LOCATION OF PROJECT: PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
NONE
SUB-TOTAL (B.)
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
CARPENTER 1 8 60.00 480.00
LABORER 2 8 45.00 720.00
SUB-TOTAL (C.) 1200
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN FACILITIES ( FARMER'S
PROJECT HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
NONE
SUB-TOTAL (B.)
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
PART-TIME SAFETY PRACTITIONER 1 87.00 75.00 6,525.00
FIRST AIDER 1 350.00 60.00 21,000.00
SUB-TOTAL (C.) 27,525.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN FACILITIES
(FARMER'S HALL)
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
0.70 X 1.20M FIXED GLASS WITH ANALOK FRAME 24.00 PCS 1,500.00 36,000.00
(TINTED WITH GRAY)
SUB-TOTAL (A.) 294,400.00
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
( LABOR FOR INSTALLATION ONLY )
4 53 50 10,600.00
ALUMINUM INSTALLER
SUB-TOTAL (C.) 10,600.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF
FARMER'S HAVEN FACILITIES (FARMER'S HALL)
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
CARPENTER 4 9 60.00 2,160.00
LABOR 4 9 45.00 1,620.00
SUB-TOTAL (C.) 3,780.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
12
PROJECT
RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN FACILITIES
( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
MASON 4 17 47 3,196.00
LABORER 6 17 45 4,590.00
SUB-TOTAL (C.) 7,786.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN FACILITIES ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
FOREMAN 1 45 81.25 3,656.25
CARPENTER 6 45 60 16,200.00
LABORER 6 45 45 12,150.00
SUB-TOTAL (C.) 32,006.25
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN FACILITIES ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
MASON 4 50 47 9,400.00
LABORER 6 50 45 13,500.00
SUB-TOTAL (C.) 22,900.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN FACILITIES ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
TILE SETTER/MASON 4 41 47 7,708.00
LABORER 6 41 45 11,070.00
SUB-TOTAL (C.) 18,778.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
PAINTER 6.00 64 57.00 21,888.00
LABORER 4.00 64 45.00 11,520.00
SUB-TOTAL (C.) 33,408.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
PAINTER 6.00 65.00 57.00 22,230.00
LABORER 4.00 65.00 45.00 11,700.00
SUB-TOTAL (C.) 33,930.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
PAINTER 6 30 57.00 10,260.00
LABORER 4 30 45.00 5,400.00
SUB-TOTAL (C.) 15,660.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
WELDING MACHINE 1 63 380 23,940.00
PORTABLE CUT-OFF SAW 1 21 450 9,450.00
MINOR TOOLS ( 10% OF LABOR COST ) 1,832.70
SUB-TOTAL (B.) 35,222.70
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
FABRICATION
A. WELDER 1.00 83.00 59.00 4,897.00
B. LABORER 2.00 83.00 45.00 7,470.00
ELECTION
A. WELDER 1.00 40.00 59.00 2,360.00
B. LABORER 2.00 40.00 45.00 3,600.00
SUB-TOTAL (C.) 18,327.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
ELECTRICIAN 4 4 60.00 960.00
HELPER 2 4 40.00 320.00
SUB-TOTAL (C.) 1,280.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
ELECTRICIAN 4 18 60.00 4,320.00
HELPER 2 18 40.00 1,440.00
SUB-TOTAL (C.) 5,760.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
PROJECT RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX ( FARMER'S HALL )
LOCATION PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
QUANTITY
B. EQUIPMENT HOURLY RATE TOTAL
NO. OF EQUIPMENT TOTAL HOURS
NONE
QUANTITY
C. LABOR HOURLY RATE TOTAL
NO. OF PERSONNEL TOTAL HOURS
NONE
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
NAME OF PROJECT : RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX
( FARMER'S HALL )
LOCATION OF THE CONTRACT : PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY
Submitted by:
1 Part No. - Enter the ''Part No. '' for each section of the BOQ where unit prices are entered
2 Part Description - Enter the ''Part Description'' corresponding to the ''Part No.''
3 Total Amount - Enter the ''Total Amount'' in Pesos for all pages having the same ''Part Description''
Duty authorizeed to sign the Bid for and on Behalf of : GENETIAN BUILDERS
PROVINCE OF ZAMBOANGA DEL SUR
PROJECT NAME : RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN FACILITIES ( FARMER'S HALL )
LOCATION : PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY
BILL OF QUANTITIES
Part No. I Part Description : BILLBOARDS - FABRICATION OF BILLBOARDS, OCCUPATIONAL SAFETY AND HEALTH PROGRAM
ColumB13:N25n (1), (2), (3) and (4) are to be filled up by the Procuring
Entity Columns (5) and (6) are to be filled up by the Bidder
Pay Item Decription Quantity Unit Unit Price ( pesos ) Amount ( Pessos )
No.
-1 -2 -3 -4 -5 -6
Part I Other General Requirements
In Words Pesos: Eleven In Words Pesos: Eleven
Thousand One Hundred Thousand One Hundred
Twenty-Five & 98/100 Twenty-Five & 98/100
B.5 PROJECT BILLBOARD/SIGNBOARD 1 SET
In Figures: Php In Figures: Php
11,125.98 11,125.98
In Words Pesos: Fifty-Seven
In Words Pesos: Thirty-Eight
Thousand Ninety-Three &
OCCUPATIONAL SAFETY AND HEALTH Thousand Sixty-Two & 17/100 26/100
PROGRAM 1.5 MONTH
B.7
In Figures: Php In Figures: Php
38,062.17 57,093.26
Sub-Total of this Page : 68,219.24
Submitted by:
PROJECT NAME :
RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN FACILITIES
( FARMER'S HALL )
LOCATION : PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY
BILL OF QUANTITIES
Part No. III Part Description : WIRE AND WIRING DEVICES, LIGHTING FIXTURES
ColumB13:N25n (1), (2), (3) and (4) are to be filled up by the Procuring
Columns (5) and (6) are to be filled up by the Bidder
Entity
Pay Item Decription Quantity Unit Unit Price ( pesos ) Amount ( Pessos )
No.
-1 -2 -3 -4 -5 -6
Part I Other General Requirements
In Words Pesos: Seventeen
In Words Pesos: Eighty-Seven
Thousand Four Hundred
& 92/100
1101 WIRE AND WIRING DEVICES 199.00 SQ.M. Ninety-Six & 8/100
In Figures: Php In Figures: Php
87.92 17,496.08
In Words Pesos: One Thousand In Words Pesos: Fifty-Eight
Fifty-Six & 98/100 Thousand One Hundred Thirty-
1102 LIGHTING FIXTURES 55.00 SQ.M. Three & 90/100
In Figures: Php In Figures: Php
1,056.98 58,133.90
Sub-Total of this Page : 75,629.98
Submitted by:
PROJECT NAME : RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN FACILITIES ( FARMER'S HALL )
LOCATION : PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY
BILL OF QUANTITIES
Part No. II Part Description : 1/4" HARDIFLEX ON METAL FRAME CEILING, 1/4" HARDIFLEX ON METAL FRAME CEILING,
UNGLAZED CERAMIC TILES (HALLWAY),WINDOWS (GLASS WINDOWS WITH ANALOK FRAME),
ColumB13:N25n (1), (2), (3) and (4) are to be filled up by the Procuring Columns (5) and (6) are to be filled up by the Bidder
Entity
Pay Item Decription Quantity Unit Unit Price ( pesos ) Amount ( Pessos )
No.
-1 -2 -3 -4 -5 -6
Part I Other General Requirements
In Words Pesos: Six Hundred In Words Pesos: Four Hundred
Ninety-Two & 31/100 Seventy-Eight Thousand Three
Hundred Three & 13/100
1/4" HARDIFLEX ON METAL FRAME
1003 ( 1 ) 690.88 SQ.M.
CEILING
In Figures: Php In Figures: Php
692.31 478,303.13
In Words Pesos: Three
In Words Pesos: Four Hundred Forty-Five Thousand
Thousand Four Hundred Seven Eight Hundred Forty-Seven &
1008 WINDOWS (GLASS WINDOWS WITH 78.46 SQ.M. & 95/100
ANALOK FRAME) 76/100
Submitted by:
PROJECT NAME : RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX ( FARMER'S HALL )
LOCATION : PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY
BILL OF QUANTITIES
ColumB13:N25n (1), (2), (3) and (4) are to be filled up by the Procuring
Entity Columns (5) and (6) are to be filled up by the Bidder
Pay Item Decription Quantity Unit Unit Price ( pesos ) Amount ( Pessos )
No.
-1 -2 -3 -4 -5 -6
Part I Other General Requirements
In Words Pesos: Thirty-Nine
Thousand Five Hundred Fifty In Words Pesos: Four Hundred
Seventy-Four Thousand Six
AIR CONDITIONING AND VENTILATING Hundred
1200 SYSTEM 12.00 SQ.M.
In Figures: Php In Figures: Php
39,550.00 474,600.00
Sub-Total of this Page : 474,600.00
Submitted by:
1 Foreman 81.25
2 Carpenter 60.00
3 Laborer 45.00
4 Part-Time Safety Practitioner 75.00
5 First Aider 60.00
6 Electrician 60.00
7 Helper 40.00
8 Welder 59.00
9 Tile Setter/Mason 47.00
10 Mason 47.00
11 Aluminum Installer 50.00
12 Painter 57.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX
Name of Project :
( FARMER'S HALL )
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN
Name of Project :
COMPLEX( FARMER'S HALL )
10PCS. SAFETY HELMET, 10 PAIRS SAFETY GLOVES,10 PAIRS SAFETY BOOTS, 10PCS.
5 SAFETY GOGGLES, 10 PCS.SAFETY VEST,10 PCS.SAFETY KNEE PAD, 10PCS. SAFETY KNEE 23000
PAD, 1 SET OF MEDICINE KIT
1.50M X 1.20M GLASS SLIDING- TYPE WINDOW WITH ANALOK FRAME (TINTED WITH
5,000.00
GRAY)
6
2.20M X 1.20M GLASS SLIDING- TYPE WINDOW WITH ANALOK FRAME (TINTED WITH
6,700.00
GRAY)
7
0.70M X 0.60 GLASS AWNING-TYPE WINDOW WITH ANALOK FRAME (TINTED WITH
5,000.00
GRAY)
8
0.70 X 1.20M FIXED GLASS WITH ANALOK FRAME (TINTED WITH GRAY) 1,500.00
9
10 1/4" x 4' x 8' HARDIFLEX (FASCIA BOARD) 650.00
11 BLIND REVITS 335.00
12 TEK SCREW 2.00
13 0.60M X 0.60M UNGLAZED FLOOR TILES 265.00
14 TILE GROUT (5KG/PACK) 70.00
15 THE ADHESIVE (25KG/BAG) 350.00
16 REDIFIX 235.00
17 TILE CUTTER 760.00
18 1/4" X 4' X 8' HARDIFLEX (CEILING BOARD) 580.00
19 METAL DOUBLE FURRING CHANNEL (12MM X 38MM X 5M X 0.8M 140.00
20 METAL CARRYING CHANNEL ( CEILING JOIST )(12MM X 38MM X 5M X 0.8M 185.00
21 WALL ANGLE 20MM X 20MM X 2M 65.00
22 1/8" X 1/2" RIVETS ( FOR CEILING JOIST METAL FURRING ) 360.00
23 METAL SCREW 2.00
24 ROD SUSPENSION HANGER W/ ADJUSTMENT SPRING 60.00
25 WIRE CLIP 6.00
26 0.60m X 0.60M GLAZED CERAMIC TILES 250.00
27 TILE GROUT (5KG/PACK) 70.00
28 TILE ADHESIVE (25KG/BAG) 340.00
29 REDIFIX 250.00
30 TILE CUTTER 755.00
31 0.30M X 0.30M GLAZED CERAMIC TILES 50.00
32 0.30M X 0.30M UNGLAZED CERAMIC TILES 50.00
33 TILE GROUT (5KG/PACK) 70.00
34 THE ADHESIVE (25KG/BAG) 355.00
35 REDIFIX 250.00
36 TILE CUTTER 745.00
37 FLAT LATEX PRIMER 680.00
38 SEMI-GLOSS LATEX 730.00
39 CONCRETE NEUTRALIZER 535.00
40 CONCRETE PUTTY 375.00
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
Name of Project : RENOVATION/IMPROVEMENT OF BUILDINGS AND FACILITIES OF FARMER'S HAVEN COMPLEX
( FARMER'S HALL )
Location : PROVINCIAL GOVERNMENT CENTER, DAO, PAGADIAN CITY
1.5 HP WINDOW TYPE ACU, 230V, 10EER ( MIN. ) INVERTER TYPE ( INCLUDE LABOR FOR
70 35,000.00
INSTALLATION )
GENEO SOPHINE C. DY
Prop./Gen. Manager
GENETIAN BUILDERS
B.5 II 2
PROJECT BILLBOARD/
SIGNBOARD
S-S =+3
3 5
3 5
0 5 10 13 20 26 31 35 40 47 50 55 60 68
0 5 10 13 20 26 31 35 43 50 50 55 60 68
.
F-S = +3
LIGHTING FIXTURES
PAINTING WORKS PAINTING WORKS
(MASONRY WORKS) (WOOD WORKS)
F-S =+6 F-S =+5
43 49 55 64 69 76
43 49 55 64 69 76
B.7 89
OCCUPATIONAL SAFETY
AND HEALTH PROGRAM
1 90
1 90
1018(a) I 6 1200 I 5 II.9 I 5
AIR CONDITIONING
CERAMIC TILES (CR FLOOR UNGLAZED CERAMIC F-S =0
AND WALL) TILES (HALLWAY) AND VENTILATING
F-S =0 F-S =0 F-S =+3 SYSTEM
68 74 74 79 82 87
68 74 74 79 82 87
1032(c) 6
PAINTING WORKS
(METAL WORKS)
F-S = +5
81 87
81 87
ITEM NO. SCOPE OF WORKS AMOUNT % WT.
B.5 PROJECT BILLBOARD / SIGNBOARD 11,125.98 0.40%
B.7 OCCUPATIONAL SAFETY AND HEALTH PROGRAM 57,093.26 2.03%
1003(1) 1/4" HARDIFLEX ON METAL FRAME CEILING 478,303.13 17.01%
1008 METAL ROOFING ACCESSORY (FASCIA BOARD) 345,847.76 12.30%
1013(2) WINDOWS (GLASS WINDOWS WITH ANALOK FRAME) 28,855.51 1.03%
1018(a) UNGLAZED CERAMIC TILES (HALLWAY) 133,881.85 4.76%
1018(b) GLAZED CERAMIC FLOOR TILES (INTERIOR) 290,991.45 10.35%
1018 (c) CERAMIC TILES (CR FLOOR AND WALL) 224,696.96 7.99%
1032(a) PAINTING WORKS ( MASONRY WORKS) 171,321.25 6.09%
1032(b) PAINTING WORKS ( WOOD PAINTING ) 164,444.31 5.85%
1032 (c) PAINTING WORKS ( METAL PAINTING ) 112,591.64 4.01%
1047 METAL STRUCTURE - TUBULAR STEEL RAILINGS 241,750.08 8.60%
1047(b) WIRE AND WIRING DEVICES 17,496.08 0.62%
1102(a) LIGHTING FIXTURES 58,133.90 2.07%
1200 AIR CONDITIONING AND VENTILATING SYSTEM 474,600.00 16.88%
TOTAL PROJECT COST: 2,811,133.16 100.00%
Scheduled accomplishment in %
Comulative accomplishment in %
Weekly Accomplishment in (Php)
PLAN
Cumulative Accomplishment in (Php)
Weekly Accomplishment in (Php)
ACTUAL
Cumulative Accomplishment in (Php)
Weekly Accomplishment in (Php)
SLIPPAGE
Cumulative Accomplishment in (Php)
MONTH 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
######
############### ######### ##################
##################
### ######
9.80%
9.80%
275,504.12
275,504.12
MONTH 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
#######################################################################################
#####################
######
###############
###############
#########
##################
44.86%
54.66%
1,260,936.29
1,536,440.41
MONTH 3
30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
###############
#########
##################
##################
###### 0.84% 0.84%#########
###############
###############
43.50%
98.15%
1,260,936.29 1,222,73
1,536,440.41 2,759,17
25 26 27 28 29 4 5 6 7 8 9 10 11
100%
###############
80%
60%
40%
###
20%
1,222,731.47
2,759,171.88
12 13 14 15 16 17 18 19 20 21
22 23 24 25 26 27 28 29 30
PROJECT I.D: INFRA 2K20 - 07
PROJECT TITLE: CONSTRUCTION / RENOVATION OF YOUTH CENTER AND OTHER FACILITIES (RENOV. OF PGC CONVENIENCE STORE)
DURATION: 15 C.D
B.5 II 1
1014 I 2 1018(a) 2 1047 1
PROJECT BILLBOARD/
SIGNBOARD METAL STRUCTURES-
APPLICATION OF ROOF
GLAZED CERAMIC TILES FABRICATION OF
S-S =+1 SEALANT F-S =0 F-S =0 DISPLAY RACKS
1 2
1 2 8 10 10 12 12 13
8 10 10 12 12 13
F-S =+0
0 2 2 4 4 5 5 6 6 8 8 9 9 11 11 13 13 15
0 2 2 4 4 5 5 6 6 8 8 9 9 11 11 13 13 15
.
F-S = 0
LIGHTING FIXTURES
PAINTING WORKS PAINTING WORKS
(MASONRY WORKS) (WOOD WORKS)
F-S =+1 F-S =0
6 7 8 11 11 13
6 7 8 11 11 13
B.7 14
OCCUPATIONAL SAFETY
S-S =+1 AND HEALTH PROGRAM
1 15
1 15
B.7
OCCUPATIONAL SAFETY AND
HEALTH PROGRAM
S-S =+1 1
1
II 1
ROJECT BILLBOARD/
SIGNBOARD
2
2
III 2 804(a) 1
UCTURAL EXCAVATION GRAVEL BEDDING (PATHWALK)
4 4 5
4 4 5
14
UPATIONAL SAFETY AND
HEALTH PROGRAM
15
15
804(b) 1 1003(a) 2
SAND BEDDING (PATHWALK) 1/4" MARINE PLYWOOD ON
WOOD FRAMING CEILING
5 6 6 8
5 6 6 8
F-S = 0
1102(a) 1
LIGHTING FIXTURES
6 7
6 7
1014 I 2 1018(a)
APPLICATION OF ROOF SEALANT GLAZED CERAMIC TILES
F-S =0
8 10 10
8 10 10
F-S =+0
1003(b) 1 1003 ( c )
3/4" PLYBOARD & 1/4 MARINE
1/4" MARINE PLYWOOD ON METAL PLYWOOD ON CASHIER COUNTER AN
FRAME DOUBLE WALL PARTITION
SNACK BAR COUNTER
8 9 9
8 9 9
1032(1)a 3 1032(1)b
PAINTING WORKS (MASONRY PAINTING WORKS (WOOD
WORKS) WORKS)
8 11 11
8 11 11
2 1047 1
METAL STRUCTURES-
AZED CERAMIC TILES FABRICATION OF DISPLAY RACKS
F-S =0
12 12 13
12 12 13
2 1007 2
PLYBOARD & 1/4 MARINE
D ON CASHIER COUNTER AND ANALOK DOUBLE-SWING GLASS DOOR
SNACK BAR COUNTER
11 11 13
11 11 13
2
NTING WORKS (WOOD
WORKS)
13
13
2
DEMOBILIZATION
13 15
13 15
PROJECT I.D: INFRA 2K20 - 07
PROJECT TITLE: CONSTRUCTION / RENOVATION OF YOUTH CENTER AND OTHER FACILITIES (RENOV. OF PGC CONVENIENCE STORE)
DURATION: 15 C.D
PROJECT BILLBOARD/
SIGNBOARD
S-S =+3 3 5
3 5
0 5 3 7 11 19 23 29 29 31 32 35 38 40 42 43 43 45
0 5 3 7 11 19 23 29 29 31 32 35 38 40 43 43 43 45
.
F-S = +1
1102(a) 3 1102(b) 1
36 39 41 42
36 39 41 42
B.7 44
OCCUPATIONAL SAFETY
S-S =+1 AND HEALTH PROGRAM
1 45
1 45
1101 2 1003(1) 2
1200 2
55 57
55 57
B.5 2 1047(3)d 2 1003(1) 2 1003(2) 2
F-S =+0
II.9 5 801 2 803(1)a 2 804(4) 3 900(1)c2 3 902(1)a 4 900(1) 3 1047(2)a 3 1047(2)c 4 1013(2) 3 1014 3 1051 3 4 3 3
0 5 3 5 8 10 12 15 17 20 21 25 26 29 31 34 34 38 38 41 41 44 44 47 49 53 53 56 57 60
0 5 3 5 8 10 12 15 17 20 21 25 26 29 31 34 34 38 38 41 41 44 44 47 49 53 53 56 57 60
.
F-S =+2 F-S =+0
UNGLAZED CERAMIC GLAZED CERAMIC TILES ANALOK GLASS WINDOW WOODENDOORS - (PANEL DOOR PAINTING WORKS (WOOD PAINTING WORKS (MASONRY PAINTING WORKS (METAL
TILES (FLOOR TILES) (WALL TILES) (SLIDING/CASEMENT/AWNIN TYPE) PAINTING) PAINTING) PAINTING)
G/FIXED GLASS) F-S =+1
F-S =+0 F-S =+0 F-S =+0 F-S
F-S =+1 =+0
36 39 39 42 43 45 45 47 48 51 51 54 54 57
36 39 39 42 43 45 45 47 48 51 51 54 54 57
B.7 59
1 60
1 60
Submitted by:
MANUEL V. SILLA
Proprietor
LMD Construction
PROJECT I.D: INFRA 2K20 - 05
PROJECT TITLE: RENOVATION/IMPROVEMENT OF BUILDING AND FACILITIES OF FARMER'S HAVEN COMPLEX (SHEPHERD'S HALL)
DURATION: 60 C.D
Submitted by:
MANUEL V. SILLA
Proprietor
LMD Construction
ITEM NO. SCOPE OF WORKS
A.1.2(4) PROVISION OF 4X4 PICK-UP TYPE SERVICE VEHICLE FOR THE ENGINEER ON BARE RENTAL BASIS
A.1.1 (6) PROVISION OF COMBINED FIELD OFFICE, LABORATORY AND LIVING QUARTERS BUILDING FOR THE ENG
E, LABORATORY AND LIVING QUARTERS BUILDING FOR THE ENGINEER (RENTAL BASIS)
PROGRAM
PCCP
TIREPATH
MATERIAL)
ON (COMMON SOIL)
MINOR STRUCTURES)
58MPA - 28DAYS)
PC)
SOIL)
OIL)
W6-2)
W8-1A)
FLECTORIZED - WHITE)
VRON SIGNS)
QTY UNIT UNIT PRICE AMOUNT
0.16%
0.21%
0.16%
0.82%
0.01%
0.21%
1.24%
0.02%
0.01%
5.44%
1.63%
0.34%
7.02%
39.34%
0.14%
0.18%
1.99%
0.34%
0.57%
2.64%
14.67%
0.07%
11.98%
7.20%
0.08%
0.01%
0.01%
0.01%
0.04%
0.02%
0.01%
0.04%
0.05%
0.10%
2.37%
0.87%
100.00%