1 4.3 Are tenderers provided The Agency will provide a list of premises
with the details of which contractor will need to cover for
participating premises the contract.
including their unit
numbers and current As clarified in Corrigendum no. 1, as a
status? Will the time guide, each hawker / coffeeshop/
required differ between canteen stall assessment can take 15 to
various premises? Will the 30minutes. The number of stalls within
time required differ with each coffeeshop and canteen will vary, so
the first and second round tenderers are advised to do their own
of assessment? ground assessment before bidding.

The time required between first and


second round of assessment for each
hawker / coffeeshop/ canteen stall
should be the same.

2 4.5 Where can I find the NEA Please refer to


website link for the specific https://www.sgclean.gov.sg and go to
advisories for SG Clean? the category or sectors for hawker
centres, coffeeshops and canteens.
There is also other information in the
website on SG Clean which tenderers will
find useful.

Agency will share more on the advisories


and checklists after award of the
contract.
3 4.6, 4.7 To clarify if the premises Yes, the SG Clean checklist posters and
have met all requirements quality mark will be issued on the spot
stated when the assessors after assessment.
conduct the on-site
assessment, will assessors
certify them to have
passed and provide them
the checklist posters and
quality marks on the spot?
4 5.2 For those establishments Agency will advise on the time frame for
who do not comply to the re-assessment when the contract has
checklist, what is the time commenced.
frame for re-assessment?
5 6.1 Can a food establishment If the food establishment decides to opt
decide to opt out of out, the food establishment can inform
assessment? If yes, how assessors verbally. Assessors can note
can the owner opt out? down that the food establishment does
What if there is a situation not want to participate and politely leave
that arises in the event the premises. After that, this information
that the premise owner can be included in the report to Agency.
decides to opt out when
the vendor arrive to assess
them?
6 6.2 What is the mode of The SG Clean quality mark will be issued
sending the quality mark to the food establishment on the spot
to the food establishment? after the assessment if they are able to
meet the requirements.
7 7 Will there be any Agency will conduct a briefing after
guidelines or trainings award of contract to brief the successful
provided by the Authority tenderer on the conduct of this contract.
regarding food safety and However, tenderers should ensure that
food hygiene? the manpower to perform this contract
has the relevant experience according to
manpower requirements stated in
section 8 of Requirement Specifications.
8 7.2 Do assessors have to Contractor should identify themselves to
immediately identify observe the food establishment’s
ourselves once they start compliance to the SG Clean
to assess the food requirements. The details of the
establishment's safety and engagement will be worked out after
hygiene standards? Can award of contract.
assessors observe first and
only introduce themselves
after the observations
9 8.1 What will be an example of As per section 4.2, Tenderer should note
the time frame given for that they should ensure 2 rounds of
the contract to complete coverage for the premises in section 4.3
the various phases? by 31 March 2022.
10 8.2 Is there any specific One common certification is the
certification SFA is looking ISO22000 lead auditor course. Tenderers
at for the equivalence to can consider this for equivalence to
Food Safety Management FSMS.
System (FSMS)?
11 8.4 How long is the approval Approval from Agency should be within 5
process? What are the working days. Agency will require the
information SFA needs? certification and particulars of the officer
to verify that they are able to meet the
manpower requirements set out in
section 8.
12 8.5 What type of training will Trainings will be conducted as required
be provided (e.g The through briefings. Agency will advise on
duration of the training, the details after award of the contract.
number of assessment
rounds and the evaluation As per section 8.8, only trained assessors
criteria. Can Contractors duly appointed by the Agency is to carry
assess on our own out the certification and assessment
subsequently? services stipulated in the Contract.
13 10 Can the authority provide The format of the report is subjected to
a sample on the different changes and Agency will finalise the
reports required? format with the contractor after award of
contract
14 11 How many days in advance Agency will send the full list of premises
would the Authority to be covered after award of Contract for
provide the Contractor the contractor to schedule their
with the list of premises to assessments.
carry out the certification
and re-assessments?