Sei sulla pagina 1di 2

W\½UhK`d5XiSXhRjȶk^aOh7WpDƣXd^ia[hF Details of billing for water supply for monitering January-2020

Sr.No Name of Division Industry Purpose Outstandin Billing Billing Bills furnished Total bills Recovery Recovery for Total Recovery Outstanding Total % Remark
Office Drinking/ g as on furnished to furnished to up to01/04/19 furnished for the current as on 31/01/20 dues as on recovery (Total out
Industrial 01/04/19 the agencies the 31/01/20 (Rs. In Lacs) Previous years2019- 31/01/20 {(12)/(9)} standing with
(Rs. In up to the last agencies Years 2020 against *100 Interest up to
Lacs) month during this Billing end of the
month amount month)
January- shown in col
2020 -(8)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

CIRCLE: MAHI IRRIGATION CIRCLE, NADIAD DIVISION: NADIAD IRRIGATION DIVISION, NADIAD
1 NADIAD BALASINOR DRINKING 1265.10 37.62 4.58 42.20 1307.30 0.00 0.00 0.00 561.91 0 1360.44
IRRIGATION NAGAR PALIKA
DIVISION,
NADIAD
2 NADIAD CHAKLASI DRINKING 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IRRIGATION NAGAR PALIKA
DIVISION,
NADIAD
3 NADIAD CHANGADA DRINKING 82.07 0.00 0.00 0.00 82.07 0.00 0.00 0.00 28.30 0 85.79
IRRIGATION (WANK) JWS
DIVISION, SCHEME
NADIAD
4 NADIAD GSECL INDUSTRIAL 10686.52 4523.35 463.85 4987.20 15673.72 4842.25 0.00 4842.25 3412.42 30.89 11106.55
IRRIGATION WANAKBORI
DIVISION, THERMAL
NADIAD POWER
STATION
5 NADIAD KHEROLI J.W.S DRINKING 692.42 87.02 7.92 94.94 787.36 35.23 0.00 35.23 374.73 4.47 783.19
IRRIGATION SCHEME
DIVISION,
NADIAD
6 NADIAD K'WANJ- DRINKING 1346.06 160.62 21.60 182.22 1528.28 143.54 0.00 143.54 611.82 9.39 1438.71
IRRIGATION LASUNDRA WS
DIVISION, SCHEME
NADIAD (DRINKING
PURPOSE)
7 NADIAD MAHI BASED DRINKING 14894.71 2614.73 221.73 2836.46 17731.17 3028.04 0.00 3028.04 5885.34 17.08 15239.15
IRRIGATION SAURASHTRA
DIVISION, PIPELINE
NADIAD
8 NADIAD MANOR INDUSTRIAL 25.70 0.00 0.00 0.00 25.70 0.00 0.00 0.00 4.65 0 26.16
IRRIGATION INDUSTRIES
DIVISION, LTD.(ACC)
NADIAD SEVALIYA
9 NADIAD NAGRAMA DRINKING 347.82 8.79 0.65 9.44 357.26 1.59 0.00 1.59 121.65 0.45 366.10
IRRIGATION WATER
DIVISION, SUPPLY
NADIAD SCHEME

Report generated from Information Management System of NWRS. Page 1/2


W\½UhK`d5XiSXhRjȶk^aOh7WpDƣXd^ia[hF Details of billing for water supply for monitering January-2020
10 NADIAD NAMNAR DRINKING 449.89 52.76 6.59 59.34 509.24 9.08 0.00 9.08 245.80 1.78 520.08
IRRIGATION WATER SUPPLY
DIVISION, SCHEME
NADIAD
11 NADIAD PADAL DRINKING 683.14 0.00 0.00 0.00 683.14 0.00 0.00 0.00 83.65 0 691.56
IRRIGATION CROSSING
DIVISION, LIFTING FOR
NADIAD SAURASHTRA
12 NADIAD PALI DRINKING 205.61 11.80 1.31 13.11 218.72 0.00 0.00 0.00 132.43 0 229.90
IRRIGATION GRAMPANCHYA
DIVISION, T (DRINKING
NADIAD PURPOSE)
13 NADIAD PARIAJ JWS DRINKING 1315.61 101.02 11.70 112.72 1428.33 78.54 0.00 78.54 414.53 5.50 1386.78
IRRIGATION SCHEME
DIVISION,
NADIAD
14 NADIAD VANODA JWS DRINKING 729.71 94.04 10.02 104.07 833.77 159.52 0.00 159.52 265.19 19.13 706.20
IRRIGATION SCHEME
DIVISION, (DRINKING
NADIAD PURPOSE)
15 NADIAD WANAKBORI DRINKING 790.74 60.53 5.75 66.28 857.02 34.11 0.00 34.11 294.09 3.98 847.60
IRRIGATION JWS SCHEME
DIVISION,
NADIAD
16 NADIAD WESTERN DRINKING, 24.30 3.83 0.55 4.38 28.68 5.20 0.00 5.20 10.32 18.13 24.17
IRRIGATION RAILWAY,SEVA INDUSTRIAL
DIVISION, LIYA
NADIAD
TOTAL 33539.40 7756.11 756.25 8512.36 42051.76 8337.10 0.00 8337.10 12446.83 110.80 34812.38

GRAND TOTAL 33539.40 7756.11 756.25 8512.36 42051.76 8337.10 0.00 8337.10 12446.83 110.80 34812.38

EXECUTIVE ENGINEER

NADIAD IRRIGATION DIVISION, NADIAD

Report generated from Information Management System of NWRS. Page 2/2