PROVISION OF SERVICES TO ASSESS PREMISES ON HYGIENE AND SANITATION STANDARDS
SFA000/(P)012(20)
Corrigendum No. 02
S/N Reference Questions to SFA SFA’s Response
1 4.3 Are tenderers provided The Agency will provide a list of premises with the details of which contractor will need to cover for participating premises the contract. including their unit numbers and current As clarified in Corrigendum no. 1, as a status? Will the time guide, each hawker / coffeeshop/ required differ between canteen stall assessment can take 15 to various premises? Will the 30minutes. The number of stalls within time required differ with each coffeeshop and canteen will vary, so the first and second round tenderers are advised to do their own of assessment? ground assessment before bidding.
The time required between first and
second round of assessment for each hawker / coffeeshop/ canteen stall should be the same.
2 4.5 Where can I find the NEA Please refer to
website link for the specific https://www.sgclean.gov.sg and go to advisories for SG Clean? the category or sectors for hawker centres, coffeeshops and canteens. There is also other information in the website on SG Clean which tenderers will find useful.
Agency will share more on the advisories
and checklists after award of the contract. 3 4.6, 4.7 To clarify if the premises Yes, the SG Clean checklist posters and have met all requirements quality mark will be issued on the spot stated when the assessors after assessment. conduct the on-site assessment, will assessors certify them to have passed and provide them the checklist posters and quality marks on the spot? 4 5.2 For those establishments Agency will advise on the time frame for who do not comply to the re-assessment when the contract has checklist, what is the time commenced. frame for re-assessment? 5 6.1 Can a food establishment If the food establishment decides to opt decide to opt out of out, the food establishment can inform assessment? If yes, how assessors verbally. Assessors can note can the owner opt out? down that the food establishment does What if there is a situation not want to participate and politely leave that arises in the event the premises. After that, this information that the premise owner can be included in the report to Agency. decides to opt out when the vendor arrive to assess them? 6 6.2 What is the mode of The SG Clean quality mark will be issued sending the quality mark to the food establishment on the spot to the food establishment? after the assessment if they are able to meet the requirements. 7 7 Will there be any Agency will conduct a briefing after guidelines or trainings award of contract to brief the successful provided by the Authority tenderer on the conduct of this contract. regarding food safety and However, tenderers should ensure that food hygiene? the manpower to perform this contract has the relevant experience according to manpower requirements stated in section 8 of Requirement Specifications. 8 7.2 Do assessors have to Contractor should identify themselves to immediately identify observe the food establishment’s ourselves once they start compliance to the SG Clean to assess the food requirements. The details of the establishment's safety and engagement will be worked out after hygiene standards? Can award of contract. assessors observe first and only introduce themselves after the observations 9 8.1 What will be an example of As per section 4.2, Tenderer should note the time frame given for that they should ensure 2 rounds of the contract to complete coverage for the premises in section 4.3 the various phases? by 31 March 2022. 10 8.2 Is there any specific One common certification is the certification SFA is looking ISO22000 lead auditor course. Tenderers at for the equivalence to can consider this for equivalence to Food Safety Management FSMS. System (FSMS)? 11 8.4 How long is the approval Approval from Agency should be within 5 process? What are the working days. Agency will require the information SFA needs? certification and particulars of the officer to verify that they are able to meet the manpower requirements set out in section 8. 12 8.5 What type of training will Trainings will be conducted as required be provided (e.g The through briefings. Agency will advise on duration of the training, the details after award of the contract. number of assessment rounds and the evaluation As per section 8.8, only trained assessors criteria. Can Contractors duly appointed by the Agency is to carry assess on our own out the certification and assessment subsequently? services stipulated in the Contract. 13 10 Can the authority provide The format of the report is subjected to a sample on the different changes and Agency will finalise the reports required? format with the contractor after award of contract 14 11 How many days in advance Agency will send the full list of premises would the Authority to be covered after award of Contract for provide the Contractor the contractor to schedule their with the list of premises to assessments. carry out the certification and re-assessments?
Guide: SOC 2 Reporting on an Examination of Controls at a Service Organization Relevant to Security, Availability, Processing Integrity, Confidentiality, or Privacy