Sei sulla pagina 1di 5

PETRUS JESE P.

PARDEDE
ME Site Manager / Coordinator
Having 5 years experience as and related to Mechanical Electrical Electronic Project
Engineer with bachelor degree in Mechanical Engineering from University of Sumatera
Utara.

Have been involved in more than 5 multi-phase projects with total budget ranging in size
of 200 Million Rupiah to 4 Trillion Rupiah, with 100% on time job completion and
quality expectation delivered.
CONTACT
Have been involved in different scope, role and responsibilities; as General Contractor,
In house CM(PM/CM), Developer, and Factory Owner Representative. Experienced
Phone working in remote area, and internationally surrounding environment with wide
+62 81377221071 diversity work circumtances and dedicated to bring excellence in works result. Handling
ranging projects; apartments, condominium, office tower, industrial factory & power
Email plant project
pj.jobs91@gmail.com
Education
Home
(S.T/B.Eng) Mechanical Engineering Department – Universitas Sumatera Utara
Klapanunggal
Concentration : Energy Conversion (GPA 3.55 out of 4.00)
Kabupaten Bogor
West Java F. P. : (Hydro Power) Analysis of Gravitational Water Vortex Generator, Circle Shaped Basin,
With Variation of Orifice Diameter, Water Head and Turbine Runner Diameter (Published in:
http://repository.usu.ac.id/handle/123456789/44100 )
SOFTWARE
AutoCAD Achievement
Ms. OFFICE
2016 : Succesfully Optimized PCI process commissioning target from 5 T/H to 24 T/H
Ms. Project 2016 : Engineer Performance Awardee, Wuhu Xinxing Ductile Iron Pipes, Co., Ltd.
2016 : Lead Team, Accomplished Scheduled Maintenance Process Below Target Time, Wuhu
Xinxing Ductile Iron Pipes, Co., Ltd.
VALUE 2014 : 1st Place Shell Eco Marathon Asia 2014 Alt. Gas Category (Manila).
2009-2014 : Achieved (PPA) DIKTI Scholarship
ME Const. Management 2012-2013 : Achieved BUMN Peduli Pendidikan Scholarship by Angkasa Pura I
ME Design & Engineering
Const. Quality System Language Non Technical Skill Reference
Schedule & Control
Test & Commissioning Bahasa • Quick Learner, Highly adaptative 1. Charles H. Siahaan
Power Plant & Distribution Native • Target & Result Oriented Project Director/SML
English • Creative Problem Solver 2. Frikelly Silaban
Total Pred. Maintenance
Fluent • Negotiative and Communicative MEE Manager/Astra Group
Coal Pulv & Handling Mandarin • Able to perform well under
Heavy Equip. Maintenance Basic minimum supervision and
Process Improvement remote area
PT. Bumi Parama Wisesa | Jan20 – Recent | ME Coordinator/Senior ME Inspector
http://navapark.id

As ME Coordinator in developer company, Mr. Petrus rensponsible for:


.
• During the Tender; we are reviewing technical submission & Contractor proposal, shortlisted the candidates and taking
part as examiner and recommender, report to Construction Dept. Head, Project Manager & Project Director for final
negotiation
• At the earlier construction stage we setup the Project parameter, such as; Communication Plan, Contractor deliveries
submission & flow, Master Schedule, Quality Plan, Safety Plan. All of this to ensure project running smooth and on
schedule, with high quality and within expected budget.
• Review DD, For Tender, For Construction and Shop Drawing approval from Consultant, and examine the VE & VO
possibilities to meet regulation of SLO/SLF for low rise building and SNI buiding system standards.
• Keep coordination with another discipline engineering to avoid composite problems

Project : North Point @ NAVAPARK BSD CITY – Join Operation with Hongkongland Limited
Located in prestigious BSD City area (Serpong-South Tangerang), with Hongkongland Limited (PM/CM in house),
Consist of : 46 units of Business Loft (4 to 5 floors) Low Rise Building

PT. SIRIUS SURYA SENTOSA | Jan19 – Jan20 | ME Coordinator


http://www.vasanta.co.id

As ME Coordinator in developer company, Mr. Petrus rensponsible for:


.
• During the Tender; we are reviewing technical submission & Contractor proposal, shortlisted the candidates and taking
part as examiner and recommender, report to GM and Planning Manager on final negotiation
• At the earlier construction stage we setup the Project parameter, such as; Communication Plan, Contractor deliveries
submission & flow, Master Schedule, Quality Plan, Safety Plan. All of this to ensure project running smooth and on
schedule, with high quality and within expected budget.
• Manage inspectors team to supervise production process (quality and schedule), to Inspect and testing all MEP system to
ensure conformance to design spec and following up NCN and make sure rectification work done before target time (using
RFIT document).
• Reviewing contractors shop drawing approval, and coordinating with engineer and consultant to examine VE and VO
based on minimum regulation and standard, then report the summary to Planning Manager.
• Following up the SLO/SLF process pre commissioning preparation by contractors and government
• Coordinating and supporting commissioning process of MEP system s.a : Transfer Plumbing, Drainage, Swimming Pool
Circulation, MVAC, Electrical Switch Gear, Genset Recover, Fire Fighting, Fire Alarm, Electronic.
• Review the contractors progress proposal due to real site progress, release NCN, review rectification method, QC

Project : VASANTA INNOPARK – Incorporation with Mitsubishi Corporation


Located in MM2100 Industrial Estate (Cibitung-West Java), with Mitsubishi Corporation (PM/CM in house),
Consist of : 2 tower apartments (Aoki-Botan) High Rise Building, 199 Shop Houses (Kosai - Tsubaki - Sumire) Low Rise
Building.
PT. Brewin Mesa Sutera (parts of Brewin Mesa Development) | Sep18 – Nov18 | Mechanical
Inspector/Project Engineer
http://brewinmesa.com/

As a mechanical inspector/junior engineer in PM/CM-Developer company, Mr. Petrus responsible for:


• Inspect project sites to ensure conformance to design spec and avoid misusement of materials.
• Review ITP & Method statement from contractors in MEP System.
• Conduct Testing for all mechanical parts and equipment, s.a. : Pumps, HE, AC, Pipeline, Mechanical Panel, etc; as design
spec and approval standard s.a.: NFPA, ASME, JIS, ASTM, ANSI, ASHRAE, ISO, SNI, etc.
• Propose NCN for non conformance works and review rectification methods and works.
• Reviewing contractors production system to overcome schedule target and quality expected both.

Project : The Lana Apartment (South Tangerang)


This project located in prestigious area of Alam Sutera, Pakulonan – Serpong, having 2 towers for residential with 38
floors, 900+units.

Lotte Engineering & Construction, Co. Ltd | Jan17 – Sep18 | ME Engineer/ME Site Manager
http://www.lottecon.co.kr

As ME Site Manager, ME Engineer in main contractor, Mr. Petrus rensponsible for:


• Manage production process (quality and schedule), Inspecting and testing all MEP system .
• Coordinating and supporting commissioning process of MEP system s.a : Transfer Plumbing, Drainage, Swimming Pool
Circulation, MVAC, Electrical Switch Gear, Genset Recover, Fire Fighting, Fire Alarm, Electronic, BMS system.
• As a Main Contractor coordinating and leading MEP NSCs in snagging inspection / handing over process to Developer
and BM in basement – podium area (4 Tower).
• Inspect project sites to ensure conformance to design spec and following up NCN and make sure rectification work done
before target time.

Project : Kota Kasablanka Phase 3 – Joint operation with PT. Totalindo Eka Persada (South Jakarta)
Located in Kota Kasablanka superblock, with Pakuwon Group (PM/CM in house) as client there,
Consist of : 2 twin tower apartments, 1 condominium ( CASA Grande Phase 2 – 45 Floors)
And 1 office tower (45 Floors)

PT. Megah Surya Pertiwi | Oct 15 – Jan 17 | PCI Section Head - Power Plant Mechanical Project
Engineer & Maintenance Staff (North Maluku – Smelter Project)
http://www.haritanickel.com/

In this company Mr. Petrus work in factory owner representative, responsible for 2 main role
• The First, as 大班长(Dà bānzhǎng) function as acting Pulverized Coal Injection Section Head in post construction period,
responsible, direct, monitor to 3 sub division :
o Maintenance Team
o Operation Control Team
o Production Team (Consist of 3 Shift Leader)
• As a Mechanical Project Engineer in construction period, responsible for Inspection, Supervision and support Test &
Commisioning Process of contractor work in Mechanical Parts in several difference division, s.a: Boiler Auxiliary (Coal
Feeder, Crusher, Belt Conveyor, BF Pump, Deaerator Tank, Economizer), Steam Turbine 3x40 MW (Dongfang Turbine
Machinery), pump station for power plant cooling tower, pump station for electric furnace cooling tower, WTP, ESP,
PCI, Rotary Kiln construction, Genset Secondary Recovery.
Project : Megah Surya Pertiwi Phase 1 (Rotary Kiln – Electric Furnace FeNi Smelter)
Located in rural area, Obi Island, North Moluccas-Indonesia
This project and company is joint venture between Xinxing Cathay Itl Group(CN) and Harita Group(INA)
Consist of : 3 Production Line ( casting line-electric furnace-rotary kiln-coal injector-dry kiln-ore feeder)
With production capacity 300 Kilo Ton per year (FeNi metal phase-non refinereed)
4 Power Plant Line (1 Back Up) steam powered line boiler-turbine (3x40MW)
with extra auxiliary Nitrogen Plant, used for supporting production needs.

Xinxing Ductile Iron Pipes, Co. Ltd | Apr – Jul 16 | Engineering and Maintenance (Trainee Program)
http://www.xinxingpipes.com.cn/
As On Job Trainee, doing similiarity analysis on the Iron Smelter and Power Generation Operation, Maintenance, Process
Optimation and System Improvement in Wuhu Xinxing Ductile Iron Pipe Factory Wuhu, Anhui – China.

HORAS TEAM USU| 2011 – 2014 | Chassis Coordinator


The Project is to Research, Plan and Build the Chassis Needs to Compete in Shell Eco Marathon Asia 2013 – 2014
(Malaysia – Phillipine)

PT. Pertamina Refinery Unit II Dumai | February 2013 – March 2013 | Internship Program
Evaluate and Analyze the Efficiency of Steam Generator (Boiler 940-B3).

LANGUAGES
XINXING DUCTILE IRON PIPE, Co. LTD – MEGAH SURYA PERTIWI – FeNi Smelter
IRON SMELTER (CN) (Maluku Utara)

KOTA KASABLANKA PHASE 3 – THE LANA APARTMENT (TANGERANG)


PAKUWON TOWER & CASA GRANDE 2
(SOUTH JAKARTA)

AOKI BOTAN TOWER APARTMENT, AND NorthPoint BUSINESS LOFT at NAVAPARK


SHOPHOUSES at MM2100 Industrial Estate BSD CITY (SOUTH TANGERANG)
(CIBITUNG)

Potrebbero piacerti anche