PROJECT : PROPOSED HOUSE EXTENSION

ITEM DESCRIPTION QTY UNIT


I EARTHWORKS
1. EXCAVATION 10.32 CU.M
2. BACFILLING AND COMPACTION 6.86 SQM
3. GRAVEL BEDDING 2.00 CU.M
II CONCRETE, REBARS AND FORMWORKS
1. REBARS 652.00 KGS
2. FORMWORKS
a. 1/2 PLYWOOD 8.00 PCS
b. 2'' x 2'' x 8' GOOD LUMBER 20.00 PCS
c. 2" x 3" X 8' GOOD LUMBER 15.00 PCS
d. ASSORTED CWN 6.00 KGS
3. CONCRETING
a. CEMENT 62.00 BAGS
b. SAND 3.50 CU.M
c. GRAVEL 7.00 CU.M
d. G.I. WIRE # 16 10.00 KGS
III CHB LAYING, PLASTERING & TILING
1. CHB 4'' 400.00 PCS
2. CEMENT 50.00 BAGS
3. SAND 2.00 CU.M
4. 10 MM DSB 25.00 PCS
5. TILES 300 X 600 30.00 PCS
6. TILE ADHESIVE 2.00 BAGS
7. TILE GROUT 1.00 BAGS
5. G.I. WIRE # 16 10.00 KGS
IV DOORS AND WINDOWS
1. DOORS 4.00 SETS
2. WINDOW 2.00 SETS
V ROOFING AND TRUSSES
1. G.I. CORRUGATED SHEETS GUAGE 24 20.00 L.M
2. GUTTER GUAGE 24 3.00 L.M
3. FLUSHING 19.00 L.M
4. 2 x 4 TUBULAR STEEL 4.00 PCS
5. 2 x 4 C PURLINS 6.00 PCS
6. WELDING ROD 15.00 KGS
7. EPOXY PRIMER 1.00 GALS
8. TEKSCREWS 100.00 PCS
9. BLIND RIVETS 1.00 BOX
10. PAINT BRUSH 2.00 PCS
11. SEALANT 1.00 TUBE
9. BLIND RIVETS 1.00 BOX
VI GATE AND GRILL
1. 2 x 4 TUBULAR STEEL 6.00 PCS
2. 1 x 1 TUBULAR STEEL 25.00 PCS
3. WELDING ROD 15.00 KGS
4. EPOXY PRIMER 2.00 GALS
5. PAINT BRUSH 2.00 PCS
VII PLUMBING
1. P - TRAP 2'' 1.00 PCS
2. PVC TEE 2'' 3.00 PCS
3. PVC ELBOW 2'' 5.00 PCS
4. PVC PIPE 2'' 3.00 PCS
5. PVC ELBOW 1/2'' 4.00 PCS
6. PVC COUPLING 1/2'' 2.00 PCS
7. PVC TEE 1/2'' 2.00 PCS
8. PVC PIPE 1/2'' 3.00 PCS
9. S/S SINK 1.00 SETS
VIII MOBILIZATION/DEMOBILIZATION 1.00 LOT
IX SUPERVISION 1.00 LOT