Sei sulla pagina 1di 6

THE UNITED REPUBLIC OF TANZANIA

MINISTRY OF WORKS, TRANSPORT AND COMMUNICATIONS

REGIONAL MANAGER’S OFFICE – TANROADS KATAVI

INVITATION FOR BIDS

For

Various Rehabilitation and Maintenance Works for Trunk & Regional Roads in Katavi Region

Bids No. AE/001/2019-20/KTV/W/01 - 27


Date: 1st July 2019

1. This Invitation for Bids follows the General Procurement Notice (GPN) for these Maintenance Works that appeared on PPRA
WEBSITE and Daily News Newspaper on 27th May 2019.

2. The Chief Executive, TANROADS represented by the Regional Manager, Katavi has received Funds from the Roads Fund Board
towards the cost of Rehabilitation and Maintenance Works of Regional Roads in Katavi Region, and it intends to apply part of
the proceeds of this Funds to cover eligible payments under the contract for Various Rehabilitation and Maintenance Works for
Trunk and Regional Roads in Katavi Region as shown below
3. The Chief Executive, TANROADS represented by the Regional Manager, Katavi now invites sealed bids from eligible National
Civil Engineering Contractors registered with the Contractors Registration Board (CRB) in Classes specified in the table below
for carrying out works as shown below:

Tender No. Project Name Scope of Works Eligible Tender Contract


Contractors Document Duration
price
AE/001/2019- Routine/Recurrent Vegetation Control………........1,200,000
20/KTV/W/01 Maintenance Works along Labour
m 2
Lyambalyamfipa - Mpanda Removal of Debris ………………13,060 m2 based Class 50,000.00 240
and Mpanda - Inyonga III and Calendar
Desilting of Open Drains..............82,600 m2
Paved Trunk Roads; T.009 above Days
Desilting of culvert inlet/outlet... 2,402 m3
& T.023
Pothole Patching…………….……..…45 m2
Shoulder Fill by gravel material.……60 m2
AE/001/2019- Routine/Recurrent Tree felling……………………….. ...50 Nos
20/KTV/W/02 Maintenance Works along Heavy Grading…………….………...42 km
Lyambalyamfipa - Mpanda- Gravelling………………..…….…...7257 m3
Trunk Road, T.009; Section I: Class VI 150,000.00 240
Vegetation Control……..….…...400,000 m2
Lyambalyamfipa - Sitalike and above Calendar
Excavate open Drains ….…….......5,600 m3 Days
Pipe culvert 900mm dia …..…...............8 m
Concete Works ……………….………13 m3
Desilting of open drains…...……..36,000 m
Desilting of culvert inlet/outlet.....1300 m3
AE/001/2019- Routine/Recurrent Tree felling…………………...….....150 Nos
20/KTV/W03 Maintenance Works along Heavy Grading ……………..…..…..43 km Class VI 150,000.00 240
Mpanda - Msobwe Gravelling…………………………7,875 m3 and above Calendar
(Katavi/ Kigoma border) Days
Vegetation Control ………..……360,000
Trunk road, T.009; Section
II: Vikonge -Mishamo m2
Excavate open Drains…………. 6,800 m3
Pipe culvert 900mm dia………………16 m
Concrete Works ……………………...26 m3
Desilting of open drains …………34,830 m
Desilting of culvert inlet/outlet….. 820 m3
Provide New road Signs…………….8 Nos
AE/001/2019- Routine/Recurrent Tree felling…………………...….......60 Nos
20/KTV/W/04 Maintenance Works along Heavy Grading ……………………...62 km
Mpanda - Uvinza (Katavi/ Gravelling………………………...14,950 m3 Class V and 200,000.00 240
Kigoma border) Trunk above Calendar
Vegetation Control ……………..540,000
road, T.009; Section III: Days
m2
Mishamo - Msobwe
Excavate open Drains………. .......8,124 m3
Pipe culvert 900mm dia……………....24 m
Concrete Works ……………………...39 m3
Desilting of open drains …………56,000 m
Desilting of culvert inlet/outlet....2,146 m3
AE/001/2019- Periodic Maintenance along Tree felling…………………...….....240 Nos
20/KTV/W/05 Lyambalyamfipa - Mpanda Heavy Grading………………………22 km Class V and 200,000.00 150
- Msobwe (Katavi /Kigoma Gravelling ………………………..27,300 m3 above Calendar
border) Trunk Road, T.009 Days
Vegetation Control………….......150,000
Section I: Lyambalyamfipa -
m2
Sitalike
Excavate open Drains………..... 16,680 m3
Pipe culvert 900mm dia………………32 m
Concrete Works …………………..…52 m3
Site Clearance……….………..…264,000 m2
AE/001/2019- Periodic Maintenance along Tree felling…………………...….....240 Nos
20/KTV/W/06 Lyambalyamfipa - Mpanda Heavy Grading………………….…...22 km
- Msobwe (Katavi/ Kigoma Gravelling ………………………..27,300 m3 Class V and 200,000.00 150
border) Trunk Road, T.009 above Calendar
Vegetation Control………….......150,000
Section II: Vikonge - Days
m 2
Mishamo
Excavate open Drains………..…16,680 m3
Pipe culvert 900mm dia……………....32 m
Concrete Works ………………..……52 m3
Site Clearance……….…………..264,000 m2
AE/001/2019- Periodic Maintenance on Excavate top soil for structure…...1,170 m3
20/KTV/W/07 hilly secions along Fill by Gravel Material …………..…585 m3
Lyambalyamfipa - Mpanda Hardcore (150mm) ………………...1,300 m Class VI 150,000.00 120
- Msobwe (Katavi/ Kigoma Provide BRC Mesh (6mm) ……....6,500 m2 and above Calendar
border) Trunk Road, T.009 Concrete Works. …………….........1,075 m3 Days
Stone Masonry Works………...….…300 m3
AE/001/2019- Bridges Preventive Vegetation Control……………...400,000
20/KTV/W/08 Maintenance along m2
Lyambalyamfipa - Mpanda Concrete Works……………………....34 m3 Class VII 100,000.00 90
- Msobwe (Katavi/ Kigoma and above Calendar
Grouted Stone Pitching ……...…….120 m2
border) Trunk Road, T.023 Days
Stone Masonry Works…………....…107 m3
Provide Road Signs…………………..8 Nos
AE/001/2019- Rehabilitation Works, Trees felling………………...……....200 Nos
20/KTV/W09 Routine/Reccurrent Heavy grading. ………………. .……15 km
Maintenance and Bridges Light Reshaping……………….….12,000 m
Preventive Maintenance Gravelling……………. …….…....12,544 m3
Class VI 150,000.00 240
Works along Ugalla - Vegetation control.. …….…..….156,000 m2 and above Calendar
Mnyamasi R.385 Regional Site Clearance……….……………52,320 m2 Days
Roads and Rehabilitation Excavation for Open Drains … .…1,500 m3
Works along Mpanda - Desilting of Open Drains ………... 5,000 m
Mnyamasi jct. Regional Desilting culvert inlet/outlet .…......800 m3
Road R.564 Pipe culvert 900mm dia……………....16 m
Concrete Works ………………...……29 m3
AE/001/2019- Rehabilitation, Periodic Site Clearance……….………..…247,000 m2
20/KTV/W/10 Maintenance and Spot Trees felling………………......….....406 Nos
Improvement Works along Light Reshaping…………….....….12,000 m Class V and 200,000.00 150
Majimoto - Inyonga above Calendar
Heavy Grading………………..……...20km
Regional Road, R.565 and Days
Gravelling…………………...........36,712 m3
Rehabilitation Works along
Uzega - Nsenkwa - Inyonga Excavate Open Drains……..…..…..6,000 m
District Roads
AE/001/2019- Routine/Recurrent and Trees felling………………….…........15 Nos
20/KTV/W/11 Bridges Preventive Heavy Grading……………..… …….40 km
Maintenance Works along Gravelling……………………….…5,760 m2
Majimoto - Inyonga
Vegetation control…………...…506,788 m2
Regional Road, R.565 Class VI 150,000.00 90
Pipe culvert 900mm dia……...…….. . 16 m and above Calendar
Concrete Works ………………..…110 m3 Days
Excavate new Open drains……. . 7,350 m3
Desilting of Open Drains..…… ... 13,000 m
Desilting culvert inlet/outlet……2,200 m3
Provide Road Signs…………………10 Nos
AE/001/2019- Rehabilitation Works, Site Clearance……….………..…128,000 m2
20/KTV/W/12 Routine /Recurrent and Trees felling………………...…........204 Nos
Periodic maintenance Light Reshaping……………….….20,500 m
works along Sitalike - Heavy Grading……………….……...90 km
Class IV 250,000.00 240
Kibaoni - Mamba - Kasansa Gravelling…………………...........52,333 m3 and above Calendar
Regional Road, R.548 Vegetation Control .....................280,000 m2 Days
Desilting of Open Drains..……….32,000 m
Desilting culvert inlet/outlet……1,350 m3
Pipe culvert 900mm dia……..………... 8 m
Concrete Works ………………..…….13 m3
Excavate Open Drains………..……7,400 m
AE/001/2019- Bridges Major Repair Excavations for Structure………..…120 m3
20/KTV/W13 Works and Bridges Provide and arrange hardcore……. 60 m3
Preventive Maintenance Reinforcement bars .........................8,500 kg Class VII 100,000.00 90
and above Calendar
along Magamba Mtisi Concrete Works ……........................ 390 m3
Days
Regional Road, R.561 Pipe culvert 900mm dia……..…………8 m
Vegetation Control .........................8,000 m2
AE/001/2019- Bridges Preventive Concrete Works ………...................... 32 m3
20/KTV/W/14 Maintenance Works along Vegetation Control .....................325,000 m 2
Katete - Kibaoni and Painting ……………………………..220 m2
Class VII 100,000.00 90
Sitalike - Kibaoni - Kasansa Excavation for structures…….…… 600 m3
and above Calendar
Regional Roads, R. 549 and Guide Posts Construction………….16 Nos Days
R.548 Grouted Stone Pitching ……………. 84 m2
River Training ………………… …4,500 m3
Stone Masonry Works…………..….112 m3
AE/001/2019- Rehabilitation Works, Site Clearance……….……………40,600 m2
20/KTV/W/15 Routine/Recurrent, Trees felling………………...……....204 Nos
Periodic and Bridges Light Reshaping………………...….8,500 m Class V and 200,000.00 210
above Calendar
Preventive Maintenance Heavy Grading……………………..109 km
Days
Works along Kagwira - Gravelling…………………...........36,343 m3
Karema Regional Road, Vegetation Control .....................680,000 m2
R.563 Desilting of Open Drains..……….15,500 m
Desilting culvert inlet/outlet……2,300 m3
Pipe culvert 900mm dia……..………. 24 m
Concrete Works..……………….. ….. 87 m3
Stone Masonry Works..………..…….58 m3
AE/001/2019- Bridges Major Repair and Excavations for Structure……….….290 m3
20/KTV/W/16
Preventive Maintenance Provide and arrange hardcore…… ..24 m3 Class VI 150,000.00 90
Works along along Reinforcement bars ...................... 18,000 kg and above Calendar
Inyonga - Ilunde - Kishelo Concrete Works ……........................ 253 m3 Days
Regional Road R.566 Pipe culvert 900mm dia……..…….. ...24 m
Vegetation Control .......................99,000 m2
Stone Masonry Works..………..…….28 m3
AE/001/2019- Bridge Major Repair Works Dewatering …………………….Lump sum
20/KTV/W/17 along Bulamata - Ifumbula Excavations for Structure……….….120 m3 Class VII 100,000.00 90
- Ilango District Road Provide and arrange hardcore………60 m3 and above Calendar
Days
Reinforcement bars .........................9,000 kg
Concrete Works ……...........................97 m3
AE/001/2019- Periodic Maintenance and Tree felling…………………...….....240 Nos
20/KTV/W/18 Spot Improvement Works Heavy Grading………………….…...33 km
along Lyambalyamfipa - Gravelling ………………………..36,588 m3
Class V and 200,000.00 150
Mpanda - Msobwe Vegetation Control……………...150,000
above Calendar
(Katavi/Kigoma border) m2 Days
Trunk Road, T.009; Section Excavate open Drains………..... 14,841 m3
III Mishamo - Msobwe Pipe culvert 900mm dia……………....16 m
Concrete Works ……………………...26 m3
Site Clearance……….…………176,000 m2
AE/001/2019- Rehabilitation Works, Site Clearance……….……………64,000 m2
20/KTV/W/19 Routine/Recurrent, Trees felling…………………..….....218 Nos
Periodic, Spot Heavy Reshaping………...……….10,000 m
Class V and 200,000.00 240
Improvement and Bridges Heavy Grading…………….………...95 km
above Calendar
Preventive Maintenance Gravelling…………………...........22,145 m3 Days
Works along Kibo - Mwese Vegetation Control .....................320,000 m2
Lugonesi Regional Road, Desilting of Open Drains..…….. 22,000 m
R.56 Desilting culvert inlet/outlet……2,300 m3
Pipe culvert 900mm dia…….…….. . 144 m
Concrete Works..……………….. …. 87 m3
Stone Masonry Works..………...…..248 m3
Rock Excavation………………..….1000 m3
Excavate Open Drains………....…..8,680 m
Grouted Stone Pitching………..…..371 m3
AE/001/2019- Upgrading of Inyonga Clearing and Grubbing…………..44,200 m
20/KTV/W/20 Urban Section along Cut to Spoil………………………....6,500
Inyonga Jct - Ilunde m3
Road Bed preparation……………...5,000 m Class III 250,000.00 150
Regional Road, R.565
Rock Excavations ……………………..10 and above Calendar
(5KM) Days
m3
Earthworks (G7, G15, G45) ……..28,375m3
Stabilized Layer C1 (150mm) …....6,375 m3
Reinforcement bars .........................9,000 kg
Ordinary Portland Cement …...…550 tons
Prime Coat (MC 30) ………….… 42,500 m2
First Seal 20mm aggregates ….....42,500 m2
Second Seal 14mm aggregates. ...42,500 m2
Concrete Pipe culvert …..………..….112 m
Concrete Works…………………......416 m3
Grouted Stone Pitching …………..8,932m2
Road Marking edge/center line..10,500 m2
AE/001/2019- Upgrading of Mpimbwe Clearing and Grubbing………….16,800 m2
20/KTV/W21 Urban Section along Cut to Spoil……………………...….2,080
Kibaoni - Usevya Regional m3
Road Bed preparation……………...1,600 m Class V 200,000.00 150
Road, R.565 (1.6KM)
Rock Excavations ……………………..10 and above Calendar
m3 Days
Earthworks (G7, G15, G45) ……...7,600 m3
Stabilized Layer C1 (150mm) ...….2,280 m3
Ordinary Portland Cement …...…120 tons
Prime Coat (MC 30) ………..…... 15,200 m2
First Seal 20mm aggregates …….15,200 m2
Second Seal 14mm aggregates. ...15,200 m2
Concrete Pipe culvert …..…………….24 m
Concrete Works…………………......158 m3
Grouted Stone Pitching ……….…1,700 m2
Road Marking edge/center line....3,450 m2
AE/001/2019- Upgrading of Mpanda Clearing and Grubbing………..….7,600 m2
20/KTV/W/22 Urban Section along Cut to Spoil…………………..…….1,040 m3 Class VI 150,000.00 150
Kawajense - Mnyamasi Jct Road Bed preparation…………….….800 m and above Calendar
Rock Excavations ………………………4 Days
Regional Road, R.565 (0.8
m3
KM) Earthworks (G7, G15, G45) ……...3,800 m3
Stabilized Layer C1 (150mm) ……1,140 m3
Ordinary Portland Cement ……….60 tons
Prime Coat (MC 30) ………..…. …7,600 m2
First Seal 20mm aggregates ……...7,600 m2
Second Seal 14mm aggregates. .…7,600 m2
AE/001/2019- Routine/Recurrent Vegetation Control .....................600,000 m2 Labour based
20/KTV/W/23 Maintenance Works along Removal of debris ……………..…. 4000 m2 Class III and 50,000.00 180
above (also Calendar
Katete - Kibaoni Regional Desilting Open Drains……..….....32,400 m newly Days
Road, R. 54 Desilting culvert inlet/outlet……3,762 m3 registered
firms can
apply)
AE/001/2019- Routine/Recurrent Trees felling………………...……......10 Nos
20/KTV/W/24 Maintenance along Mpanda Heavy Grading…………………..…...16km
- Koga (Town Section); Gravelling………………….............5,770 m3
Class VII 100,000.00 240
T.023 and Vegetation Control .....................132,980 m2
and above Calendar
Routine/Recurrent Desilting Open Drains………...…..5,000 m Days
Maintenance, Spot Excavate Open Drains..…….. .... .. .3,580 m
Improvement Works along Desilting culvert inlet/outlet…….…855 m
Magamba - Ibindi- Mtisi
Regional Road R.561
AE/001/2019- Rehabilitation Works, Site Clearance……….………..…233,000 m2
20/KTV/W/25 Routine /Recurrent Trees felling………………...…........625 Nos
Maintenance, Spot Light Reshaping…………………..11,000 m Class IV 250,000.00 240
and above Calendar
Improvement Works and Heavy Grading…………………..…...70km
Days
Periodic Maintenance Gravelling…………………...........50,700 m3
Works along Inyonga - Vegetation Control .....................252,000 m2
Ilunde - Kasheto Regional Excavate Open Drains………....…..2,800 m
Road R.566 Desilting of Open Drains..…..… 15,500 m
Desilting culvert inlet/outlet……2,300 m3
Pipe culvert 900mm dia…….…..….. . 88 m
Concrete Works..………………..…. 152m3
AE/001/2019- Rehabilitation and Periodic Site Clearance……….……………93,000 m2
20/KTV/W/26 Maintenance Works along Trees felling…………………..….....185 Nos
Bulamata - Ifumbula - Light Reshaping…………………. 5,000 m Class VI 150,000.00 150
and above Calendar
Ilango District Road Heavy Grading……………….……...20 km
Days
Gravelling…………………...........12,568 m3
Excavate Open Drains………....…..2,000 m
Pipe culvert 900mm dia……...…….. . 88 m
Concrete Works..……………...….. 144 m3
AE/001/2019- Rehabilitation Works along Site Clearance……….……………28,000 m2
20/KTV/W/27 Uzega - Kamsisi- Trees felling…………………..….....470 Nos Class VI 150,000.00 150
Songambele - Mapili Light Reshaping…………………. 6,500 m and above Calendar
Days
District Road (14 km) Heavy Grading…………….………...95 km
Gravelling…………………...........24,075 m3

4. Bidding will be conducted through the National Competitive Bidding procedures specified in the Public Procurement
Regulations, 2013 - Government Notice No.446 and their amendments in 2016; are open to National Bidders only as indicated
above in respective bids.

5. Interested eligible Bidders may obtain further information from and inspect the Bidding Documents at the office of the Secretary
of the Delegated TANROADS Regional Tender Board, Katavi Region, P.O Box 440 Mpanda Telephone No. 025 2957112, Fax
+255-252957111 and E-mail address rm-katavi@tanroads.go.tz from 8 a.m. to 4.30 p.m. on Mondays to Fridays inclusive except on
public holidays (Offices are located at Ilembo Areas near new Mpanda Bus Terminal)

6. A complete set of Bidding Documents in English and additional sets may be purchased by interested Bidders upon submission of
the written application to the address given under paragraph 5 above and upon payment of a non-refundable fee as shown in the
above table. Payment should either be by Cash, Banker’s Draft, or Banker’s Cheque, payable to TANROADS Regional Manager,
Katavi Region.

7. For bid no. AE/001/2019-20/KTV/W/23 newly registered firms are also encouraged to apply.

8. All bids must be accompanied by a Bid Securing Declaration in the format provided in the Bidding Documents.

9. Pre-bid meeting shall be held on Tuesday 9th July 2019 at the TANROADS Regional Manager’s Office, located at Ilembo area next
to New Regional bus terminal in Katavi Region. Site visit will be conducted on Monday 8 th July 2019 for the interested bidders.

10. All bids in one original plus three copies, properly filled in, and enclosed in plain envelopes must be delivered to the address
below at or before 1100 hours on Tuesday 16th July 2019. Bids will be opened shortly in public and in the presence of Bidders’
representatives who choose to attend in the opening ceremony at the TANROADS Regional Manager’s Office, Katavi.

11. Late bids, portion of bids, electronic bids, bids not received, bids not opened and not read out in public at the bid opening ceremony
shall not be accepted for evaluation irrespective of the circumstance.

REGIONAL MANAGER
TANROADS Regional Manager’s Office,
P.O Box 440 - Katavi

Potrebbero piacerti anche