HN PURA INFRA QUALITY TESTS DETAILS

Date of No. of Tests


SI.No. Item Description Date of Test Remarks
Execution Required

1 Soil Test

a MDD & OMC 01.08.17 01.08.17 1

As per MORTH 5th Revision,


2 GSB (Grade -2)
Section 400

a Gradation 03.08.17 03.08.17 1

b Gradation 02.05.18 02.05.18 1

c Gradation 03.06.18 03.06.18 1

As per MORTH 5th Revision,


3 DLC
Section 900

a Gradation 05.08.17 05.08.17 1

b MDD & OMC 05.08.17 05.08.17 1

c 28th Day Cube Test 06.08.17 06.08.17 2

d 28th Day Cube Test 05.05.18 05.05.18 2

e 28th Day Cube Test 03.06.18 03.06.18 2

4 Concrete - M20 Grade

a 28th Day Cube Test 05.08.17 02.09.17 2

b 28th Day Cube Test 02.05.18 30.05.18 2

c 28th Day Cube Test 03.06.18 01.06.18 3

d 28th Day Cube Test 05.07.18 02.08.18 1

5 M-30 Road Concrete

a 28th Day Cube Test 06.08.17 03.09.17 2

b 28th Day Cube Test 06.05.18 03.06.18 2

c 28th Day Cube Test 07.06.18 05.07.18 2