Considerations for Overall Earthing Layout Drawing-Underground for SG Package

1) Overall Earthing Layout Drawing-Underground for SG Package is prepared in line with the
Earthing Calculation for SG package, NTPC DOC. NO.: 9915-370-215-PVE-Y-073, Rev-01.
2) Earthing quantities are higher w.r.t. Earthing Calculation for SG package, as FGD, Gate area, Ash
silo area, AWRS/Seepage Pump house area, etc are also indicated in this drawing.
3) Transformer Neutral Earthing pit quantities are indicated as per the latest transformer quantity.
4) Earthing quantities for cable trays shall be included in respective raceway drawings.
5) This drawing is revised as per our responses provided against LMB’s comments received via Ref
No. : Khurja-Engg-LTSL-DTN00078.
1) As per LMB's email dated 6-Jun-2020, risers for Boiler / ESP / ID Fan area, Compressor house,
and FOPH area above ground earthing are indicated in line with reference provided by LMB.
2) As per LMB's email dated 6-Jun-2020, risers for FGD Area above ground earthing are indicated in
line with latest GLP.
3) As per LMB's email dated 6-Jun-2020, C&I earthing is indicated in line with Khargone project
philosophy.
4) Risers for Coal conveyor, CPU regeneration and Owner’s facility area above ground earthing are
indicated.