INSPECTION REQUEST FORM

PLANT PIPING
Rev 02, 21st Nov 2010

IRF LOG #:
Contractor: Date Raised :
CRF / WO # : Date Required To
Charge Code : Scope of Work
Project Title : Attachement P & ID's
Location : Detailed Dwg.
Section:

Work Insp. Activity Insp. Activity


Activity Time Work Description Activity Time
Description Point Status Point Status

WPS W Prp. Of Punch List H


7. Punch List
1. Welding Qual. PQR W Review of Punch List W

WQT H Cal. Of Instrument C

Material Ident. C Review of Package H


8. Hydro Test
Dimension Insp. W Hydro Test H

Visual Inspection W Post-test Inspection W


2. Material
Swabbing W 9. Flushing Flushing W

Surface. Prep. H1/W 10. Final hook Up As Per Check List H

Initial Painting W Surface Prep. H1/W


11. Final Paint
Joint Fit-up H1/W Final Painting W

Welding M 12. Insulation Insulation W


3.Welding
Visual Inspection W 13. Pre Commissioning Check Sheet H

NDT-RT,PT,MT,UT H

Surface Prep. H1/W

Coating/Wrapping H1/W

4. Field Coating Application of Liquid Epoxy


H
(Underground pipe) Upon U/G Fittings

Holiday Test H

Adhesion Test H1/W


NOTE :
Excavation W
IRF's should be raised at least 24 hrs before also sepecity time for "H" Point.
5. Trench Lowering H For H/H1 (Hold Point) the Time must be specifiend.

Back Filling W For Required "W","M"or"C" Inspection point indicate time or mark "√"

6. CP CP Installation (UG) H

*Activity Status*
To Be Carried out = 1
In Progress = 2
Completed = 3

Prepard by Contractor Approved by UEP Received by TUV


Name: Construction Name:

Sign: Sign: Sign:

Date: Time: Date: Time Date: Time: