Proyecto :"MANTENIMIENTO DE LA INFRAESTRUCTURA DEL PARQUE SANTA ROSA DEL DISTRITO DE HUARAZ, PROVINCIA DE
HUARAZ - ANCASH"
MANO DE OBRA
PEON HH 1,667.8282 13.80 23,016.03 1,167.48 16,111.22 500.35 6,904.81 ###
OFICIAL hh 191.3978 15.89 3,041.31 114.84 1,824.79 76.56 1,216.52 ###
OPERADOR DE EQUIPO LIVIANO hh 49.1390 15.89 780.82 29.48 468.49 19.66 312.33 ###
OPERARIO hh 789.2824 18.36 14,491.22 473.57 8,694.73 315.71 5,796.49 ###
MATERIALES
ABRAZADERAS PLASTICAS 7.6x360 MM und 6.0000 10.16 60.96 6.00 60.96 0.00 0.00 ###
AGUA m3 60.0558 2.50 150.14 36.03 90.08 24.02 60.06 ###
ALAMBRE NEGRO N°16 kg 19.0800 3.82 72.89 15.26 58.31 3.82 14.58 ###
ALAMBRE NEGRO N°8 kg 18.7200 3.82 71.51 14.98 57.21 3.74 14.30 ###
ARANDELA CURVA DE 57x57x4.5 MM und 1.0000 1.00 1.00 0.80 0.80 0.20 0.20 ###
ARENA FINA m3 12.0837 84.75 1,024.09 9.67 819.27 2.42 204.82 ###
ARENA GRUESA m3 36.6420 80.51 2,950.05 29.31 2,360.04 7.33 590.01 ###
BENTONITA sac 2.0000 21.20 42.40 0.00 0.00 2.00 42.40 ###
CABLE ELECTRICO 2x2.5 MM2 AWG m 329.7000 3.39 1,117.68 263.76 894.15 65.94 223.54 ###
CABLE ELECTRICO NYY 2-1x10 MM2, DE COBRE m 332.9990 13.56 4,515.47 266.40 3,612.37 66.60 903.09 ###
CABLE ELECTRICO NYY 2-1x16 MM2, DE COBRE m 23.1750 17.80 412.52 18.54 330.01 4.64 82.50 ###
CABLE ELECTRICO NYY 2-1x6 MM2, DE COBRE m 52.8905 6.78 358.60 42.31 286.88 10.58 71.72 ###
CABLE NLT DE 2 X 2.5 MM2 m 64.0000 3.39 216.96 51.20 173.57 12.80 43.39 ###
CAJA DE CONCRETO PARA REGISTRO und 1.0000 38.14 38.14 1.00 38.14 0.00 0.00 ###
CAJA DE PASO METALICO SEMIPESADO DE 5"x5" und 24.0000 8.47 203.28 24.00 203.28 0.00 0.00 ###
CARTEL DE OBRA, 3.60 X 2.40M, (INC. COLOCACION) GLB 1.0000 300.00 300.00 1.00 300.00 0.00 0.00 ###
CEMENTO PORTLAND TIPO I (42.5KG) BOL 419.8892 21.02 8,826.07 335.91 7,060.86 83.98 1,765.21 ###
CENTRO DE PILETA GLB 2.0000 1,500.00 3,000.00 0.00 0.00 2.00 3,000.00 ###
CINTA AISLANTE und 10.1400 3.40 34.48 10.14 34.48 0.00 0.00 ###
CINTA BANDIT 3/4" m 3.0000 4.24 12.72 3.00 12.72 0.00 0.00 ###
CINTA TEFLON pza 2.5000 1.95 4.88 2.50 4.88 0.00 0.00 ###
CINTA VULCANIZANTE 3M - 23 rll 7.1000 25.42 180.48 5.68 144.39 1.42 36.10 ###
CLAVOS kg 14.4000 3.82 55.01 11.52 44.01 2.88 11.00 ###
CLAVOS DE 2 1/2" kg 28.0800 3.82 107.27 22.46 85.81 5.62 21.45 ###
CLAVOS DE 3" kg 5.6160 3.82 21.45 4.49 17.16 1.12 4.29 ###
CONDUCTOR AUTOPORTANTE 2x16/25 MM2 - AMKA m 2.0000 5.51 11.02 1.60 8.82 0.40 2.20 ###
CONDUCTOR DE COBRE DESNUDO 16 MM2 m 10.0000 5.93 59.30 8.00 47.44 2.00 11.86 ###
CONECTOR ALUMINIO-ALUMINIO SL 2.11 und 2.0000 6.78 13.56 1.60 10.85 0.40 2.71 ###
CONECTOR ALUMINIO-COBRE SM 1.11 und 2.0000 6.78 13.56 1.60 10.85 0.40 2.71 ###
CONECTOR DE COBRE TIPO AB, 5/8" und 2.0000 5.93 11.86 1.60 9.49 0.40 2.37 ###
CORTACIRCUITO und 24.0000 118.64 2,847.36 19.20 2,277.89 4.80 569.47 ###
CUBIERTA AISLANTE DE CONECTOR SP 14 und 2.0000 2.12 4.24 1.60 3.39 0.40 0.85 ###
CURVA DE F° G° 1 1/2" und 1.7000 8.47 14.40 1.36 11.52 0.34 2.88 ###
CURVA PVC SAP (PESADO) 1 1/2" und 4.5000 5.08 22.86 3.60 18.29 0.90 4.57 ###
CURVA PVC SAP (PESADO) 1" und 74.9300 5.08 380.64 59.94 304.52 14.99 76.13 ###
CURVA PVC SAP (PESADO) 3/4" und 62.8000 4.24 266.27 50.24 213.02 12.56 53.25 ###
DISEÑO DE MEZCLA GLB 1.0000 300.00 300.00 1.00 300.00 0.00 0.00 ###
EMPALME 3M PARA 10 MM2 und 24.0000 13.56 325.44 19.20 260.35 4.80 65.09 ###
ESTAñO pza 5.0000 6.78 33.90 0.00 0.00 5.00 33.90 ###
FIERRO CORRUGADO DE 1/4", FY=4200 KG/CM2 var 9.0000 9.00 81.00 7.20 64.80 1.80 16.20 ###
FUSIBLE TIPO "C" und 48.0000 5.08 243.84 38.40 195.07 9.60 48.77 ###
GANCHO DE SUSPENSION PASANTE SOT 15.8 und 1.0000 15.25 15.25 0.80 12.20 0.20 3.05 ###
GRANALLA GRUESO kg 936.0000 0.80 748.80 936.00 748.80 0.00 0.00 ###
HEBILLA DE 3/4" und 3.0000 1.70 5.10 2.40 4.08 0.60 1.02 ###
HORMIGON m3 0.0950 38.89 3.69 0.08 2.96 0.02 0.74 ###
LADRILLO K.K. DE ARCILLA 9X14X24 CM und 290.0000 0.70 203.00 290.00 203.00 0.00 0.00 ###
LLAVE DE FUERZA 2X40 AMP. und 1.0000 207.63 207.63 0.00 0.00 1.00 207.63 ###
LLAVE DIFERENCIAL 2X32 AMP. und 1.0000 111.86 111.86 0.00 0.00 1.00 111.86 ###
LLAVE TERMICA RIEL 2X25 AMP. und 1.0000 33.05 33.05 0.00 0.00 1.00 33.05 ###
LLAVE TERMICA RIEL 2X32 AMP. und 3.0000 33.05 99.15 0.00 0.00 3.00 99.15 ###
LONA DE MATERIAL SINTETICO m2 252.0000 1.53 385.56 252.00 385.56 0.00 0.00 ###
LUMINARIA LED C/EQUIPO COMPLETO DE 70 W. und 24.0000 322.00 7,728.00 0.00 0.00 24.00 7,728.00 ###
LUZ ACUATICA MULTICOLOR RGB DE 18 W. (EQUIPO COMPLE und 4.0000 813.56 3,254.24 0.00 0.00 4.00 3,254.24 ###
MADERA EUCALIPTO DE 2"x3" m 564.0000 2.00 1,128.00 564.00 1,128.00 0.00 0.00 ###
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES
Proyecto :"MANTENIMIENTO DE LA INFRAESTRUCTURA DEL PARQUE SANTA ROSA DEL DISTRITO DE HUARAZ, PROVINCIA DE
HUARAZ - ANCASH"