Sei sulla pagina 1di 10

1 2 3 4 5 6 Notes:

PATTERNS ELEVATION
PATTERNS ELEVATION
Client:

+1.885
-0.115

+4.11
A B C D A B C D +0.185
4800 3600 4450 4800 3600 4450
E E

Project Manager:

2000 2200
400 50

1850
1785

785 2755 890 Designer:

485
235

1 1

1335

2650
General Key Plan:

+1.885
4600

4600
350

+4.11 170
D D
350

16
+4
50
2 750 2

PLAN NORTH
Gewan Island
2285 470

QIB
+0.185 -0.115

LA
3800
5400

5400
950

300
250

3 3
350 450

1050
1350

150 C
3100

3100
C 235

2050
4 4
270

+4.11
Project Name:

+0.185 -0.115
7300

7300
Project Number Q18020-0100D
2115

ISSUED FOR TENDER


B B
150 APRIL 2019
400

250
5 5
300
600

600

1950
400 270
1480

2150

420
2000 1800 1450 3750
00 TD 04/04/2019 Approved Issue A.M.
Rev. Phase Date Description Appr.

Issue:

FILE NAME: Q18020-0100D-PK3-02A-TD-SC-1000-00

DRAWN BY: M.W./N.O./A.N.


BACKFILL PLAN NOTES:- ENGINEERING FILL PLAN DESIGNED BY: M.TH

1 : 50 1. THE SHOWN FILL LEVELS ARE IN M QNHD. 1 : 50 CHECKED BY: T.KH.

APPROVED BY: M.M.


2. THE FILL LEVELS INDICATED CORRESPOND TO BOTTOM OF BLINDING.
Sheet Title
3. CONTRACTOR MAY ADJUST THE FILL LIMITS TO ALLOW FOR THE WORKING SPACE REQUIRED TO SUIT ITS CONSTRUCTION METHODS.
Standalone Villa
Zone Key Plan:
4. A DEWATERING SYSTEM IS TO BE MAINTAINED TO LOWER THE WATER LEVEL DOWN TO BELOW THE PROPOSED EXCAVATION/FOUNDATION LEVELS. THE WATER LEVEL DOWN TO BELOW THE PROPOSED
EXCAVATION/FOUNDATION LEVELS BY A MINIMUM OF 0.50M TO ENABLE INSPECTION, CLEANING, AND POURING THE CONCRETE IN THE DRY. THE DEWATERING SYSTEM IS TO BE DESIGNED TO ENSURE THERE IS NO
MIGRATION OF FINES AND SAND PARTICLES DURING THE DEWATERING PROCEDURES.
BUILDING 02A
5. THE BOTTOM OF EXCAVATION SHALL BE INSPECTED AND PREPARED IN ACCORDANCE WITH SPECIFICATIONS.
A
PLANS
6. DEWATERING SHOULD NOT BE STOPPED IN ANY CASE WITHOUT THE ENGINEER'S WRITTEN APPROVAL.

7. THE CONTRACTOR SHALL ENSURE THAT ALL DIVERSIONS OF EXISTING UTILITIES ARE CARRIED OUT PRIOR TO EXCAVATION AND TO THE APPROVAL OF THE ENGINEER. ENGINEERED FILL PLAN &
BACKFILL PLAN
8 . THE ENGINEERED FILL SHALL BE COMPACTED IN LAYERS OF 25CM IN LOOSE THICKNESS TO A MINIMUM DENSITY OF 98% MDD AS OBTAINED FROM MODIFIED PROCTOR TEST. THE CONTRACTOR TO ENSURE THE
REQUIREMENT AND QUALITY OF THE ENGINEERED FILL. THE FILL SHALL EXTEND 1M BEYOND THE FOUNDATION DIMENSIONS FROM EACH SIDE. THE ENGINEERED FILL SHALL BE PLACED WITH A SLOPE OF 1V:1.5H FROM Plot Key Plan:

THE RAFT LEVEL AND THICKNESS EXTENDING TILL THE TOP OF COMPETENT BEDROCK WHICH CORRESPONDS TO TOP OF CAPROCK IF THE PROBE DRILLING CONFIRMS THE ABSENCE OF SILT LAYER BELOW THE Sheet No.
CAPROCK. OTHERWISE THE FILL SHALL EXTEND TILL TOP OF SIMSIMA LIMESTONE.

9. THE FILL UNDER THE GROUND FLOOR SLAB SHALL SATISFY THE SUITABLE FILL MATERIAL CRITERIA AND SHALL BE PLACED IN LAYERS OF 25CM AND COMPACTED TO A MINIMUM DENSITY OF 95% MDD. 02A-SC-1000
10. PROBING SHALL BE CARRIED OUT UNDER THE BUILDING FOOTPRINT AT A GRID OF 5*5M. THE DEPTH OF THE PROBING SHALL EXTEND 15M BELOW THE CAPROCK TOP LEVEL. IF A CAVITY IS DETECTED, THE EXTENTS PACKAGE BUILDING DESIGN TRADE SERIAL
SHEET
SHALL BE DEFINED AND GROUTED AS PER THE SPECIFICATIONS. CODE PHASE
NUMBER

PK3 02A TD SC 1000


1 2 3 4 5 6
1 2 3 4 5 6 Notes:

1. THIS DRAWING SHOULD BE READ IN


CONJUNCTION WITH GENERAL NOTES AND
GENERAL DETAILS DRAWINGS.

Client:

A B C D
4800 3600 4450 A B C D A B C D
4800 3600 4450 4800 3600 4450
A B C D
E 4800 3600 4450 E

Project Manager:

1
1 1

1
4600

4600

4600
Designer:

4600
2
2 2

2
5400

5400

5400
General Key Plan:

5400
3
3 3
3100

3100

3100

3100
D D
4
4 4

16
+4
50
4

PLAN NORTH
Gewan Island
7300

7300

7300

QIB
LA
7300
5
5 5

BASEMENT FLOOR LOADING PLAN GROUND FLOOR LOADING PLAN FIRST FLOOR LOADING PLAN ROOF LOADING PLAN
1 : 100 1 : 100 1 : 100 1 : 100
C

SUPER IMPOSED DEAD LOAD (TON/m2)


PATTERNS FUNCTION LIVE LOAD
A B C D PARTITION FINISHING HANGING CEILING (TON/m2 )
4800 3600 4450

RESIDENTIAL 1 0.45 0.25 0.05 0.025 0.20

Project Name:
STAIRS 0.00 0.25 0.00 0.00 0.50

1 0.20
INCLUDING
INACCESSIBLE 0.00 0.45 0.05 0.025 0.10(SAND LOAD)
4600

POOL 0.00 0.45 0.00 0.00 1.50

Project Number Q18020-0100D


GARDEN / GREEN 0.00 1.35 0.05 0.025 0.50
2

ROOF 0.30 0.45 0.05 0.025 0.30 ISSUED FOR TENDER


B B
5400

APRIL 2019

TOILET 0.65 0.45 0.05 0.025 0.20

3 MEP 1 0.35 0.65 0.05 0.025 0.50


3100

PLANTERS 0.00 2.35 0.05 0.025 0.00

4 00 TD 04/04/2019 Approved Issue A.M.


Rev. Phase Date Description Appr.
WATER TANK 1 0.00 0.65 0.05 0.025 1.50
Issue:

RESIDENTIAL 2 0.35 0.60 0.00 0.00 0.20 FILE NAME: Q18020-0100D-PK3-02A-TD-SC-1001-00


7300

DRAWN BY: M.W./N.O./A.N.

DESIGNED BY: M.TH

WATER TANK 2 0.00 0.2 0.00 0.00 3.70 CHECKED BY: T.KH.

APPROVED BY: M.M.

Sheet Title
RESIDENTIAL 3 0.35 0.25 0.00 0.00 0.20
Standalone Villa
5 Zone Key Plan:

MEP 2 0.35 0.60 0.00 0.00 0.50


BUILDING 02A
A
NOTE: PLANS
-A LINE LOAD WITH A VALUE OF 1.8 TON/M IS PLACED AT THE BUILDING PERIPHERY TO ACCOUNT FOR SKIN LOAD. LOADING PLANS
TOP OF ROOF LOADING PLAN -IN CASE OF ANY CHANGE IN THE MECHANICAL / ELECTRICAL EQUIPMENT LOCATION AND/OR LOADING VALUE ,
1 : 100 THE CONTRACTOR SHALL BRING TO THE CONSULTANT NOTICE FOR REVIEW AND APPROVAL.
Plot Key Plan:
-IN CASE OF ANY CHANGE / DISCREPANCY IN THE FUNCTION OF AREA WITHIN FLOORS,
THE CONTRACTOR SHALL BRING TO THE CONSULTANT NOTICE FOR REVIEW AND APPROVAL. Sheet No.

02A-SC-1001
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER

PK3 02A TD SC 1001


1 2 3 4 5 6
1 2 3 4 5 6 Notes:

1. THIS DRAWING SHOULD BE READ IN


CONJUNCTION WITH GENERAL NOTES AND
GENERAL DETAILS DRAWINGS.

2. ALL COLUMNS ARE CONCENTRIC Client:


WITH THEIR RELATIVE AXES UNLESS
OTHERWISE SHOWN ON PLAN.

E E

A B C D
Project Manager:

4800 3600 4450

Designer:

300 100 General Key Plan:


1

650

250
C5

C3

4600
D D

16
+4
50
50 2650

300
300 150 PLAN NORTH
Gewan Island
600 C1 BW1 C1 BW1

QIB
LA
2

BW4
C3 C5 BW2

BW1
5400

WT1
700

4450
BW2

1900
1400

300
1535
WT1 C
W1
3

WT2

600

600
C
350

1050
350

WT1
1350
1350 C4
C2
150 C1
3100

BW2 2380

SW1
WT1
1150

BW4
1535
50
350

W1
350

C1
4

600
1350 1350 1000
C4
C2

BW3
Project Name:

2100
SW1

850

SW1
BW4

1350 1000
7300

Project Number Q18020-0100D

SW1

C3 C1
ISSUED FOR TENDER
B B
APRIL 2019

3600
3550

3500

50

C1 C1 BW1
BW1
5
480

480

300

150
300 C3 200 C3
00 TD 04/04/2019 Approved Issue A.M.
Rev. Phase Date Description Appr.

Issue:

FILE NAME: Q18020-0100D-PK3-02A-TD-SC-1002-00

DRAWN BY: M.W./N.O./A.N.

DESIGNED BY: M.TH

CHECKED BY: T.KH.

APPROVED BY: M.M.

Sheet Title

Standalone Villa
Zone Key Plan:

COLUMN & AXIS LAYOUT BUILDING 02A


A 1 : 50
PLANS
COLUMNS & AXES LAYOUT

Plot Key Plan:

Sheet No.

02A-SC-1002
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER

PK3 02A TD SC 1002


1 2 3 4 5 6
1 2 3 4 5 6 Notes:

1. THIS DRAWING SHOULD BE READ IN


CONJUNCTION WITH GENERAL NOTES AND
GENERAL DETAILS DRAWINGS.
CONCRETE PAD
2.PAD LOCATIONS / FINAL DIMENSIONS SHALL Client:
BE VERIFIED BY THE CONTRACTOR PRIOR
CONSTRUCTION BASED ON EQUIPMENT
HATCH T.O.C. LEVEL THICKNESS (mm) MANUFACTURERER / SUPPLIER
RECOMMENDATIONS.

+1.06 600

E E

A B C D
A B C D

4800 3600 4450


4800 3600 4450 Project Manager:

Designer:

900 1100
750

1
1

2100
2100
General Key Plan:

C3 C5 2100
2100

2600
4600

4600
D D

350 2650

16
+4
50
1250
850

850
BW1 BW1

3500
2500
PLAN NORTH
2 Gewan Island
2
C5

QIB
C3 C1 C1

LA
BW2

1950
2000
RAFT TOP LEVEL
BW4

3450

3525
3555

3555

BW1
F5 2100
SC-3001 F2 F3 HATCH T.O.C. LEVEL
SC-3001 SC-3001
2000 1500
5400

5400
195 550 2050 MESH ɸ 16 @ 200 mm +0.46
490 1060 800 250 500 TOP AND BOTTOM IN BOTH
560 DIRECTIONS

2450
800

PIT +0.76
1000 1000
565

F1 1000X1000X1200D
SC-3001
400

F4
WT2

1700
1200

SC-3001

1000
BW2

1000
40

W1
WT1

250
3
235

F4
3
WT1

SC-3001
835

1000
C4
4600
600

C C2
300 1115
C1
3100

BW2 WT1 575 400

3100
BW4
SW1

1000 1000

W1

1000
4
4
SW1
C4 C2 C1

1000

1000

1000

1000

1000
RAFT THICK. RAFT THICK.
500 mm 500 mm

2000

2000
1700
F5
BW3

Project Name:
SC-3001
1600 2600

1400 1500 1500 850


SW1
BW4

1000 1000
7300

1700

7300
SW1

Project Number Q18020-0100D


C3 C1

2600

3000
2650 ISSUED FOR TENDER
1500 1000
B 2100 B
APRIL 2019
BW4
1350

2000

1500
1400
2200
BW1 BW1
5
5

1900
850

850
1050

1050

C1 C1
C3 C3
2650
350
900 700 1400 1600

00 TD 04/04/2019 Approved Issue A.M.


Rev. Phase Date Description Appr.

Issue:

FILE NAME: Q18020-0100D-PK3-02A-TD-SC-1003-00

DRAWN BY: M.W./N.O./A.N.

DESIGNED BY: M.TH

CHECKED BY: T.KH.

APPROVED BY: M.M.


FOUNDATION ARRANGEMENT PLAN FOUNDATION REINFORCEMENT PLAN Sheet Title
1 : 50 1 : 50
Standalone Villa
Zone Key Plan:

BUILDING 02A
A
PLANS
FOUNDATION ARRANGEMENT &
REINFORCEMENT PLANS
Plot Key Plan:

Sheet No.

02A-SC-1003
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER

PK3 02A TD SC 1003


1 2 3 4 5 6
1 2 3 4 5 6 Notes:

1. THIS DRAWING SHOULD BE READ IN


HATCH T.O.C. LEVEL THICKNESS (mm) CONJUNCTION WITH GENERAL NOTES AND
GENERAL DETAILS DRAWINGS.
Client:

+3.61 200

+4.26 200

E E

A B C D A B C D
4800 3600 4450 Project Manager:

4800 3600 4450

350
Designer:

200 2455 3505 815 200


B30
2285

1
410

SC-3001

200
600
185 General Key Plan:

185
1 W-200 1

1360
B01
C3 C5

W
-20
0

1620
W-200
MESH ɸ 12 @ 200 mm
4600

4600
D TOP AND BOTTOM IN BOTH D

W-200
B35

DIRECTIONS
B01

SLAB THICK. W-200


200mm

16
+4
50
+4.36 350

W-200

800
TOC 250 PLAN NORTH
Gewan Island
BW1 BW1
C3

QIB
2 2

LA
C1 SLAB THICK.
C3 B01 C1
200mm

BW4
BW2 MESH ɸ 12 @ 200 mm
TOP AND BOTTOM IN BOTH
DIRECTIONS
+3.61
B01

SLAB THICK.

1500
100
TOC
200mm

BW1
5400

5400
SC-3001
B09

+4.36
TOC

B05
WT2

2945
1905

1000
WT1
BW2

C
1000
300

3 3
C
WT1

C4
W1 B01 1000
165
C2 WT1
B08

400 150 C1
STAIR 2A1
3100

3100
B34

BW2 STAIR 2A3


BW4

BW3
1650

B04
SW1

W1
B02

4 4
320

150

B01 C1 1000
1210

C2
C4
1950

Project Name:

700 B01
B04

300

SLAB THICK.
SLAB THICK. 200mm
BW4

200mm MESH ɸ 12 @ 200 mm


TOP AND BOTTOM IN BOTH
+4.36 DIRECTIONS
B17

4
TOC
7300

7300
+4.36
SC-3001 Project Number Q18020-0100D
TOC C3 STAIR 2A2
B27 B28

2000
1000 1000
C1
B03

ISSUED FOR TENDER


B B
SLAB THICK. APRIL 2019
BW4

200mm
B09

3
2165

+4.26 SC-3001

TOC

C3 B16 C3 C1 BW1 C1 BW1


5 5

ɸ12 @200 (ADD.)


630

SLAB THICK.
1710

350 250
B32

L= 2500
200mm
B32

00 TD 04/04/2019 Approved Issue A.M.


+4.36 Rev. Phase Date Description Appr.
TOC
Issue:
250 350

FILE NAME: Q18020-0100D-PK3-02A-TD-SC-1004-00

DRAWN BY: M.W./N.O./A.N.

DESIGNED BY: M.TH

CHECKED BY: T.KH.

APPROVED BY: M.M.

Sheet Title

Standalone Villa
GROUND FLOOR ARRANGEMENT PLAN GROUND FLOOR REINFORCEMENT PLAN Zone Key Plan:

1 : 50 1 : 50
BUILDING 02A
A
PLANS
GROUND FLOOR ARRANGEMENT &
REINFORCEMENT PLANS
Plot Key Plan:

Sheet No.

02A-SC-1004
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER

PK3 02A TD SC 1004


1 2 3 4 5 6
1 2 3 4 5 6 Notes:
1. THIS DRAWING SHOULD BE READ IN
CONJUNCTION WITH GENERAL NOTES AND
GENERAL DETAILS DRAWINGS.
HATCH T.O.C. LEVEL THICKNESS (mm)

Client:

+8.26 200

+8.19 250

E E

Project Manager:
A B C D A B C D
4800 3600 4450
4800 3600 4450

350 770 Designer:

MESH ɸ 12 @ 200 mm
TOP AND BOTTOM IN BOTH
DIRECTIONS

2285
General Key Plan:

1 1

C3 B16 C5

SLAB THICK.
D 250mm D
4600

4600
B01
B08

270 750

16
+4
50
+8.36
TOC
SLAB THICK. +8.36

1800
PLAN NORTH
250mm TOC Gewan Island

QIB
B16

LA
B15 C3
2 2
C3
1185

1200
1235

1755 C1 C1

1500

1500
4
SC-3001

TOP AND BOTTOM IN BOTH


5400

5400
SLAB THICK.
B12

B01

MESH ɸ 12 @ 200 mm
B06

250mm
B20

SLAB THICK.

B20
250mm
+8.36

DIRECTIONS
TOC
+8.36
TOC

4 C
185 600
320

670

SC-3001
350

B01
C
3 C4 3
B15
W1 C2
B01
C1
STAIR 2A1

150
MESH ɸ 12 @ 200 mm
3100

3100
TOP AND BOTTOM IN BOTH
B07
B08

B07

DIRECTIONS
2200

4
4
SC-3001
SC-3001

W1 B11
400 50

4 4
340

B09 B10
700

600

C4 Project Name:
C2 C1
185 2000
1970

1350 150
B12
150 230 4
SC-3001
500

B18
B18

SLAB THICK. Project Number Q18020-0100D


7300

7300
B17

250mm
B21

+8.36 MESH ɸ 12 @ 200 mm


TOP AND BOTTOM IN BOTH

3000

3000
C3 TOC C1 DIRECTIONS ISSUED FOR TENDER
B B
APRIL 2019
B09
B09

C1 B23 C1
B15 C3
C3
115

5 5
115
70 560

630

4
00 TD 04/04/2019 Approved Issue A.M.
1830

350 250 +8.19 SC-3001


SLAB THICK. Rev. Phase Date Description Appr.
B32

TOC
250mm
Issue:

370 FILE NAME: Q18020-0100D-PK3-02A-TD-SC-1005-00


750
5 DRAWN BY: M.W./N.O./A.N.
5
SC-3001
SC-3001 DESIGNED BY: M.TH

CHECKED BY: T.KH.

APPROVED BY: M.M.

Sheet Title

FIRST FLOOR ARRANGEMENT PLAN FIRST FLOOR REINFORCEMENT PLAN Zone Key Plan:
Standalone Villa
1 : 50 1 : 50

BUILDING 02A
A
PLANS
FIRST FLOOR ARRANGEMENT &
REINFORCEMENT PLANS
Plot Key Plan:

Sheet No.

02A-SC-1005
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER

PK3 02A TD SC 1005


1 2 3 4 5 6
1 2 3 4 5 6 Notes:
1. THIS DRAWING SHOULD BE READ IN
CONJUNCTION WITH GENERAL NOTES AND
CONCRETE PAD GENERAL DETAILS DRAWINGS.
HATCH T.O.C. LEVEL THICKNESS (mm)
2. PAD LOCATIONS / FINAL DIMENSIONS SHALL
BE VERIFIED BY THE CONTRACTOR PRIOR Client:
HATCH T.O.C. LEVEL
CONSTRUCTION BASED ON EQUIPMENT
+12.21 350 MANUFACTURERER / SUPPLIER
RECOMMENDATIONS.
+12.76 3. SE DENOTES SLAB EDGE TYPICAL DETAIL.

4. ALL SLAB EDGES / UPSTANDS / PARAPETS


LOCATIONS, EXTENDS AND DETAILS SHALL BE
+12.66 VERIFIED WITH THE ARCHITECTURAL AND SKIN
DRAWINGS SETS BY THE CONTRACTOR PRIOR
ANY CONSTRUCTION WORK COMMENCEMENT.
IN CASE OF ANY DISCREPANCY CONTRACTOR
E SHALL NOTIFY THE ENGINEER. E

Project Manager:

A B C D
4800 3600 4450 A B C D

4800 3600 4450 Designer:

5940
SE1

370 770

General Key Plan:


2285

200
130 200

2
35 200
2
735
2
SC-3001 SC-3001
SC-3001
1
250

250
1
C3
600 PC1 B36 PC1 235 C5

1500

1500
5855
D D

SE1
7185
SE1

16
+4
50
SLAB THICK. 2090 5940
250mm SE1 SE1
4600

750

4600
B01

PLAN NORTH
B08

740 Gewan Island


+12.21

QIB
TOC

LA
SE1

200
770 185
185

2000

1800
20
200

600 200 50 200

1100
235 2

1000
SC-3001
PC1 PC1
330

B26

200 150
2
300

2
2
C3 B37 C1

1000

1000

1000
SC-3001
C3 C1
SLAB THICK.
250mm
SLAB THICK.
SLAB THICK. 200
250mm +12.21
250mm
TOC 200 1450
+12.21 +12.21
MESH ɸ 12 @ 200 mm
5400

TOC TOC

5400
8 TOP AND BOTTOM IN BOTH
B06

B01

SC-3001 DIRECTIONS
B20

B20
C

C 2000
8 2000
SC-3001
200
300

B01 C4
3
200 3
100

650
W1 B15

2000
B01
STAIR 2A1

SLAB THICK. C1
150
3100

SLAB THICK. C2 250mm MESH ɸ 12 @ 200 mm

3100
B08

TOP AND BOTTOM IN BOTH


250mm +12.21
B07

DIRECTIONS
B07

200

+12.21 TOC
200 Project Name:
TOC 1450
W1 B09 B07 B08
680

100
300

400 50

2000
4
4
700

C4
600

C1
1220

1220

1000
1500

C2
1970

2000 8 1350 150


850

185 PC2
SC-3001
845
200
B18

405 PC2
925 275 2500 1150

5635
1175 2875
500

SLAB THICK. Project Number Q18020-0100D


1300

250mm 1905
150 230 2500 1150
+12.21
B18

200

TOC
8
2000 ISSUED FOR TENDER
7300

7300

B SC-3001 B
B17

SLAB THICK. 2 APRIL 2019


B24

1175 1370 3000


7610
SE1

3300

250mm SC-3001
2000
200

C3 C1
+12.21
1740

TOC 845
405
PC2 PC2 MESH ɸ 12 @ 200 mm
2960
B09

TOP AND BOTTOM IN BOTH


B09

SE1 DIRECTIONS
1370

SLAB THICK.
1965

11 350mm 8
1580

11
1450

SC-3001
1580

SC-3001
SC-3001
00 TD 04/04/2019 Approved Issue A.M.

3000
C1 C1 Rev. Phase Date Description Appr.
C3 C3
5 11
200 790

+12.21 B22 5
650

220 SC-3001 Issue:


B22 TOC
270
1830

1830
220

185 FILE NAME: Q18020-0100D-PK3-02A-TD-SC-1006-00


8
DRAWN BY: M.W./N.O./A.N.
SC-3001
5440 DESIGNED BY: M.TH
370 270
SE1 CHECKED BY: T.KH.
370 750
185

APPROVED BY: M.M.


5570
SE1 Sheet Title

Standalone Villa
Zone Key Plan:

BUILDING 02A
A
ROOF ARRANGEMENT PLAN ROOF REINFORCEMENT PLAN
1 : 50 1 : 50 PLANS
ROOF ARRANGEMENT &
REINFORCEMENT PLANS
Plot Key Plan:

Sheet No.

02A-SC-1006
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER

PK3 02A TD SC 1006


1 2 3 4 5 6
1 2 3 4 5 6 Notes:

1. THIS DRAWING SHOULD BE READ IN


CONJUNCTION WITH GENERAL NOTES AND
GENERAL DETAILS DRAWINGS.
Client:
2. PAD LOCATIONS / FINAL DIMENSIONS SHALL
BE VERIFIED BY THE CONTRACTOR PRIOR
CONSTRUCTION BASED ON EQUIPMENT
MANUFACTURERER / SUPPLIER
RECOMMENDATIONS.

E E

Project Manager:

Designer:
A B C A B C

4800 3600 4800 3600

General Key Plan:

185 SC-3001 480 CLOSED


STIRRUPS

1 ɸ 12 @ 200 (ADD.)
1100

D 980 3150 D

B25
1 1

16
+4
50
300
300

PC1 PC1
300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 275

PLAN NORTH
Gewan Island
450 230 300
85
300

QIB
285 MESH ɸ 12 @ 200 mm

LA
TOP AND BOTTOM IN BOTH
4600

4600
DIRECTIONS
B14
B14

3900

12
SC-3001

PC1
2 2
PC1

CLOSED CLOSED
STIRRUPS STIRRUPS
3875

C
5400

5400
B13

B13

10
SLAB THICK.
SC-3001
200mm 890
300

C4
300

3 3
10
W1 B29 SC-3001

450 B29
C2 MESH ɸ 12 @ 200 mm Project Name:
B29

TOP AND BOTTOM IN BOTH


3100

3100
10
B29

+15.11 DIRECTIONS
SC-3001
TOC

W1 B27 C4 B28

4 4
200
320

C2 +14.81
1220

185
405 3200 TOB
10 Project Number Q18020-0100D
PC2 B29 PC2
SC-3001
250 200 200 200 200 200 200 200 200 250

+14.81 ISSUED FOR TENDER


+14.81
B B
TOB TOB APRIL 2019
4500
B29

B29

7
SC-3001

+14.81 00 TD 04/04/2019 Approved Issue A.M.


PC2 TOB B29 PC2 Rev. Phase Date Description Appr.

Issue:

FILE NAME: Q18020-0100D-PK3-02A-TD-SC-1007-00

DRAWN BY: M.W./N.O./A.N.

DESIGNED BY: M.TH

CHECKED BY: T.KH.

APPROVED BY: M.M.

Sheet Title

Standalone Villa
TOP OF ROOF ARRANGEMENT PLAN TOP OF ROOF REINFORCEMENT PLAN Zone Key Plan:

1 : 50 1 : 50
BUILDING 02A
A
PLANS
TOP OF ROOF ARRANGEMENT &
REINFORCEMENT PLANS
Plot Key Plan:

Sheet No.

02A-SC-1007
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
NUMBER

PK3 02A TD SC 1007


1 2 3 4 5 6
1 2 3 4 5 6 Notes:
1. THIS DRAWING SHOULD BE READ IN
BEAMS SCHEDULE COLUMNS TYPES CONJUNCTION WITH GENERAL NOTES AND
GENERAL DETAILS DRAWINGS.
TOP
BEAM SIZE BOTTOM BARS LOCATION CADRE AND STIRRUPS S1 CADRE AND STIRRUPS S2
REINFORCEMENT SIDE TYPE "A" TYPE "B" TYPE "C" TYPE "D" TYPE "E" TYPE "F"
1 2 REFER TO
MARK REINF'T BARS SLAB REFER TO
Client:
W T C/L C/L AR/LS
END 1 END 2 CADRE STIRRUPS SPACING CADRE STIRRUPS SPACING 14 ɸ 16 REINF. PLAN
(mm) (mm) 14 ɸ 16 12 ɸ 20
12 ɸ 16

THICK.
SLAB
2 ɸ 10 ɑ 200 2 ɸ 10 ɑ 200 8 ɸ 16
3 ɸ 10 ɑ 200 7 ɸ 16 3 ɸ 10 ɑ 200

400

500

300
600

700
B01 300 500 3 ɸ 20 3 ɸ 20 3 ɸ 20 1 ɸ 10 200 1 ɸ 10 200 1 ɸ 10 ɑ 200
REFER TO SLAB SLAB REFER TO
ɸ 10 ɑ 200 PLAN REINF. REINF. PLAN

THICK.

THICK.
300

SLAB

SLAB
400 300
B02 250 500 3 ɸ 20 3 ɸ 16 3 ɸ 16 1 ɸ 10 200 1 ɸ 10 200 500
300
400
WATER PROOFING
MEMBRANE
WATER PROOFING
E B03 300 800 3 ɸ 25 3 ɸ 20 1 ɸ 10 200 1 ɸ 10 200 2x2 ɸ 12 MEMBRANE E

COLUMNS SCHEDULE CRYSTALLINE WATER PROOFING


B04 300 500 3 ɸ 16 3 ɸ 20 1 ɸ 10 200 1 ɸ 10 200 WATER PROOFING MEMBRANE
UMN FLOOR FOUNDATION TO GROUND FLOOR FIRST FLOOR ROOF TO REMARKS
L
CO GROUND FLOOR TO FIRST FLOOR TO ROOF TOP OF ROOF ɸ 16 ɑ 200 ɸ 12 ɑ 200 ɸ 12 ɑ 200 ɸ 16 ɑ 200 Project Manager:
ɸ 12 ɑ 200 ɸ 12 ɑ 200
B05 300 950 3 ɸ 25 3 ɸ 20 1 ɸ 10 200 1 ɸ 10 200 2x2 ɸ 12
ɸ 16 ɑ 200 ɸ 12 ɑ 200
ɸ 12 ɑ 200
C1 TYPE A A A ɸ 12 ɑ 200

B06 300 500 3 ɸ 20 3 ɸ 16 3 ɸ 20 1 ɸ 10 200 1 ɸ 10 200


WATER SIDE WATER SIDE

C2 TYPE A A A A 300 300


B07 300 500 3 ɸ 16 3 ɸ 25 1 ɸ 10 200 1 ɸ 10 200 300

Designer:

B08 300 500 3 ɸ 25 3 ɸ 16 1 ɸ 10 100 1 ɸ 10 200


C3 TYPE D A A

1500
1500

1500
1500
B09 300 500 3 ɸ 20 3 ɸ 20 3 ɸ 20 1 ɸ 10 200 1 ɸ 10 200 ɸ 20 ɑ 100
ɸ 16 ɑ 100 ɸ 20 ɑ 200
ɸ 20 ɑ 200
C4 TYPE D A A A REFER TO
REFER TO
FOUNDAION PLAN
PLAN FOUNDAION REFER TO
B10 300 500 3 ɸ 16 3 ɸ 16 1 ɸ 10 200 1 ɸ 10 200 FOUNDAION REFER TO REINF.
REFER TO REINF. PLAN
REINF. PLAN
PLAN General Key Plan:

FOUNDATION
FOUNDATION

FOUNDATION
C5 TYPE E B B

THICK.
THICK.

THICK.
B11 300 500 3 ɸ 20 3 ɸ 16 3 ɸ 16 1 ɸ 10 200 1 ɸ 10 200

B12 300 500 3 ɸ 16 3 ɸ 12 3 ɸ 12 1 ɸ 10 200 1 ɸ 10 200 PC1 TYPE C BLINDING


BLINDING
BLINDING

B13 300 400 3 ɸ 20 3 ɸ 20 3 ɸ 20 1 ɸ 10 100 1 ɸ 10 200


PC2 TYPE F
BW1 BW2 BW3
D 1 : 25 1 : 25 1 : 25
D

B14 300 400 3 ɸ 16 3 ɸ 16 1 ɸ 10 100 1 ɸ 10 200


REFER TO SLAB

16
+4
50
REFER TO SLAB
SLAB REFER TO PLAN REINF.
PLAN REINF.
2 ɸ 20 REINF. PLAN

THICK.
B15

SLAB
300

THICK.
500 3 ɸ 20 3 ɸ 20 1 ɸ 10 100 1 ɸ 10 100

SLAB
3 ɸ 25

THICK.
SLAB
REFER TO SLAB SLAB REFER TO
PLAN REINF. REINF. PLAN PLAN NORTH
150 300 150 Gewan Island
B16 300 600 3 ɸ 25 3 ɸ 20 3 ɸ 20 1 ɸ 10 100 1 ɸ 10 200

THICK.

THICK.
SLAB

SLAB
ɸ 10 ɑ 200 ɸ 10 ɑ 200

QIB
RAFT REFER TO

300

LA
REINF. ɸ 10 ɑ 200 PLAN
ɸ 10 ɑ 200
2 ɸ 25
B17 300 700 3 ɸ 25 3 ɸ 25 1 ɸ 10 200 1 ɸ 10 200 2x2 ɸ 12 CRYSTALLINE WATER CRYSTALLINE WATER
3 ɸ 25 CRYSTALLINE WATER
PROOFING PROOFING

THICK.
RAFT
WATER PROOFING PROOFING
MEMBRANE

B18 300 500 3 ɸ 20 3 ɸ 20 1 ɸ 10 200 1 ɸ 10 200

BLINDING WATER PROOFING


MEMBRANE
WATER PROOFING CRYSTALLINE WATER
B19 300 500 3 ɸ 20 3 ɸ 16 1 ɸ 10 200 1 ɸ 10 200 MEMBRANE PROOFING
ɸ 16 ɑ 200 ɸ 16 ɑ 200
ɸ 12 ɑ 200 ɸ 12 ɑ 200
ɸ 16 ɑ 200 ɸ 12 ɑ 200
SECTION F2 - F2
2 ɸ 16 WALL SCALE: 1 : 25
B20 300 500 3 ɸ 25 1 ɸ 10 100 1 ɸ 10 200 ɸ 16 ɑ 200
ɸ 16 ɑ 200 REINF.
3 ɸ 25
ɸ 12 ɑ 200

2 ɸ 16 WATER SIDE WATER SIDE 200 REFER 200


WATER SIDE
B21 300 700 3 ɸ 20 1 ɸ 10 100 1 ɸ 10 200 2x2 ɸ 12 TO PAN
3 ɸ 25
WALL WATER SIDE
300 REFER TO REFER TO
300 THICK.
300 PLAN PLAN
2 ɸ 20 ɸ 12 ɑ 200
B22 300 600 3 ɸ 16 3 ɸ 16 1 ɸ 10 100 1 ɸ 10 200
3 ɸ 25

REFER TO PLAN
THICK.

MAX 1200 MM
RAFT
B23

1500

1500
500 600 5 ɸ 25 5 ɸ 25 5 ɸ 25 1 ɸ 16 1 ɸ 10 100 1 ɸ 12 1 ɸ 10 200 2x2 ɸ 16

1500

1500
PIT C

1500
BLINDING BLINDING
ɸ 16 ɑ 100 ɸ 16 ɑ 100
2 ɸ 25 ɸ 16 ɑ 100 ɸ 16 ɑ 200
B24 300 ɸ 20 ɑ 200 RAFT RAFT
C 700 3 ɸ 25 3 ɸ 25 1 ɸ 12 100 1 ɸ 10 200 2x2 ɸ 12
3 ɸ 25 REINF. REINF.
FOUNDAION
FOUNDAION REFER TO
FOUNDAION REFER TO REINF.
FOUNDAION REFER TO REINF. PLAN

THICK.
REINF. PLAN

RAFT
REFER TO PLAN WATER PROOFING WATER PROOFING
REINF.
B25 300 400 3 ɸ 16 3 ɸ 12 3 ɸ 12 1 ɸ 12 200 1 ɸ 10 200 PLAN MEMBRANE MEMBRANE

FOUNDATION
FOUNDATION
FOUNDATION

THICK.
FOUNDATION

THICK.
THICK.
THICK.

2 ɸ 20 RAFT
B26 300 600 3 ɸ 16 3 ɸ 16 1 ɸ 10 100 1 ɸ 10 200 REINF. BLINDING
3 ɸ 25
RAFT RAFT
THICK. THICK.
BLINDING
BLINDING BLINDING WATER PROOFING
B27 300 400 3 ɸ 16 3 ɸ 16 3 ɸ 16 1 ɸ 10 200 1 ɸ 10 200 BLINDING WATER PROOFING
MEMBRANE
MEMBRANE
SECTION F1 - F1 SECTION F3 - F3
B28 300 400 3 ɸ 16 3 ɸ 16 1 ɸ 10 200 1 ɸ 10 200 BW4 WT1 SCALE: 1 : 25 SCALE: 1 : 25

1 : 25 1 : 25 WT2
1 : 25 Project Name:
B29 300 400 3 ɸ 16 3 ɸ 16 3 ɸ 16 1 ɸ 10 200 1 ɸ 10 200 CRYSTALLINE WATER RAFT REFER TO
REINF.
FOR OVERFLOW FOR OVERFLOW
PROOFING PLAN DETAILS AND DETAILS AND
DIMENSIONS REFER TO 1 ɸ 10 1 ɸ 10 DIMENSIONS REFER TO
LS/AR DRAWINGS 1 ɸ 10 REFER TO REFER TO 1 ɸ 10 LS/AR DRAWINGS REFER TO WALL
THICK.

B30 200 500


RAFT

2 ɸ 12 2 ɸ 16 2 ɸ 16 1 ɸ 10 200 1 ɸ 10 200 RAFT AR/LS AR/LS


REFER TO REFER TO 200 PLAN WIDTH
PLAN REINF. REFER TO
AR/LS
ɸ 10 ɑ 150 ɸ 10 ɑ 150 PLAN
4 ɸ 12 REFER TO
ɸ 12 ɑ 150 4 ɸ 12 ɸ 12 ɑ 150 PLAN
B31
THICK.

300 500

250
3 ɸ 25 3 ɸ 25 1 ɸ 10 100 1 ɸ 10 200

250
RAFT

4 ɸ 12

THICK.
REFER TO

MAX. 600
BLINDING 4 ɸ 12

SLAB
SLAB
ɸ 10 ɑ 150 PLAN SLAB REFER TO
CRYSTALLINE REINF.
CRYSTALLINE REINF. PLAN
REFER TO

THICK.
WATER PROOFING WATER PROOFING WATER PROOFING

SLAB
SLAB

MAX.1500 mm
MAX.1500 mm
B32 300 500 3 ɸ 12 3 ɸ 20 3 ɸ 20 1 ɸ 10 200 1 ɸ 10 200 MEMBRANE PLAN ɸ 12 ɑ 150 SLAB SLAB

THICK.
RAFT REINF.

SLAB
BLINDING REINF. REINF.
THICK.
BEAM Project Number Q18020-0100D

THICK.

THICK.
SLAB

SLAB

DEPTH
BEAM
WALL REINF.
B33 300 500 3 ɸ 16 3 ɸ 16 1 ɸ 10 200 1 ɸ 10 200 SECTION F4 - F4 ɸ 12 ɑ 200
ɸ 16 ɑ 200 ɸ 16 ɑ 200
ɸ 12 ɑ 200
REINF.
SCALE: 1 : 25 BEAM
ɸ 12 ɑ 200 ɸ 12 ɑ 200 WIDTH
WALL
THICK.
B34 200 500 3 ɸ 16 3 ɸ 12 3 ɸ 12 1 ɸ 10 200 1 ɸ 10 200
ɸ 12 ɑ 200 ɸ 12 ɑ 200 +2.53 ISSUED FOR TENDER
T.O.C
B B
SECTION 2 - 2 SECTION 3 - 3 SECTION 4 -REFER
4 TO APRIL 2019
B35 300 BW 200
300

500 3 ɸ 16 1 ɸ 10 200 1 ɸ 10 200 SCALE: 1 : 25 SCALE: 1 : 25 SCALE: 1 : 25 AR/LS


REINF.

4 ɸ 25 REFER TO RAFT
REINF. BLINDING BLINDING
B36 400 850 4 ɸ 25 4 ɸ 25 1 ɸ 16 1 ɸ 10 100 1 ɸ 12 1 ɸ 10 200 2x2 ɸ 20 PLAN WATER PROOFING
4 ɸ 25 200 MEMBRANE 200
THICK.

RAFT REFER TO
RAFT

B37 400 600 4 ɸ 25 4 ɸ 20 4 ɸ 20 1 ɸ 10 1 ɸ 10 100 1 ɸ 10 1 ɸ 10 200 2x2 ɸ 12 REINF. PLAN SECTION 1 - 1

MAX. 1600
SCALE: 1 : 25 ɸ 10 ɑ 200
REFER TO
REFER TO
THICK.

PLAN BEAM SLAB


RAFT

BLINDING REINF. PLAN ɸ 12 ɑ 200


WIDTH

THICK.
SLAB
WATER PROOFING REFER TO
MEMBRANE AR/LS 200 00 TD 04/04/2019 Approved Issue A.M.
REFER TO
RAFT
B PLAN
2 ɸ 12 REFER TO
SLAB Rev. Phase Date Description Appr.
BLINDING PLAN

DEPTH
THICK.

BEAM
ɸ 10 ɑ 200 REINF.

200
BEAM

MAX. 600
ɸ 10 ɑ 200
200

REFER TO REINF. Issue:


2 ɸ 12

THICK.
PLAN

SLAB
DEPTH

DEPTH
REFER TO
BEAM

BEAM
REFER TO PLAN BEAM BEAM 200 SLAB ɸ 10 ɑ 200

THICK.
SECTION F5 - F5 PLAN

SLAB
REINF. B REINF. REINF.
FILE NAME: Q18020-0100D-PK3-02A-TD-SC-3001-00
ɸ 16 ɑ 200 SLAB
SECTION B-B

DEPTH
SCALE: 1 : 25

BEAM
BEAM

THICK.
REINF. DRAWN BY: M.W./N.O./A.N.

SLAB
BEAM REFER TO PLAN BEAM SLAB REINF. REINF.
THICK.
SLAB

CLOSED DESIGNED BY: M.TH


WIDTH WIDTH
STIRRUPS
450

REFER TO ɸ 12 ɑ 200 CHECKED BY: T.KH.


SLAB REFER TO BEAM
ɸ 12 ɑ 200
BLINDING VAPOR BARRIER
PLAN
REINF.
ɸ 16 ɑ 200 REFER TO
PLAN SECTION 7 - 7 WIDTH APPROVED BY: M.M.
THICK.
SLAB

THICK.

SCALE: 1 : 25
SECTION 9 - 9 SECTION 10 - 10 SECTION 11 - 11
SLAB

ɸ 12 ɑ 200 PLAN
ɸ 12 ɑ 200 REFER TO Sheet Title
200
THICK.

BEAM AR/LS SCALE: 1 : 25 SCALE: 1 : 25 SCALE: 1 : 25


SLAB

DEPTH

Standalone Villa
BEAM
DEPTH

TYPICAL DETAIL FOR SUSPENDED SLAB AT


BEAM

BEAM
W1 REINF.
REINF.
Zone Key Plan:

FROM FOUNDATION TO GROUND FLOOR GROUND FLOOR ABOVE FILL


BEAM REFER TO PLAN REFER BEAM REFER
SCALE 1:25 ɸ 16 ɑ 100
SCALE 1:25 WIDTH TO PLAN WIDTH TO PLAN
BUILDING 02A
REFER TO PLAN CLOSED CLOSED
SECTION 6 - 6
MAX. 1600

A ɸ 16 ɑ 200
REFER TO PLAN
SECTION 5 - 5 ɸ 12 ɑ 200 ɸ 12 ɑ 200
STIRRUPS
REFER TO REFER TO
STIRRUPS
ɸ 12 ɑ 200
DETAILS
ɸ 12 ɑ 200 SCALE: 1 : 25
SCALE: 1 : 25 ɸ 12 ɑ 200
PLAN
A PLAN
ɸ 12 ɑ 200 2 ɸ 12

ɸ 10 ɑ 200 SECTION & COLUMNS R.C.


THICK.

THICK.
350

200
SLAB

SLAB
200

200
2 ɸ 12 DETAILS & SCHEDULE

DEPTH

DEPTH
REFER TO PLAN 185

BEAM

BEAM
BEAM BEAM 200
ɸ 12 ɑ 200
70

ɸ 12 ɑ 200 REFER TO REINF. REINF.


SLAB A
PLAN Plot Key Plan:
REINF. SECTION A-A
THICK.

W1 SLAB
SLAB

SW1 TYPICAL REINFORCEMENT DETAIL PLAN REINF.


REFER BEAM REFER TO PLAN BEAM REFER Sheet No.
THICK.

THICK.
SLAB

SLAB

TO PLAN WIDTH WIDTH TO PLAN

FROM GROUND FLOOR TO TOP OF ROOF SLAB 02A-SC-3001


SCALE 1:25
FROM FOUNDATION TO STAIR FLIGHT LEVEL REINF.
SECTION 12 - 12
SCALE 1:25 SCALE: 1 : 25
PACKAGE BUILDING DESIGN TRADE SERIAL
CODE PHASE SHEET
SECTION SE1 - SE1 SECTION 8 - 8
NUMBER

SCALE: 1 : 25 PK3 02A TD SC 3001


SCALE: 1 : 25
1 2 3 4 5 6
1 2 3 4 5 6 Notes:
C
SC-8001
1. THIS DRAWING SHOULD BE READ IN
CONJUNCTION WITH GENERAL NOTES AND
ɸ 10 ɑ 200 GENERAL DETAILS DRAWINGS.
5 1 ɸ 10 / STEP 4 Client:
(TYP.)
REFER TO
AR/LS
REFER TO
LANDING ɸ 12 ɑ 200
REINF.
B
A SC-8001 B 2 ɸ 12

200
300
4800
2 ɸ 16
TYPICAL STEPS REINFORCEMENT DETAIL
ɸ 10 ɑ 200 1 : 25
200 REFER TO ARCH.
DRAWINGS (TYP.)
E 3 E

0
20
ɸ 16 ɑ 200
REFER TO PLAN ɸ 10 ɑ 200
ɸ 16 ɑ 200 ɸ 16 ɑ 200
ɸ 10 ɑ 200 Project Manager:

0
+2.50

20
ɸ 16 ɑ 200
3100

ɸ 12 ɑ 200

200
T.O.C
A A
SC-8001 SC-8001
SLAB
REINF.
WALL

THICK.
SLAB
REINF. REFER TO ARCH.
4 DRAWINGS (TYP.)

0
BEAM Designer:

20
REINF. WALL

DEPTH
B THICK.

BEAM
WALL
SC-8001 REINF.
ɸ 16 ɑ 200
BEAM
WIDTH WALL ɸ 10 ɑ 200

STAIR 2A1 PLAN FLIGHT 3 5


THICK.

1 : 50 1 : 25

+0.46 FOUNDAION General Key Plan:


WALL
C T.O.C REINF.
REINF.
SC-8001

SLAB
REINF.

THICK.
SLAB
STAIR 2A2 PLAN

DEPTH
BEAM
BEAM
A B REINF. 1 : 50
D D
4800
BEAM
+15.11 TOP OF WIDTH

16
+4
50
ROOF
T.O.C ɸ 16 ɑ 200 STAIR 2A2 SEC. C-C
200

ɸ 10 ɑ 200
1 : 25

20
0
PLAN NORTH
Gewan Island

QIB
REFER TO

LA
LANDING
REINF.
2 ɸ 12 D
200
300

SC-8001
2 ɸ 16
+12.21 ROOF ɸ 10 ɑ 200 C
T.O.C 200 3 4
200

+4.36 GROUND
T.O.C FLOOR
FLIGHT 2

THICK.
SLAB

200
1 : 25

H T2
20

IG
FL
0

+10.40

20
+2.99 3

0
T
T.O.C T.O.C I GH
FL
200
300

200
REFER TO ARCH.
200 REFER TO ARCH. DRAWINGS (TYP.)
DRAWINGS (TYP.)
FL
IG

0
HT FL

20
IG +1.40
0

3 4
20

HT
+8.36 FIRST 2 T.O.C
REFER TO C

200
T.O.C FLOOR LANDING
200

REINF.
C FLIGHT 1 +0.46
2 ɸ 12
T.O.C
200
300

2 ɸ 16

ɸ 10 ɑ 200
20

T 2 200
GH
WALL
0

+6.40 I
FL THICK. WALL
T.O.C THICK.
D
200
300

SC-8001
200 REFER TO ARCH. ɸ 16 ɑ 200
DRAWINGS (TYP.) ɸ 10 ɑ 200
FL
STAIR 2A3 PLAN STAIR 2A3 SEC. D-D
0

IG
20

HT
1
1 : 50 1 : 50
0
20

+4.36 GROUND
T.O.C FLOOR
THICK.

Project Name:
SLAB

WALL
SLAB THICK. SLAB
REINF. REINF.

THICK.
THICK.

SLAB
SLAB
ɸ 12 ɑ 200

DEPTH
BEAM
ɸ 10 ɑ 200
BEAM
THICK.

REINF.
RAFT

200
WALL
WALL BEAM
THICK.
THICK. ɸ 10 ɑ 200 WIDTH

20
ɸ 12 ɑ 200
WALL

0
ɸ 16 ɑ 200
REINF.
WALL ɸ 16 ɑ 200
ɸ 12 ɑ 200
RAFT REINF.
REINF. ɸ 10 ɑ 200 ɸ 10 ɑ 200 Project Number Q18020-0100D

STAIR 2A1 SEC. A-A


THICK.
RAFT

ɸ 16 ɑ 200

200
ɸ 12 ɑ 200
ɸ 10 ɑ 200
1 : 50 ɸ 10 ɑ 200

0
20
ɸ 12 ɑ 200 ɸ 16 ɑ 200 ISSUED FOR TENDER
B ɸ 10 ɑ 200 WALL B
WALL WALL REINF. APRIL 2019
THICK. THICK. FLIGHT 1 FLIGHT 3

200
1 : 25 1 : 25

ɸ 10 ɑ 200
ɸ 12 ɑ 200
FOUNDAION
ɸ 12 ɑ 200 REINF. WALL
ɸ 10 ɑ 200 REINF.
1 ɸ 10 / STEP
220

(TYP.) WALL

THICK.
RAFT
THICK.
ɸ 16 ɑ 200
WALL WALL
REINF. REINF.

00 TD 04/04/2019 Approved Issue A.M.


ɸ 10 ɑ 200 Rev. Phase Date Description Appr.
1 ɸ 10 / STEP
Issue:
TYPICAL LANDING REINFORCEMENT DETAIL TYPICAL STEPS REINFORCEMENT DETAIL (TYP.)

1 : 25
FLIGHT 2 FILE NAME: Q18020-0100D-PK3-02A-TD-SC-8001-00
STAIR 2A1 SEC. B-B 1 : 25
DRAWN BY: M.W./N.O./A.N.
WALL
1 : 25 THICK.
DESIGNED BY: M.TH

CHECKED BY: T.KH.

APPROVED BY: M.M.


ɸ 10 ɑ 200 TYPICAL STEPS REINFORCEMENT DETAIL
1 : 25 Sheet Title
ɸ 12 ɑ 200

Standalone Villa
200

Zone Key Plan:


ɸ 10 ɑ 200
ɸ 16 ɑ 200
0
20

ɸ 10 ɑ 200
ɸ 10 ɑ 200
WALL
REINF. ɸ 10 ɑ 200 BUILDING 02A
FOUNDAION
A REFER TO
REINF.
PLAN WALL DETAILS
REINF.

FOUNDATION
STAIRS R.C. DETAILS

THICK.
WALL Plot Key Plan:
THICK.
Sheet No.

FLIGHT 1 02A-SC-8001
1 : 25

PACKAGE BUILDING DESIGN TRADE SERIAL


CODE PHASE SHEET
NUMBER

PK3 02A TD SC 8001


1 2 3 4 5 6