Sei sulla pagina 1di 2

Waste to Energy Project Summary

Project Name: Click here to enter text.


Location: Click here to enter text.
Developer: Click here to enter text.
EPC: Click here to enter text.
Current Status: Early Stage (Investigation)

1. Developer Information
a. Company Name: Open
b. Phone Number: Click here to enter text.
c. Address: Click here to enter text.
d. Size Click here to enter text.
e. Experience in WTE development Click here to enter text.
f. Background: Click here to enter text.
g. Website: Click here to enter text.
h. Investment Status
i. Seed ☐
ii. Equity ☐
iii. Debt ☐
1. Name of debt bank : Click here to enter text.
2. Has debt bank issued term sheets: Choose an item.

2. Economic Feasibility
a. Feedstock: Choose an item.
b. Waste amount: Click here to enter text. Tons/day
c.Waste
composition/
Item Unit Value analysis available?
Moisture Content wt% Choose an item.
Ash Content wt%
Combustible Content wt%
Material Composition
Paper dry wt %
Cloth dry wt %
Vinyl and plastic dry wt %
Rubber dry wt %
Grass and wood dry wt %
Kitchen waste dry wt %
Metal dry wt %
Glass dry wt %
Stone and ceramic dry wt %
Others dry wt %
d. Is there a diversion requirement: yes Click here to enter text.
e. Has a site been selected: Choose an item.
i. Location: Click here to enter text.
ii. Land area: Click here to enter text.
iii. Are municipal utilities available on site or close: yes
f. Tipping fees: Click here to enter text.
g. Region power costs: Click here to enter text. $/kWh
h. Renewable power credits: Choose an item.
i. Renewable Rate: Click here to enter text. Choose an item.
j. Is there a maximum MW cap on power generated: Choose an item.
k. Grid connection available: Choose an item.
l. Are term sheets issued for PPA’s: Choose an item. Click here to enter text.
m. Availability of fuel:
i. Natural Gas Choose an item. Price: Click here to enter
text.
ii. Petroleum Gas Choose an item. Price: Click here to enter text.
iii. Coke Choose an item. Price: Click here to enter text.
iv. Limestone Choose an item. Price: Click here to enter text.
n. Can the project include additional power generated by biogas or natural gas?
i. List flow rate of biogas (landfill gas) Click here to enter text. SCFM
ii. List biogas composition Click here to enter text.

3. Political and Regional

a. Name of Utility Company: Click here to enter text.


b. National policies relating to waste or environment: Click here to enter text.
c. Regulating authorities: Click here to enter text.
d. Permits
1. Environmental Choose an item.
2. Construction site Choose an item.
3. Power Interconnection (wheeling) Choose an item.
e. PPA
1. Structure Click here to enter text.
2. Term Click here to enter text.
3. Price Click here to enter text. Choose an item.
f. Waste concession
1. Term Click here to enter text.
2. Executed by Click here to enter text.

• Need to Issue NDA: yes


• Need Proposal By: Click here to enter text.
• Need Engineering Services Contract:
• Need Early Tendering Form Issued:

Potrebbero piacerti anche