1.

Resistance, current rating, rated withstand time, % tapping of Neutral


Grounding Resistor (NGR). In absence of above, please refer sub process
ESD-MP-3.06.01 for NGR specification and EPS 3.09.00 for NGR sizing
calculation.
2. Type of connection between generator neutral and NGT i.e. IPBD, cable
etc.
3. Type of bus duct connection between generator, generator step-up
transformer, generator circuit breaker (if provided), unit transformers,
station transformer, excitation transformers, grounding transformer (if
provided). Also, calculate the current carrying capacity of each bus duct
run based on
 Max. generator rating (for main run)
 Connected transformer/load rating (for tap-off run)

In case of bank of three (3) nos. single phase Generator Transformer,


current rating of bus duct run used for delta formation (each phase current
rating) on LV side shall be calculated.

Tap-off connection for unit transformer, station/standby/maintenance


transformer (if applicable) excitation transformer and grounding
transformer has been taken from main IPBD run between generator circuit
breaker and generator step-up transformer.

Refer sub process ESD-MP-3.03.04 for Isolated Phase bus duct sizing
calculation.

4. For Generator transformer, check for whether 3 phase or bank of 1 phase


transformer, its vector group, type of cooling (ODAF/OFAF/ONAF/ONAN),
type of tap changer (OLTC/OCTC), tap changer variation with steps, type
of grounding etc.

Also, Calculate the MVA rating of generator transformer based on the Max
generator rating. Refer sub process ESD-MP-3.02.05 for Generator
Transformer sizing calculation.

For % impedance of GT, it shall be assumed as per the rated %


impedance voltages per relevant IS/IEC (say 15 % in case of transformer
having size greater than 200 MVA). This value shall be verified during
system study and shall be modified if required. Percentage impedance
shall be defined with base MVA which is at highest cooling and at principal
tap position.

5. For excitation transformer, its rating, vector group, LV voltage, %


impedance etc. shall be provided in main single line diagram after receipt
from generation system supplier.