MANDYA UNIT-1 INFRA QUALITY TESTS DETAILS

Date of No. of Tests


SI.No. Item Description Date of Test Remarks
Execution Required

1 Soil Test

a MDD & OMC 02.09.16 02.09.16 1 MDD:1.80 & OMC:11

As per MORTH 5th Revision,


2 GSB (Grade -2)
Section 400

a Gradation 02.09.16 02.09.16 1

b MDD & OMC 02.09.16 02.09.16 1 MDD:2.26 & OMC:5.5

c Gradation 05.09.16 05.09.16 1

As per MORTH 5th Revision,


3 DLC
Section 600 & 900

a Gradation 01.09.16 01.09.16 1

b MDD & OMC 01.09.16 01.09.16 1 MDD:2.24 & OMC:5.5

c 28th Day Cube Test 07.09.16 05.10.16 2

d 28th Day Cube Test 08.09.16 06.10.16 2

4 M-30 Road Concrete

a 28th Day Cube Test 17.09.16 15.10.16 2

b 28th Day Cube Test 18.09.16 16.10.16 2

c 28th Day Cube Test 19.09.16 17.10.16 2

5 M-15 Concrete 1:2:4

a 28th Day Cube Test 02.10.16 30.10.16 1