Item Description Quantity Unit Labor Material

1. Site Clearing 105 sq.m. 900.00 750.00


2. Gravel Fill 1 cu.m. 660.00
3. Rebar (10mm x 7.5m) 46 length 1200.00 4600.00
4. Concreting 10.5 cu.m. 2400.00
4.a Cement 65 bag 14300.00
4.b Sand 5.1 cu.m. 3366.00
4.c Gravel 10.5 cu.m. 6930.00
Grand Total
Total 4500.00 30606.00 35106.00
14 7.5 105
28 15 420
For Gravel - Fill (Oil Pit) For Gravel - Fill (Oil Pit)
Volume Quantity Unit 2.1
10.0269 Gravel 10.0269 cu.m
11 Gravel 11 cu.m

For Oil Pit Structure (Pouring)


Total Length 16.73226 Class A Quantity Unit
Thickness 0.101613 Cement 9 23.37021 bags
Height 1.527273 Sand 0.5 1.298345 cu.m
Total Volume 2.59669 Gravel 1 2.59669 cu.m.

Total Length 17 Class A Quantity Unit


Thickness 0.1 Cement 9 22.95 bags
Height 1.5 Sand 0.5 1.275 cu.m
Total Volume 2.55 Gravel 1 2.55 cu.m.

For Breaker Foundation (Pouring)


Length 3 Class A Quantity Unit For Oil Pit Structure (Po
Width 1.78 Cement 9 24.03 bags Height
Height 0.5 Sand 0.5 1.335 cu.m 1.5
Total Volume 2.67 Gravel 1 2.67 cu.m.
22
2.95
Total (For Purchase) 16
Quantity Unit Cost/Unit Cost
Cement 47.40021 bags 220 10428.05 For Breaker Foundation
Sand 2.633345 cu.m 1600 4213.352 Width
Gravel 16.26669 cu.m 1600 26026.7 1.78
Total: 40668.1
For Gravel - Fill (Oil Pit)
31 0.067742 Area Thickness Voulme
Width 104 7.045161 86.86002 0.2 17.372
Length 182 12.32903 Total Volume
10.87861

Thickness Volume
Width 55 3.725806 31.54917 0.2 6.493392
Length 125 8.467742
Width 20 1.354839 0.917794
Length 10 0.677419 32.46696

54.39306 10.87861

6125
For Oil Pit Structure (Pouring)
Thickness 1 2.825
0.101613 104 7.045161 91 6.164516 52 3.522581 2.825
Total Length 16.73226 1.125 1.06875
0.095455 Total Volume 2.596689 0.95
30.90476
1.527273

For Breaker Foundation (Pouring)


Length Height
3 0.5
3.89375