Sei sulla pagina 1di 3

BAMBALPITIYA PUMPING STATION – OUTSTANDING WORK

NO DISCIPLINE WORK DESCRIPTION


SUB STRUCTURE - PUMPING STATION
1.0 PENSTOCK CHAMBER
1.1 Mech Cage Screen Installation
2.0 INLET WEL
2.1 Civil Closing of Re- Circulation line opening
3.0 COARSE SCREEN CHAMBER
3.1
4.0 DISTRIBUTION CHAMBER
4.1 Civil  Chamber bed needs to be prepared
5.0 GRIT TRAPS
5.1    
6.0 OUTLET CHAMBER
 Benching arrangement to be provided to guide the flow from 2openning to
6.1 Civil
single opening.
7.0 WET WELL
7.1    
SUPERSTRUCTURE - PUMPING STATION
1.0 MCC ROOM
1.1 Civil MCC Room Aluminium Partition Work
1.2 Elec VFD panel shifting and fixing -CO6A
2.0 OTHER AREA
2.1 Civil Ledge wall for Screening Container
2.2 Civil Ledge wall for Grit Container
2.3 Civil Removable Handrail Fixing at Grit Area
2.4 Mech uPVC line from Booster system to Screen Compactor
2.5 Mech Flushing line from Screen Compactor to nearby Chamber
2.6 Civil Precast slab installation for Grit Container Bin
2.7 Civil Aluminium Grill Fixing (Bird Mesh)
2.8 Civil Aluminium Windows & Doors Fixing
2.9 Civil Chequered plate modification where wheel load is applied
2.10 Inst Pressure Transmitter Sensor Fixing in common Header
2.11 Civil Final Coat Painting - Inside & Outside
2.12 Civil Chain link
2.13 Civil Blind wall external paint
2.14 Civil Bins for Classifier, Compactor & Cage screen
2.15 Civil Glass Panel fixing of marine drive facing wall
ANCILARY WORKS
1.0 DG ROOM
1.1 Civil Sound Proof Doors fixing (fixed final verification to be done)
1.2 Civil Aluminum Chequered Plate Fixing
1.3 Civil Final Coat Painting - Inside & Outside
2.0 BOOSTER PUMP SYSTEM
2.1 Inst Level Indicator transmitter & level sensor installation- Booster Tank
2.2   Sealing of pipe opening
2.3 Civil Roof Shed Construction
Feasibility checking and obtaining permission from Water resources
2.4 Civil
department
2.5 Civil Tube well construction
2.6 Mech Tube well pipe line from tube well to Booster tank
2.7 Mech Submersible Pump
3.0 ODOUR CONTROL UNIT
3.1 Mech Activated Carbon Filling
3.2 Mech Pressure Gauge Fixing in OCU
3.3 Civil Casting and Placing OCU trench cover slab
4.0 SECURITY HUT
4.1 Civil Final coat painting
5.0 OFFICE ROOM
5.1 Civil Final coat painting
5.2 Civil Water tank       
5.3 Civil Pantry Cup Board Fixing
6.0 CO6A
6.1 Civil PCC filling ( silt pit)
6.2 Civil Existing Silt pit wall construction
6.3 Civil Provide opening for chamber to chamber connection
6.4 Mech Installation of new pumps in Silt pit
6.5 Mech Pipe Connection from pump to common Header
6.6 Mech Chequered Plate Fixing (MS)
6.7 Elec Installation & Termination of LCP Panel
6.8 Civil Pedestal construction
6.9 Civil Vent pipe fixing/ installation of Extraction pipe
6.10 Civil Closing of inlets to Existing pit
7.0 FLOW METER CHAMBER
7.1 Civil Pre Cast Cover Slab
7.2 Civil Manhole Cover
8.0 VALVE CHAMBER - CO6A
8.1 Civil Pre Cast Cover Slab
8.2 Civil Manhole Cover
8.3 Mech Gate Valve Fixing
9.0 FORCE MAIN CHAMBER
9.1 Mech End Connection
9.2 Civil Pre Cast Cover Slab
9.3 Civil Rehabilitation Work
10.0 BOUNDARY WALL
10.1 Civil 1st Coat Paint
10.2 Civil 2nd Coat Paint
10.3 Civil Barbed  wire fixing (top of the wall)  
10.4 Civil Gate (2 no’s)
10.5 Civil Gate light fixing (Arthur’s place side)
11.0 AIR VALVE CHAMBER - CO6A
11.1 Civil Construction of Chamber
11.2 Mech Installation of Air Valve
11.3 Civil PVC insulated rungs fixing
11.4 Civil Pre Cast Slab
12.0 OTHER OUT DOOR WORKS
12.1 Elec Street light pole fixing (1nos)
12.2 Civil Earth pits
12.3 Civil Drinking water supply system
12.4 Civil Construction Storm water collection Pit
12.5 Civil Construction Sewer collection Pit
12.6 Civil Storm water pipe laying
12.7 Civil Sewer pipe laying
12.8 Civil Ramp
12.9 Civil Drainage Arrangement
12.1
Civil Paving blocks
0
12.1
Civil Kerb fixing
1
12.1
Civil Grating for drains & collection pit
2
12.1
Civil Road construction
3
12.1
Civil Grassing
4
12.1
Civil Tree Planting
5
12.1
Civil Container Yard
6
12.1
Civil Raising the manhole invert level of existing U3-1 Manhole at Arthurs Place
7
12.1 Back drop Arrangement for newly laid line from existing U3-1 Manhole to new
Civil
8 ADB manhole U3-ADB1- 3
12.1
Civil Name Board and Plaque Fixing
9
12.2
Civil Cleaning and Gardening water supply system from well supply
0