Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
TOTAL SHEET
SECTION COUNTY
RTE. SHEETS NO.
74 * CHAMPAIGN 93 39
STEEL FOUNDATION CONCRETE FOUNDATION
STA. TO STA.
LIGHT POLE BOLT CIRCLE SHAFT SHAFT SHAFT SHAFT ANCHOR ROD FED. ROAD DIST. NO. ILLINOIS FED. AID PROJECT
TOP PLATE (min)
MOUNTING HEIGHT DIAMETER DIAMETER DEPTH DIAMETER DEPTH LENGTH 1 * (10,92-8 HB-1)BR
CONTRACT NO. 70695
9.1 m
< 292 220 1.83 m 300 x 300 x 25 610 1.52 m 1.45 m
(30’) (11.5) (8 5/8 ) (6’) 12 x 12 x 1 (24) (5’-0") (4’-9")
9.4 m - 10.7 m 292 220 1.83 m 300 x 300 x 25 610 1.67 m 1.60 m
(31’-35’) (11.5) (8 5/8 ) (6’) 12 x 12 x 1 (24) (5’-6") (5’-3")
610 (24) min. dia. with
10.9 m - 12.2 m 381 220 1.83 m 375 x 375 x 31 762 1.83 m 1.75 m Or
292 (11.5) bolt circle
(36’-40’) (15) 3 (8 5/8 ) (6’) 2 15 x 15 x 1 1/4 (30) (6’-0") (5’-9")
762 (30) min. dia. with
12.5 m - 13.7 m 381 220 1.83 m 375 x 375 x 31 762 1.98 m 1.90 m
2 15 x 15 x 1 1/4 381 (15) or 432 (17)
bolt
(41’-45’) (15) 3 (8 5/8 ) (6’) (30) (6’-6") (6’-3")
circle
14.0 m - 15.2 m 381 220 2.44 m 375 x 375 x 31 762 2.13m 2.00 m
(46’-50’) (15) 3 (8 5/8 ) (8’) 15 x 15 x 1 1/4 (30) (7’-0") (6’-9") 125 (5)
I.D.
Pole Foundation Setback:
1 Length does not include100 (4)
hook P.V.C. wiring
2 220 mm x 2.44 m (8 5/8 "x
for8’-0")
Twin luminaires window
For horizontal mounted luminaires, setback
3 Bolt circle diam. shall be
430 (17)when a TB3-17 transformer base is used shall 6.1 m (20’)from edge
be a minimum of
Plate to be of pavement.
installed when
required (See ring For vertical mount luminaires, setback shall
plate detail) 9 m
be a minimum of (30’) from edge of
pavement. Poles shall be located 1.5 m (5’)
Bolt circle 75 (3)
Min. concrete cover behind guardrail or other protective
Length above foundation
diameter Fill with fine on all steel barriers, or as directed by the Engineer.
shall be adjusted to accomodate
(See table) aggregate
breakaway devices furnished by
Anchor rod 230 (9) threads.
25 (1) diameter with
the contractor for a specific
Anchor rod shall extend through nut 25 (1) .
installation.
For barrier or foundation behind guardrail, use
self-locking nut and flat washer. Do not use lock washer.
Formed
(24) min.
(15)
Finished
381
grade
Shaft dia.
610
Use dirt removed from
(See table)
305
(12)
foundation to meet
Plate Detail
STEEL FOUNDATION unless otherwise shown.
16 mm x 3 m ( 5/8 "x 10’)
Copperclad grounding
DATE REVISIONS
electrode. When foundation
is set in rock, install ground 10/7/02 Bridge Office depth calc. LIGHT POLE
electrode in cable trench.
RING PLATE DETAIL FOUNDATION
(When rock is encountered
and foundation is shallower)
CONCRETE FOUNDATION
LGT007-836