Sei sulla pagina 1di 1

1.

In case of LV side of ST is resistance grounded, refer sub process ESD-


MP-3.06.03 for NGR sizing calculation.
2. Check for type of connection between HV terminal of generator
transformer/station transformer and switchyard, whether overhead line or
EHV cable or gas insulated line (GIL).

For overhead line / gas insulated line (GIL), calculate the current carrying
capacity of transmission line based on respective transformer rating.

For EHV cable, calculate the size of cable run based on respective
transformer rating. Refer sub process ESD-MP-3.12.04 for HV cable
sizing calculation.

3. Also, provide lightning arrestor near to the generator transformer / station


transformer for protection against switching and lightning surges. Rating of
LA shall be decided based on related IS/IEC standards which needs to be
verified with insulation coordination study during detail engineering.
4. Check for type of connection between unit/station transformer and MV
switchgear, whether SPBD or power cable.

For SPBD, calculate the current carrying capacity of bus duct run based
on unit/station transformer rating. Refer sub process ESD-MP-3.03.06 for
Segregated Phase bus duct sizing calculation.

For cable, calculate the size of cable run based on unit/station transformer
rating. Refer sub process ESD-MP-3.12.04 for HV cable sizing calculation.