HOLLOWCORE SLAB END BEARING ON WALL TP-HOL-01

OPTION:
CL TURN DOWEL UP AND GROUT INTO WALL ABOVE

MIN 1-10 DOWEL IN EACH GROUTED


WALL ABOVE (IF APPLICABLE) JOINT DRILLED 300 (12") INTO BOND BEAM
TOPPING OR SKIM COAT BELOW AND ANCHORED WITH HILTI ADHESIVE
AS SHOWN ON PLAN INCREASE WHERE REQUIRED FOR DIAPHRAGM
SHEAR TRANSFER.
FACE BLOCK WITH TIE BACKS

(16")
600 (2'-0")

400
HOLLOWCORE CANTILEVER
(WHERE APPLICABLE)

90 (3 1/2") MIN 720

GROUT JOINT SOLID


CONT. BEARING PADS, REFER
TO SPECIFICATIONS

390 (15 1/2") BOND BEAM


REINF WITH 1-15 T&B U/N

WALL REINFORCEMENT (IF APPLICABLE).


CARRY THROUGH OR PROVIDE MATCHING
OCT 2016

DOWELS AND LAP.


HOLLOWCORE SLAB SIDE BEARING ON WALL TP-HOL-02
OPTION:
TURN DOWEL UP AND GROUT INTO WALL ABOVE
CL BREAKOUT AND GROUT SOLID AT BAR LOCATIONS

WALL ABOVE (IF APPLICABLE) MIN 10@1800 (6'-0") MAX DOWELS DRILLED
300 (12") INTO BOND BEAM BELOW AND
TOPPING OR SKIM COAT ANCHORED WITH HILTI ADHESIVE.
AS SHOWN ON PLAN INCREASE WHERE REQUIRED
FOR DIAPHRAGM SHEAR TRANSFER.
FACE BLOCK WITH TIE BACKS
300 (12")

(16")
TO SUITE

400
396

50 (2") MIN 30

GROUT JOINT SOLID BEARING

DRY PACK GROUT PRIOR


TO BUILDING WALL
390 (16") BOND BEAM
REINF WITH 1-15 T&B U/N
OCT 2016

WALL REINFORCEMENT (IF APPLICABLE).


CARRY THROUGH OR PROVIDE MATCHING
DOWELS AND LAP.
HOLLOWCORE SLAB END TO END BEARING ON WALL TP-HOL-03

CL

WALL ABOVE (IF APPLICABLE)


MIN 1-15 x 1200 (4'-0") LG. DOWEL
IN EACH GROUTED JOINT. INCREASE
TOPPING OR SKIM COAT WHERE REQUIRED FOR DIAPHRAGM
AS SHOWN ON PLAN SHEAR TRANSFER.

20 (3/4") MAX
18

CONT BEARING PADS, REFER


GROUT JOINT SOLID
TO SPECIFICATIONS

390 (16") BOND BEAM


REINF WITH 1-15 T&B U/N
WALL REINFORCEMENT (IF APPLICABLE)
CARRY THROUGH OR PROVIDE MATCHING
IF PRECAST THICKNESS AT TWO SIDES OF DOWELS AND LAP. IF NO WALL ABOVE,
DEC 2016

WALL IS NOT THE SAME, PACK WITH SOLID TERMINATE WITH STANDARD HOOK 50 (2")
BLOCK CUT TO SUITE BELOW TOP OF PRECAST.
HOLLOWCORE SLAB END TO SIDE BEARING ON WALL TP-HOL-04
CL

TOPPING OR SKIM COAT


AS SHOWN ON PLAN
WALL ABOVE (IF APPLICABLE)
MIN 1-10 DOWEL IN EACH GROUTED JOINT.
GROUT JOINT SOLID INCREASE WHERE REQUIRED FOR DIAPHRAGM
SHEAR TRANSFER.
BREAKOUT AND GROUT 900 (3'-0")

(12")
SOLID AT BAR LOCATIONS

300
50 (2") MIN
82
90 (3 1/2") MIN 480

BEARING
CONT. BEARING PADS, REFER
TO SPECIFICATIONS
DRY PACK GROUT PRIOR
TO BUILDING WALL ABOVE 390 (16") BOND BEAM
REINF. WITH 1-15 T&B U/N
WALL REINFORCEMENT (IF APPLICABLE)
CARRY THROUGH OR PROVIDE MATCHING
IF PRECAST THICKNESS AT TWO SIDES OF DOWELS AND LAP. IF NO WALL ABOVE,
DEC 2016

WALL IS NOT THE SAME, PACK WITH SOLID TERMINATE WITH STANDARD HOOK 50 (2")
BLOCK CUT TO SUITE BELOW TOP OF PRECAST.
HOLLOWCORE SLAB SIDE TO SIDE TP-HOL-05
BEARING ON SHEAR WALL
CL

WALL ABOVE (IF APPLICABLE)

ANTI-ROTATION BARS

521

(10")
521
250
(10")

250
GROUT JOINT SOLID MIN 10@1800 (6'-0") MAX.
INCREASE WHERE REQUIRED
TOPPING OR SKIM COAT FOR DIAPHRAGM
AS SHOWN ON PLAN SHEAR TRANSFER. TO SUITE 35

50 (2") MIN.
28

BREAKOUT AND GROUT BEARING


SOLID AT BAR LOCATIONS (TYP)

DRY PACK GROUT PRIOR 390 (16") BOND BEAM


TO BUILDING WALL ABOVE REINF. WITH 1-15 T&B U/N
WALL REINFORCEMENT (IF APPLICABLE)
CARRY THROUGH OR PROVIDE MATCHING
IF PRECAST THICKNESS AT TWO SIDES OF DOWELS AND LAP. IF NO WALL ABOVE,
DEC 2016

WALL IS NOT THE SAME, PACK WITH SOLID TERMINATE WITH STANDARD HOOK 50 (2")
BLOCK CUT TO SUITE BELOW TOP OF PRECAST.
HOLLOWCORE SLAB END BEARING ON STEEL BEAM TP-HOL-11

MIN 1-10 WELDABLE REBAR


CL
IN EACH GROUTED JOINT.
TOPPING OR SKIM COAT 40 (1 5/8") INCREASE WHERE REQUIRED
AS SHOWN ON PLAN MIN.
350

FOR DIAPHRAGM 600 (2'-0")


SHEAR TRANSFER.

150
(6")
HOLLOWCORE CANTILEVER
(WHERE APPLICABLE)
MIN
75 (3")

STEEL BEAM
OCT 2016
HOLLOW CORE SLAB SIDE BEARING ON STEEL BEAM TP-HOL-12

TO SUIT. OMIT
WHERE POSSIBLE

)
(8"

150 (6")
MIN 1-10 AT MAX 1800 (6'-0").
INCREASE WHERE REQUIRED 200
FOR DIAPHRAGM
SHEAR TRANSFER. TO SUIT
NOTCH P/C LOCALLY AND GROUT
MIN 75 (3")
SOLID AT BAR LOCATION TOPPING OR SKIM COAT
AS SHOWN ON PLAN

DRYPACK

CUT SLOT TO FEED REBAR,


MAKE GOOD
OCT 2016
HOLLOWCORE SLAB END TO END BEARING TP-HOL-13
ON STEEL BEAM

CL
GROUT JOINT SOLID
MIN 1-15 DOWEL x 1200 (4'-0") LG
25 (1") 163
IN EACH GROUTED JOINT.
TOPPING OR SKIM COAT MAX INCREASE WHERE REQUIRED
AS SHOWN ON PLAN FOR DIAPHRAGM SHEAR TRANSFER.

025
80 (3 1/8") MIN
BEARING 25x6 x 100 (1"x1/4" x 4") LG
FLAT BAR @ 1200 (4'-0") WELDED
TO TOP FLANGE

STEEL BEAM

CL

76 (3") WIDE CONT HSS x 6 (1/4") THICK


HEIGHT TO SUITE PRECAST
126
25
25 127

50x6 x 100 (2"x1/4" x 4") LG


PLATE @ 1200 (4'-0") WELDED
TO SIDE OF HSS

REMAINDER SAME AS FOR DETAIL ABOVE


DEC 2016
HOLLOWCORE SLAB END TO SIDE BEARING
TP-HOL-14
ON STEEL BEAM
TOPPING OR SKIM COAT
GROUT JOINT SOLID CL AS SHOWN ON PLAN

NOTCH P/C LOCALLY AND MIN 1-10 WELDABLE REBAR


GROUT SOLID AT BAR IN EACH GROUTED JOINT. 600 (2'-0")
LOCATIONS INCREASE WHERE REQUIRED

150
(6")
25 (1") FOR DIAPHRAGM
DRYPACK GROUT
150

MIN SHEAR TRANSFER.


MIN
75 (3")

CUT OUT SLOT TO FEED 50 (2") MIN


REBAR, MAKE GOOD
270

BEARING
MIN 1-10 WELDABLE REBAR
@ 1800 (6'-0") MAX.
INCREASE WHERE
20

STEEL BEAM
0(

REQUIRED FOR
8"
)

DIAPHRAGM
150 (6")

SHEAR TRANSFER.
TO SUIT.

51 (2") WIDE CONT HSS x 6 (1/4") THICK


HEIGHT TO SUITE PRECAST

REMAINDER SAME AS FOR DETAIL ABOVE

600 (2'-0")
.
150
(6")

76 (3") WIDE CONT HSS x 6 (1/4") THICK


HEIGHT TO SUITE PRECAST

REMAINDER SAME AS FOR DETAIL ABOVE


DEC 2016
HOLLOWCORE SLAB END TO END BEARING TP-HOL-15
ON STEEL ANGLES
CL MIN 1-15 DOWEL x 1200 (4'-0") LG
IN EACH GROUTED JOINT.
GROUT JOINT SOLID INCREASE WHERE REQUIRED
FOR DIAPHRAGM
25 (1") 258
SHEAR TRANSFER.
TOPPING OR SKIM COAT MAX
AS SHOWN ON PLAN

80 (3 1/8") MIN
194

BEARING STEEL ANGLES


(TYP) SEE PLAN

PROVIDE TEMPORARY SHORING


UNTIL THE DOWELS BETWEEN
HOLLOWCORE SLABS HAVE
BEEN GROUTED FOR AT LEAST
72 HOURS
OCT 2016
HOLLOWCORE SLAB END TO SIDE BEARING TP-HOL-16
ON STEEL ANGLES
TOPPING OR SKIM COAT
CL AS SHOWN ON PLAN
GROUT JOINT SOLID
MIN 1-10 DOWEL IN EACH GROUTED JOINT.
INCREASE WHERE REQUIRED FOR
NOTCH P/C LOCALLY AND DIAPHRAGM SHEAR TRANSFER.
GROUT SOLID AT BAR
LOCATIONS 900 (3'-0")

(1'-0")
300
DRYPACK GROUT
50 (2") MIN
193
80 (3 1/8") MIN
48

BEARING BEARING

PROVIDE TEMPORARY SHORING


STEEL ANGLES UNTIL THE DOWELS BETWEEN
SEE PLAN HOLLOWCORE SLABS HAVE
BEEN GROUTED FOR AT LEAST
72 HOURS
OCT 2016
HOLLOWCORE SLAB END TO END BEARING TP-HOL-17
ON RAISED STEEL BEAM
CL MIN 1-10 WELDABLE REBAR
IN EACH GROUTED JOINT (TYP)
INCREASE WHERE REQUIRED
FOR DIAPHRAGM
GROUT JOINT SOLID SHEAR TRANSFER. 600 (2'-0")
370

150
60 (2 3/8")

(6")
TOPPING OR SKIM COAT 38 (1 1/2")
AS SHOWN ON PLAN 21
MIN
(TYP) 75 (3")

80 (3 1/8") MIN
845

BEARING 12 (1/2") CONT PLATE


EACH SIDE OF WEB

10 THICK FITTED STIFFENERS


EACH SIDE OF WEB @ 600 (2'-0")
MAXIMUM
OCT 2016
HOLLOWCORE SLAB END TO END BEARING TP-HOL-18
AT STEEL COLUMNS
CL
NOTCH P/C SLABS AT .
COLUMN

GROUT JOINT SOLID

25 (1") MAX
TOPPING OR SKIM COAT 130

L102x102x13
AT ALL COLUMNS THROUGH SLAB.
WELD TO COLUMN TO TRANSFER
LOADS NOTED ON PLAN

BEAM BEYOND/BEHIND,
OCT 2016

SEE TP-HOL-13
HOLLOWCORE SLAB ANTI-ROTATION BAR TP-HOL-21

ANTI-ROTATION BARS

521

(10")
521
250
(10")

250
MIN 10@1800 MAXIMUM.
INCREASE WHERE REQUIRED
FOR DIAPHRAGM
SHEAR TRANSFER. 250 (10") 845

TOPPING OR SKIM COAT


GROUT VOID SOLID AS SHOWN ON PLAN
OCT 2016
BALLUSTRADE / GUARDRAIL SUPPORT AT EDGE OF TP-HOL-31
HOLLOW CORE SLAB

LOADS ON GUARD AS SPECIFIED


BY APPLICABLE BUILDING CODE

BALLUSTRADE OR GUARDRAIL, MIN 13 (1/2") PRE-INSTALLED ANGLE (BY HOLLOWCORE)


SEE ARCH DRAWINGS ANCHORED TO TRANSFER GUARDRAIL LOADS.
RECCESS FLUSH IF NO TOPPING.

TOPPING OR SKIM COAT


AS SHOWN ON PLAN

LOADS ON GUARD AS SPECIFIED


BY APPLICABLE BUILDING CODE

BALLUSTRADE OR GUARDRAIL,
SEE ARCH DRAWINGS MIN 13 (1/2") PRE-INSTALLED ANGLE (BY HOLLOWCORE)
ANCHORED TO TRANSFER GUARDRAIL LOADS.
RECCESS FLUSH IF NO TOPPING.

TOPPING OR SKIM COAT


AS SHOWN ON PLAN
OCT 2016
STEEL STAIR SUPPORT AT EDGE OF TP-HOL-32
HOLLOW CORE SLAB

PRE-INSTALLED L152x152x9.5x300 (12") LG (BY HOLLOWCORE)


WITH 2-19 (3/4")Ø x100 (4") LG STUDS @ 200 (8") o/c
AT EACH STRINGER; RECESS FLUSH WITH
TOP OF HOLLOW CORE IF NO TOPPING
NOTCH P/C LOCALLY
TOPPING OR SKIM COAT
100 AS SHOWN ON PLAN
(4")
894

GROUT STUDS SOLID

STEEL STAIRS
SEE ARCH DRAWINGS

PRE-INSTALLED L152x152x9.5x MIN 300 (12") LG


(BY HOLLOWCORE) WITH 2-19 (3/4")Ø x100 (4") LG
STUDS @ MIN 200 (8") AT EACH STRINGER;
RECESS FLUSH WITH TOP OF HOLLOW CORE
IF NO TOPPING

TOPPING OR SKIM COAT


AS SHOWN ON PLAN

INSULATION DISK IN
EACH GROUTED CORE

GROUT STUDS SOLID

STEEL STAIRS
SEE ARCH DRAWINGS

NOTE:
ALTERNATIVE CONNECTION DETAILS MAY BE PROPOSED BY HOLLOWCORE
OCT 2016

SUPPLIER FOR REVIEW BY THE CONSULTANT.


REINFORCED MASONRY WALL SUPPORTED BY
TP-HOL-41
HOLLOWCORE

POST INSTALLED DOWELS


SEE PLAN FOR WALL TO MATCH WALL
REINFORCEMENT (TYP) REINFORCING DRILL IN
15 HOOKED DOWELS AND BOND WITH HILTI
IN EACH GROUTED ADHESIVE
JOINT U/N GROUT SOLID FULL LENGTH
190 (8") BOND BEAM, REINF OF CORE UNDER WALL
900 (3'-0")

WITH 1-15 T&B U/N IF DISTANCE FROM DOWEL


TOPPING OR SKIM COAT TO ADJACENT CORE IS
25

AS SHOWN ON PLAN LESS THAN 100 (4"), ALSO


(TYP) GROUT SOLID ADJACENT CORE.
328

15

MIN 100 (4")


25 (1") 38

50 (2") MAX

WALL PERPENDICULAR TO PLANK SPAN WALL PARALLEL TO PLANK SPAN