100%(1)Il 100% ha trovato utile questo documento (1 voto)
5K visualizzazioni1 pagina
This document is a quotation for installing aluminum partitions with doors and windows in 6 rooms and a store at the Civil Engineering Laboratory at the Federal Polytechnic Ilaro. It provides the details of the work, including descriptions, quantities, rates and amounts for each item. The total cost for the project is 1,895,250 Naira.
This document is a quotation for installing aluminum partitions with doors and windows in 6 rooms and a store at the Civil Engineering Laboratory at the Federal Polytechnic Ilaro. It provides the details of the work, including descriptions, quantities, rates and amounts for each item. The total cost for the project is 1,895,250 Naira.
This document is a quotation for installing aluminum partitions with doors and windows in 6 rooms and a store at the Civil Engineering Laboratory at the Federal Polytechnic Ilaro. It provides the details of the work, including descriptions, quantities, rates and amounts for each item. The total cost for the project is 1,895,250 Naira.
QUOTATION FOR ALUMINIUM PARTITIONS OF SIX (6) ROOMS WITH DOOR
AND WINDOW GLAZE WITH BOARD AND GLASS AT THE CIVIL ENGINEERING LABORATORY AT THE ENGINEERING BUILDING COMPLEX FEDERAL POLYTECHNIC ILARO
S/ DESCRIPTION QTY RATE AMOUNT
N 1. Complete aluminium with board and 1 N 175, 000 N 175, 000 glass 3250 x 2150 (store) 2. Complete aluminium with board and 11 N 130, 000 N 1, 430, 000 glass 2760 x 2150 (5 rooms) 3. Complete aluminium doors with glass and 6 N 27, 000 N 162, 000 board (6 rooms) SUBTOTAL N1, 505, 000. 00
STABILITY CERTIFICATE FOR PATIL SADAN I Hereby Certify That I Had Inspected The Above Referred Structure With A View To Ascertain The Structural Stability of The Building