Report #: PR - 001

PAINTING INSPECTION REPORT


Date:
QC

JOB : STD PAINT: V SPECIAL PAINT:

PROJECT NAME : PAINT SPEC :

Sr. # Part.# Qty SURFACE PREPARATION


1 Date of Surface Prep. ANCHOR PROFILE [ Micron ]
2 Profile Gauges Model Min. Max.
3 Required 40 70
4 Actual 50 60
5
6 ABRASIVE DETAILS
7 Media G18
8 Result :
Accept V Reject
9
10 DFT Gauge Model: A456CFBS Serial No: MG14041
11 DFT Actual:
12 COATING
13 Coat Type Primer 1 Midcoat1 Midcoat 2 Topcoat
14 Paint Product
15 Color / RAL #
16 Base Batch #
17 Cure Batch #
18 Date of Application
19 Ambient Temp ºC
20 Steel Temp ºC (a)
21 Dew Point ºC (b)
22 Difference (a & b)
23 Max. RH [%]
24 Weather Condition
25 Required DFT (µm)
26 Actual DFT Min. (µm)
27 Actual DFT Max. (µm)
28 Average DFT

Result : (1) Visual Inspection Accept V Reject

(2) DFT Actual Accept V Reject

Note: All tolerances and standards as


per SSPC unless otherwise noted.
Average DFT as per SSPC PA2- Appendix2
QF-MFF(QC)-09 R02 1-12-2015
NA = Not Applicable QC INSPECTOR QC SUPERVISOR
Trịnh Minh Khoa

QF-MFF(QC)-09 R02 1-12-2015