146 Thermal power plant simulation and control

LQG FB test with fuel disturbance (130 MW)


i r i r

2
r~l ok ^ v ~e"
o

2
-4
~6 I I I I I I
0 10 20 30 40 50 60 70
Time (mind

15 i ! i i i r
r
10
O
o 5
i-
0 i

"= --5

-10 \ / - - With LQG FB


-15 -,_. ] - - - Without LQG FB
-20
10 2~) 30 410 510 610 70
Time (rain.)

Figure 5.11 Response of Psh3,err and Tshl,err to fuel disturbance

LQG FB-test with fuel disturbance (130 MW)


• i i i i i

o.5 i i

-1.5 I - - FB control signal


- - - Disturbance signal

-2 110 210 3'0 40 5'0 60


Time (rain.)

-2
-4
~5
0 l'O 2'o 3'o 4o 5'o 6o
Time (rain.)

Figure 5.12 Generated control signals