
Extremos 1.00 1/2" 4.00 4.55 18.20
Centro 1.00 1/2" 2.00 4.55 9.10
Estribos 1.00 1/4" 28.00 0.98 27.44

VIGAS, ACERO FY=4200 KG/CM2

VIGA VA 101 EJE 1-1


Superior 1.00 1/2" 2.00 6.82 13.64
Inferior 1.00 1/2" 2.00 6.82 13.64
Estribo
eje 1-1 entre M-K 1.00 1/4" 13.00 0.66 8.58
eje 1-1 entre K-I 1.00 1/4" 13.00 0.66 8.58
eje 1-1 entre I-H 1.00 1/4" 11.00 0.66 7.26
eje 1-1 entre H-F 1.00 1/4" 11.00 0.66 7.26

VIGA VP 101 EJE 1-1


Superior 1.00 5/8" 2.00 4.52 9.04
medio 1.00 1/2" 2.00 4.52 9.04
Inferior 1.00 5/8" 3.00 4.52 13.56
Estribo
eje 1-1 entre F-E 1.00 3/8" 14.00 1.3 18.20
eje 1-1 entre E-C 1.00 3/8" 14.00 1.3 18.20

VIGA Vs 101 EJE 1-1


Superior 1.00 1/2" 2.00 5.52 11.04
Inferior 1.00 1/2" 3.00 5.52 16.56
Estribo
eje 1-1 entre C-B 1.00 3/8" 12.00 0.78 9.36
eje 1-1 entre B-A 1.00 3/8" 20.00 0.78 15.60
VIGA VA 101 EJE 2-2
eje 2-2 entre K-I
Superior 1.00 1/2" 2.00 0.87 1.74
Inferior 1.00 1/2" 2.00 0.87 1.74
Estribo
eje 2-2 entre K-I 1.00 1/4" 5.00 0.98 4.90

eje 2-2 entre I-H 1.00 1/4" 11.00 0.66 7.26


eje 2-2 entre H-F 1.00 1/4" 11.00 0.66 7.26

eje 2-2 entre H-F


Superior 1.00 3/8" 2.00 0.82 1.64
Inferior 1.00 3/8" 2.00 0.82 1.64
Estribo
eje 2-2 entre H-F 1.00 3/8" 4.00 0.98 3.92

eje 3-3 entre B-A


Superior 1.00 3/8" 2.00 4.45 8.90
Inferior 1.00 3/8" 2.00 4.45 8.90
Estribo
eje 3-3 entre B-A 1.00 3/8" 20.00 0.98 19.60

eje 4-4 entre M-L


Superior 1.00 3/8" 2.00 1.25 2.50
Inferior 1.00 3/8" 2.00 1.25 2.50
Estribo
eje 4-4 entre M-L 1.00 3/8" 4.00 0.98 3.92

eje 4-4 entre J-G


Superior 1.00 3/8" 2.00 1.56 3.12
Inferior 1.00 3/8" 2.00 1.56 3.12
Estribo
eje 4-4 entre J-G 1.00 3/8" 11.00 0.98 10.78

EJE 6-6
Superior 1.00 3/8" 2.00 16.68 33.36
Inferior 1.00 3/8" 2.00 16.68 33.36
Estribo
eje 6-6 entre M-L 1.00 3/8" 13.00 0.98 12.74
eje 6-6 entre L-J 1.00 3/8" 11.00 0.98 10.78
eje 6-6 entre J-F 1.00 3/8" 18.00 0.98 17.64
eje 6-6 entre F-E 1.00 3/8" 14.00 0.98 13.72
eje 6-6 entre E-C 1.00 3/8" 14.00 0.98 13.72
eje 6-6 entre C-B 1.00 3/8" 12.00 0.98 11.76
eje 6-6 entre B-A 1.00 3/8" 20.00 0.98 19.60

EJE M-M
Superior 1.00 3/8" 2.00 7.28 14.56
Inferior 1.00 3/8" 2.00 7.28 14.56
Estribo
eje M-M entre 1-2 1.00 3/8" 16.00 0.98 15.68
eje M-M entre 2-4 1.00 3/8" 5.00 0.98 4.90
eje M-M entre 4-6 1.00 3/8" 16.00 0.98 15.68

EJE L-L
Superior 1.00 3/8" 2.00 3.1 6.20
Inferior 1.00 3/8" 2.00 3.1 6.20
Estribo
eje L-L entre 4-6 1.00 3/8" 16.00 0.98 15.68

EJE J-J
Superior 1.00 3/8" 2.00 3.1 6.20
Inferior 1.00 3/8" 2.00 3.1 6.20
Estribo
eje J-J entre 4-6 1.00 3/8" 14.00 0.98 13.72

EJE I-I
Superior 1.00 3/8" 2.00 3.1 6.20
Inferior 1.00 3/8" 2.00 3.1 6.20
Estribo
eje I-I entre 1-2 1.00 3/8" 16.00 0.98 15.68
EJE H-H
Superior 1.00 3/8" 2.00 3.1 6.20
Inferior 1.00 3/8" 2.00 3.1 6.20
Estribo
eje H-H entre 1-2 1.00 3/8" 16.00 0.98 15.68

EJE A-A
Superior 1.00 3/8" 2.00 2.76 5.52
Inferior 1.00 3/8" 2.00 2.76 5.52
Estribo
eje A-A entre 5-6 1.00 3/8" 15.00 1.18 17.70

05.03.02 ACERO ESTRUCTURAL PARA LOSA MACIZA

PAREDES 3/8¨ 0.00


1/2" 0.00

LOSA MACIZA DE FONDO DE PISO


3/8¨ 0.00
0.00

05.04.01 ACERO ESTRUCTURAL PARA CUARTO DE CISTERNAS


Cisterna y Cuarto de maquinas
Acero para la losa de cubierta 3/8¨ 0.00
1/2" 0.00
3/8¨ 0.00
1/2" 0.00

Acero para la losa de fondo de piso 3/8¨ 0.00


1/2" 0.00

Acero para paredes


Acero horizontal 3/8¨ 0.00
3/8¨ 0.00
Acero vertical 1/2¨ 0.00
1/2" 0.00
05.03 PLATAFORMA DE ESCULTURA
05.03.01 ACERO ESTRUCTURAL GRADO 60

ACERO EN PAREDES 1/2" 0.00


3/8¨ 0.00

ACERO EN LOSAS
3/8¨ 0.00
ACERO

KILOGRAMOS
0.25 0.56 1.02 1.56 2.26 4.04
TOTAL
1/4¨ 3/8¨ 1/2¨ 5/8¨ 3/4¨ 1¨

6.07 6.07

6.43 6.43

22.49 22.49

22.49 22.49

22.49 22.49

22.49 22.49

7.50 7.50

7.50 7.50

6.07 6.07

6.43 6.43

6.07 6.07

6.43 6.43

4.59 4.59

4.59 4.59

TOTAL 151.62

33.696 33.70
14.688 14.69
22.464 22.46
31.5392 31.54

33.696 33.70
14.688 14.69
22.464 22.46
31.5392 31.54

Ttotal: 204.77

18.6816 18.68
18.6816 18.68

3.19 3.19
3.19 3.19
2.70 2.70
2.70 2.70
3.43 3.43
3.43 3.43
2.94 2.94
4.90 4.90
0.9184 0.92
0.9184 0.92
1.23 1.23

0.9184 0.92
0.9184 0.92

0.98 0.98

4.984 4.98
4.984 4.98

4.90 4.90

1.40 1.40
1.4 1.40

0.98 0.98

1.75 1.75
1.7472 1.75

2.70 2.70

18.6816 18.68
18.6816 18.68

3.19 3.19
2.70 2.70
4.41 4.41
3.43 3.43
3.43 3.43
2.94 2.94
4.90 4.90

8.1536 8.15
8.1536 8.15

3.92 3.92
1.23 1.23
3.92 3.92

3.472 3.47
3.472 3.47

3.92 3.92

3.472 3.47
3.472 3.47

3.43 3.43

3.472 3.47
3.472 3.47

3.92 3.92

3.472 3.47
3.472 3.47
3.92 3.92

3.0912 3.09
3.0912 3.09

4.43 4.43
Ttotal: 235.84

321.708 321.71
160.854 160.85
130.34 130.34

16.932 16.93
8.47 8.47
16.9344 16.93

18.564 18.56
18.564 18.56
13.16 13.16

198.744 198.74
64.974 64.97
129.5168 129.52

37.128 37.13
37.128 37.13
23.52 23.52

18.564 18.56
9.282 9.28
6.86 6.86

Ttotal: 1231.24

13.9128 13.91
13.9128 13.91

2.15 2.15
2.15 2.15
1.82 1.82
1.82 1.82

14.1024 14.10
9.2208 9.22
21.1536 21.15

10.192 10.19
10.192 10.19

11.2608 11.26
16.8912 16.89

5.2416 5.24
8.736 8.74
1.7748 1.77
1.7748 1.77

1.23 1.23

0.00 0.00
0.00 0.00

0.00
0.00

0.00 0.00

0.00
0.00

0.00 0.00

0.00
0.00

0.00 0.00

0.00
0.00

0.00 0.00

0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00
0.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00
0.00

0.00 0.00

0.00
0.00

0.00 0.00

0.00
0.00

0.00 0.00
0.00
0.00

0.00 0.00

0.00
0.00

0.00 0.00
Ttotal: 147.51

0.00
0.00
0.00 0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00 0.00 0.00


0.00
0.00

0.00

0.00 0.00
TOTAL 0.00
HOJA DE METRADOS
PRESUPUESTO:

SUBPRESUPUESTO:
CLIENTE:
LUGAR:
ITEM

06
HOJA DE METRADOS

ARQUITECTURA

DESCRIPCION UND.
CANT. L A H PARCIAL SUBTOTAL TOTAL

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

6.00
6.00
6.00 6.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00

0.00
0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00
0.00 0.00 0.00
0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

#REF!
#REF!
HOJA DE METRADOS
PRESUPUESTO:
SUBPRESUPUESTO:
CLIENTE:
LUGAR:
ITEM
HOJA DE METRADOS

DESCRIPCION UND. CANT.


INSTALACIONES SANITARIAS
L A H PARCIAL SUBTOTAL TOTAL

0.00
0.00
135.00 0.00

0.00
0.00
2.50 0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
32.00 0.00

0.00
0.00
55.00 0.00

2.00
2.00
2.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
86.00 0.00

0.00
0.00
35.00 0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00 0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00 0.00
HOJA DE METRADOS
PRESUPUESTO:
SUBPRESUPUESTO:
CLIENTE:
LUGAR:
ITEM
HOJA DE METRADOS

DESCRIPCION UND. CANT.


INSTALACIONES ELECTRICAS
L A H PARCIAL SUBTOTAL TOTAL

0.00
0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

0.00
0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00

0.00
0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00
0 0.00 0.00 0.00

#REF!

Potrebbero piacerti anche