Group Member: Leader: Dominic R. Datuin Jake SJ.

Marigondon Sydney Marero


Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

A.1 Building Plans


Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

A.2 Floor Plans


Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

A3. Elevation + Door and Window Schedule


Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

A4. Section + Kitchen & T&B Details

A5. Foundation + 2/F Framing


Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

A7. Sanitary - Water, Soil, Drainage & Vent


Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

A8. Sanitary - Septic Tank Details + Iso-Plumbing


Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

A9. Electrical Layout - Lighting & Outlets


Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

A10. Loading Sch & Riser Diagram


Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

B. Technical Specification
1.  Foundation and Plinth: - Foundation and plinth shall be of first class brick work in lime
mortar or 1: 6 cement mortar over lime concrete or 1 : 4 : 8 cement concrete.
2.  Damp Proof Course: - D.PC. shall be 2.5 cm thick cement concrete 1: 1.5: 3, mixed
with one kg of impermo per bag of cement or other standard water proofing materials as
specified and painted with two coats of bitumen.
3. Superstructure: - Superstructure shall be of first class with lime mortar or 1 : 6 cement
mortar.  lintels over doors and windows shall be of R.C.C.
4. Roof: - Roofs shall be of R.C.C slab with an insulation layers and lime concrete terracing
above, supported over R.S joists or R.C.C beams as required. height of rooms shall not be
less than 3.7 m.
5. Flooring: - Drawing room and dining room floors shall be of mosaic. Both room and
W.C floors and dado shall be of mosaic. Floors of bed rooms shall be colored and
polished of 2.5 cm cement concrete over 7.5 cm lime concrete. Floors of others shall be of
2.5 cm cement concrete over 7.5 cm lime concrete polished.
6. Finishing: - Inside and outside shall be of 12 mm cement lime plastered 1: 1 : 6 Drawing,
dining and bed rooms inside shall be distempered, and others inside white washed 3 coats.
Outside shall be colored snowcem washed two coats over one coat of white wash.
7. Door and Windows: - Chau khats shall be seasoned teak wood. shutters shall be teak,
wood 4.3 cm thick paneled glazed or partly paneled and partly glazed as required, with
additional wire gauge shutters. all fittings shall be of brass. Doors and windows shall be
varnished or painted two coats with high class enamel paints over one coat of priming.
windows shall be provided with iron gratins or grills.
8.  For Other materials: - Rain water pipes of cast iron or of asbestos cement shall be
provided and finished painted. Building shall be provided with 1st class sanitary and
water fittings and electrical installation. one meter wide 7.5 cm thick C.C 1: 3: 6 aprons
shall be provided
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

C. Bill of Materials & Cost Estimate

ITEM WORK DESCRIPTION QT UNI COST AMOUNT


Y. T
I. EARTHWORKS
General Preliminaries
1.1 Excavation 30.7 cu.m
5 . - -
1.2 Backfill 90.0 cu.m
0 . 600.00 54,000.00
1.3 Soil Poisoning 1L (172sqm @15sqm 12.0 li
coverage) 0 600.00 7,200.00

Subtot 61,200.00
al
II. CONCRETING & MASONRY
2.1 40 kgs. Bag Cement 939. bags
00 215.00 201,885.00
2.2 White Sand 62.0 cu.m
0 . 900.00 55,800.00
2.3 Gravel 3/4 124. cu.m
00 . 1,100. 136,400.00
00
2.4 CHB 4" 1685 pcs.
.00 13.00 21,905.00
2.6 CHB 6" 2550 pcs.
.00 16.00 40,800.00
2.7 16 mm x 6 m Deformed Bar 277. pcs.
00 473.00 131,021.00
2.8 12 mm x 6 m Deformed Bar 127. pcs.
00 213.12 27,066.24
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

2.8 10 mm x 6 m Deformed Bar 418. pcs.


00 147.84 61,797.12
2.9 Tie Wire #16 3.00 rolls
1,800. 5,400.00
00

Subtot 682,074.36
al
III CARPENTRY, WOODWORKS, &
CEILING FRAME
3.1 2x2x12 R.O. 50 pcs.
42.00 2,100.00
3.2 2x4x12 R.O. 70 pcs.
42.00 2,940.00
3.3 1/4 thk. Ordinary Plywood 30 pcs.
385.00 11,550.00
3.4 1/4 thk. Hardilite 58.0 pcs.
0 420.00 24,360.00
3.6 2x3X2.44m Metal Furring - 413.604m 170. pcs.
00 108.65 18,470.50
3.7 Hardware 1.00 lot
lumpsu 2,000.00
m

Subtot 61,420.50
al
IV TILEWORKS & CLADDING
4.1 Mariwasa Porcelain Tiles 40 x 40 - 963. pcs.
154sqm 00 85.00 81,855.00
4.2 Mariwasa Ceramic Floor Tiles 30x30 - 123. pcs.
10.24sqm Common T&B 00 19.50 2,398.50
4.3 Mariwasa Ceramic Wall Tiles 30x30 - 290. pcs.
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

26sqm Common T&B 00 19.50 5,655.00


4.4 Granite (Salt & Pepper) 2.00 slab
1,400. 2,800.00
00
4.5 Stone Deco 15.0 sqm
0 1,400. 21,000.00
00
4.6 40 kgs. Bag Cement - 190.24sqmx25mm 43.0 bag
0 215.00 9,245.00
4.7 White Sand 3.00 cu.m
. 900.00 2,700.00
4.8 2kgs. Bag ABC Tile Grout 40.0 bag
0 85.00 3,400.00
4.9 20kgs. Bag ABC Tile Adhesive 44.0 bag
0 250.00 11,000.00
4.1 1kg Sahara Waterproofing 20.0 pack
0 0 35.00 700.00

Subtot 140,753.50
al
V DOORS AND WINDOWS
5.1 Door 1 (1.6m x 1.75m) 1.00 set
14,560 14,560.00
.00
5.2 Door 2 (0.9m x 2.0m) 3.00 set
3,200. 9,600.00
00
5.3 Door 3 (0.9m x 2.0m) 5.00 set
4,170. 20,854.60
92
5.4 Door 4 (0.8m x 2.0m) 2.00 set
1,550. 3,100.00
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

00
5.5 Door 5 (1.66m x 2.1m) 1.00 set
19,950 19,950.00
.00
5.6 Window 1 (Fixed Glazed Glass Type) 15.0 per
2 sqm 7,820. 117,463.46
47
5.7 Window 2 (Awning Type) 2.70 per
sqm 3,650. 9,855.00
00
5.8 Window 3 ( Sliding Type) 2.80 per
sqm 4,400. 12,320.00
00
5.9 Steel Spiral Stairs 1.00 pcs.
lumpsu 13,000.00
m
5.1 Wooden Spiral Stairs 1.00 pcs.
0 lumpsu 10,000.00
m

Subtot 230,703.06
al
VI STEELWORKS
6.1 2x3x1.5mm C-Purlin Common Rafter at 22.0 pcs.
Roof -127m 0 740.00 16,280.00
6.2 2x6x1.5mm C-Purlin Common Rafter at 2.00 pcs.
Roof -8.6m 1,050. 2,100.00
00
6.3 Welding rod 15.0 kg
0 120.00 1,800.00

Subtot 20,180.00
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

al
VII TINSMITHRY
7.1 GA 26 G.I.Box Gutter 0.40mm x 2.44 x 5.00 pcs.
24"- 11.2m 600.00 3,000.00
7.2 Insulation 5mm x 1 sided x 68.58m 12.0 rolls
0 1,500. 18,000.00
00
7.3 GA 26 Ribtype Roofing 160. l.m.
00 590.00 94,400.00
7.4 Hardwares 1.00 lot
lumpsu 1,500.00
m

Subtot 116,900.00
al
VIII PLUMBING WORKS
Water Line
8.1 3/4"Ø PVC Pipe - 6m 2.00 pcs.
125.00 250.00
8.2 1/2"Ø PVC Pipe - 31.2m 5.00 pcs.
68.47 342.35
8.3 1/2"Ø PVC Elbow 4.00 pcs.
6.00 24.00
8.4 1/2"Ø PVC Tee 10.0 pcs.
0 13.00 130.00
8.5 1/2"Ø PVC Coupling 4.00 pcs.
3.00 12.00
8.6 1/2"Ø Brass Gate Valve 3.00 pcs.
245.00 735.00
8.7 Water Meter 1.00 pcs.
600.00 600.00
Sanitary & Storm Line
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

8.8 4"Ø PVC Pipe - 11m 4.00 pcs.


748.99 2,995.96
8.9 3"Ø PVC Pipe - 26.70m 9.00 pcs.
562.00 5,058.00
8.1 4X3 45deg Wye (Neltex) 3.00 pcs.
0 130.00 390.00
8.1 3" 45deg Wye 13.0 pcs.
1 0 70.00 910.00
8.1 3" 45deg Elbow 2.00 pcs.
2 52.45 104.90
8.1 4" Floor Clean-out (Neltex) 2.00 pcs.
3 50.00 100.00
8.1 Solvent Cement 200cc 1.00 can
4 114.45 114.45
8.1 Teflon Tape 16.0 rolls
5 0 5.00 80.00
Fixtures
8.1 Water Closet, Lavatory, Tissue Holder 2.00 set
5 Set 5,750. 11,500.00
00
8.1 Faucet 4.00 set
6 195.00 780.00
8.1 Floor drain 4.00 set
7 68.00 272.00
Septic Tank
8.1 40 kgs. Bag Cement 15.0 bags
8 0 215.00 3,225.00
8.1 White Sand 1.00 cu.m
9 . 900.00 900.00
8.2 Gravel 3/4 2.00 cu.m
0 . 1,100. 2,200.00
00
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

8.2 CHB 4" 160. pcs.


1 00 13.00 2,080.00
8.2 10 mm x 6 m Deformed Bar 15.0 pcs.
2 0 147.84 2,217.60
8.2 Tie Wire #16 1.00 rolls
3 1,800. 1,800.00
00

Subtot 36,821.26
al
IX ELECTRICAL WORKS
Power Distribution & Lighting System
Wire
9.1 8.0mm2 ∅ THHN - 150m Philflex 15.0 mete
0 r 55.00 825.00
9.2 5.5mm2 ∅ THHN - 150m Philflex 2.00 box
4,848. 9,696.00
00
9.3 3.5mm2 ∅ THHN - 150m Philflex 2.00 box
3,366. 6,732.00
00
Conduits, Pipes & Accessories
9.4 3/4" ∅ RSC 1.00 pc
350.00 350.00
9.5 1/2" ∅ Flexible Hose 100m 5.00 rolls
612.00 3,060.00
9.6 Utility Box 2"x4" 25.0 set
0 25.00 625.00
9.7 Junction Box 4"x4" 9.00 set
17.00 153.00
9.8 Electrical Tape 5.00 pc
20.00 100.00
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

9.9 Fluorescent lamp 2.00 pcs.


819.82 1,639.64
9.1 Fluorescent housing 2.00 pcs.
0 650.00 1,300.00
9.1 Ceiling Fan 2.00 pcs.
1 2,599. 5,198.00
00
Panel Board & Circuit Breaker Plug-in
9.1 15A (lighting) 24.0 pcs.
2 0 450.00 10,800.00
9.1 20A (Convenience Outlet) 22.0 pcs.
3 0 500.00 11,000.00
9.1 30A (ACU) 3.00 pcs.
4 550.00 1,650.00
9.1 Panel Board Housing 1.00 pcs.
5 1,200. 1,200.00
00
Electrical Fixtures
9.1 Pinlight Housing 4.00 set
6 179.00 716.00
9.1 Receptacle 15.0 set
7 0 50.00 750.00
9.1 5w Bulbs/ Pinlight set 19.0 set
8 0 135.00 2,565.00
9.1 3w Spotlight Set 5.00 set
9 518.69 2,593.45
9.2 1 gang 1 way Switch 4.00 set
0 51.00 204.00
9.2 2 gang 1 way Switch 5.00 set
1 81.60 408.00
9.2 Convenience Outlet 22.0 set
2 0 81.60 1,795.20
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

9.2 Aircon Outlet 3.00 set


3 103.70 311.10

Subtot 63,671.39
al
X PAINTING WORKS
10. Primer Acrytex Primer 4.00 16-L
1 1,290. 5,160.00
00
10. Top Coat Semi-gloss Latex 4.00 16-L
2 1,723. 6,893.20
30
10. Elastomeric Top Coat 8.00 4-L
3 525.00 4,200.00
10. Quick Dry Enamel 4.00 4-L
4 441.75 1,767.00
10. Accessories 1.00 lot
5 lumpsu 1,500.00
m

Subtot 19,520.20
al

PREPARED BY: HOUSE


MATERIAL COST 1,433,244.27
CONTING 15%
ENCY 214,986.64
AR. FATIMA MARIE D. BATOON SUBTOTA
L 1,648,230.91
Project Designer LABOR 45%
741,703.91
GRAND
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

TOTAL 2,389,934.82
Group Member: Leader: Dominic R. Datuin Jake SJ. Marigondon Sydney Marero
Daniel S. Julian Cristopher C. Cogal Ros Ann Tayamora

D. Construction Schedule - for 90 days