Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 1 of 11
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 2 of 11
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 3 of 11
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 4 of 11
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 5 of 11
Serial Sub-Activities Hazards Identified Risks Involved Risk Rating Residual
No. Initial Control Measures
(Generic & Task) (People & Property) Severity Probability Risk
Risk
• Defective equipment Hearing losses
Electricity Eye injury • PTW shall be applied and obtained prior to
7. Use of power tools Improper use of Crushing start, If spark producing activity is performed
(Grinder, Pipe cutter, equipment Back injury · Defective tools should not be issued or used to M
drill ) Poor maintenance Burns 3 C M perform a task. (ALARP)
Untrained workers Electrocution • Operators must be having their training card.
Flying object Ringing in the • Monthly inspection should be carried out by the
Noise and vibration ear / Deafness electrician and record to be kept at the store
Fire · All portable power tools should be fitted with
Dust adequate fuse protection either in the tool body
or in its electrical plug.
· The weight, size and type of tool should be
selected to suit the job being carried out.
• Don’t lay the cables around the access way, it
should be routed properly.
• Industrial distribution board and socket only
shall be used at site.
• No joints shall be made in electrical cable.
• Cable hangers shall be used to avoid the
direct contact of power tools cable with the
scaffolding members.
• Electrical connection shall be routed through
ELCB only ( Eg. 30ma )
· Tools should be stored and maintained in good
working condition.
· Appropriate PPE Should be use ( Goggles,
Mask, Ear plug, Gloves, Shoe, Helmet, Overall,
Vest )
Project Name
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 6 of 11
Serial Sub-Activities Hazards Identified Risks Involved Risk Rating Residual
No. Initial Control Measures
(Generic & Task) (People & Property) Severity Probability Risk
Risk
·Defective Machine
·Improper use of Machine • Cuts • Polythene sheets shall be laid and drip trays to
• Crush be placed below the machine to prevent M
·Poor maintenance
Operating with Thread • Skin Effect 3 C M spillages. (ALARP)
8. ·Untrained, Unauthorized • Entanglement • Defective machine should not be used to
Machine Workers • Eye, finger injury perform the task.
• Slip, trip and fall • Fracture • Only those persons who have been adequately
• Spillage trained and experienced in the use of the
machine should be allowed to use the same.
• Machine should be maintained in good working
condition.
• All spillages must be cleaned immediately
• Waste oil should be disposed in an approved
manner.
• Operator should check the machine condition
prior to start the work.
• Adequate lighting and ventilation shall be
provided.
• Fire extinguisher shall be provided
• Area shall be barricaded and provide signage.
· Appropriate PPE Should be use ( Goggles,
Mask, Ear plug, Gloves, Shoe, Helmet, Overall,
Vest )
• PTW to be applied and obtained prior to start,
If spark producing activity is performed
• Fire •Electric Shock • Certified person only undertake the welding job
• Untrained, Unauthorized •Burns • All Flammable /combustible materials should Low
9. Welding/ brazing work Worker •Skin Effect 4 C H be removed from the area where welding & gas (ALARP)
• Improper lighting •Eye Injury cutting operations are carried out.
• Inadequate ventilation •Property damage • Fire blankets should be used to contain sparks
and molten metal’s within the floor and should
not be allowed to fall from height.
Project Name
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 7 of 11
Serial Sub-Activities Hazards Identified Risks Involved Risk Rating Residual
No. Initial Control Measures
(Generic & Task) (People & Property) Severity Probability Risk
Risk
• Warning signs and boards should be provided
And area to be well barricaded
• Adequate lighting and ventilation to be
Provided.
• Close supervision to be done at all times.
•Flash back arrestor to be installed for the
cylinder
•Empty cylinder to be identified and stored
separately.
•Fire extinguishers to be made available.
• Gauges of cylinders to be functional to ensure
the pressure variation inside the cylinder.
• Hoses should be of approved type and should
be free and hose checklist to be maintained.
∙Area to be restricted to unauthorized personnel.
• Calibrated gauges only to be used.
·Appropriate PPE Should use ( Face shield, Dust
mask, Goggles, Gloves, Shoe, Helmet, Overall,
Vest )
Serial Sub-Activities Hazards Identified Risks Involved Risk Rating Control Measures Residual
Project Name
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 8 of 11
No. (Generic & Task) (People & Property) Severity Probability Initial Risk
Risk
• Do not work from the top of two rungs of step
ladders.
• Remember the 3 point contact.
• Do not work in front of the door. If work is
carried out then locked the door or blocked off
• Ladder shall be used for short duration works
Only limited to 15 min.
• Colour code system shall be implemented.
• Do not stack materials on to the scaffold.
• Visual inspection should be carried out before
• Uneven surface • Sprain and strain use (i.e., hand rails, toe board, on the platform
• Overhead structure and cable • Fracture and any opening are there). Low
• Materials and worker fall • Spinal cord damage 3 C M • Out rigger shall be fitted and breaks are locked (ALARP)
Working on mobile from height • Musculoskeletal on.
11. scaffold • Untrained, unauthorized Injury • Only trained scaffolders shall be involved in
Workers • Fatality erection & dismantling activities.
• Collapse of scaffold • No person to be on the scaffold while it is
being moved.
• Safety harness shall be used above 2mtr height
and anchored in above shoulder height at all time
• Tagging system shall be implemented ( i.e., all
safe scaffolds shall be provided with green tags
and unsafe scaffolds with red tag )
• Keep walkways free of obstacles, tools and
equipment.
• Work at height is restricted during adverse
weather condition.
• Adequate lighting shall be provided while
working at night.
• Never stand and sit on the hand rails
• Mobile scaffold height should be restricted to
3.5 to 4 times the shortest base width, If height
of scaffold exceeds raker support or it should be
tied to the structure properly.
Serial Sub-Activities Hazards Identified Risks Involved Risk Rating Control Measures Residual
No. (Generic & Task) (People & Property) Severity Probability Initial Risk
Project Name
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 9 of 11
Risk
• Unauthorized/ • Openings in the roof must be securely covered
Untrained workers • Fatality or guarded.
• Slip, trip and fall • Fracture 4 B M • Keep walkways free of obstacles, tools and Low
12. Working on roofs • Material Fall from • Sprain and strain Equipment (ALARP)
height • Covering or guarding may be removed to allow
• Abnormal weather the passage of men or material, it must be
replaced immediately after that operation.
• Barricade the ground level area of work and
post warning signs.
• Wet, windy or hot weather can seriously affect
your safety during roofing works, ask if in
doubt and do not work in that abnormal
weather condition
• High visibility vest to be worn at all times
while work on roof.
Serial Sub-Activities Hazards Identified Risks Involved Risk Rating Control Measures Residual
No. (Generic & Task) (People & Property) Severity Probability Initial Risk
Project Name
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 10 of 11
Risk
· Isotonic drinks shall be provided.
• Provide sufficient rest breaks based on the
humidity & temperature conditions.
• Heat stress management plan shall be
developed and implemented during the
activity.
RISK MATRIX
Probability
A B C D E
Project Name
Ref No:
ACTIVITY– INSTALLATION OF CHILLED WATER EXPANSION TANKS & PRESSURIZATION UNITS Rev.No:0
Page 11 of 11
Improbable Remote Occasional
Probable Frequent
Severity People Assets Environment Reputation 1 in 100,000 1 in 10,000 1 in 1000
1 in 100 years 1 in 10 years
Years Years years
Multiple
fatalities or
Extensive International
5-Catatrophic permanent Massive effect
damage impact
total
disabilities
Single
fatalities or
4-Severe permanent
Major
Major effect National impact
High Risk
damage
total
disabilities
Major injury
Local Considerable
Medium Risk
3-critical or health Localised effect
effects
damage impact (ALARP)
Minor
Minor
2-Marginal injury or Minor effect Minor impact
damage
health effects
Slight injury
Slight
1-Negligble or health
Damage
Slight effect Slight impact Low Risk
effects
3-E
HIGH 4-C,D,E
5-B,C,D,E
1-D,E
2-B,C,D,E
3-A,B,C,D
MEDIUM 4-A,B
5-A
LOW 1-A,B,C
2A