Sei sulla pagina 1di 5

REQUEST FOR INFORMATION

DATE: 1-Jul-2020 STATUS OPEN

CLIENT: CIMTAS JOB # : C32002

PROJECT: Lowman and Marlim Azul Project (CIMTAS) RFI # : 013

TO: FROM: DISTRIBUTION:


CIMTAS BJCHI

NUMBER AND TITLE OF DOCUMENTS IN QUESTION:


G1-S3789 G1-T0508 G1-S3791

DESCRIPTION:
Referrent to attachment above , BJCHI would like to clearly issues as below

• ATTACHMENT#1: Bolt collide with the Plate and hollow section steel ,Please advise
• ATTACHMENT#2: Bolt collide with the Plate and hollow section steel ,Please advise
• ATTACHMENT#3: The NPT collide with Steel . please advsise
• ATTACHMENT#4: dimension betwwen G1-S3791 and G1-T0508 is differenct. please advise

Required Schedule Impact? YES NO


Response
Date: 11-Jul-2020
Cost Impact? YES NO

RESPONSE:

Please see my comment inside of the drawing, first three page question we are waiting customer respond

BY: TITLE: Site Manager DATE: 02.07.2020


Ozturk KILIC

CIMTAS-RFI-013.xlsm 7/1/2020 1
Attachment#1

the marking bolt is collides


with the Plate and Hollow
section . please advise
Attachment#2

the marking bolt is


collides with the Plate
and Hollow section .
please advise
Attachment#3

the marking NPT collides


with the Shape steel . please
advise

Sleeve pipe can be


move 20mm right
side
Attachment#4

The marking dimension betwwen this


dwg and G1-T0508 is differenct ,we
intent to do it as per this dwg
dimension , please advise

please follow
dimension pipe
support base dwg
G1-S3791

Potrebbero piacerti anche